CN204418435U - A kind of new steel plate shear wall - Google Patents

A kind of new steel plate shear wall Download PDF

Info

Publication number
CN204418435U
CN204418435U CN201420873331.1U CN201420873331U CN204418435U CN 204418435 U CN204418435 U CN 204418435U CN 201420873331 U CN201420873331 U CN 201420873331U CN 204418435 U CN204418435 U CN 204418435U
Authority
CN
China
Prior art keywords
steel plate
steel
wall
frame columns
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420873331.1U
Other languages
Chinese (zh)
Inventor
丁昌银
何炳泉
邓恺坚
林舒
陈慕贞
冯少鹏
杨翔
李泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Original Assignee
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd filed Critical GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority to CN201420873331.1U priority Critical patent/CN204418435U/en
Application granted granted Critical
Publication of CN204418435U publication Critical patent/CN204418435U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of new steel plate shear wall, comprise the body of wall that frame columns is connected with this frame columns, frame columns comprises box steel pipe column, build concrete column in this box steel pipe column and the first steel plate, first steel plate is fixed in the surrounding outer wall of box steel pipe column respectively, and each first steel plate forms the reinforced pipe of package bin shaped steel tubing string; Body of wall is by the side Vertical dimension extension of frame columns, and this body of wall comprises and being parallel to each other and two the second steel plates mutually separated, and one end and first steel plate of the second steel plate are affixed, and the other end of this second steel plate is set to opening end; Be connected with the spaced pull bar of multiple length directions along the second steel plate between two second steel plates, each pull bar is all vertical with two second steel plates.The utility model effectively improves bearing capacity, saves material usage, reduces deadweight.

Description

A kind of new steel plate shear wall
Technical field
The utility model relates to shear wall field, particularly relates to a kind of new steel plate shear wall.
Background technology
Shear wall (shear wall) is also known as wind-resistant wall or seismic structural wall, earthquake resistant wall, structural wall.At present, there is following defect in traditional shear wall:
(1) for traditional super high-rise steel plate shear wall, in order to improve all necessary enlarging section of bearing capacity, therefore dead load is comparatively large, and not only material usage is large, and fund input is high, and foundation cost is more expensive, and is not suitable for karst foundation.
(2) for double steel plate shear wall, it generally comprises one block of web, a component, because double-layer plate steel using amount is large, member dead weight is larger, if need one joint across two layers, then need the tower crane that crane capacity is larger, thus often can only one joint one deck, not only do not play the maximal efficiency of tower crane, shear wall installation progress is also slow.
(3) after conventional double steel plate shear force wall one saves lifting, concrete placings must be built from shear wall top, not only have impact on lifting progress, and easily makes concrete emanate and affect quality.
Utility model content
In order to overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of new steel plate shear wall, effectively improves bearing capacity, saves material usage, reduces deadweight.
The purpose of this utility model adopts following technical scheme to realize:
A kind of new steel plate shear wall, comprise the body of wall that frame columns is connected with this frame columns, frame columns comprises box steel pipe column, build concrete column in this box steel pipe column and the first steel plate, first steel plate is fixed in the surrounding outer wall of box steel pipe column respectively, and each first steel plate forms the reinforced pipe of package bin shaped steel tubing string; Body of wall is by the side Vertical dimension extension of frame columns, and this body of wall comprises and being parallel to each other and two the second steel plates mutually separated, and one end and first steel plate of the second steel plate are affixed, and the other end of this second steel plate is set to opening end; Be connected with the spaced pull bar of multiple length directions along the second steel plate between two second steel plates, each pull bar is all vertical with two second steel plates.
Preferably, described second steel plate is double-deck.
Preferably, described box steel pipe and the first steel plate have the mutually through fabrication hole for welding.
Compared to existing technology, the beneficial effects of the utility model are:
Frame columns of the present utility model comprises concrete column, box steel pipe column and is wrapped in the first steel plate of box steel pipe column surrounding, strengthen the support stiffness to Core Walls Structure, effective raising structural bearing capacity, can save again at box steel pipe column surrounding concreting, save material usage, reduce dead load, be applicable to the core wall structure of super highrise building on karst foundation; And, the other end due to the second steel plate is Chang Kaiduan, frame columns and body of wall form the web component longitudinally can assembled and laterally assemble, be beneficial to assembled, and then the piecemeal quantity of web component can be set according to tower crane elevating capacity, not only reduce the requirement to tower crane elevating capacity, also maximum performance tower crane elevating capacity, improve efficiency of construction; Simultaneously, reserved fabrication hole, not only be convenient to welding procedure, ensure that welding procedure quality, steel plate shear force wall can be allowed simultaneously to lift and its concrete placings technique independent separate, concrete placings quality is ensure that while accelerating construction speed, the phenomenon of concrete segregation can be stopped, again owing to changing this concrete placings technique, then can reduce pull bar according to the minimizing of the second steel plate side pressure, saving steel consumption, reduces resource consume.
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of new steel plate shear wall of the utility model.
In figure: 1, frame columns; 11, box steel pipe column; 12, concrete column; 13, the first steel plate; 2, body of wall; 21, the second steel plate; 3, pull bar.
Detailed description of the invention
A kind of new steel plate shear wall as shown in Figure 1, comprise the body of wall 2 that frame columns 1 is connected with this frame columns 1, frame columns 1 comprises box steel pipe column 11, build concrete column 12 in this box steel pipe column 11 and the first steel plate 13, first steel plate 13 is fixed in the surrounding outer wall of box steel pipe column 11 respectively, and each first steel plate 13 forms the reinforced pipe of package bin shaped steel tubing string 11; Body of wall 2 by the side Vertical dimension extension of frame columns 1, this body of wall 2 comprise be parallel to each other and the one end of two the second steel plate 21, second steel plates 21 mutually separated and the first steel plate 13 affixed, the other end of this second steel plate 21 is set to opening end; Be connected with the spaced pull bar 3 of multiple length directions along the second steel plate 21 between two second steel plates 21, each pull bar 3 is all vertical with two second steel plates 21.Between two second steel plates 21, concreting then can form stable body of wall 2, comes to reinforce concrete location to arranging rivet inside the second steel plate 21.Above-mentionedly affixedly welding all can be adopted convenient fixing to realize.
The overturning moment of structure mainly born by this box steel pipe column 11, significantly reduces the carrying burden of this new steel plate shear wall.Particularly, comprise concrete column 12, box steel pipe column 11 due to frame columns 1 and be wrapped in the first steel plate 13 of box steel pipe column 11 surrounding, strengthen the support stiffness to outside Core Walls Structure, effective raising structural bearing capacity, can save again at box steel pipe column 11 surrounding concreting, save material usage, reduce dead load, be applicable to the core wall structure of super highrise building on karst foundation; And, the other end due to the second steel plate 21 is Chang Kaiduan, frame columns 1 and body of wall 2 form the web component longitudinally can assembled and laterally assemble, be beneficial to assembled, and then the piecemeal quantity of web component can be set according to tower crane elevating capacity, not only reduce the requirement to tower crane elevating capacity, also maximum performance tower crane elevating capacity, improve efficiency of construction.
More specifically, the second steel plate 21 is double-deck, can increase supporting capacity further.Box steel pipe column 11 and the first steel plate 13 have the mutually through fabrication hole (not shown) for welding, and this fabrication hole is set to multiple, can be set to rectangular shape.This reserved fabrication hole, not only be convenient to welding procedure, ensure that welding procedure quality, steel plate shear force wall can be allowed simultaneously to lift and its concrete placings technique independent separate, while accelerating construction speed, ensure that concrete placings quality, the phenomenon of concrete segregation can be stopped, again owing to changing this concrete placings technique, then can reduce pull bar 3, saving steel consumption according to the minimizing of the second steel plate 21 lateral pressure, reduce resource consume.Welding and concreting after, can at fabrication hole cartridge plate last time with plugging technology hole.
Above-mentioned embodiment is only preferred embodiment of the present utility model; can not limit the scope of the utility model protection with this, change and the replacement of any unsubstantiality that those skilled in the art does on basis of the present utility model all belong to the utility model scope required for protection.

Claims (3)

1. a new steel plate shear wall, comprise the body of wall that frame columns is connected with this frame columns, it is characterized in that: frame columns comprises box steel pipe column, build concrete column in this box steel pipe column and the first steel plate, first steel plate is fixed in the surrounding outer wall of box steel pipe column respectively, and each first steel plate forms the reinforced pipe of package bin shaped steel tubing string; Body of wall is by the side Vertical dimension extension of frame columns, and this body of wall comprises and being parallel to each other and two the second steel plates mutually separated, and one end and first steel plate of the second steel plate are affixed, and the other end of this second steel plate is set to opening end; Be connected with the spaced pull bar of multiple length directions along the second steel plate between two second steel plates, each pull bar is all vertical with two second steel plates.
2. new steel plate shear wall according to claim 1, is characterized in that: described second steel plate is for double-deck.
3. new steel plate shear wall according to claim 1 and 2, is characterized in that: described box steel pipe and the first steel plate have the mutually through fabrication hole for welding.
CN201420873331.1U 2014-12-31 2014-12-31 A kind of new steel plate shear wall Active CN204418435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420873331.1U CN204418435U (en) 2014-12-31 2014-12-31 A kind of new steel plate shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420873331.1U CN204418435U (en) 2014-12-31 2014-12-31 A kind of new steel plate shear wall

Publications (1)

Publication Number Publication Date
CN204418435U true CN204418435U (en) 2015-06-24

Family

ID=53468819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420873331.1U Active CN204418435U (en) 2014-12-31 2014-12-31 A kind of new steel plate shear wall

Country Status (1)

Country Link
CN (1) CN204418435U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839847A (en) * 2016-03-31 2016-08-10 初明进 Beeline-shaped steel member

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839847A (en) * 2016-03-31 2016-08-10 初明进 Beeline-shaped steel member

Similar Documents

Publication Publication Date Title
CN102251602A (en) Anti-seismic damper of shearing type opening soft steel building structure
CN201671226U (en) Expanded flanged cross-shaped steel SRC column
CN203639807U (en) Y-shaped pier for concrete filled steel tube truss beam
CN202090458U (en) Anti-vibration damper of shear perforated mild steel building structure
CN202787047U (en) Deck type triangular steel truss composite beam
CN202379602U (en) Steel tube concrete crane truss
CN204491640U (en) A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN104563333A (en) Exterior steel plate and in-fill concrete combined shear wall
CN204418435U (en) A kind of new steel plate shear wall
CN201193409Y (en) Support structure of steel storing bin top
CN204418420U (en) The steel plate shear force wall of improvement
CN102720269B (en) Multilayer cantilever rigid cylindrical structure system
CN202152555U (en) Double-barreled chimney with section-type hung steel inner cylinder
CN201671393U (en) Inner-outer tubular self-supporting steel chimney
CN102535748A (en) Rectangular concrete-filled steel tube column added with I-shaped rib plate and preparing method of rectangular concrete-filled steel tube column
CN206570928U (en) A kind of building structure of high-rise building arch type commutation layer
CN202865731U (en) Saddle weight steel box structure of steel truss cable-stayed bridge
CN202090457U (en) Shearing earthquake-resistant damper for architectural structure with mild steels in parallel
CN205134352U (en) Bored pile basis is united to only post of narrow ji ta
CN205330003U (en) Carbon fiber thin wall steel tube concrete combination column of built -in FRP section bar
CN204401829U (en) RPC compound shear wall is filled out in a kind of encased steel plate
CN202529753U (en) Wall-attaching structure of tower crane for high-rise building
CN204609046U (en) Thin wall steel tube concrete frame-light-steel light-concrete compound shear wall
CN204060109U (en) 750kV transformer station concrete filled steel tube framework
CN202299061U (en) Reinforced concrete honeycomb core

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant