CN204437475U - A kind of oilfield construction line securement device - Google Patents

A kind of oilfield construction line securement device Download PDF

Info

Publication number
CN204437475U
CN204437475U CN201520085384.1U CN201520085384U CN204437475U CN 204437475 U CN204437475 U CN 204437475U CN 201520085384 U CN201520085384 U CN 201520085384U CN 204437475 U CN204437475 U CN 204437475U
Authority
CN
China
Prior art keywords
fixing
strut
securement device
construction line
quarter moon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520085384.1U
Other languages
Chinese (zh)
Inventor
梅宏林
侯建忠
田具宝
杜富强
王君
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaohe Petroleum Exploration Bureau
Original Assignee
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaohe Petroleum Exploration Bureau filed Critical Liaohe Petroleum Exploration Bureau
Priority to CN201520085384.1U priority Critical patent/CN204437475U/en
Application granted granted Critical
Publication of CN204437475U publication Critical patent/CN204437475U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a kind of oilfield construction line securement device, comprise fixing chuck, fixing rod, clamping bolt and chuck bolt, described fixing chuck comprises two the first quarter moon covers be oppositely arranged in left and right, the two ends of first quarter moon cover are provided with boss, boss is provided with extension tube, in first quarter moon cover, be provided with cambered way, arc regulator plate is provided with in cambered way, arc regulator plate is provided with strut, in the middle of strut, is provided with through hole, strut tail end is provided with perforation; Two fixing chucks are linked together by through hole by fixing rod, and clamping bolt fixes two fixing chucks further by the perforation on strut.The utility model improves the efficiency of welded pipeline under the condition of bad environments, improve the welding quality of soldering opening, effectively prevent the oil gas of pipeline from revealing, fixing by fixed cover, what docked by two pipelines is more neat, pipeline after welding is not easily revealed, and reduces economic loss, increases work efficiency.

Description

A kind of oilfield construction line securement device
Technical field
The utility model relates to field, especially relates to a kind of oilfield construction line securement device.
Background technique
In the process of oilfield construction, need a large amount of pipelines is installed, in order to ensure the waste of the Security that oil gas transports and minimizing oil gas, need to weld in the joint of each pipeline, the leakage of oil gas can be prevented so well, but oil field is all in field, wilderness, the environment of the construction of Oilfield Pipelines is very poor, need some short duct to be welded into long pipeline, and when middle welding, ensure not reveal; Welding difficulty so is out of doors very large, with a varied topography, and pipeline not easily welds neatly, needs a kind of oilfield construction line securement device to carry out the welding of auxiliary oil field pipe, so that can be quick, and the high-quality construction completing Oilfield Pipelines.
Summary of the invention
Problem to be solved in the utility model is to provide a kind of oilfield construction line securement device.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of oilfield construction line securement device, comprise fixing chuck, fixing rod, clamping bolt and chuck bolt, described fixing chuck comprises two the first quarter moon covers be oppositely arranged in left and right, the two ends of first quarter moon cover are provided with boss, boss is provided with extension tube, cambered way is provided with in first quarter moon cover, arc regulator plate is provided with in cambered way, arc regulator plate is provided with strut, in the middle of strut, be provided with through hole, strut tail end is provided with perforation; Two fixing chucks are linked together by through hole by fixing rod, and clamping bolt fixes two fixing chucks further by the perforation on strut.
Further, the through hole on described strut is above-below direction.
Further, described fixing rod two ends are provided with peg, and peg inserts in through hole, realizes the connection of two fixing chucks.
Further, described clamping bolt two is separately fixed at the opposition side of the perforation of two fixing chucks.
Further, two described first quarter moon covers realize the connection of two first quarter moon covers through the extension tube on boss by chuck bolt.
Further, described cambered way is equal with the radius of arc regulator plate.
Further, fixed hole is provided with in described fixing chuck.
The advantage that the utility model has and beneficial effect are: the efficiency that improve welded pipeline under the condition of bad environments, improve the welding quality of soldering opening, effectively prevent the oil gas of pipeline from revealing, fixing by fixed cover, what docked by two pipelines is more neat, pipeline after welding is not easily revealed, and reduces economic loss, increases work efficiency.
Accompanying drawing explanation
Fig. 1 is the utility model stereogram;
Fig. 2 is the utility model explosive view;
Fig. 3 is the stereogram of the fixing chuck in Fig. 2;
Fig. 4 is the plan view of Fig. 3;
Fig. 5 is the AA schematic cross-section of Fig. 4.
In figure: 1, first quarter moon cover 101, boss 102, extension tube 2, fixing rod 3, clamping bolt 4, chuck bolt 5, cambered way 6, strut 601, through hole 602, perforation 603, arc regulator plate 7, fixed hole.
Embodiment
Below in conjunction with accompanying drawing, specific embodiment of the utility model is elaborated.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, a kind of oilfield construction line securement device, comprise fixing chuck, fixing rod 2, clamping bolt 3 and chuck bolt 4, fixing chuck comprises the first quarter moon cover 1 that two, left and right is oppositely arranged, the two ends of first quarter moon cover 1 are provided with boss 101, boss 101 is provided with extension tube 102, cambered way 5 is provided with in first quarter moon cover 1, arc regulator plate 603 is provided with in cambered way 5, arc regulator plate 603 is provided with strut 6, in the middle of strut 6, be provided with through hole 601, strut 6 tail end is provided with perforation 602; Two fixing chucks are linked together by through hole 601 by fixing rod 2, and clamping bolt 3 fixes two fixing chucks further by the perforation 602 on strut 6.
Through hole 601 on strut 6 is above-below direction; Fixing rod 2 two ends are provided with peg, and peg inserts in through hole 601, realizes the connection of two fixing chucks; Perforation 602 on strut 6 is left and right directions; Clamping bolt 3 two is separately fixed at the opposition side of the perforation 602 of two fixing chucks; Two first quarter moon covers 1 realize the connection of two first quarter moon covers 1 through the extension tube 102 on boss 101 by chuck bolt 4; Cambered way 5 is equal with the radius of arc regulator plate 603; Fixed hole 7 is provided with in fixing chuck.
Two fixing chucks on a kind of oilfield construction line securement device are separately fixed on two pipelines, fixing rod 2 is inserted on the through hole 601 on strut 6, with fixing further to two pipelines of clamping bolt 3, the docking of two pipelines can be assisted like this, all weld owing to will enclose pipeline one, so just need mobile fixing rod 2 and clamping bolt 3, by regulating the arc regulator plate 603 of strut 6 west section, arc regulator plate 603 slides in cambered way 5, this makes it possible to the movement realizing fixing rod 2 and strut 6, thus in pipeline welding, can effectively avoid, do not hinder the welding to pipeline.
The utility model improves the efficiency of welded pipeline under the condition of bad environments, improve the welding quality of soldering opening, effectively prevent the oil gas of pipeline from revealing, fixing by fixed cover, what docked by two pipelines is more neat, pipeline after welding is not easily revealed, and reduces economic loss, increases work efficiency.
Above an embodiment of the present utility model has been described in detail, but described content being only preferred embodiment of the present utility model, can not being considered to for limiting practical range of the present utility model.All equalizations done according to the utility model application range change and improve, and all should still belong within patent covering scope of the present utility model.

Claims (8)

1. an oilfield construction line securement device, comprise fixing chuck, fixing rod (2), clamping bolt (3) and chuck bolt (4), it is characterized in that: described fixing chuck comprises two the first quarter moon covers (1) be oppositely arranged in left and right, the two ends of first quarter moon cover (1) are provided with boss (101), boss (101) is provided with extension tube (102), cambered way (5) is provided with in first quarter moon cover (1), arc regulator plate (603) is provided with in cambered way (5), arc regulator plate (603) is provided with strut (6), through hole (601) is provided with in the middle of strut (6), strut (6) tail end is provided with perforation (602), two fixing chucks are linked together by through hole (601) by fixing rod (2), and clamping bolt (3) fixes two fixing chucks further by the perforation (602) on strut (6).
2. a kind of oilfield construction line securement device according to claim 1, is characterized in that: the through hole (601) on described strut (6) is above-below direction.
3. a kind of oilfield construction line securement device according to claim 2, is characterized in that: described fixing rod (2) two ends are provided with peg, and peg inserts in through hole (601), realizes the connection of two fixing chucks.
4. a kind of oilfield construction line securement device according to claim 1, is characterized in that: the perforation (602) on described strut (6) is left and right directions.
5. a kind of oilfield construction line securement device according to claim 4, is characterized in that: described clamping bolt (3) two is separately fixed at the opposition side of the perforation (602) of two fixing chucks.
6. a kind of oilfield construction line securement device according to claim 1, is characterized in that: two described first quarter moon covers (1) realize the connection of two first quarter moon covers (1) through the extension tube (102) on boss (101) by chuck bolt (4).
7. a kind of oilfield construction line securement device according to claim 6, is characterized in that: described cambered way (5) is equal with the radius of arc regulator plate (603).
8. a kind of oilfield construction line securement device according to claim 1, is characterized in that: be provided with fixed hole (7) in described fixing chuck.
CN201520085384.1U 2015-02-06 2015-02-06 A kind of oilfield construction line securement device Expired - Fee Related CN204437475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520085384.1U CN204437475U (en) 2015-02-06 2015-02-06 A kind of oilfield construction line securement device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520085384.1U CN204437475U (en) 2015-02-06 2015-02-06 A kind of oilfield construction line securement device

Publications (1)

Publication Number Publication Date
CN204437475U true CN204437475U (en) 2015-07-01

Family

ID=53605342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520085384.1U Expired - Fee Related CN204437475U (en) 2015-02-06 2015-02-06 A kind of oilfield construction line securement device

Country Status (1)

Country Link
CN (1) CN204437475U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715869A (en) * 2016-04-14 2016-06-29 上海逸通科技股份有限公司 Hydraulic pipe tensioning machine
CN111059355A (en) * 2020-03-18 2020-04-24 胜利油田新大管业科技发展有限责任公司 Combined chain plate type pulling and clamping tool
CN111520540A (en) * 2020-04-13 2020-08-11 中建三局集团有限公司 Mounting device and method for T-shaped interface nodular cast iron pipe
CN112066147A (en) * 2020-09-15 2020-12-11 孙国花 Municipal administration high pressure water pipe breakage rapid repair's initiative linking device
CN113063033A (en) * 2021-03-16 2021-07-02 江苏中湖市政园林工程有限公司 Underground sewage pipeline protection framework and pipeline construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715869A (en) * 2016-04-14 2016-06-29 上海逸通科技股份有限公司 Hydraulic pipe tensioning machine
CN111059355A (en) * 2020-03-18 2020-04-24 胜利油田新大管业科技发展有限责任公司 Combined chain plate type pulling and clamping tool
CN111059355B (en) * 2020-03-18 2020-07-14 胜利油田新大管业科技发展有限责任公司 Combined chain plate type pulling and clamping tool
CN111520540A (en) * 2020-04-13 2020-08-11 中建三局集团有限公司 Mounting device and method for T-shaped interface nodular cast iron pipe
CN112066147A (en) * 2020-09-15 2020-12-11 孙国花 Municipal administration high pressure water pipe breakage rapid repair's initiative linking device
CN112066147B (en) * 2020-09-15 2022-08-19 浙江磐石建设有限公司 Municipal administration high pressure water pipe breakage rapid repair's initiative linking device
CN113063033A (en) * 2021-03-16 2021-07-02 江苏中湖市政园林工程有限公司 Underground sewage pipeline protection framework and pipeline construction method

Similar Documents

Publication Publication Date Title
CN204437475U (en) A kind of oilfield construction line securement device
CN202411761U (en) Thick-wall pipeline aligning and welding seam adjusting device
CN205716010U (en) Oilfield construction line securement device
CN104827231A (en) Elbow welding tool
CN205363073U (en) Mouth of pipe butt joint anchor clamps
CN204565486U (en) A kind of isometrical steel-pipe welding special fixture
CN204195165U (en) A kind of pipeline quick-assembling positioning tool alignment device
CN208289327U (en) Heavy caliber submarine pipeline counterpart connects clamper
CN204565487U (en) A kind of isometrical steel elbow welding special fixture
CN104014974A (en) Joint gap locating device for welding pipeline openings of utility boiler
CN203817702U (en) Fast pipeline opening alignment device
CN204879070U (en) A pipe clamp for light truck
CN204221222U (en) For the back filled argon protection device of large diameter steel pipe welding
CN202716020U (en) Jacket for butt-welding stainless steel tubes
CN203330754U (en) Elbow clamp for lathing
CN203918342U (en) A kind of small-bore gas riser welding is to mouthpart
CN204852718U (en) But quick assembly disassembly's pipeline connecting device
CN204504641U (en) A kind of for the two laterally opened fixture holding clamping of pipe pipe docking welding
CN204686352U (en) A kind of petrochemical pipe weld jig
CN208713262U (en) Submarine pipeline weld bond group is to auxiliary device
CN203804447U (en) Steel pipe component butt joint node lining tube adjusting device
CN201818822U (en) Combustion gas gate valve with PE (Polythene) pipe joint
CN203712183U (en) Fixing mechanism for field installation of storage tank
CN207119935U (en) A kind of clamping tooling of machining
CN203304846U (en) Fast pipe orifice aligning device for small-diameter pipelines

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20160206