CN204424768U - A kind of mounting operation platform of outdoor disconnector operating mechanism - Google Patents
A kind of mounting operation platform of outdoor disconnector operating mechanism Download PDFInfo
- Publication number
- CN204424768U CN204424768U CN201520041477.4U CN201520041477U CN204424768U CN 204424768 U CN204424768 U CN 204424768U CN 201520041477 U CN201520041477 U CN 201520041477U CN 204424768 U CN204424768 U CN 204424768U
- Authority
- CN
- China
- Prior art keywords
- operating mechanism
- mounting operation
- fixed
- operation platform
- guide pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及电力设施辅助用具,尤其涉及一种应用于110~220kV隔离开关操动机构的现场安装作业一体平台。The utility model relates to an auxiliary appliance for electric power facilities, in particular to an on-site installation and operation integrated platform applied to an operating mechanism of a 110-220 kV isolating switch.
背景技术Background technique
隔离开关作为电力系统一次主要分断设备,它运行状况的好坏直接影响电能的传输、分配以及系统的安全可靠运行。电力系统应在有电压无负荷电流的情况下,应用隔离开关分、合电路,达到安全隔离的目的,因此隔离开关是高压电器中应用最多的一种电器。隔离开关的功能,主要是隔离高压电源,以保证其他设备和线路的安全检修。因此其结构有如下特点,即断开后有明显可见的断开间隙,而且断开间隙的绝缘及相间绝缘都是足够可靠的,能充分保证设备检修的人身安全。As a main breaking device of the power system, the isolating switch directly affects the transmission and distribution of electric energy and the safe and reliable operation of the system. The power system should use the isolating switch to open and close the circuit under the condition of voltage and no load current to achieve the purpose of safety isolation. Therefore, the isolating switch is the most widely used electrical appliance in high-voltage electrical appliances. The function of the isolating switch is mainly to isolate the high-voltage power supply to ensure the safe maintenance of other equipment and lines. Therefore, its structure has the following characteristics, that is, there is a clearly visible disconnection gap after disconnection, and the insulation of the disconnection gap and the phase-to-phase insulation are sufficiently reliable, which can fully guarantee the personal safety of equipment maintenance.
由于隔离开关设备经常操作,处于活动的状态,不仅需要考虑导电接触、绝缘爬距等,最重要的是要考虑隔离开关的机械性能,机械性能的正常与否直接决定着隔离开关分合位置、触头电阻、部件受力等典型故障、缺陷的发生。据有关数据统计,隔离开关机械部分故障大约占隔离开关全部故障的70%。所以,做好隔离开关的检修维护工作,应将重点放在处理隔离开关机械部分上。只有把握隔离开关检修维护的关键点,才能保障隔离开关的安全运行。而隔离开关操动机构的安装质量与隔离开关的机械性能直接相关。Since the isolating switch equipment is often operated and is in an active state, not only the conductive contact, insulation creepage distance, etc., but also the mechanical properties of the isolating switch must be considered. Whether the mechanical properties are normal or not directly determines the opening and closing position of the isolating switch, Occurrence of typical faults and defects such as contact resistance and component stress. According to relevant statistics, the failure of the mechanical part of the isolating switch accounts for about 70% of all the failures of the isolating switch. Therefore, to do a good job in the repair and maintenance of the isolating switch, the focus should be on the mechanical part of the isolating switch. Only by grasping the key points of overhaul and maintenance of the isolating switch can the safe operation of the isolating switch be guaranteed. The installation quality of the isolating switch operating mechanism is directly related to the mechanical properties of the isolating switch.
电力生产现场,隔离开关操动机构的安装作业不同于设备厂家有专用的安装调试车间,安装作业中隔离开关本体与操动机构的垂直中心定位、水平位置校准两个关键步骤,完全依赖人力及以往的安装经验,这必然会浪费大量的人力和时间,且安装质量无法给与保证。另外,由于操动机构箱较重,系统内不乏此类作业伤人的事故。In the power production site, the installation of the operating mechanism of the disconnector is different from the special installation and commissioning workshop of the equipment manufacturer. The two key steps of vertical center positioning and horizontal position calibration of the disconnector body and the operating mechanism in the installation operation are completely dependent on manpower and Based on past installation experience, this will inevitably waste a lot of manpower and time, and the installation quality cannot be guaranteed. In addition, due to the heavy operating mechanism box, there are many accidents of such operations in the system.
据调查,目前隔离开关操动机构的传统安装方法是人工架设木块来搭建安装平台。传统安装方法非常麻烦且存在着较多的弊端:According to the survey, the traditional installation method of the isolating switch operating mechanism is to manually erect wooden blocks to build the installation platform. The traditional installation method is very troublesome and has many disadvantages:
1、需要较多人力对操动机构进行三维移动定位,定位通常不能一次性就位,反复性定位加重了人力的浪费;1. More manpower is required to carry out three-dimensional mobile positioning of the operating mechanism, and the positioning is usually not in place at one time, and repeated positioning increases the waste of manpower;
2、人工架设木块搭建安装平台时,地面是否平坦以及土质情况将严重影响平台的搭建速度,平台的搭建时间较长;2. When manually erecting wooden blocks to build the installation platform, whether the ground is flat or not and the soil quality will seriously affect the speed of platform construction, and the platform will take a long time to build;
3、操动机构的三维移动定位与安装平台的搭建需要协同合作,需要经验丰富的作业人员指挥协调,额外提升了对作业人员的经验及技能要求;3. The three-dimensional mobile positioning of the operating mechanism and the construction of the installation platform need to be coordinated and coordinated, and require the command and coordination of experienced operators, which additionally increases the experience and skill requirements of the operators;
4、安装作业中隔离开关本体与操动机构的垂直中心定位、水平位置校准两个关键步骤,完全依赖人力及以往的安装经验,安装质量无法给与保证;4. The vertical center positioning and horizontal position calibration of the isolating switch body and the operating mechanism are two key steps in the installation operation, which completely rely on manpower and previous installation experience, and the installation quality cannot be guaranteed;
5、木块搭建的平台稳定性无法保证且操动机构较重,作业人员的安全无法得到有效保障。5. The stability of the platform built with wooden blocks cannot be guaranteed and the operating mechanism is heavy, so the safety of the operators cannot be effectively guaranteed.
实用新型内容Utility model content
本实用新型所要解决的技术问题是实现一种可以高效完成操动机构的三维移动定位,降低对安装作业人员经验及技能的要求,有效节省大量的人力和时间,提高隔离开关安装质量,保障作业人员安全的隔离开关操动机构现场安装作业一体平台。The technical problem to be solved by the utility model is to realize a three-dimensional mobile positioning of the operating mechanism efficiently, reduce the requirements for the experience and skills of the installation operators, effectively save a lot of manpower and time, improve the installation quality of the isolating switch, and ensure the operation An integrated platform for on-site installation and operation of the isolating switch operating mechanism for personnel safety.
为了实现上述目的,本实用新型采用的技术方案为:一种户外隔离开关操动机构的安装作业平台,平台设有放置隔离开关操动机构的支架,所述支架固定在两根导柱上,所述导柱通过至少两个抱箍固定在柱体上。In order to achieve the above purpose, the technical solution adopted by the utility model is: an installation work platform for the operating mechanism of an outdoor isolating switch, the platform is provided with a bracket for placing the operating mechanism of the isolating switch, and the bracket is fixed on two guide columns. The guide post is fixed on the post by at least two hoops.
所述导柱与支架之间设有升降机构,所述升降机构包括将支架固定在导柱上的滑套、设置在支架上的齿条,设置在导柱上与所述齿条相配合的驱动齿轮,所述驱动齿轮上固定有传动轴,所述传动轴外端固定有驱动轮,所述固定导柱上还设有锁止机构,所述锁止机构通过转轴固定在导柱上,所述转轴一端设有嵌入齿条的卡齿,另一端与导柱之间设有压簧。A lifting mechanism is provided between the guide post and the bracket, and the lifting mechanism includes a sliding sleeve for fixing the bracket on the guide post, a rack arranged on the bracket, and a tooth rack arranged on the guide post to match the rack. A drive gear, a drive shaft is fixed on the drive gear, a drive wheel is fixed on the outer end of the drive shaft, a locking mechanism is also provided on the fixed guide post, and the lock mechanism is fixed on the guide post through a rotating shaft, One end of the rotating shaft is provided with a locking tooth embedded in the rack, and a compression spring is provided between the other end and the guide post.
所述的支架由两个直角架构成,所述支架外端设有限制隔离开关操动机构位置的挡板,两个所述直角架之间设有加固连杆,且两个直角架上均设有水平仪,所述的加固连杆由两根分别固定在两侧的直角架上的连杆,以及连接两个连杆的螺母套构成,所述螺母套一端与其中一个连杆螺纹连接,另一端为供另一个连杆插入的通孔,并设有贯穿侧壁的锁止螺钉。The bracket is composed of two right-angle frames, the outer end of the bracket is provided with a baffle plate that limits the position of the operating mechanism of the isolation switch, and a reinforcing link is arranged between the two right-angle frames, and the two right-angle frames are equipped with A level is provided, and the reinforced connecting rod is composed of two connecting rods respectively fixed on the right-angle frames on both sides, and a nut sleeve connecting the two connecting rods, one end of the nut sleeve is threadedly connected with one of the connecting rods, The other end is a through hole for the insertion of another connecting rod, and is provided with a locking screw penetrating through the side wall.
所述支架上设有支撑板,所述的水平仪固定在支撑板上,所述支架上设有螺孔,且螺孔内设有水平调节丝杆,所述水平调节丝杆上端设有接触支撑板底面的支撑块。The bracket is provided with a support plate, the level is fixed on the support plate, the bracket is provided with a screw hole, and a level adjustment screw is provided in the screw hole, and the upper end of the level adjustment screw is provided with a contact support Support blocks for the underside of the board.
所述支架外端设有水平设置的前后调节丝杆,所述前后调节丝杆的端部接触支撑板外端。The outer end of the bracket is provided with a horizontally arranged front and rear adjusting screw rod, and the end of the front and rear adjusting screw rod contacts the outer end of the support plate.
所述支撑板底面固定滑轮条,每个所述直角架上设共四个水平调节丝杆。The pulley bar is fixed on the bottom surface of the support plate, and a total of four horizontal adjustment screw rods are arranged on each of the right-angle frames.
所述支撑板外侧均设有两个左右调节丝杆,所述左右调节丝杆的端部接触隔离开关操动机构。Two left and right adjustment screw rods are arranged on the outside of the support plate, and the ends of the left and right adjustment screw rods contact the isolation switch operating mechanism.
所述抱箍通过自锁夹扣固定在柱体上,所述的抱箍内侧设有一圈防滑垫圈,所述的自锁夹扣包括扳手、夹套和固定卡口,所述的夹套呈U形且端部设有螺纹,所述的扳手上设有安装夹套的固定孔,所述夹套通过螺母固定在扳手上。The hoop is fixed on the cylinder through a self-locking clip, and a circle of anti-skid washers is provided inside the hoop. The self-locking clip includes a wrench, a jacket and a fixed bayonet. The jacket is U-shaped and threaded at the end, the wrench is provided with a fixing hole for installing a jacket, and the jacket is fixed on the wrench by a nut.
所述的导柱为中空结构,内部设有导柱升降丝杆,所述导柱升降丝杆底部设有支撑在地面上的底座。The guide post is a hollow structure, and a guide post lifting screw is provided inside, and a base supported on the ground is provided at the bottom of the guide post lifting screw.
所述支架两侧设有撬棍插槽并配有撬棍,所述导柱升降丝杆的底座侧面设有撬棍孔,所述的驱动轮侧面也设有撬棍孔。Both sides of the bracket are provided with crowbar slots and equipped with crowbars, the side of the base of the guide post lifting screw rod is provided with crowbar holes, and the side of the driving wheel is also provided with crowbar holes.
本实用新型的优点在于:The utility model has the advantages of:
1、节省大量的人力、物力、财力1. Save a lot of manpower, material and financial resources
隔离开关作为电力系统一次主要分断设备,它运行状况的好坏直接影响电能的传输、分配以及系统的安全可靠运行。电力系统应在有电压无负荷电流的情况下,应用隔离开关分、合电路,达到安全隔离的目的,因此隔离开关是高压电器中应用最多的一种电器。As a main breaking device of the power system, the isolating switch directly affects the transmission and distribution of electric energy and the safe and reliable operation of the system. The power system should use the isolating switch to open and close the circuit under the condition of voltage and no load current to achieve the purpose of safety isolation. Therefore, the isolating switch is the most widely used electrical appliance in high-voltage electrical appliances.
最近几年,供电公司发展迅速,每年都有多个新变电站投入运行。由于公司管辖变电站较多,变电站综自改造工程等需对隔离开关设备进行更换的检修工作较为繁重。每年技改大修工程,隔离开关更换工作需要耗费大量人力和时间、工程费用开支高昂。本项目研制成功的110~220kV隔离开关操动机构现场安装作业一体平台可高效完成隔离开关操动机构的安装,工程所需人力及耗时大幅减少,为公司创造了可观的效益。In recent years, power supply companies have developed rapidly, and many new substations are put into operation every year. Due to the large number of substations under the jurisdiction of the company, the maintenance work for the replacement of isolating switch equipment such as the comprehensive self-renovation project of substations is relatively heavy. The annual technical overhaul project and the replacement of the isolating switch need a lot of manpower and time, and the project cost is high. The integrated platform for on-site installation and operation of the 110-220kV isolating switch operating mechanism successfully developed in this project can efficiently complete the installation of the isolating switch operating mechanism, greatly reducing the manpower and time-consuming required for the project, and creating considerable benefits for the company.
2、提高工作效率,保障安装质量及作业人员安全。2. Improve work efficiency, ensure installation quality and safety of operators.
传统人工架设木块搭建安装平台的方法完全依赖人力及以往的安装经验,需要较多人力对操动机构进行三维移动定位,定位通常不能一次性就位,反复性定位加重了人力和时间的浪费;操动机构的三维移动定位与安装平台的搭建需要协同合作,需要经验丰富的作业人员指挥协调,额外提升了对作业人员的经验及技能要求;作业风险不可控,作业人员的安全得不到有效保障。The traditional method of manually erecting wooden blocks to build the installation platform completely relies on manpower and previous installation experience. It requires more manpower to carry out three-dimensional mobile positioning of the operating mechanism. The positioning is usually not in place at one time. Repeated positioning increases the waste of manpower and time. ;The three-dimensional mobile positioning of the operating mechanism and the construction of the installation platform need to be coordinated and coordinated, and require the command and coordination of experienced operators, which additionally increases the experience and skill requirements of the operators; the operating risks are uncontrollable, and the safety of the operators cannot be guaranteed. effective guarantee.
研制的110~220kV隔离开关操动机构现场安装作业一体平台,可以方便快速的调节操动机构的空间位置,实现操动机构三维的自由移动、一次性精确定位以及水平位置校准;通过上、下抱箍固定在隔离开关下面的支柱上,使平台整体悬空,在进行操动机构安装过程中不受地面因素的影响;作业人员应用该平台可高效、可控的完成隔离开关操动机构的安装,大幅减少了作业人员的工作量,提高了工作效率;平台对作业人员经验及技能不设门槛,作业流程简单清晰,安装质量给予保证的同时有效保障了作业人员的安全。The integrated platform for on-site installation and operation of the operating mechanism of the 110-220kV isolation switch developed can conveniently and quickly adjust the spatial position of the operating mechanism, realize three-dimensional free movement of the operating mechanism, one-time precise positioning and horizontal position calibration; The hoop is fixed on the pillar below the isolating switch, so that the platform is suspended in the air as a whole, and is not affected by ground factors during the installation of the operating mechanism; operators can use this platform to complete the installation of the operating mechanism of the isolating switch efficiently and controllably , greatly reducing the workload of operators and improving work efficiency; the platform does not set thresholds for the experience and skills of operators, the operation process is simple and clear, the installation quality is guaranteed and the safety of operators is effectively guaranteed.
