CN204415782U - Vertical PE film device of full automatic packaging - Google Patents

Vertical PE film device of full automatic packaging Download PDF

Info

Publication number
CN204415782U
CN204415782U CN201420714020.0U CN201420714020U CN204415782U CN 204415782 U CN204415782 U CN 204415782U CN 201420714020 U CN201420714020 U CN 201420714020U CN 204415782 U CN204415782 U CN 204415782U
Authority
CN
China
Prior art keywords
film
frame
annulus
gear
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420714020.0U
Other languages
Chinese (zh)
Inventor
赖兴华
赵柏林
唐良军
刘松桃
张勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chaint Corp
Original Assignee
Changsha Chaint Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Chaint Machinery Co Ltd filed Critical Changsha Chaint Machinery Co Ltd
Priority to CN201420714020.0U priority Critical patent/CN204415782U/en
Application granted granted Critical
Publication of CN204415782U publication Critical patent/CN204415782U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of vertical PE film device of full automatic packaging, comprise mainframe, bont, hold-down devices, running gear, turning gear, actuating device, folder film device, film rack device, roller conveyor, jacking apparatus and autonomous cruise speed system, pneumatic system, hydraulic efficiency pressure system.Bont imput shaft adopts four fulcrum supports, adopts the mid-driving of motor; Die set device by film prestension to 250%, can reduce the use of consumptive material; The suspension mounting means of folder film device can not produce film tail when packing; Adopt paired brush to obtain power and communication signal in the 8 pole trolleys closed, can ensure that signal is without loss in operational process; Jacking material carries out packing and can rely on the tension force of film, to the parcel that the upper surface of material and lower surface are carried out to a certain degree.

Description

Vertical PE film device of full automatic packaging
Technical field
The utility model belongs to packaging facilities, and be a kind of vertical PE film device of full automatic packaging, the PE film for the commodity nonwoven fabric roll of nonwoven fabrics industry is packed.
Background technology
Nonwoven fabrics has another name called non-weaving cloth.Wherein for the ease of transport and storage, need to carry out multilayer PE film packaging to nonwoven fabric roll.Because nonwoven fabric roll is more open, take vertical packaging can be relatively good.But in all kinds of vertical PE film wrapping machine of prior art, be difficult to meet the requirement of nonwoven fabric roll to the high-speed packaging of annual output more than 50,000 tons, be also difficult to meet nonwoven fabric roll to packing the requirement being highly greater than 1.8m, and equipment price is expensive, maintenance difficulties is large.
Utility model content
The utility model aims to provide a kind of PE film vertical packaging equipment, is applicable to nonwoven fabric roll packaging production line uses, and package speed is fast, and range of packages is large, and attractive packages is without film tail.This automation degree of equipment is high, production efficiency is high, its cost and maintenance cost relatively low.
The purpose of this utility model is realized by technical scheme below:
Vertical PE film device of full automatic packaging, is made up of mainframe, bont, hold-down devices, running gear, turning gear, actuating device, folder film device, film rack device, roller conveyor, jacking apparatus and autonomous cruise speed system, pneumatic system, hydraulic efficiency pressure system.Mainframe is directly placed in ground base, and bont and hold-down devices are installed on the left of equipment and top respectively.Running gear hangs within mainframe, relies on the walking of surrounding track adjusting wheel.Turning gear, actuating device, folder film device are installed on the bottom of running gear, left side, inside respectively.Film rack device is installed on the bottom of turning gear, and roller conveyor is positioned on mainframe ground, and roller machine line of centers overlaps with the line of centers of turning gear.Jacking apparatus is positioned over the below of roller conveyor.
Described mainframe comprises right gate-type composite beam, left-hand door formula composite beam, main beam, auxiliary crossbeam, upper limit position block, lower position block.The supporting leg of right gate-type composite beam adopts square tubes soldering, and the supporting leg of left-hand door formula composite beam adopts the welding of clod wash channel-section steel.Main beam is positioned on right gate-type composite beam, left-hand door formula composite beam, and auxiliary crossbeam is positioned over below in the middle of right gate-type composite beam, left-hand door formula composite beam, relies on screw to connect.Upper limit position block is arranged on main beam, and lower position block is arranged on the composite beam of left and right.
Described bont comprises reductor, imput shaft, double chain wheel, rolling bearing units, chain, clump weight, counterweight track adjusting wheel, excessive double chain wheel, chain, excessive single sprocket chain.Imput shaft is arranged between two main beams of mainframe, and reductor is arranged on position to the left in the middle part of imput shaft.Main beam two side adopts rolling bearing units to support imput shaft, and double chain wheel is arranged in imput shaft.Chain is placed on double chain wheel, excessively double chain wheel, excessively single sprocket chain, chain left end hinge clump weight, and clump weight is provided with counterweight track adjusting wheel near the side of left-hand door formula composite beam, the connection suspension rod of chain right-hand member articulated walking device;
Described hold-down devices comprises lower air cylinder, combination crossbeam, trident linkage, synchronizer gear, platen, upper parallel shafts, middle part hinge, lower parallel shafts.Combination crossbeam is arranged on mainframe, presses down cylinder flange and is arranged on above combination crossbeam.Trident mechanism is installed on below combination crossbeam, and the pair of parallel axle of trident mechanism upper articulation, bottom is hinged pair of parallel axle also.Two pairs of parallel shafts are respectively provided with a pair synchronizer gear.In the middle part of trident mechanism, a hinge is connected with cylinder piston rod end, the pair of parallel axle in trident mechanism bottom and platen hinged.
Described running gear comprises walked frame, track adjusting wheel, connection suspension rod, interior lights spending frame, exterior light spending frame, deviation correcting device.Walked frame is the framed structure be welded by rectangle steel, is provided with 8 groups of track adjusting wheels above and below walked frame altogether, connects hanger erection above the surrounding of walked frame.Interior lights spending frame, exterior light spending frame, deviation correcting device are arranged on below walked frame.
Described turning gear comprises bearing, annulus guide rail, revolution annulus, brush, support, 8 pole trolleys, walking and track adjusting wheel, drive belt, clump weight.Annulus guide rail is fixed on the below of walked frame by bearing, and brush is arranged on revolution annulus, and drive belt walks around actuating device belt pulley set and revolution annulus successively, and clump weight is arranged on below revolution annulus.Revolution annulus is suspended to below annulus guide rail, installs 8 groups of walkings and track adjusting wheel is placed in upper surface and the inner surface of annulus guide rail respectively inside it, and 8 pole trolleys bend to a closed annulus, rely on support to be fixed on the top of annulus guide rail;
Annulus guide rail and the revolution annulus of described turning gear are welded by plurality of steel plates roll bending and process, and to diametric(al) depression 2mm in the middle part of revolution belt wheel outer ring, above has rib;
Described actuating device comprises connecting panel, reductor, belt pulley, swing arm, cylinder.Connecting panel upper surface uses screw to withstand walked frame downwards, and side uses screw to be fixed on walked frame side.Reductor, belt pulley, swing arm, cylinder are all arranged on connecting panel.
Described folder film device comprises folder film frame, swing arm cylinder, gear film cylinder, folder film cylinder, line slideway, transverse cylinder, swing arm, welding wire assembly, gear membrane arms, folder membrane arms, bearing pin.Folder film device is positioned at the side in the parallel travel line direction of walked frame, and folder film frame is positioned on two line slideways perpendicular to travel line direction; Gear membrane arms, swing arm and folder membrane arms are arranged on below folder film frame successively, and by a hinge in the middle part of three arms, the other end connects three difference cylindeies; Gear membrane arms is positioned at outermost below folder film frame, and near material one side, swing arm is taken second place, and folder membrane arms from material farthest; Welding wire assembly is arranged in swing arm, is in the centre of gear membrane arms and folder membrane arms;
Described welding wire assembly is made up of heater strip, screw rod, collets, cylinder guide rod, linear axis bearing, spring, nut etc., heater strip is arranged on collets by screw rod, linear axis bearing is arranged in swing arm, collets are connected with cylinder guide rod, cylinder guide rod is successively through spring and linear axis bearing, and cylinder guide rod end uses nut that spring is pushed down swing arm;
Described die set device is wrapped adapter plate, servomotor, Timing Belt wheels, tension bracket, lower installation board, is put film frame, film discharging roller, disconnected film detecting device, L shape flap, transition roller, jockey pulley, main draw roll, from draw roll.Film frame frame is bolted by upper mounting plate and left and right L shape flap and lower installation board to form, main draw roll, from draw roll, excessive roller, and jockey pulley, Duan Mo testing agency is installed in film frame frame, main draw roll and from draw roll surface use rough surface belt wrap up, main draw roll with from draw roll, all synchronous pulley is installed, excessive roller and the unpowered transmission of jockey pulley, servomotor is arranged on the left of mould bases frame, film discharging roller is arranged on mould bases frame lower right and puts on film frame, put film frame by a backward L-shaped bending plate with two piece 7, left and right letter stencil is hinged forms, two piece of 7 font flap relies on screw to be fixed on below upper plate.
The main draw roll of described die set device is 1.25: 1 with the diameter ratio from draw roll, on main draw roll synchronous pulley with from the transmitting ratio of draw roll synchronous pulley be 1: 2.
Described roller conveyor comprises roller conveyor frame, reductor, roller.Roller conveyor frame is welding structural element, places on ground.Reductor is installed on roller conveyor frame side, and roller is installed on above roller conveyor frame.In the middle part of roller conveyor, the width between centers of 6 rollers is 120mm, and the width between centers of all the other rollers is 90mm;
Described jacking apparatus comprises lifting platform, bottom extremely keeps off, fixing hinge, jacking apparatus base, fixing raising plate, movable top lift slab, guide plate, cylinder, oil cylinder, road wheel, guide plate block, middle part hinge, yoke.Jacking apparatus base is positioned on ground, inner two hinged fixed pin shafts in yoke one end support lifting platform in jacking apparatus base, one end installed rows travelling wheel, outside two hinged fixed pin shafts in yoke one end are in lifting platform, one end installed rows travelling wheel on jacking apparatus base, and middle part is hinged between two respectively for inner yoke and outside yoke.Oil cylinder one end is connected with jacking apparatus base, and one end connects in inner yoke.Lifting platform is provided with fixing raising plate and movable top lift slab, left and right cylinder each, cylinder piston rod end connecting guide plate, movable top lift slab is placed in the top of guide plate, and guide plate block is installed on the below of guide plate;
Substantive distinguishing features of the present utility model and marked improvement: bont imput shaft adopts four fulcrum supports, adopt the mid-driving of motor, optimize structure and reduce the diameter of axle; Adopt band counterweight to promote, reduce the energy consumption index promoted; Hold-down devices can ensure when packing that material can not topple and have an accident; Annulus turning gear is compacter than traditional L shape suspending arm rotary apparatus structure, and packaging is highly unrestricted, and speed of revolutions is faster, and packaging efficiency is higher; Die set device by film prestension to 250%, can reduce the use of consumptive material; The suspension mounting means of folder film device can not produce film tail when packing; Adopt paired brush to obtain power and communication signal in the 8 pole trolleys closed, can ensure that signal is without loss in operational process; Jacking material carries out packing and can rely on the tension force of film, to the parcel that the upper surface of material and lower surface are carried out to a certain degree.
Accompanying drawing explanation
Fig. 1 is vertical PE film device of full automatic packaging schematic diagram.In figure: 1-mainframe, 2-bont, 3-hold-down devices, 4-running gear, 5-turning gear, 6-actuating device, 7-presss from both sides film device, 8-die set device, 9-roller conveyor, 10-jacking apparatus.
Fig. 2 is the schematic diagram of mainframe.In figure: 101-main beam, 102-limiting stopper, the right gate-type composite beam of 103-, 104-limiting stopper, the auxiliary crossbeam of 105-, 106-left-hand door formula composite beam.
Fig. 3 is the schematic diagram of bont.In figure: 201-imput shaft, 202-clump weight, 203-counterweight track adjusting wheel, the excessive double chain wheel of 204-, 205-chain, the excessive single sprocket chain of 206-, 207-reductor, 208-rolling bearing units, 209-double chain wheel.
Fig. 4 is the schematic diagram of hold-down devices.In figure: air cylinder under 301-, 302-combines crossbeam, 303-trident linkage, 304-platen, 305-synchronizer gear, the upper parallel shafts of 306-, hinge in the middle part of 307-, parallel shafts under 308-.
Fig. 5 is the schematic diagram of running gear.In figure: 401-connects suspension rod, 402-walked frame, 403-interior lights spending frame, 404-track adjusting wheel, 405-deviation correcting device, 406-exterior light spending frame.
Fig. 6 is the schematic diagram of turning gear.In figure: 501-bearing, 502-annulus guide rail, 503-turns round annulus, 504-brush, 505-support, 506-8 pole trolley, 507-walking and track adjusting wheel, 507-drive belt, 508-clump weight.
Fig. 7 is the schematic diagram of actuating device.In figure: 601-belt pulley, 602-swing arm, 603-cylinder, 604-connecting panel, 605-reductor.
Fig. 8 is the schematic diagram of folder film device.In figure: 701-presss from both sides film frame, 702-swing arm cylinder, 703-keeps off film cylinder 704-and presss from both sides film cylinder, and 705-line slideway, 706-transverse cylinder, 707-swing arm, 708-welding wire assembly, 709-keeps off membrane arms, and 710-presss from both sides membrane arms, 711-bearing pin.
Fig. 9 is the schematic diagram of welding wire assembly.In figure: 712-cylinder guide rod, 713-collets, 714-heater strip, 715-screw rod, 716-spring, 717-linear bearing, 718-nut.
Figure 10, Figure 11 are the schematic diagram of film rack device.In figure: 801-upper mounting plate, 802-servomotor, 803-Timing Belt wheels, 804-tension bracket, 805-lower installation board, 806-puts film frame, 807-film discharging roller, and 808-breaks film detecting device, 809-L shape flap, 810-transition roller, 811-jockey pulley, the main draw roll of 812-, 813-is from draw roll.
Figure 12 is the schematic diagram of roller conveyor.In figure: 901-roller conveyor frame, 902-reductor, 903-roller.
Figure 13 is the schematic diagram of film rack device.In figure: 1001-lifting platform, the next dead gear of 1002-, 1003-fixes hinge, 1004-jacking apparatus base, 1005-fixes raising plate, 1006-movable top lift slab, 1007-guide plate, 1008-cylinder, 1009-oil cylinder, 1010-road wheel, 1011-guide plate block, hinge in the middle part of 1012-, 1013-yoke.
Detailed description of the invention
Fig. 1 ~ Figure 12 illustrates an embodiment of the present utility model.
As shown in Figure 1: vertical PE film device of full automatic packaging comprises 1-mainframe, 2-bont, 3-hold-down devices, 4-running gear, 5-turning gear, 6-actuating device, and 7-presss from both sides film device, 8-die set device, 9-roller conveyor, 10-jacking apparatus.In addition, necessary pneumatic system, hydraulic efficiency pressure system and autonomous cruise speed system composition is also comprised.Each system is connected in turn.
As shown in Figure 2: mainframe comprises 101-main beam, 102-upper limit position block, the right gate-type composite beam of 103-, 104-lower position block, the auxiliary crossbeam of 105-, 106-left-hand door formula composite beam.By 101-main beam, the right gate-type composite beam of 103-, the auxiliary crossbeam of 105-; the framework of 106-left-hand door formula composite beam composition; be the basis of load-bearing, be positioned on embedded board, 102-limiting stopper and 104-limiting stopper carry out upper protection and lowermost position protection to traveling gear respectively.
As shown in Figure 3: bont comprises 201-imput shaft, 202-clump weight, 203-counterweight track adjusting wheel, the excessive double chain wheel of 204-, 205-chain, the excessive single sprocket chain of 206-, 207-reductor, 208-rolling bearing units, 209-double chain wheel.201-imput shaft is arranged between two 101-main beams of 1-mainframe, and 207-reductor is arranged on position to the left in the middle part of 201-imput shaft.101-main beam two side adopts 208-rolling bearing units to support 201-imput shaft, and 209-double chain wheel is arranged in 201 imput shaft.205-chain is placed on 209-double chain wheel, the excessive double chain wheel of 204-, the excessive single sprocket chain of 206-, 205-chain left end hinge 202-clump weight, 202-clump weight is provided with 203-counterweight track adjusting wheel near the side of 106-left-hand door formula composite beam, and the 401-of the hinged 4-running gear of 205-chain right-hand member connects suspension rod.Rely on 207-reductor to drive, drive the 209-double chain wheel in 201-imput shaft to drive 4-running gear and 202-clump weight up-and-down movement.
As shown in Figure 4: hold-down devices comprises air cylinder under 301-, and 302-combines crossbeam, 303-trident linkage, 304-platen, 305-synchronizer gear, the upper parallel shafts of 306-, hinge in the middle part of 307-, parallel shafts under 308-.302-combines crossbeam and is arranged on 1-mainframe, and 301-presses down cylinder flange and is arranged on above 302-combination crossbeam.303-trident mechanism is installed on 302-and combines below crossbeam, and 303-trident mechanism upper articulation a pair 306-parallel shafts, bottom is hinged a pair 308-parallel shafts also.Two pairs of parallel shafts are respectively provided with a pair 305-synchronizer gear.In the middle part of 303-trident mechanism, 307-hinge is connected with 301-cylinder piston rod end, a pair, 303-trident mechanism bottom 308-parallel shafts and 304-platen hinged.Under 301-, in the middle part of air cylinder promotion 303-trident linkage, 307-hinge moves downward, and makes 304-platen push down nonwoven fabric roll.
As shown in Figure 5: running gear comprises 401-and connects suspension rod, 402-walked frame, 403-interior lights spending frame, 404-track adjusting wheel, 405-deviation correcting device, 406-exterior light spending frame.402-walked frame is the framed structure be welded by rectangle steel, is provided with 8 groups of 404-track adjusting wheels above and below 402-walked frame altogether.404-track adjusting wheel is adjustable eccentric structure, axle center is adjustable 5mm, can regulate the position of 402-walked frame in 1-mainframe like this.401-connects hanger erection above the surrounding of 402-walked frame, is connected with 205-chain.Under the driving of 205-chain, 402-walked frame can move up and down along 1-mainframe inside.403-interior lights spending frame, 406-exterior light spending frame, 405-deviation correcting device are arranged on below 402-walked frame.403-interior lights spending frame is for detecting the opportunity starting and terminate packaging, and 406-exterior light spending frame exceedes the distance of yardage roll upper surface for detecting film volume.405-deviation correcting device is used for carrying out correction protection to drive belt, drops to prevent drive belt.
As shown in Figure 6: turning gear comprises 501-bearing, 502-annulus guide rail, 503-turns round annulus, 504-brush, 505-support, 506-8 pole trolley, 507-walking and track adjusting wheel, 507-drive belt, 508-clump weight.502-annulus guide rail is fixed on the below of 402-walked frame by 501-bearing, 504-brush is arranged on 503-and turns round on annulus, 6-actuating device 601-belt pulley walked around successively by 507-drive belt and 503-turns round annulus, and 508-clump weight is arranged on 503-and turns round below annulus.503-turns round annulus and is suspended to below 502-annulus guide rail, upper surface and inner surface that 8 groups of 507-walking and track adjusting wheel are placed in 502-annulus guide rail are respectively installed inside it, 506-8 pole trolley bends to a closed annulus, relies on 505-support to be fixed on the top of 502-annulus guide rail.It is welded by plurality of steel plates roll bending and process that 502-annulus guide rail and 503-turn round annulus, to diametric(al) depression 2mm in the middle part of 503-revolution annulus outer ring, above has rib, can carry out auxiliary correction like this to 507-drive belt.When the 601-pulley rotation of 6-actuating device, just drive 503-to turn round annulus and turn round.504-brush is relied on to obtain power and communication signal during revolution in the 506-8 pole trolley closed.
As shown in Figure 7: actuating device comprises 601-belt pulley, 602-swing arm, 603-cylinder, 604-connecting panel, 605-reductor.601-connecting panel upper surface uses screw to withstand 402-walked frame downwards, and side uses screw to be fixed on 402-walked frame side.605-reductor, 601-belt pulley, 602-swing arm, 603-cylinder are all arranged on connecting panel.603-cylinder is arranged on one end of 602-swing arm, and adjustable cylinder pressure, to regulate the tensile force of belt, can carry out auto-tensioning to flat belt.
As shown in Figure 8: folder film device comprises 701-and presss from both sides film frame, 702-swing arm cylinder, and 703-keeps off film cylinder 704-and presss from both sides film cylinder, and 705-line slideway, 706-transverse cylinder, 707-swing arm, 708-welding wire assembly, 709-keeps off membrane arms, and 710-presss from both sides membrane arms, 711-bearing pin.7-presss from both sides the side that film device is positioned at the parallel travel line direction of 402-walked frame, and 701-presss from both sides film frame and is positioned over two perpendicular on the 705-line slideway in travel line direction; 709-keeps off membrane arms, 707-swing arm and 710 folder membrane arms and is arranged on successively below 701-folder film frame, and by 711-hinge in the middle part of three arms, the other end connects three difference cylindeies; 709-keeps off membrane arms and is positioned at outermost below 701-folder film frame, and near material one side, 707-swing arm is taken second place, and 710-presss from both sides membrane arms from material farthest.708-welding wire assembly is arranged in swing arm, is in the centre of 707-blocking arm and 710-folder membrane arms.702-swing arm cylinder, 703-keep off film cylinder, 704-presss from both sides the control 707-swing arm respectively of film cylinder, 709-keeps off membrane arms, 710 folder membrane arms, rely on combinative movement carry out the folder of film and put
As shown in Figure 9: welding wire assembly comprises: 712-cylinder guide rod, 713-collets, 714-heater strip, 715-screw rod, 716-spring, 717-linear bearing, 718-nut.714-heater strip is arranged on 713-collets by 715-screw rod, 717-linear bearing is arranged in 707-swing arm, 713-collets are connected with 712-cylinder guide rod, 712-cylinder guide rod is successively through 716-spring and 717 linear axis bearings, and 712-cylinder guide rod end uses 718-nut that spring is pushed down 707-swing arm; 714 heater strip positions keep off the centre of membrane arms and 710 folder membrane arms at 709-, rely on and are cut off by the film be clipped between gear membrane arms and jig arm to heater strip energising.
As shown in Figure 10,11: die set device comprises: 801-upper mounting plate, 802-servomotor, 803-synchronous pulley, 804-tension bracket, 805-lower installation board, 806-puts film frame, 807-film discharging roller, 808-breaks film detecting device, 809-L shape flap, 810-transition roller, 811-jockey pulley, the main draw roll of 812-, 813-is from draw roll.Film frame frame is bolted by 801-upper mounting plate and left and right 809-L shape flap and 805-lower installation board to form, the main draw roll of 812-, 813-is from draw roll, the excessive roller of 810-, and 811-jockey pulley, 808-Duan Mo testing agency is installed in film frame frame, 812-drive roll and 813-driven voller surface use rough surface belt to wrap up, the main draw roll of 812-and 813-are all provided with 803-synchronous pulley from draw roll, the excessive roller of 810-and the unpowered transmission of 811-jockey pulley, 802-servomotor is arranged on the left of mould bases frame, 807-film discharging roller is arranged on mould bases frame lower right 806-and puts on film frame, 806-puts film frame by a backward L-shaped bending plate with two piece 7, left and right letter stencil is hinged forms, two piece of 7 font flap relies on screw to be fixed on below upper plate.Film is pressed shown in Figure 10, draws from draw roll, the main draw roll of 812-, 810-transition roller through 811-jockey pulley, 813-.Under the transmission of 802-servomotor and 803-Timing Belt, by film prestension and send.The main draw roll of 812-and 813-are that on the main draw roll of 1.25: 1,812-, synchronous pulley and 813-are 1: 2 from the transmitting ratio of draw roll synchronous pulley from the diameter ratio of draw roll, and when can ensure that film is sent like this, prestension ratio is 250%.
As shown in figure 12: roller conveyor comprises 901-roller conveyor frame, 902-reductor, 903-roller.901-roller conveyor frame is welding structural element, places on ground.902-reductor is installed on 901-roller conveyor frame side, and 903-roller is installed on above roller conveyor frame.In the middle part of 9-roller conveyor, the width between centers of 6 903-rollers is 120mm, and the width between centers of all the other 903-rollers is 90mm, and the 1005-of 10-jacking apparatus can be allowed like this to fix raising plate and 1006-movable top lift slab through 9-roller machine.902-reductor drives 903-roller to carry yardage roll;
As shown in figure 13: jacking apparatus comprises 1001-lifting platform, the next dead gear of 1002-, 1003-fixes hinge, 1004-jacking apparatus base, 1005-fixes raising plate, 1006-movable top lift slab, 1007-guide plate, 1008-cylinder, 1009-oil cylinder, 1010-road wheel, 1011-guide plate block, hinge in the middle part of 1012-, 1013-yoke.1004-jacking apparatus base is positioned on ground, inner two hinged 1003-fixed pin shafts in 1013-yoke one end are installed 1010-road wheel support 1001-lifting platform in 1004-jacking apparatus base, one end, outside two hinged 1003-fixed pin shafts in 1013-yoke one end install 1010-road wheel on 1004-jacking apparatus base in 1001-lifting platform, one end, and middle part is hinged between two respectively for inner 1013-yoke and outside 1013-yoke.1009-oil cylinder one end is connected with 1004-jacking apparatus base, and one end connects in inner 1013-yoke.1001-lifting platform is provided with 1005-and fixes raising plate and 1006-movable top lift slab, left and right 1008-cylinder each one, 1008-cylinder piston rod end connects 1007-guide plate, 1006-movable top lift slab is placed in the top of 1007-guide plate, and 1011-guide plate block is installed on the below of 1007-guide plate.1009-oil cylinder pushing 1013-yoke can drive 10-jacking apparatus to hoist.Whether 1008-cylinder promotes 1007-orienting lug and can stretch out together with 1001-lifting platform by control 1006-movable top lift slab.
Operation flow process of the present utility model is as follows:
Yardage roll delivers to the center of vertical PE film device of full automatic packaging through 9-roller conveyor, and the 10-jacking apparatus below wrapping machine starts to hoist and to be risen by yardage roll, and the 3-hold-down devices simultaneously above wrapping machine starts to press down, until yardage roll is pushed down by 304-platen.After pushing down, 4-running gear starts to decline, and after 8-die set device drops to initial package position, 5-actuating device starts to drive 6-turning gear to turn round, thus drives the revolution of 8-die set device to pack.When packing initial, 7-presss from both sides the outermost that film device is positioned at line slideway, and away from material side, 709-keeps off membrane arms, 710-presss from both sides membrane arms, 707-swing arm is all in retracted state, namely parallel state of pressing from both sides film frame with 701-, now film is sandwiched in 710-and presss from both sides between membrane arms and 707-swing arm.After yardage roll winds with one circuit at a slow speed by film, 710-presss from both sides membrane arms and opens namely vertical state of pressing from both sides film frame with 701-at once, and now film pulls between 710-folder membrane arms and 707-swing arm.Film is pulled rear 710-and is pressed from both sides membrane arms returning quickly, after return, 6-turning gear starts fast rotation packaging, 2-bont drives 4-running gear and 8-die set device to move up and down one is simultaneously back and forth a packaging recycle, and the number of plies of yardage roll two end packaging and the number of times of circulation all can free settings.When after the packaging number of turns completing setting and the number of plies, 8-die set device gets back to initial package position again, and this position is also packaging stop bit simultaneously.When after the instruction assigning packaging end, 6-turning gear reduces speed now revolution, now 701-folder film frame starts transverse shifting near yardage roll, 709-gear membrane arms is stretched out and is in plumbness simultaneously, 709-keeps off in membrane arms and sensor is housed, and 701-presss from both sides after film frame can wait 709-gear membrane arms to press close to yardage roll and stops moving.8-die set device 709-can be kept off membrane arms when turning round at a slow speed and yardage roll is packaging together, but only only has a circle.710-presss from both sides membrane arms and to stretch out and vertical and 701-presss from both sides film frame direction subsequently, after 8-die set device gets back to mould bases initial bit again and stop revolution, 602-swing arm starts to stretch out, front end and the 709-of 602-swing arm keep off membrane arms and contact, rear end and the 710-of 602-swing arm press from both sides membrane arms and contact, and so just PE mould are kept off between membrane arms and 710-folder membrane arms at 709-.708-heater strip is equipped with at the middle part of 602-swing arm, cuts off after electrified regulation by being packaged in film unnecessary on yardage roll above, the film that reservation 710-folder membrane arms and 707-swing arm is simultaneously clamped.After all completing, 3-hold-down devices and 4-running gear rise simultaneously, and 602-swing arm and 710-press from both sides membrane arms and reclaim, and 709-keeps off membrane arms and is still in plumbness when 4-running gear rises, until 709-gear membrane arms return at once after extracting out from the PE film be wound.After 709-keeps off membrane arms return, 701-presss from both sides film frame and also starts transverse shifting away from yardage roll return.10-jacking apparatus starts to drive yardage roll to decline, until after 3-hold-down devices and 4-running gear all rise and put in place, after 10-jacking apparatus declines and puts in place, yardage roll is sent 9-conveying roller handset, the circulation of the cloth coil packing that is so just over.

Claims (5)

1. vertical PE film device of full automatic packaging, comprise mainframe, bont, hold-down devices, running gear, turning gear, actuating device, folder film device, film rack device, roller conveyor, jacking apparatus and autonomous cruise speed system, pneumatic system, hydraulic efficiency pressure system, mainframe is directly placed in ground base, bont and hold-down devices are installed on the left of equipment and top respectively, running gear hangs within mainframe, turning gear, actuating device, folder film device is installed on the bottom of running gear respectively, left side, inner, film rack device is installed on the bottom of turning gear, roller conveyor is positioned on mainframe ground, roller machine line of centers overlaps with the line of centers of turning gear, jacking apparatus is positioned over the below of roller conveyor, it is characterized in that:
The supporting leg of the right gate-type composite beam of described mainframe adopts square tubes soldering, and the supporting leg of left-hand door formula composite beam adopts the welding of clod wash channel-section steel; Main beam is positioned on right gate-type composite beam, left-hand door formula composite beam, and auxiliary crossbeam is positioned over below in the middle of right gate-type composite beam, left-hand door formula composite beam, relies on screw to connect; Upper limit position block is arranged on main beam, and lower position block is arranged on the composite beam of left and right;
The imput shaft of described bont is arranged between two main beams of mainframe, and reductor is arranged on position to the left in the middle part of imput shaft; Main beam two side adopts rolling bearing units to support imput shaft, and double chain wheel is arranged in imput shaft; Chain is placed on double chain wheel, excessively double chain wheel, excessively single sprocket chain, chain left end hinge clump weight, and clump weight is provided with counterweight track adjusting wheel near the side of left-hand door formula composite beam, the connection suspension rod of chain right-hand member articulated walking device;
The combination crossbeam of described hold-down devices is arranged on mainframe, presses down cylinder flange and is arranged on above combination crossbeam; Trident mechanism is installed on below combination crossbeam, the pair of parallel axle of trident mechanism upper articulation, and bottom is hinged pair of parallel axle also; Two pairs of parallel shafts are respectively provided with a pair synchronizer gear; In the middle part of trident mechanism, a hinge is connected with cylinder piston rod end, the pair of parallel axle in trident mechanism bottom and platen hinged;
The walked frame of described running gear is the framed structure be welded by rectangle steel, is provided with 8 groups of track adjusting wheels altogether above and below walked frame, connects hanger erection above the surrounding of walked frame; Interior lights spending frame, exterior light spending frame, deviation correcting device are arranged on below walked frame;
The annulus guide rail of described turning gear is fixed on the below of walked frame by bearing, brush is arranged on revolution annulus, and drive belt walks around actuating device belt pulley set and revolution annulus successively, and clump weight is arranged on below revolution annulus; Revolution annulus is suspended to below annulus guide rail, installs 8 groups of walkings and track adjusting wheel is placed in upper surface and the inner surface of annulus guide rail respectively inside it, and 8 pole trolleys bend to a closed annulus, rely on support to be fixed on the top of annulus guide rail;
The connecting panel upper surface of described actuating device uses screw to withstand walked frame downwards, and side uses screw to be fixed on walked frame side; Reductor, belt pulley, swing arm, cylinder are all arranged on connecting panel;
Described folder film device is positioned at the side in the parallel travel line direction of walked frame, and folder film frame is positioned on two line slideways perpendicular to travel line direction; Gear membrane arms, swing arm and folder membrane arms are arranged on below folder film frame successively, and by a hinge in the middle part of three arms, the other end connects three difference cylindeies; Gear membrane arms is positioned at outermost below folder film frame, and near material one side, swing arm is taken second place, and folder membrane arms from material farthest; Welding wire assembly is arranged in swing arm, is in the centre of gear membrane arms and folder membrane arms;
The film frame frame of described film rack device is bolted by upper mounting plate and left and right L-type flap and lower installation board to form, main draw roll, from draw roll, excessive roller, and jockey pulley, Duan Mo testing agency is installed in film frame frame, main draw roll and from draw roll surface use rough surface belt wrap up, main draw roll with from draw roll, all synchronous pulley is installed, excessive roller and the unpowered transmission of jockey pulley, servomotor is arranged on the left of mould bases frame, film discharging roller is arranged on mould bases frame lower right and puts on film frame, put film frame by a reverse L type bending plate with two piece 7, left and right letter stencil is hinged forms, two piece of 7 font flap relies on screw to be fixed on below upper plate,
The jacking apparatus base of described lifting body is positioned on ground, inner two hinged fixed pin shafts in yoke one end support lifting platform in jacking apparatus base, one end installed rows travelling wheel, outside two hinged fixed pin shafts in yoke one end are in lifting platform, one end installed rows travelling wheel on jacking apparatus base, and middle part is hinged between two respectively for inner yoke and outside yoke; Oil cylinder one end is connected with jacking apparatus base, and one end connects in inner yoke; Lifting platform is provided with fixing raising plate and movable top lift slab, left and right cylinder each, cylinder piston rod end connecting guide plate, movable top lift slab is placed in the top of guide plate, and guide plate block is installed on the below of guide plate.
2. vertical PE film device of full automatic packaging according to claim 1, it is characterized in that: roller conveyor comprises roller conveyor frame, reductor, roller, roller conveyor frame is welding structural element, is positioned on ground; Reductor is installed on roller machine frame side, and roller is installed on the top of roller conveyor frame;
3. according to the vertical PE film device of full automatic packaging of claim 1 or 2, it is characterized in that: annulus guide rail and the revolution annulus of described turning gear are welded by plurality of steel plates roll bending and process, to diametric(al) depression 2mm in the middle part of revolution belt wheel outer ring, above have rib.
4. according to the vertical PE film device of full automatic packaging of claim 1 or 2, it is characterized in that: the drive roll of described film rack device and the diameter of driven voller are than being 1.25:1, and on drive roll, the transmitting ratio of synchronous pulley and driven voller synchronous pulley is 1:2.
5. vertical PE film device of full automatic packaging according to claim 2, is characterized in that: in the middle part of roller conveyor, the width between centers of 6 rollers is 120mm, and the width between centers of all the other rollers is 90mm.
CN201420714020.0U 2014-11-25 2014-11-25 Vertical PE film device of full automatic packaging Withdrawn - After Issue CN204415782U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420714020.0U CN204415782U (en) 2014-11-25 2014-11-25 Vertical PE film device of full automatic packaging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420714020.0U CN204415782U (en) 2014-11-25 2014-11-25 Vertical PE film device of full automatic packaging

Publications (1)

Publication Number Publication Date
CN204415782U true CN204415782U (en) 2015-06-24

Family

ID=53466172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420714020.0U Withdrawn - After Issue CN204415782U (en) 2014-11-25 2014-11-25 Vertical PE film device of full automatic packaging

Country Status (1)

Country Link
CN (1) CN204415782U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104401522A (en) * 2014-11-25 2015-03-11 长沙长泰机械股份有限公司 Full-automatic vertical PE (Poly Ethylene) film packaging machine
CN107839918A (en) * 2017-10-31 2018-03-27 大连佳林设备制造有限公司 The online winding-packing machine of full-automatic cantilever

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104401522A (en) * 2014-11-25 2015-03-11 长沙长泰机械股份有限公司 Full-automatic vertical PE (Poly Ethylene) film packaging machine
CN104401522B (en) * 2014-11-25 2016-08-24 长沙长泰智能装备有限公司 Vertical PE film device of full automatic packaging
CN107839918A (en) * 2017-10-31 2018-03-27 大连佳林设备制造有限公司 The online winding-packing machine of full-automatic cantilever

Similar Documents

Publication Publication Date Title
CN104401522B (en) Vertical PE film device of full automatic packaging
CN205253735U (en) Push away steel formula steel billet material loading rack
CN103112612A (en) Ceramic tile automatic packaging production line
CN201961883U (en) Special delivery device for automatic die cutting and stamping machines
CN201633939U (en) Folding machine
CN204415782U (en) Vertical PE film device of full automatic packaging
CN201446365U (en) Welding platform conveying device
CN101885424B (en) Hanging basket stacking machine
CN201530630U (en) Steel coil delivering trolley for full-automatic decoiling machine
CN101758417B (en) Steel pipe blanking frame capable of automatically reducing noise
CN101642887B (en) Transferring platform of glass edge grinding machine
CN101863324A (en) Folder
CN106629166A (en) Automotive glass heat-insulating film winding device
CN203512567U (en) Laundry detergent chain board conveyor
CN101428678B (en) Transverse bottom draw-in apparatus in boat body plane section product line
CN210756251U (en) Intelligent full-automatic bearing press-mounting machine
CN110814732A (en) Automatic frame overturning machine
CN203124974U (en) Self-driving type walking lifting device
CN206392850U (en) Die filling mechanism for automatic die-filling dolly
CN211971630U (en) Accompanying side jacking machine lifting mechanism matched with plate chain conveying line
CN207609228U (en) Vehicle-carrying plate transverse-moving mechanism based on vertically displaceable parking apparatus
CN202272494U (en) Yarn group carrier for bobbin winder
CN112338497A (en) Intelligent full-automatic bearing press-mounting machine
CN102249015B (en) Side-mounted Automatic change film weather screen wrapping machine
CN201376794Y (en) Movable type belt loading conveyor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 410116 Hunan province Changsha Yuhua Economic Development Zone emerging Road No. 268

Patentee after: CHANGSHA CHAINT MACHINERY CO., LTD.

Address before: 410117 No. 118 Xinxing Road, Changsha environmental protection science and Technology Park, Hunan, China

Patentee before: Changsha Chaint Machinery Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20150624

Effective date of abandoning: 20160824

C25 Abandonment of patent right or utility model to avoid double patenting