CN204455844U - The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage - Google Patents

The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage Download PDF

Info

Publication number
CN204455844U
CN204455844U CN201520094852.1U CN201520094852U CN204455844U CN 204455844 U CN204455844 U CN 204455844U CN 201520094852 U CN201520094852 U CN 201520094852U CN 204455844 U CN204455844 U CN 204455844U
Authority
CN
China
Prior art keywords
rectangular frame
frame main
main body
lifting
prefabricated pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520094852.1U
Other languages
Chinese (zh)
Inventor
徐波
王文山
沈家海
孙建波
王一鹏
邵凯
史虎彬
冯宝强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
Priority to CN201520094852.1U priority Critical patent/CN204455844U/en
Application granted granted Critical
Publication of CN204455844U publication Critical patent/CN204455844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage, it is characterized in that described lifting hold-fast body comprises the rectangular frame main body of a lifting setting, this rectangular frame main ring is horizontally disposed with around the prefabricated pier of vertical lifting, this rectangular frame main body surrounding distribution be fixed with positioning hydraulic cylinder, this positioning hydraulic cylinder along this rectangular frame main body to the inside the prefabricated pier of Level Promoting sidewall arrange.The lifting hold-fast body reasonable in design of the prefabricated pier of this large-tonnage, Hoisting Security stability are high, it effectively avoids prefabricated pier and hangs the problem producing in the process of supporting body and rock caused each suspension centre discontinuity, has stopped the unsafe factor lifted.

Description

The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage
Technical field
The utility model belongs to the lifting spacing equipment of precast pier body, and what prevent prefabricated pier from rocking when being specifically related to a kind of transhipment and lifting of large-tonnage Prefabricated integral pier hangs a hold-fast body.
Background technology
Along with the development of bridge and overhead road bridge technology, marine or become the important engineering of bridge construction across the overhead road bridge construction in waters.Due to viaduct many employings Steel Continuous Box beam bridge, the supporter of non-navigation bridge mostly is prefabricate and install pier structure, can be divided into overall pier, cushion cap adds lower joint pier shaft, middle joint pier shaft and upper joint pier shaft Four types by classification.Because the overall weight of prefabricated monolithic pier can reach 3000-5000 many tons, the pier of pier shaft bottom adopts back pouring hole design simultaneously, needs safety and the stability robust design of carrying out pier shaft and pier integral hoisting.
Existing Large-scale Hoisting arranges the lifting adopting upright monolithic to carry out prefabricated pier, but when prefabricated pier departs from supporting body, rocking of certain amplitude can occur, and this rocks and will have a strong impact on the stressed uniformity of each suspension centre, causes the stability of lifting and safety to reduce.
Utility model content
The utility model provides the lifting hold-fast body of a kind of reasonable in design, the prefabricated pier of large-tonnage that Hoisting Security stability is high, it effectively avoids prefabricated pier and hangs the problem producing in the process of supporting body and rock caused each suspension centre discontinuity, has stopped the unsafe factor lifted.
The technical scheme that the utility model adopts is as follows:
The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage, it is characterized in that described lifting hold-fast body comprises the rectangular frame main body of a lifting setting, this rectangular frame main ring is horizontally disposed with around the prefabricated pier of vertical lifting, this rectangular frame main body surrounding distribution be fixed with positioning hydraulic cylinder, this positioning hydraulic cylinder along this rectangular frame main body to the inside the prefabricated pier of Level Promoting sidewall arrange.
Concretely, in described rectangular frame main body, distribution is provided with four Heave Heres that hoist cable connects this rectangular frame main body.
In one embodiment, in described rectangular frame main body, distribution is provided with four of connecting lifting pier cushion cap hoist cable and holds suspension centre.
In one embodiment, the cylinder body of hydraulic cylinder of transposing be fixedly installed in described rectangular frame main body, the telescopic hydraulic bar level of positioning hydraulic cylinder is arranged to pushing tow inside described rectangular frame main body.
In another embodiment, on the four edges frame of described rectangular frame main body, distribution is provided with two positioning hydraulic cylinders separately.
The lifting that the lifting hold-fast body of the prefabricated pier of this large-tonnage is applicable to various all-in-one-piece prefabricated pier is spacing, can install use additional on existing upright hoisting appliance.It relies on the rectangular frame main body of rigidity to be sleeved on the lateral wall of prefabricated pier, upwards connect hoist cable by Heave Here, pass downwardly through the hoist cable holding suspension centre and connect cushion cap lifting, the size of rectangular frame main body is corresponding with the largest cross-sectional sized of prefabricated pier to be arranged, to ensure that it can carry easily in hoisting process again and be lifted on any side position height of the prefabricated pier of large-tonnage.Positioning hydraulic cylinder in rectangular frame main body sling in suspender is adjusted prefabricated pier process in can start and use the sidewall of the prefabricated pier of telescopic hydraulic bar horizontal annular pushing tow, hold pier shaft tightly, pier shaft and suspender and rectangular frame main body is made to form an entirety, reduce prefabricated pier shaft rocking in hoisting process, ensure that each suspension centre and accepting of hoist cable are consistent substantially.
The beneficial effects of the utility model are, the lifting hold-fast body reasonable in design of the prefabricated pier of this large-tonnage, Hoisting Security stability are high, it effectively avoids prefabricated pier and hangs the problem producing in the process of supporting body and rock caused each suspension centre discontinuity, has stopped the unsafe factor lifted.
Below in conjunction with the drawings and specific embodiments, the utility model is further elaborated.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of a whole lifting structure in the utility model detailed description of the invention;
Fig. 2 is the application state top view lifting hold-fast body in the utility model detailed description of the invention.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the lifting hold-fast body of the prefabricated pier of this large-tonnage can be used for the lifting of the all-in-one-piece prefabricated pier 50 of thousands of tons of, and it comprises hanging part 10 together, and this plays hanging part and comprises two suspension hooks be set up in parallel, and is connected with crossbeam 11 between described suspension hook; Two suspension hooks playing hanging part lift a top suspender 20 by hoist cable, and top suspender has a rigid frame, and described suspension hook connects four Heave Heres of this rigid frame by hoist cable.Under the suspender of top, lifting arranges a lifting hold-fast body 30, this lifting hold-fast body comprises the rectangular frame main body 32 that a lifting is arranged, this rectangular frame main ring is horizontally disposed with around the prefabricated pier 50 of vertical lifting, this rectangular frame main body surrounding distribution be fixed with positioning hydraulic cylinder 31, this positioning hydraulic cylinder along this rectangular frame main body to the inside the prefabricated pier 50 of Level Promoting sidewall arrange.In rectangular frame main body, not only distribution is provided with four Heave Heres 33 that hoist cable connects this rectangular frame main body, and also distribution is provided with four of the hoist cable 40 connecting lifting pier cushion cap 60 and holds suspension centre 34.The cylinder body of positioning hydraulic cylinder 31 is fixedly installed in described rectangular frame main body 32, and the telescopic hydraulic bar level of positioning hydraulic cylinder is arranged to pushing tow inside described rectangular frame main body.On the four edges frame of rectangular frame main body, distribution is provided with two positioning hydraulic cylinders separately.As shown in Figure 2, the size of rectangular frame main body 32 is suitable with the cross sectional dimensions of prefabricated pier 50, therefore no matter rectangular frame main body arbitrary height of prefabricated pier can be positioned at, all can realize holding operation tightly to the pier shaft of prefabricated pier, guarantee suspender, hold-fast body are integrally fixedly connected with prefabricated pier.