3、社会效应显著3. Significant social effect
安全生产是电力企业永恒的主题,而电力设备的安全,将直接影响电力企业的生产安全;供电可靠性是供电企业规划、运行、管理等各方面质量和水平的集中体现,可反映电力用户对供电企业的满意程度。隔离开关机械性能故障将会导致其出现分不开、合不上等严重缺陷,紧急情况下严重危害电网的安全生产和供电可靠性。一旦发生因电气设备停电,那么在方方面面造成的损失是不可估量。尤其是在电力供应日益紧张的今天,电网设备的安全、稳定运行体现的社会效益远远大于其经济价值,在一定程度上影响社会的稳定。Safe production is the eternal theme of electric power enterprises, and the safety of electric power equipment will directly affect the production safety of electric power enterprises; power supply reliability is a concentrated expression of the quality and level of power supply enterprise planning, operation, management, etc. Satisfaction with power supply companies. The failure of the mechanical performance of the isolating switch will lead to serious defects such as inseparability and closure, which will seriously endanger the safe production and power supply reliability of the power grid in emergency situations. Once a power outage occurs due to electrical equipment, the losses caused in all aspects are immeasurable. Especially in today's increasingly tense power supply, the safe and stable operation of power grid equipment reflects social benefits far greater than its economic value, which affects social stability to a certain extent.
附图说明Description of drawings
下面对本实用新型说明书中每幅附图表达的内容及图中的标记作简要说明:The following is a brief description of the content expressed in each piece of drawings in the specification sheet of the utility model and the marks in the figure:
图1-4为平台结构示意图;Figure 1-4 is a schematic diagram of the platform structure;
上述图中的标记均为:1、抱箍;2、导柱;3、支架;4、支撑板;5、升降机构;6、锁止机构;7、前后调节丝杆;8、左右调节丝杆;9、水平调节丝杆;10、自锁夹扣;11、隔离开关操动机构;12、加固连杆。The marks in the above figures are: 1. Hoop; 2. Guide column; 3. Bracket; 4. Support plate; 5. Lifting mechanism; 6. Locking mechanism; 7. Front and rear adjustment screw rod; Rod; 9. Horizontal adjustment screw; 10. Self-locking clip; 11. Isolation switch operating mechanism; 12. Reinforced connecting rod.
具体实施方式Detailed ways
本实用新型110~220kV隔离开关操动机构11现场安装作业一体平台,可以方便快速的调节操动机构的空间位置,实现操动机构三维的自由移动、一次性精确定位以及水平位置校准;通过上、下抱箍1固定在隔离开关下面的支柱上,使平台整体悬空,在进行操动机构安装过程中不受地面因素的影响。平台对作业人员经验及技能不设门槛,作业流程简单清晰,安装质量给予保证的同时有效保障了作业人员的安全。The 110-220kV isolation switch operating mechanism 11 of the utility model is an integrated platform for on-site installation and operation, which can conveniently and quickly adjust the spatial position of the operating mechanism, realize three-dimensional free movement of the operating mechanism, one-time precise positioning and horizontal position calibration; through the upper , The lower hoop 1 is fixed on the pillar below the isolating switch, so that the platform is suspended in the air as a whole, and is not affected by ground factors during the installation of the operating mechanism. The platform has no threshold for the experience and skills of the operators, the operation process is simple and clear, the installation quality is guaranteed and the safety of the operators is effectively guaranteed.
安装作业平台具体结构如图1-4所示,平台通过抱箍1固定在柱体(电线柱)上,抱箍1通过自锁夹扣10固定在柱体上,方便现场安装,为提高固定可靠性,抱箍内侧设有一圈防滑垫圈,可以是橡胶垫。此外由于现场柱体的粗细不同,为提高设备通用性,自锁夹扣包括扳手、夹套和固定卡口,夹套呈U形且端部设有螺纹,扳手上设有安装夹套的固定孔,夹套通过螺母固定在扳手,这样可以通过螺母调节夹套的长度,从而调节包箍1的内径。The specific structure of the installation work platform is shown in Figure 1-4. The platform is fixed on the column (wire column) through the hoop 1, and the hoop 1 is fixed on the column through the self-locking clip 10, which is convenient for on-site installation. Reliability, the inside of the hoop is provided with a circle of non-slip washer, which can be a rubber pad. In addition, due to the different thicknesses of the cylinders on site, in order to improve the versatility of the equipment, the self-locking clip includes a wrench, a jacket and a fixed bayonet. The jacket is U-shaped and has threads at the end. hole, the jacket is fixed on the wrench by a nut, so that the length of the jacket can be adjusted by the nut, thereby adjusting the inner diameter of the hoop 1.
抱箍1两侧各焊接有一根导柱2,用于支撑隔离开关操动机构11的支架3固定在导柱2上,支架3由两个直角架构成,分别固定在两侧的导柱2上,直角架设有限制隔离开关操动机构11位置的挡板,这样可以保证隔离开关操动机构11摆放不发生偏斜,并能在设备损坏发生断裂时,对隔离开关操动机构11有一定的阻挡作用。A guide post 2 is welded on both sides of the hoop 1, and the bracket 3 used to support the operating mechanism 11 of the isolation switch is fixed on the guide post 2. The bracket 3 is composed of two right-angle frames, which are respectively fixed on the guide post 2 Above, a baffle plate that limits the position of the isolating switch operating mechanism 11 is set at a right angle, so that the placement of the isolating switch operating mechanism 11 will not be deflected, and when the equipment is damaged and broken, the isolating switch operating mechanism 11 will be protected. Certain blocking effect.
为提高牢固性,直角架之间设有加固连杆12。加固连杆11由两根分别固定在两侧的直角架上的连杆,以及连接两个连杆的螺母套构成,螺母套一端与其中一个连杆螺纹连接,另一端为供另一个连杆插入的通孔,并设有贯穿侧壁的锁止螺钉,这样可以调节两个直角架之间的距离。For improving firmness, be provided with reinforcing connecting rod 12 between the right-angled frames. The reinforced connecting rod 11 is composed of two connecting rods respectively fixed on the right-angle frames on both sides, and a nut sleeve connecting the two connecting rods. It is inserted into the through hole, and is equipped with a locking screw through the side wall, so that the distance between the two right-angle brackets can be adjusted.
为便于调节隔离开关操动机构11的高度,导柱2与支架3之间设有升降机构5,升降机构5包括将支架3固定导柱2上的滑套、设置在支架3上的齿条,设置在导柱2上与齿条相配合的驱动齿轮,这样通过,齿轮齿条配合,可以方便的调节隔离开关操动机构11的高度,驱动齿轮上固定有传动轴,传动轴外端固定有驱动轮,这样可以通过驱动轮驱动升降,用于省力。此外,驱动齿轮还设有锁止机构6,通过锁止机构6可以在调节到适当高度后,锁止升降机构5。锁止机构通过转轴固定在导柱上,转轴一端设有嵌入齿条的卡齿,另一端与导柱之间设有压簧。For the convenience of adjusting the height of the isolation switch operating mechanism 11, a lifting mechanism 5 is provided between the guide post 2 and the support 3. The lifting mechanism 5 includes a sliding sleeve for fixing the support 3 on the guide post 2, and a rack set on the support 3. , the driving gear that is arranged on the guide post 2 to match the rack, through the cooperation of the rack and the gear, the height of the disconnector operating mechanism 11 can be adjusted conveniently, the driving gear is fixed with a transmission shaft, and the outer end of the transmission shaft is fixed There are driving wheels, so that the lifting can be driven by the driving wheels to save effort. In addition, the driving gear is also provided with a locking mechanism 6, through which the lifting mechanism 5 can be locked after being adjusted to an appropriate height. The locking mechanism is fixed on the guide post through the rotating shaft. One end of the rotating shaft is provided with a locking tooth embedded in the rack, and a compression spring is provided between the other end and the guide post.
为便于微调隔离开关操动机构11的位置,支架3上设有支撑板4,可以在支撑板4上设置水平仪,方便观察是否处于水平状态,支架3上设有螺孔,且螺孔内设有水平调节丝杆9,水平调节丝杆9上端的支撑块接触支撑板4底面。每个直角架设有四个水平调节丝杆9,这样无论支撑板4运动到任何位置,都可以通过水平调节丝杆9调节调隔离开关操动机构11水平度。For the convenience of fine-tuning the position of the isolating switch operating mechanism 11, a support plate 4 is provided on the support 3, and a level can be set on the support plate 4 to facilitate observation whether it is in a horizontal state. The support 3 is provided with a screw hole, and the screw hole is provided with a There is a horizontal adjustment screw rod 9, and the support block at the upper end of the horizontal adjustment screw rod 9 contacts the bottom surface of the support plate 4. Each right-angle frame is provided with four horizontal adjustment screw rods 9, so that no matter where the support plate 4 moves to any position, the levelness of the isolation switch operating mechanism 11 can be adjusted through the horizontal adjustment screw rods 9.
支架3外端设有水平设置的前后调节丝杆7,前后调节丝杆7的端部接触支撑板4外端,从而可以通过前后调节丝杆7调节隔离开关操动机构11前后位置,而在支撑板4外侧均设有两个左右调节丝杆8,左右调节丝杆8的端部接触隔离开关操动机构11,从而可以通过左右调节丝杆8调节隔离开关操动机构11的侧向位置。The outer end of the bracket 3 is provided with a horizontally arranged front and rear adjusting screw rod 7, and the end of the front and rear adjusting screw rod 7 contacts the outer end of the support plate 4, so that the front and rear positions of the isolation switch operating mechanism 11 can be adjusted through the front and rear adjusting screw rod 7. Two left and right adjustment screw rods 8 are arranged on the outside of the support plate 4, and the ends of the left and right adjustment screw rods 8 contact the isolation switch operating mechanism 11, so that the lateral position of the isolation switch operating mechanism 11 can be adjusted by the left and right adjustment screw rods 8 .
设备的导柱为中空结构,内部设有导柱升降丝杆,导柱升降丝杆底部设有支撑在地面上的底座,这样能够更加可靠的支撑整个设备,提高工作安全性,支架两侧设有撬棍插槽并配有撬棍,导柱升降丝杆的底座侧面设有撬棍孔,驱动轮侧面也设有撬棍孔,可以方便的利用撬棍对设备进行调节。The guide column of the equipment is a hollow structure, with a guide column lifting screw inside, and a base supported on the ground at the bottom of the guide column lifting screw, which can support the entire equipment more reliably and improve work safety. There is a crowbar slot and equipped with a crowbar. There are crowbar holes on the side of the base of the guide post lifting screw, and there are also crowbar holes on the side of the driving wheel. The equipment can be adjusted with a crowbar conveniently.
平台采用铝合金作为支架3的框架,强度、耐压性能均满足支撑操动机构的要求,平台整体结构轻盈,便于操控,平台设计的操动机构位置调节部件(上下、左右、前后以及水平调节部件)可以方便快速的调节操动机构的空间位置,实现操动机构三维的自由移动、一次性精确定位以及水平位置校准;平台通过机械部件来判定和调节操动机构的空间位置,比靠人工经验的传统方法要精确、方便、高效;平台较人工架设对作业人员经验及技能不设门槛,作业流程简单清晰,优化了传统操动机构的安装工艺,安装质量给予保证的同时有效保障了作业人员的安全。通过上、下抱箍1固定在隔离开关下面的柱体上,使平台整体悬空,在进行操动机构安装过程中不受地面因素的影响。The platform adopts aluminum alloy as the frame of the bracket 3, and its strength and pressure resistance meet the requirements of supporting the operating mechanism. The overall structure of the platform is light and easy to operate. Parts) can conveniently and quickly adjust the spatial position of the operating mechanism, realize the three-dimensional free movement of the operating mechanism, one-time precise positioning and horizontal position calibration; the platform judges and adjusts the spatial position of the operating mechanism through mechanical components, which is more manual The traditional method of experience should be accurate, convenient and efficient; compared with manual erection, there is no threshold for the experience and skills of the operators, the operation process is simple and clear, and the installation process of the traditional operating mechanism is optimized. The installation quality is guaranteed while the operation is effectively guaranteed. personnel safety. The upper and lower hoops 1 are fixed on the cylinder below the isolating switch, so that the platform is suspended in the air as a whole, and is not affected by ground factors during the installation of the operating mechanism.
上面结合附图对本发明进行了示例性描述,显然本实用新型具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种非实质性的改进,或未经改进将本发明的构思和技术方案直接应用于其它场合的,均在本实用新型的保护范围之内。The present invention has been exemplarily described above in conjunction with the accompanying drawings. Obviously, the specific implementation of the present invention is not limited by the above-mentioned manner, as long as various insubstantial improvements are carried out by adopting the method concept and technical solutions of the present invention, or without Improvements that directly apply the concept and technical solutions of the present invention to other occasions are within the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520041477.4U CN204424768U (en) | 2015-01-21 | 2015-01-21 | A kind of mounting operation platform of outdoor disconnector operating mechanism |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520041477.4U CN204424768U (en) | 2015-01-21 | 2015-01-21 | A kind of mounting operation platform of outdoor disconnector operating mechanism |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204424768U true CN204424768U (en) | 2015-06-24 |
Family
ID=53475099
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520041477.4U Expired - Lifetime CN204424768U (en) | 2015-01-21 | 2015-01-21 | A kind of mounting operation platform of outdoor disconnector operating mechanism |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204424768U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104577835A (en) * | 2015-01-21 | 2015-04-29 | 国家电网公司 | Installation operation platform of outdoor disconnecting switch operating mechanism |
-
2015
- 2015-01-21 CN CN201520041477.4U patent/CN204424768U/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104577835A (en) * | 2015-01-21 | 2015-04-29 | 国家电网公司 | Installation operation platform of outdoor disconnecting switch operating mechanism |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104577835B (en) | The mounting operation platform of outdoor disconnector operating mechanism | |
| CN203850679U (en) | Elevating disassembly and assembly platform with limiting support for current transformer in high-voltage switchgear | |
| CN204925202U (en) | Novel portable multi -functional electric power batch meter support | |
| CN103326304B (en) | 10kV charged drainage wire supporting device | |
| CN107732767A (en) | The adjustable pillar insulator live replacing device of gear-rack drive | |
| CN211063305U (en) | Screw lifting type insulating cross arm | |
| CN203553682U (en) | Universal-type low-voltage circuit breaker bypass device | |
| CN204424768U (en) | A kind of mounting operation platform of outdoor disconnector operating mechanism | |
| CN201302897Y (en) | Replacement device of transformer oil pump | |
| CN101299520B (en) | High voltage transmission line ground wire riser | |
| CN106450835A (en) | Shoe manufacturer high voltage wire landing device | |
| CN205051219U (en) | Supplementary device of installing and removing of high pressure substation equipment ground connection | |
| CN202268637U (en) | Special-purpose maintenance platform for 3AH type handcart type breaker | |
| CN204156488U (en) | Lightning arrester installation assembly | |
| CN205791238U (en) | A kind of 10kV distribution line charged lifter of straightway three-phase conducting wire | |
| CN207269129U (en) | Adjustable pillar insulator live replacing device | |
| CN101593940A (en) | Replacement method of substation support type busbar support equipment | |
| CN201234089Y (en) | Protective interval for live operation on 1000kV AC very high voltage line | |
| CN105977860B (en) | A kind of replacement overhead transmission line composite cross-arm insulator device and method | |
| CN205382736U (en) | Isolator support frame | |
| CN203026397U (en) | Grounding hook | |
| CN218569687U (en) | Auxiliary support rod capable of live working | |
| CN207234284U (en) | Pillar insulator replaces instrument | |
| CN204066622U (en) | Portable adjustable lever number plate stationary installation | |
| CN204167686U (en) | Power distribution station, city installation breakers upper strata fixed frame |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20150624 Effective date of abandoning: 20161012 |
|
| C25 | Abandonment of patent right or utility model to avoid double patenting |