CN204441087U - Transformer high-voltage bushing lead-in wire mounting bracket - Google Patents

Transformer high-voltage bushing lead-in wire mounting bracket Download PDF

Info

Publication number
CN204441087U
CN204441087U CN201520213943.2U CN201520213943U CN204441087U CN 204441087 U CN204441087 U CN 204441087U CN 201520213943 U CN201520213943 U CN 201520213943U CN 204441087 U CN204441087 U CN 204441087U
Authority
CN
China
Prior art keywords
pulley
pedestal
lead
mounting bracket
wires hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520213943.2U
Other languages
Chinese (zh)
Inventor
徐海林
陈晨
叶俭
丛英俊
岳恒宽
张晓军
李毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520213943.2U priority Critical patent/CN204441087U/en
Application granted granted Critical
Publication of CN204441087U publication Critical patent/CN204441087U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Insulators (AREA)

Abstract

The utility model belongs to substation equipment maintenance and repair technical field, is a kind of device of being drawn fast from bushing by high-voltage connection specifically.A kind of transformer high-voltage bushing lead-in wire mounting bracket, the utility model comprises pull rope, A-frame, assembly pulley and fast connector; Wherein A-frame is made up of pedestal, supporting leg and leg, and described pedestal is provided with through wires hole, and assembly pulley is made up of the first pulley and the second pulley, and pull rope passes the through wires hole on pedestal through assembly pulley and is connected with fast connector.The utility model utilizes A-frame and assembly pulley to coordinate, and the high-voltage connection of distinct interface can be drawn fast, has both decreased and has installed required number, turn improved bushing installation rate.

Description

Transformer high-voltage bushing lead-in wire mounting bracket
Technical field
The utility model belongs to substation equipment maintenance and repair technical field, relates to a kind of utensil in installing for transformer high-voltage bushing in electric power system, is a kind of device of being drawn fast from bushing by high-voltage connection specifically.
Background technology
State Grid Corporation of China has issued " State Grid Corporation of China's power construction engineering major industrial accident prevention and emergency processing temporary provisions " and has proposed clear and definite requirement to the Ability of emergency management of power supply enterprise, namely ensures the actual effect of emergency disposal, reliability and disposal efficiency.The method of traditional transformer mounting sleeve is from the direct threading of cannula tip until bottom position exposes by pull rope, lead-in wire pulls out from cannula tip after being connected with lead-in wire by pull rope, go between in the inner easily knotting of main transformer body, accurately can not arrive precalculated position, cause repeatedly lifting, add the set-up time.Meanwhile, sleeve bottom is easy to touch the danger coefficient that casing greatly adds sleeve pipe installation.Lead-in wire, in the process of repeatedly drawing, repeatedly with the mutual friction of sleeve shell phase, has a negative impact to the outer layer insulation of lead-in wire.No matter be rush to repair under tackling infrastructure project or case of emergency, or protect the shortcomings such as electric task all also exists the length that expends time in, labor intensive is many, process step is complicated, technology test property is high.
Patent CN103794348A, disclose a kind of transformer high-voltage bushing lead-in wire draw-gear, dress entirety is a columniform housing, T-shaped rotating shaft is provided with in housing, for avoiding lead-in wire knotting, the two ends of housing are respectively equipped with upper connector and lower connector, and upper connector is connected with pull rope.During use, whole device is put into bushing, lower connector, under gravity through the cavity of bushing, is then connected with lead-in wire, carries device and complete whole lead-in wire drawing-in motion finally by device.Although this device can be avoided, lead-in wire is twisted together, dog leg, but due to in-built restriction, its weight is relatively large with volume, tenesmus and on carry in process very easily occurring with inside pipe casing to rub or clash into sleeve pipe damaged with going between, the weight and volume with timer also limit the flexible use in the sleeve pipe of different size.
A kind of new casing of current urgent need installs thinking with raising to the emergency processing of accident and adaptibility to response, can apply in a flexible way among the bushing and lead-in wire of various different size, also can avoid lead-in wire and sleeve pipe to greatest extent in distraction procedure owing to rubbing and clashing into the damage occurred simultaneously.
Utility model content
The purpose of this utility model overcomes transformer high-voltage bushing lead-in wire to install the large problem of long difficulty consuming time, a kind of special transformer high-voltage bushing lead-in wire mounting bracket is provided, the utility model utilizes A-frame and assembly pulley to coordinate, the high-voltage connection of distinct interface can be drawn fast, both decreased and required number had been installed, turn improved bushing installation rate.
In order to solve the problems of the technologies described above, the utility model adopts following technical scheme:
A kind of transformer high-voltage bushing lead-in wire mounting bracket, comprises pull rope, also comprises: A-frame, assembly pulley and fast connector; Wherein A-frame is made up of pedestal, supporting leg and leg, and described pedestal is provided with through wires hole, and one end of three supporting legs is hinged mutually with base bottom respectively, and the other end is respectively equipped with leg; Assembly pulley is made up of the first pulley and the second pulley, and the first pulley and the second pulley to be arranged on successively on pedestal along through wires hole radial direction through pulley yoke and to make the tangent line of the first pulley and the axes coincide of through wires hole; Pull rope passes the through wires hole on pedestal through assembly pulley and is connected with fast connector.
Further, be connected on three summits of the equilateral triangle of base bottom surface in three described supporting legs are distributed in, respectively there is a lug junction of base bottom surface, supporting leg top through pin and lug hinged.
Further, described leg has positioning screw hole, in positioning screw hole, is provided with bolt.
The beneficial effects of the utility model are: 1, the open-angle of A-frame supporting leg is adjustable and with the design of positioning screw hole on bearing, this device all firmly can be connected with the cannula tip of various sizes, ensure that the stability of lead-in wire process.2, the setting of through wires hole relative position on the first pulley and pedestal, make to go between in distraction procedure and be in sleeve pipe centre position all the time, avoid when lead-in wire involves and sleeve pipe rubs, both can not damage the insulating barrier that lead-in wire is outside, the inwall of bushing can not be damaged again.3, adopt the assembly pulley of sister block, guide pull rope motion, structural safety, reliable, stability is high, not twisted wire, does not offset, and can effectively avoid, and the kink that goes between and dog leg occur in the process of traction.
Accompanying drawing explanation
Fig. 1 is the utility model general structure schematic diagram.
Fig. 2 is front view of the present utility model.
Fig. 3 is end view of the present utility model.
Fig. 4 is vertical view of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
As shown in Figure 1, Figure 2, described in Fig. 3 and Fig. 4, transformer high-voltage bushing lead-in wire mounting bracket of the present utility model comprises: pedestal 1, supporting leg 2, bearing 3, positioning screw hole 4, first pulley 5, second pulley 6, wheel carrier 7, pull rope 8 and fast connector 9.As shown in Figure 4, pedestal is a plectane with through wires hole 1a, and the lower end of pedestal is hinged with three supporting legs 2, supporting leg end is provided with supporting seat 3, supporting seat has positioning screw hole 4, by pedestal 1, supporting leg 2 and supporting seat 3 jointly composition are used for the A-frame of firm whole device.Hinge between supporting leg 2 and pedestal 1 makes the subtended angle of support adjustable, like this can so that support be connected with the bushing end of various sizes, utilize positioning screw hole 4 set screw be preset on bearing to match, A-frame main part and cannula tip can be fixed, prevent support-moving.
Assembly pulley is made up of the first pulley 5 and the second pulley 6, and the first pulley 5 and the second pulley 6 to be arranged on successively on pedestal 1 along through wires hole 1a radial direction through pulley yoke and to make the tangent line of the first pulley and the axes coincide of through wires hole as shown in Figure 3, Figure 4.Pull rope 8 passes the through wires hole 1a on pedestal through assembly pulley and is connected with fast connector 9.When installation assembly pulley, guarantee the tangent line of the first pulley and the axes coincide of through wires hole, this design makes the centre position being in sleeve pipe around the pull rope on pulley all the time, avoid pull rope and lead-in wire in distraction procedure with the friction of bushing inner tubal wall, thus smoothly lead-in wire to be taken out of.
In technique scheme, the hinge of supporting leg and base bottom surface is achieved in the following ways: be connected on three summits of the equilateral triangle of base bottom surface in three supporting legs are distributed in, respectively there is a lug junction of base bottom surface, supporting leg top through pin and lug hinged.
In technique scheme, fast connector can also be designed to detachable, fast connector 9 is divided into pull rope joint and pigtail splice, removably connects between them.Pigtail splice is connected with lead-in wire to be drawn in bushing, and during use, pigtail splice can be arranged to different specifications, can change at any time when coordinating from different lead-in wires.
In such scheme, the periphery of fixed pulley is provided with the U-type groove 5a matched with pull rope, can play better guide effect to pull rope.
Using method of the present utility model is: according to the opening angle of the Sizes adjusting triangle support of bushing end, after adjustment, the positioning screw hole of this device on bearing is fixed on the end face of sleeve pipe, the axis of through wires hole and the dead in line of bushing on A-frame is guaranteed time fixing, and the outward flange of pulley will exceed sleeve upper end edge, improve stability when lead-in wire is drawn.During traction, one end of pull rope has manpower or pulling equipment to pull, the other end through assembly pulley through the cavity in bushing to it bottom, fast connector 9 is used to be connected with lead-in wire by pull rope, pulling traction rope, high pressure is drawn out to cannula tip by lead-in wire, thus completes the installment work of whole bushing.