Claims (5)

1. the lifting hold-fast body of the prefabricated pier of large-tonnage, it is characterized in that described lifting hold-fast body comprises the rectangular frame main body of a lifting setting, this rectangular frame main ring is horizontally disposed with around the prefabricated pier of vertical lifting, this rectangular frame main body surrounding distribution be fixed with positioning hydraulic cylinder, this positioning hydraulic cylinder along this rectangular frame main body to the inside the prefabricated pier of Level Promoting sidewall arrange.
2. the lifting hold-fast body of the prefabricated pier of large-tonnage according to claim 1, to is characterized in that in described rectangular frame main body four Heave Heres that distribution is provided with hoist cable and connects this rectangular frame main body.
3. the lifting hold-fast body of the prefabricated pier of large-tonnage according to claim 1, to is characterized in that in described rectangular frame main body that distribution is provided with four of connecting lifting pier cushion cap hoist cable and holds suspension centre.
4. the lifting hold-fast body of the prefabricated pier of large-tonnage according to claim 1, it is characterized in that the cylinder body of transposed hydraulic cylinder is fixedly installed in described rectangular frame main body, the telescopic hydraulic bar level of positioning hydraulic cylinder is arranged to pushing tow inside described rectangular frame main body.
5. the lifting hold-fast body of the prefabricated pier of large-tonnage according to claim 1, on the four edges frame that it is characterized in that described rectangular frame main body, distribution is provided with two positioning hydraulic cylinders separately.
CN201520094852.1U 2015-02-10 2015-02-10 The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage Active CN204455844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520094852.1U CN204455844U (en) 2015-02-10 2015-02-10 The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520094852.1U CN204455844U (en) 2015-02-10 2015-02-10 The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage

Publications (1)

Publication Number Publication Date
CN204455844U true CN204455844U (en) 2015-07-08

Family

ID=53662753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520094852.1U Active CN204455844U (en) 2015-02-10 2015-02-10 The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage

Country Status (1)

Country Link
CN (1) CN204455844U (en)

Similar Documents

Publication Publication Date Title
CN203639095U (en) Inner-side-column lifting device for reverse installation method
CN206624553U (en) Lifting component system
CN103663101A (en) Method for lifting voltage stabilizer of nuclear power station
CN102795532A (en) Hoisting tool for large heavy object with enter of gravity deviated from geometric center and hoisting method thereof
CN104234636B (en) Jack-up unit derrick installation method
CN204455844U (en) The lifting hold-fast body of the prefabricated pier of a kind of large-tonnage
CN202754690U (en) Large weight hoisting tools with center of gravity deviating from geometric center to one side
CN201176365Y (en) Light-duty adjustable hanger
CN102991646A (en) Gravity anchor and manufacturing methods thereof
CN106351125A (en) Method for integrally overturning steel rope tower
CN103183283A (en) Tool structure used for installing lifting rigging, system and method
CN203612810U (en) Offshore platform skid hoisting structure
CN205530308U (en) Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers
CN206266077U (en) Sling system
CN204455846U (en) The hoisting appliance of the prefabricated pier of a kind of large-tonnage
CN204737588U (en) Compensating beam for bridge crane
CN205766057U (en) A kind of circular magnesium alloy die casting hitch
CN205170175U (en) Large castings's two point type hoists
CN204251194U (en) A kind of Novel hanging tool
CN208413637U (en) A kind of crane hanger
CN201914830U (en) Rope separator of tower hoist
CN206188205U (en) Hoist device is used in prefabricated piping lane upset
CN206447496U (en) Spacing fixation is hung
CN204434114U (en) The hanging beam of crane in bridge type
CN204455851U (en) The hoisting appliance of the prefabricated pier cap of a kind of large-tonnage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant