CN204407813U - A kind of GIS device bus bar canister end and long draw bracing or strutting arrangement - Google Patents

A kind of GIS device bus bar canister end and long draw bracing or strutting arrangement Download PDF

Info

Publication number
CN204407813U
CN204407813U CN201520011680.7U CN201520011680U CN204407813U CN 204407813 U CN204407813 U CN 204407813U CN 201520011680 U CN201520011680 U CN 201520011680U CN 204407813 U CN204407813 U CN 204407813U
Authority
CN
China
Prior art keywords
annulus
bus bar
annulus card
card
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520011680.7U
Other languages
Chinese (zh)
Inventor
王志惠
何喜梅
杨小库
赵德祥
李军
陈文强
李玉海
钱建华
张海宁
康均
刘高飞
李生平
王鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Qinghai Electric Power Co Ltd, Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520011680.7U priority Critical patent/CN204407813U/en
Application granted granted Critical
Publication of CN204407813U publication Critical patent/CN204407813U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a kind of GIS device bus bar canister end and long draw bracing or strutting arrangement, specifically relates to transformer station 110kV and 330kV GIS bus bar canister device support device.Pull bar described in the utility model is fixed on outside main bus bar transition bus cylinder along main bus bar transition bus cylinder is axially uniform, pull bar termination fixed head is fixed in bus bar canister end flange through the bus bar canister end cap fastener hole that pull bar termination fixed head is arranged by bus bar canister bolt of cover, pull bar through the tie rod hole on the fixed head of pull bar termination by nut on the screw thread of tie rod end; Described end bracing or strutting arrangement comprises flange beam stand, flange beam stand end diagonal bar, flange beam stand sidepiece diagonal bar, flange beam stand base.The utility model has installed pull bar additional at main bus bar transition bus cylinder, and installed end support additional in transition bus cylinder end, bus bar canister is out of shape greatly reduce, and improve the stable operation degree of electrical network, for Qinghai Area expanding economy, social stability serve impetus, its stealthy economic benefit is very huge.

Description

A kind of GIS device bus bar canister end and long draw bracing or strutting arrangement
Technical field
The utility model relates to technical field of electric power transmission, specifically relates to transformer station 110kV and 330kV GIS bus bar canister device support device.
Background technology
In existing 330kV transformer station 110kV and 330kV GIS bus bar canister equipment use, find that the weld seam of 330kV GIS bus bar canister and supporting leg exists anti-thread breakage defect, some GIS bus bar canister supporting leg crackles have ftractureed to GIS bus bar canister body, have influence on bus bar canister body, weld cracking have impact on the safe operation of equipment greatly.330kV transformer station 110kV GIS device breaker interval bus bar canister and support junction weld cracking is even had to cause bus bar canister SF6 gas leakage.
Testing result shows, crackle generally all appears at the joint edge of supporting leg and barrel soldering along sharp corner position, this mainly contains the reason of two aspects, one be welding sharp corner easily produce stress concentrate, two is from adopted supporting construction, when bus bar canister one end is subject to thrust or pulling force, supporting leg supporting bracket, reinforcement gusset and bus bar canister welding position weld edge stress are maximum, and this position easily occurs fatigue crack; This expands with heat and contract with cold because bus bar canister produces when variations in temperature, and supporting leg is fixed on its deflection of ground and is less than bus bar canister body deformability amount and the axial stress that produces; Strengthen gusset to weld vertically with bus bar canister welding position weld seam, therefore stressed maximum, the crackle that this position of Site Detection occurs is also more, particularly in the end of bus bar canister.More easily there is crackle in the barrel support weld at the most two ends of the regularity of distribution of cracking defect in GIS device, these defects not only affect the safe operation of GIS device, and weld cracking causes bus bar canister SF6 gas leakage also can cause serious security incident.
Summary of the invention
The technical problems to be solved in the utility model is the deficiency existed for prior art, provides a kind of and installs for power failure GIS device the GIS device bus bar canister end and long draw bracing or strutting arrangement that bus bar canister end supports and long draw supports additional.
A kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement are achieved by following technical proposals: a kind of GIS device bus bar canister end and long draw bracing or strutting arrangement comprise long draw bracing or strutting arrangement and end bracing or strutting arrangement, described long draw bracing or strutting arrangement comprises main bus bar transition bus cylinder, pull bar, bus bar canister end flange, pull bar termination fixed head, transition bus cylinder pull bar termination fixed head, described pull bar is fixed on outside main bus bar transition bus cylinder along main bus bar transition bus cylinder is axially uniform, pull bar termination fixed head is fixed in bus bar canister end flange through the bus bar canister end cap fastener hole that pull bar termination fixed head is arranged by bus bar canister bolt of cover, pull bar through the tie rod hole on the fixed head of pull bar termination by nut on the screw thread of tie rod end, described end bracing or strutting arrangement comprises flange beam stand, flange beam stand end diagonal bar, flange beam stand sidepiece diagonal bar, flange beam stand base, being arranged on end first, annulus card is bolted fixing with upper left, the end first annulus fastener hole be arranged on the left annulus card of end first, being arranged on the annulus card of first time, end is bolted fixing with lower-left, the end first annulus card fastener hole be arranged on the left annulus card of end first, being arranged on the left annulus card of end second is bolted fixing with upper left, the end second annulus card fastener hole be arranged on end second on annulus card, being arranged on the left annulus card of end second is bolted fixing with lower-left, the end second annulus card fastener hole be arranged on the annulus card of second time, end, the end first upper right annulus fastener hole be arranged on end first on annulus card and on the first right annulus card is bolted fixing, being arranged on the right annulus card of end second is bolted fixing with bottom right, the end first annulus fastener hole be arranged on end second on annulus card, being arranged on the annulus card of first time, end and being arranged on the right annulus card of end first is bolted fixing with the second upper right annulus fastener hole, being arranged on second time annulus card is bolted fixing with the second bottom right annulus fastener hole on the second right annulus card, annulus card on described end first, first time, end annulus card, end first left annulus card, the right annulus card in end first are arranged on the inner side of bus bar canister end flange, and annulus card on described end second left annulus card, the right annulus card in end second, end second, second time, end annulus card are arranged on the outside of bus bar canister end flange, fixing hole on the flange beam stand being arranged on flange beam stand upper end, to be arranged on first on end first on annulus card annulus fixing hole and to be arranged on annulus on second on end second on annulus card and fasten hole and be connected and fixed by spacer bolt, be arranged on the flange beam stand lower fixed hole of flange beam stand lower end, the second time annulus be arranged on the annulus card of second time, end fastens hole and the first time annulus be arranged on the annulus card of first time, end is fastened hole and be connected and fixed by spacer bolt.
A kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement have following beneficial effect compared with prior art: according to current DianKeYuan result of detection, the free state of scene each interval supporting leg in complete man-hour and underframe attachment screw, consider that the later stage (January ~ February) when temperature is minimum adds parallels to strengthen the stressing conditions of end support to the support of end part interval simultaneously, it is reasonable that the utility model 110kV GIS bus supports reinforced work design theory, construction quality management and control puts in place, solve 110kV GIS bus supporting leg crack problem, reach Expected Results.The utility model first temperature close to when 20 DEG C by tightly trivial for bellows two ends nut, and bus air chamber gas is reclaimed on-the-spot, install pull bar additional again, strengthen the strength and stiffness of end part interval bus bar canister bearing (hold-down support), secondly different according to ambient temperature, regulate the regulated quantity of bellows each section of pull bar inner corrugated pipe to carry out in-situ processing, and termination support is added to 110kVGIS equipment.By the research to on-the-spot GIS device bus bar canister bead crack mechanism, propose first to fully utilize the lossless detection methods such as ultrasonic wave, eddy current, infiltration, power grid GIS equipment weld cracking is detected, effectively can detect weld cracking and accurate depth survey is carried out to cracking; In order to the on-the-spot Non-Destructive Testing of specification, make Q/QDL10-14025-2012 " Cubicle Gas-Insulated Switchgear cylindrical shell weld seam eddy detection technology directive/guide " in order to guide field testing.
By to the distribution form of crackle field monitoring, crackle, the research of mechanism of production and finite element analysis, show that the bellows that GIS device is installed is in failure state; The bus bar canister of termination is because only having while be subject to stress that variations in temperature causes and blind flange force, and therefore its supporting leg weld seam more easily occurs crackle.
By the regularity of distribution of a large amount of finite element analyses, calculating and on-the-spot crackle, work out the measures to rectify and reform of Qinghai Power Grid High aititude, the temperature difference large, long bus 110kVGIS equipment bus bar canister equipment cracking exception, modification scheme is proposed to the type selecting of Qinghai Power Grid GIS device and the design and installation of bellows from now on.
Measures to rectify and reform for power failure 110kVGIS equipment first on bus bar canister, install pull bar additional; And according to ambient temperature, regulate the regulated quantity of each section of pull bar inner corrugated pipe; Secondly add end to equipment to support.Install and carry out preferably winter because now cylindrical shell reduces, after bracing or strutting arrangement is fastening to summer be heated rise after time support be stretching, can effectively control cylindrical shell and appliance feet distortion.
The utility model has installed pull bar additional at main bus bar transition bus cylinder, and installed end support additional in transition bus cylinder end, bus bar canister is out of shape greatly reduce, and improve the stable operation degree of electrical network, for Qinghai Area expanding economy, social stability serve impetus, its stealthy economic benefit is very huge.
Accompanying drawing explanation
A kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement have following accompanying drawing:
Fig. 1 is a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement pull bar mounting structure schematic diagram;
Fig. 2 is a kind of GIS device bus bar canister end of the utility model and the main TV structure schematic diagram of long draw bracing or strutting arrangement pull bar termination stationary state;
Fig. 3 is a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement pull bar termination stationary state backsight structural representation;
Fig. 4 is a kind of GIS device bus bar canister end of the utility model and termination, long draw bracing or strutting arrangement pull bar both sides fixed plate structure schematic diagram;
Fig. 5 is that a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement pull bar fixedly mount main TV structure schematic diagram;
Fig. 6 is a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement pull bar fixed installation backsight structural representation;
Fig. 7 is a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement transition bus cylinder pull bar fixed plate structure schematic diagram;
Fig. 8 is that a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement end support mounting structure schematic diagram;
Fig. 9 is a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement end support-side TV structure schematic diagram;
Figure 10 is a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement end support structure schematic diagram;
Figure 11 is that a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement end support embodiment 2 structural representation.
Wherein 1, main bus bar transition bus cylinder; 2, pull bar; 3, bus bar canister end flange; 4, pull bar termination fixed head; 5, transition bus cylinder pull bar termination fixed head; 6, annulus card on end first; 7, first time, end annulus card; 8, the left annulus card in end first; 9, the right annulus card in end first; 10, bus bar canister end flange; 11, the left annulus card in end second; 12, the right annulus card in end second; 13, annulus card on end second; 14, second time, end annulus card; 15, flange beam stand; 16, flange beam stand end diagonal bar; 17, flange beam stand sidepiece diagonal bar; 18, flange beam stand base; 19, fixing hole on flange beam stand; 20, annulus fixing hole on end first; 21, flange beam stand lower fixed hole; 22, second time, end annulus fastens hole; 23, first time, end annulus fastens hole; 24, on end second, annulus fastens hole; 25, upper left, end first annulus card fastener hole; 26, lower-left, end first annulus card fastener hole; 27, upper left, end second annulus card fastener hole; 28, lower-left, end second annulus card fastener hole; 29, end first upper right annulus card fastener hole; 30, bottom right, end first annulus card fastener hole; 31, end second upper right annulus card fastener hole; 32, bottom right, end second annulus card fastener hole; 33, flange in right bus bar canister; 34, grooved parallels on first; 35, longitudinal rein forcement on first; 36, grooved parallels on second; 37, reinforcement on second; 38, first time grooved parallels; 39, first time reinforcement; 40, second time grooved parallels; 41, second time reinforcement; 42, spacer bolt; 43, bus bar canister end cap fastener hole; 44, bus bar canister bolt of cover; 45, tie rod hole.
Embodiment
Below in conjunction with drawings and Examples, a kind of GIS device bus bar canister end of the utility model and long draw bracing or strutting arrangement technical scheme are further described.
