CN204433363U CN201520009085.XU CN201520009085U CN204433363U CN 204433363 U CN204433363 U CN 204433363U CN 201520009085 U CN201520009085 U CN 201520009085U CN 204433363 U CN204433363 U CN 204433363U
Authority
CN
China
Prior art keywords
steel pipe
facade
staged
assembly set
combination unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520009085.XU
Other languages
Chinese (zh)
Inventor
张珉
黄迪纲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Chengdu Steel and Vanadium Co Ltd
Original Assignee
Pangang Group Chengdu Steel and Vanadium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Chengdu Steel and Vanadium Co Ltd filed Critical Pangang Group Chengdu Steel and Vanadium Co Ltd
Priority to CN201520009085.XU priority Critical patent/CN204433363U/en
Application granted granted Critical
Publication of CN204433363U publication Critical patent/CN204433363U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of steel pipe and deposits combination unit, comprise identical 2 groups and above staged assembly set continuous, discontiguous along same level axis arranged on horizontal support table top; Often organize staged assembly set and comprise identical and symmetrically arranged two staged components and some supporting traverses, staged component comprises the platform of high facade, low facade and mediate continuously graded; Supporting traverse two ends are placed on two platforms of staged assembly set in same level respectively removably.Achieve the object of stratified storage steel pipe, Bedding storage can also be carried out according to the length difference of steel pipe.The height of the stacking of every in actual use one deck can adjust flexibly.Meanwhile, supporting traverse sets up removably, loads onto and unloads conveniently, simple to operate.

Description

Combination unit deposited by steel pipe
Technical field
The utility model is that field deposited by the steel pipe of Steel Tube Industry, more specifically, relates to one and deposits steel pipe and put combination unit.
Background technology
At Steel Tube Industry, current known steel pipe material-storing rack is generally the tower structure or rectangular structure that are formed by combining by column, vertical pole, cross bar, cross bar is provided with continuous print waveform or jagged groove in order to prevent the slip of steel pipe, and can weld hook to facilitate lifting and transfer on support.
The patent No. is " stacking frame for steel tubes " of zl201120337044, adopts tower structure, carries out the barrier of steel pipe with column, and strengthens the intensity of column with diagonal ligament post, and integral structure is simpler.The patent No. is " a kind of steel pipe rack " of zl201210507309, be in support, place copper pipe seat upper surface with laciniation, steel pipe can steadily be placed can not sway, support is welded with the convenient lifting of hook, support four angles place is respectively equipped with cylinder leg, rack can upwards be stacked, with conserve space.The patent No. is " a kind of steel pipe rack " of zl201220289717, it is the fixed mount be made up of horizontal adapter plate and fixing feet, fixing feet is fixed on lower end, horizontal adapter plate both sides, horizontal side, adapter plate upper end is provided with fixed dam, opposite side is provided with shifting board, shifting board and horizontal adapter plate chain connection, solve steel pipe and place inconvenient problem of easily skidding.The patent No. is " steel pipe storage rack " of zl201210339734, respectively be provided with two poles of erectting at rectangular support frame two ends and middle part, two, left and right is respectively provided with a pipe link between pole and rectangular support frame, do not intersect, conveniently tie up between the pipe link of two, left and right.The patent No. is " the steel pipe stock shelf " of zl201120369268, is by assemble box of column, vertical connecting rod and tranverse connecting rod and assemblnig frame mounting.The patent No. is " a kind of steel pipe bin " of zl201120520047, is that bin main body is hinged with lever, and one end of described lever is connected with described lid flitch, and the other end is connected with the engine installation of activation lever action.The patent No. is " a kind of steel pipe storage rack " of zl201220183936, it is a kind of steel pipe storage rack relating to canopy cloth manufacturing equipment technical field, comprise spiral filament forming machine, described spiral filament forming machine is provided with around roller, bottom it is characterized in that described spiral filament forming machine, side is provided with material storage rack, and described material storage rack is fixed on side bottom spiral filament forming machine.
These known steel pipe material-storing rack patented technologies, solve from different aspects that batch steel pipe is deposited, the problem such as anti-skidding and convenient mobile.But on a material-storing rack, place the tube product of number of different types, due to the extruding of upper and lower steel pipe and the rolling of self, easily cause the generation of the accident such as mixed batch of variety classes steel pipe, mixed number, do not meet the standard specifications that each enterprise classifying is stacked.If when only placing a kind of steel pipe of identical type on a material-storing rack, when this batch of tube product quantity only has the small lot of several, tens, a large bin will be taken, greatly reduce the degree of utilization of bin, cause the significant wastage of space and storage facilities.
Utility model content
The purpose of this utility model is to solve at least one item in prior art above shortcomings.
Such as, one of the purpose of this utility model there are provided a kind of steel pipe and deposits combination unit, when different types of tube product placed by needs, physically-isolated mode can be taked, different types of tube product is deposited by layered mode, to avoid mixed batch of mixed number accident to occur, realize the maximized utilization of parking space.
Combination unit deposited by a kind of steel pipe that the utility model provides, comprise identical staged assembly set more than two continuous, discontiguous along same level axis arranged on horizontal support table top; Often organize staged assembly set and comprise identical and symmetrically arranged two staged components and some supporting traverses, staged component comprises the platform of high facade, low facade and mediate continuously graded.
Supporting traverse two ends are placed on two platforms of staged assembly set in same level respectively removably, and all supporting traverses in same level form the supporting plane that is deposited steel pipe jointly.
In an exemplary embodiment of the present utility model, described can layer-stepping steel pipe deposit combination unit often organize in staged assembly set also comprise 1 or 2 U-shaped components uprightly arranged respectively with two high facades of staged assembly set or/and two low facades are corresponding; Each U-shaped component is combined by two root posts, a cross bar, two root posts are individually fixed in two high facades or two low facades of staged assembly set, cross bar is fixed on horizontal support table top, and is connected with end-to-end to be fixed by the mode such as to weld of two root posts.
In the utility model exemplary embodiment, two root posts of described U-shaped component are connected and fixed on two high facades or two low facades of staged assembly set by the mode of bolt or welding.
In the utility model exemplary embodiment, described can layer-stepping steel pipe deposit combination unit adopt process with the Q345 low-alloy high-strength steel plate of 8 ~ 16mm.
In the utility model exemplary embodiment, described supporting traverse is hollow rectangle steel pipe, adopts the Q345 low-alloy high-strength steel plate of 8 ~ 16mm to process.
In the utility model exemplary embodiment, described support platform is formed with groove, and adopts the mode of welding to be provided with baffle plate in the outside of groove.
Further, when steel pipe deposit combination unit include 2 groups of staged assembly sets time, with high facade, to low facade, spread configuration is carried out to low facade or high facade to high facade, low facade between staged assembly set.
Further, when steel pipe deposit combination unit include the staged assembly set of more than 2 groups time, between two groups of staged assembly sets at the most two ends of described horizontal axis, carry out spread configuration with high facade to high facade, low facade to low facade or high facade to low facade, staged assembly set is therebetween towards any one end at described horizontal axis two ends.
Deposit combination unit when steel pipe and include 2 groups of (more than 2 groups) staged assembly sets, and between 2 groups of staged assembly sets (between 2 groups of staged assembly sets at the most two ends of described horizontal axis) with high facade to high facade arrangement time, namely can be different according to supporting plane length, store different steel pipes from long to short from the bottom up successively; When arranging low facade with low facade, namely can, according to the difference of supporting plane length, store from being short to long different steel pipes from the bottom up successively; And when arranging low facade with high facade, all supporting plane length is consistent, storage steel pipe can be carried out as required.
Compared with prior art, the beneficial effects of the utility model comprise: by providing a kind of combination unit depositing steel pipe, achieve the object of stratified storage steel pipe, can also carry out Bedding storage according to the length difference of steel pipe.The height of the stacking of every in actual use one deck can adjust flexibly.Meanwhile, supporting traverse sets up removably, and load onto and unload conveniently, simple to operate, be applicable to steel pipe's production enterprise, steel pipe storage enterprise according to different lot number, model and unlike material, even the tube product of different length stores classifiedly.
Accompanying drawing explanation
By the description carried out below in conjunction with accompanying drawing, above-mentioned and other object of the present utility model and feature will become apparent, wherein:
Fig. 1 shows the schematic perspective view that combination unit deposited by a kind of steel pipe.
Fig. 2 forms the schematic perspective view that the staged assembly set of combination unit deposited by steel pipe shown in Fig. 1.
Fig. 3 is the lateral plan of the staged component forming staged assembly set shown in Fig. 2.
Fig. 4 shows staged assembly set along the different arrangement mode of horizontal axis A-A ', wherein:
4A, 4B, 4C are the different arrangement modes comprising 2 groups of staged assembly sets;
4D, 4E, 4F are the different arrangement modes (to be positioned at the relative position of two groups of staged assembly sets at the most two ends of horizontal axis as judgement) of the staged assembly set comprising more than 2 groups.
Description of reference numerals:
The column of 1-staged component, 2-supporting traverse, 3-U type component, the cross bar of 4-U type component, 5-height facade, the low facade of 6-, 7-platform, 8-groove, 9-baffle plate.
Detailed description of the invention
Hereinafter, steel pipe of the present utility model will be described in detail in conjunction with the utility model exemplary embodiment and deposit combination unit.
As shown in Figure 1, combination unit deposited by a kind of steel pipe of the present utility model, and it is continuous in, discontiguous same level axis A-A that it comprises 2 groups of identical staged assembly sets ' be arranged on horizontal support table top; Often organize staged assembly set and comprise identical and symmetrically arranged two staged components 1 and some supporting traverses 2, staged component 1 comprises the platform 7 of high facade 5, low facade 6 and intervenient continuously graded; Supporting traverse 2 two ends are placed on two platforms 7 of staged assembly set in same level respectively removably.
Two supporting traverses 2 in same level form the supporting plane that is independently deposited steel pipe jointly, are the vertical direction spatial depositing steel pipe between upper and lower supporting plane.Two staged components 1 of staged assembly set at intervals, form the horizontal space storing steel pipe.
Store the vertical direction spatial height of steel pipe, horizontal space width, the length of supporting traverse 2, the magnitude setting of platform 7 and width and height etc. all to determine according to actual conditions and concrete needs.
In the present embodiment, 2 groups of staged assembly sets that combination unit deposited by above-mentioned steel pipe distinguish corresponding 1 U-shaped component uprightly arranged separately, each U-shaped component is combined by two root posts, 3, cross bar 4, two root posts 3 are fixed on two high facades 5 of staged assembly set respectively by the mode of bolt or welding, cross bar 4 is fixed on horizontal support table top, and cross bar 4 is fixed with the end-to-end mode by welding of two root posts 3 and is connected.U-shaped component can be deposited combination unit to described steel pipe and carry out actv. reinforcing, the rolling that interception steel pipe is outside.
Above-mentioned can layer-stepping steel pipe deposit combination unit adopt process with the Q345 low-alloy high-strength steel plate of 8 ~ 16mm, supporting traverse 2 is hollow rectangle steel pipe, also adopt the Q345 low-alloy high-strength steel plate of 8 ~ 16mm to process, there is intensity on the whole high, and the advantage being easy to processing and safeguarding.
Above-mentioned platform 7 is formed with groove 8, and adopts in the outside of groove the mode of welding to be provided with baffle plate 9, can effectively fix supporting traverse 2, prevent supporting traverse 2 from sliding to front, rear, left and right.
Utilize described steel pipe to deposit combination unit, the tube product of the tube product of different cultivars or different length can be deposited by layered mode, to avoid mixed batch of mixed number accident to occur, realize the maximization that parking space utilizes.
Although below describe the utility model in conjunction with the embodiments; but those skilled in the art should be clear; when not departing from the spirit and scope that claim limits; various distortion and change can be carried out to exemplary embodiment of the present utility model, all in design of the present utility model and any amendment, the improvement made within principle be equal to replacement and all should be included within protection domain of the present utility model.