Claims (3)

1. a transformer high-voltage bushing lead-in wire mounting bracket, comprises pull rope, characterized by further comprising: A-frame, assembly pulley and fast connector; Wherein A-frame is made up of pedestal, supporting leg and leg, and described pedestal is provided with through wires hole, and one end of three supporting legs is hinged mutually with base bottom respectively, and the other end is respectively equipped with leg; Assembly pulley is made up of the first pulley and the second pulley, and the first pulley and the second pulley to be arranged on successively on pedestal along through wires hole radial direction through pulley yoke and to make the tangent line of the first pulley and the axes coincide of through wires hole; Pull rope passes the through wires hole on pedestal through assembly pulley and is connected with fast connector.
2. a kind of transformer high-voltage bushing lead-in wire mounting bracket according to claim 1, it is characterized in that three described supporting legs are connected on three summits of the equilateral triangle of base bottom surface in being distributed in, respectively there is a lug junction of base bottom surface, supporting leg top through pin and lug hinged.
3. a kind of transformer high-voltage bushing lead-in wire mounting bracket according to claim 1, is characterized in that, described leg has positioning screw hole, is provided with bolt in positioning screw hole.
CN201520213943.2U 2015-04-10 2015-04-10 Transformer high-voltage bushing lead-in wire mounting bracket Expired - Fee Related CN204441087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520213943.2U CN204441087U (en) 2015-04-10 2015-04-10 Transformer high-voltage bushing lead-in wire mounting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520213943.2U CN204441087U (en) 2015-04-10 2015-04-10 Transformer high-voltage bushing lead-in wire mounting bracket

Publications (1)

Publication Number Publication Date
CN204441087U true CN204441087U (en) 2015-07-01

Family

ID=53608922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520213943.2U Expired - Fee Related CN204441087U (en) 2015-04-10 2015-04-10 Transformer high-voltage bushing lead-in wire mounting bracket

Country Status (1)

Country Link
CN (1) CN204441087U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106548860A (en) * 2015-09-21 2017-03-29 王明强 Bushing shell for transformer lead auxiliary traction instrument
CN107425482A (en) * 2017-07-20 2017-12-01 北京机电工程研究所 It is a kind of to be applied to the auxiliary threader that cable duct threads under blast wall
CN107706832A (en) * 2017-08-21 2018-02-16 河海大学 Fast threading device and method of work in a kind of steel reinforcement cage
CN108747966A (en) * 2018-08-24 2018-11-06 安徽安凯汽车股份有限公司 One kind being convenient for warm wind water pipe sheath mounting tool
CN110994468A (en) * 2019-12-27 2020-04-10 安徽天卓信息技术有限公司 Guiding device for underground cable

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106548860A (en) * 2015-09-21 2017-03-29 王明强 Bushing shell for transformer lead auxiliary traction instrument
CN107425482A (en) * 2017-07-20 2017-12-01 北京机电工程研究所 It is a kind of to be applied to the auxiliary threader that cable duct threads under blast wall
CN107706832A (en) * 2017-08-21 2018-02-16 河海大学 Fast threading device and method of work in a kind of steel reinforcement cage
CN107706832B (en) * 2017-08-21 2020-03-17 河海大学 Rapid threading device in reinforcement cage and working method
CN108747966A (en) * 2018-08-24 2018-11-06 安徽安凯汽车股份有限公司 One kind being convenient for warm wind water pipe sheath mounting tool
CN108747966B (en) * 2018-08-24 2023-08-08 安徽安凯汽车股份有限公司 Installation tool for sheath of warm air water pipe
CN110994468A (en) * 2019-12-27 2020-04-10 安徽天卓信息技术有限公司 Guiding device for underground cable

Similar Documents

Publication Publication Date Title
CN204441087U (en) Transformer high-voltage bushing lead-in wire mounting bracket
CN201706073U (en) Support of cable grounding wire device
CN201910499U (en) Special telescopic insulation grounding rod for ultrahigh voltage transmission lines
CN104868397A (en) Tumbling pulley used for crossing horizontally-arranged double-bundled conductor spacer
CN203103882U (en) Insulation bracing frame for live 10kV cable lead disconnection and connection operation
CN204927971U (en) A embrace pole for electrified insulator chain that changes of transmission line
CN202134674U (en) Cable cladding type ground wire hook
CN210536203U (en) Cable support
CN103332608B (en) GW6 disconnecting link porcelain knob is changed special pole and is hung
CN203284128U (en) Hoisting tool of main mechanism of switch blade
CN102761077A (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN104242214B (en) Electric cable with large cross-section lays the general fixing device that wish-bone arm type is installed
CN203284094U (en) Rod hanger special for GW6 knife switch porcelain column replacement
CN206437788U (en) One kind wears cable formula sleeve pipe and tilts erecting device
CN201741514U (en) Lightning rod installing support
CN204481397U (en) A kind of novel conductive wire charged disconnecting drainage thread arc suppression tackle
CN203347676U (en) Multifunctional insulating ladder end hanger
CN205484430U (en) Transformer high -voltage testing support
CN202268651U (en) Fixing device of transmission wire lifter
CN204156477U (en) Electric cable with large cross-section lays the general fixing device that wish-bone arm type is installed
CN206117066U (en) WLG tubular busbar groove is with wind -powered electricity generation generating line mounting structure
CN203838387U (en) Temperature measurement optical cable laying apparatus
CN104184071A (en) Unmanned aerial vehicle safety ground wire device for installing 110 kV-500 kV line
CN204156106U (en) The earth connection clamping unit that a kind of nuclear bridge is special
CN204497659U (en) A kind of insulated platform for live line working, to insulate every terraced combination tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20180410

CF01 Termination of patent right due to non-payment of annual fee