Claims (8)

1. a combination unit deposited by steel pipe, it is characterized in that: described combination unit comprise identical 2 groups and above staged assembly set continuous, discontiguous along same level axis arranged on horizontal support table top; Often organize staged assembly set and comprise identical and symmetrically arranged two staged components and some supporting traverses, staged component comprises the platform of high facade, low facade and mediate continuously graded; Supporting traverse two ends are placed on two platforms of staged assembly set in same level respectively removably.
2. combination unit deposited by steel pipe according to claim 1, it is characterized in that: also respectively comprise in described staged assembly set U-shaped component that 1 or 2 uprightly arrange respectively with two high facades of staged assembly set or/and two low facades are corresponding; Each U-shaped component is combined by two root posts, a cross bar, two root posts are individually fixed in two high facades or two low facades of staged assembly set, cross bar is fixed on horizontal support table top, and is fixed with the end-to-end mode by welding of two root posts and is connected.
3. combination unit deposited by steel pipe according to claim 2, it is characterized in that: two root posts of described U-shaped component are connected and fixed on two high facades of staged assembly set by the mode of bolt or welding.
4. steel pipe according to claim 1 is deposited combination unit and is adopted the Q345 low-alloy high-strength steel plate of 8 ~ 16mm to process.
5. combination unit deposited by steel pipe according to claim 1, it is characterized in that: described supporting traverse is hollow rectangle steel pipe, adopts the Q345 low-alloy high-strength steel plate of 8 ~ 16mm to process.
6. combination unit deposited by steel pipe according to claim 1, it is characterized in that: be formed with groove on the platform, and adopts the mode of welding to be provided with baffle plate in the outside of groove.
7. deposit combination unit according to the arbitrary described steel pipe of claim 1 to 6, it is characterized in that: when there being 2 groups of staged assembly sets, between staged assembly set, with high facade, to low facade, spread configuration being carried out to low facade or high facade to high facade, low facade.
8. deposit combination unit according to the arbitrary described steel pipe of claim 1 to 6, it is characterized in that: when there being the staged assembly set of more than 2 groups, between two groups of staged assembly sets at the most two ends of described horizontal axis, carry out spread configuration with high facade to high facade, low facade to low facade or high facade to low facade, staged assembly set is therebetween towards any one end at described horizontal axis two ends.
CN201520009085.XU 2015-01-07 2015-01-07 Combination unit deposited by steel pipe Expired - Fee Related CN204433363U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520009085.XU CN204433363U (en) 2015-01-07 2015-01-07 Combination unit deposited by steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520009085.XU CN204433363U (en) 2015-01-07 2015-01-07 Combination unit deposited by steel pipe

Publications (1)

Publication Number Publication Date
CN204433363U true CN204433363U (en) 2015-07-01

Family

ID=53601261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520009085.XU Expired - Fee Related CN204433363U (en) 2015-01-07 2015-01-07 Combination unit deposited by steel pipe

Country Status (1)

Country Link
CN (1) CN204433363U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106976052A (en) * 2017-05-23 2017-07-25 苏州木山云智能科技有限公司 A kind of metal pipe material is given out a contract for a project folder
CN109760916A (en) * 2018-12-27 2019-05-17 佛山市依时利新科技有限公司 A kind of interim rack of steel pipe transmission
CN109795790A (en) * 2019-03-13 2019-05-24 成都西顿硬质合金有限公司 It is a kind of for producing the thermoformed article frame of hard alloy

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106976052A (en) * 2017-05-23 2017-07-25 苏州木山云智能科技有限公司 A kind of metal pipe material is given out a contract for a project folder
CN109760916A (en) * 2018-12-27 2019-05-17 佛山市依时利新科技有限公司 A kind of interim rack of steel pipe transmission
CN109795790A (en) * 2019-03-13 2019-05-24 成都西顿硬质合金有限公司 It is a kind of for producing the thermoformed article frame of hard alloy

Similar Documents

Publication Publication Date Title
CN204433363U (en) Combination unit deposited by steel pipe
CN102491042A (en) Adjustable storage transfer device
CN211418427U (en) New forms of energy goods shelves
CN203544672U (en) Combined movable storage rack
CN104648806A (en) Stepped component for steel tube storage and method for stepped component for steel tube storage to store steel tubes
CN202190686U (en) Combined draining frame
CN205282953U (en) Assembled goods shelves of spatial structure of transformer substation
CN212709487U (en) Novel material turnover vehicle
CN208812060U (en) A kind of mould placing rack
CN206447091U (en) Automate the intensive storehouse of bar
CN209850893U (en) Support is deposited to reinforcing bar prefabricated component
CN208994149U (en) A kind of transport frock
CN206140458U (en) Deposit work or material rest
CN207773725U (en) The device of the storage of lattice supporting member, transport and installation
CN204897329U (en) Bracket
CN221020975U (en) Goods shelves are deposited to aluminium alloy
CN210704729U (en) Material basket of depositing of right-hand side of quick change
CN205891958U (en) A vehicle for transporting chassis
CN203319093U (en) Special storage shelf for electric power fittings
CN219858101U (en) Sweet potato splendid attire basket of convenient transport
CN220974881U (en) Material placing square frame
CN219428677U (en) Die steel transfer device
CN209634879U (en) A kind of mobilizable nonstandard material frame mechanism of limit protection fixing piece
CN209192335U (en) Copper plated steel grounding rod wrapping tool
CN211269432U (en) Storage rack convenient for hoisting goods

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20170107