As Figure 1-Figure 11, a kind of GIS device bus bar canister end and long draw bracing or strutting arrangement comprise long draw bracing or strutting arrangement and end bracing or strutting arrangement, described long draw bracing or strutting arrangement comprises main bus bar transition bus cylinder 1, pull bar 2, bus bar canister end flange 3, pull bar termination fixed head 4, transition bus cylinder pull bar termination fixed head 5, described pull bar 2 is fixed on outside main bus bar transition bus cylinder 1 along main bus bar transition bus cylinder 1 is axially uniform, pull bar termination fixed head 4 is fixed in bus bar canister end flange 3 through the bus bar canister end cap fastener hole 43 that pull bar termination fixed head 4 is arranged by bus bar canister bolt of cover 44, pull bar 2 through the tie rod hole 45 on the fixed head of pull bar termination by nut on the screw thread of pull bar 2 end, described end bracing or strutting arrangement comprises flange beam stand 15, flange beam stand end diagonal bar 16, flange beam stand sidepiece diagonal bar 17, flange beam stand base 18, being arranged on end first, annulus card 6 is bolted fixing with upper left, the end first annulus fastener hole 25 be arranged on end first left annulus card 8, being arranged on the annulus card 7 of first time, end is bolted fixing with lower-left, the end first annulus card fastener hole 26 be arranged on end first left annulus card 8, being arranged on end second left annulus card 11 is bolted fixing with upper left, the end second annulus card fastener hole 27 be arranged on end second on annulus card 13, being arranged on end second left annulus card 11 is bolted fixing with lower-left, the end second annulus card fastener hole 28 be arranged on the annulus card 14 of second time, end, the end first upper right annulus fastener hole 29 be arranged on end first on annulus card 6 and on the first right annulus card 9 is bolted fixing, being arranged on end second right annulus card 12 is bolted fixing with bottom right, the end first annulus fastener hole 30 be arranged on end second on annulus card 13, being arranged on the annulus card 7 of first time, end and being arranged on end first right annulus card 9 is bolted fixing with the second upper right annulus fastener hole 31, being arranged on second time annulus card 14 is bolted fixing with the second bottom right annulus fastener hole 32 on the second right annulus card 12, annulus card 6 on described end first, first time, end annulus card 7, end first left annulus card 8, the right annulus card 9 in end first are arranged on the inner side of bus bar canister end flange 10, and annulus card 13 on described end second left annulus card 11, the right annulus card 12 in end second, end second, second time, end annulus card 14 are arranged on the outside of bus bar canister end flange 10, fixing hole 19 on the flange beam stand being arranged on flange beam stand 15 upper end, to be arranged on first on end first on annulus card 6 annulus fixing hole 20 and to be arranged on annulus on second on end second on annulus card 13 and fasten hole 24 and be connected and fixed by spacer bolt, be arranged on the flange beam stand lower fixed hole 21 of flange beam stand 15 lower end, the second time annulus be arranged on the annulus card 14 of second time, end fastens hole 22 and the first time annulus be arranged on the annulus card 7 of first time, end is fastened hole 23 and be connected and fixed by spacer bolt 42.As Figure 1-Figure 8.
Further, described pull bar 2 is fixed on outside main bus bar transition bus cylinder 1 along main bus bar transition bus cylinder 1 is axially uniform, pull bar termination fixed head 4 is fixed in bus bar canister end flange 3 through the bus bar canister end cap fastener hole 46 that transition bus cylinder pull bar termination fixed head 5 is arranged by bus bar canister bolt of cover 44, pull bar 2 through the tie rod hole 45 on transition bus cylinder pull bar termination fixed head 5 by nut on the screw thread of pull bar 2 end.
Further, described pull bar 2 length is equal with bus bar canister length.As Figure 1-Figure 5.
Further, described end bracing or strutting arrangement to arrange on first flute profile parallels 36 on flute profile parallels 34 and second on end first between annulus card 6 and flange beam stand 15 upper end, arrange first time flute profile parallels 38 and second time flute profile parallels 40 between first time, end annulus card 7 and flange beam stand 15 lower end.
Further, on described first, flute profile parallels 34 longitudinally arranges longitudinal rein forcement 35 on first, on second, flute profile parallels 36 longitudinally arranges longitudinal rein forcement 37 on second, described first time flute profile parallels 38 longitudinally arranges first time longitudinal rein forcement 39, and described second time flute profile parallels 40 longitudinally arranges second time longitudinal rein forcement 41.
Further, annulus card 6 and end second adopt spacer bolt 42 to be fastenedly connected between annulus card 13 in described end first, between first time, described end annulus card 7 and second time, end annulus card 14, adopts spacer bolt 42 to be fastenedly connected.As shown in Figure 9.
Embodiment 1.
Described pull bar 2 is fixed on outside main bus bar transition bus cylinder 1 along main bus bar transition bus cylinder 1 is axially uniform, pull bar termination fixed head 4 is fixed in bus bar canister end flange 3 through the bus bar canister end cap fastener hole 43 that pull bar termination fixed head 4 is arranged by bus bar canister bolt of cover 44, pull bar 2 through the tie rod hole 45 on the fixed head of pull bar termination by nut on the screw thread of pull bar 2 end; described end bracing or strutting arrangement comprises flange beam stand 15, flange beam stand end diagonal bar 16, flange beam stand sidepiece diagonal bar 17, flange beam stand base 18, being arranged on end first, annulus card 6 is bolted fixing with upper left, the end first annulus fastener hole 25 be arranged on end first left annulus card 8, being arranged on the annulus card 7 of first time, end is bolted fixing with lower-left, the end first annulus card fastener hole 26 be arranged on end first left annulus card 8, being arranged on end second left annulus card 11 is bolted fixing with upper left, the end second annulus card fastener hole 27 be arranged on end second on annulus card 13, being arranged on end second left annulus card 11 is bolted fixing with lower-left, the end second annulus card fastener hole 28 be arranged on the annulus card 14 of second time, end, the end first upper right annulus fastener hole 29 be arranged on end first on annulus card 6 and on the first right annulus card 9 is bolted fixing, being arranged on end second right annulus card 12 is bolted fixing with bottom right, the end first annulus fastener hole 30 be arranged on end second on annulus card 13, being arranged on the annulus card 7 of first time, end and being arranged on end first right annulus card 9 is bolted fixing with the second upper right annulus fastener hole 31, being arranged on second time annulus card 14 is bolted fixing with the second bottom right annulus fastener hole 32 on the second right annulus card 12, annulus card 6 on described end first, first time, end annulus card 7, end first left annulus card 8, the right annulus card 9 in end first are arranged on the inner side of bus bar canister end flange 10, and annulus card 13 on described end second left annulus card 11, the right annulus card 12 in end second, end second, second time, end annulus card 14 are arranged on the outside of bus bar canister end flange 10, fixing hole 19 on the flange beam stand being arranged on flange beam stand 15 upper end, to be arranged on first on end first on annulus card 6 annulus fixing hole 20 and to be arranged on annulus on second on end second on annulus card 13 and fasten hole 24 and be connected and fixed by spacer bolt, be arranged on the flange beam stand lower fixed hole 21 of flange beam stand 15 lower end, the second time annulus be arranged on the annulus card 14 of second time, end fastens hole 22 and the first time annulus be arranged on the annulus card 7 of first time, end is fastened hole 23 and be connected and fixed by spacer bolt 42.
Embodiment 2.
Preferably, described pull bar 2 is fixed on outside main bus bar transition bus cylinder 1 along main bus bar transition bus cylinder 1 is axially uniform, pull bar termination fixed head 4 is fixed in bus bar canister end flange 3 through the bus bar canister end cap fastener hole 46 that transition bus cylinder pull bar termination fixed head 5 is arranged by bus bar canister bolt of cover 44, pull bar 2 through the tie rod hole 45 on transition bus cylinder pull bar termination fixed head 5 by nut on the screw thread of pull bar 2 end.
Preferably, described end bracing or strutting arrangement to arrange on first flute profile parallels 36 on flute profile parallels 34 and second on end first between annulus card 6 and flange beam stand 15 upper end, arrange first time flute profile parallels 38 and second time flute profile parallels 40 between first time, end annulus card 7 and flange beam stand 15 lower end.
Preferably, on described first, flute profile parallels 34 longitudinally arranges longitudinal rein forcement 35 on first, on second, flute profile parallels 36 longitudinally arranges longitudinal rein forcement 37 on second, described first time flute profile parallels 38 longitudinally arranges first time longitudinal rein forcement 39, and described second time flute profile parallels 40 longitudinally arranges second time longitudinal rein forcement 41.
Preferably, annulus card 6 and end second adopt spacer bolt 42 to be fastenedly connected between annulus card 13 in described end first, between first time, described end annulus card 7 and second time, end annulus card 14, adopts spacer bolt 42 to be fastenedly connected.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection range of the present utility model.

Claims (6)

1. a GIS device bus bar canister end and long draw bracing or strutting arrangement, comprise long draw bracing or strutting arrangement and end bracing or strutting arrangement, it is characterized in that: described long draw bracing or strutting arrangement comprises main bus bar transition bus cylinder (1), pull bar (2), bus bar canister end flange (3), pull bar termination fixed head (4), transition bus cylinder pull bar termination fixed head (5), described pull bar (2) is fixed on main bus bar transition bus cylinder (1) outside along main bus bar transition bus cylinder (1) is axially uniform, pull bar termination fixed head (4) is fixed in bus bar canister end flange (3) through the upper bus bar canister end cap fastener hole (43) arranged in pull bar termination fixed head (4) by bus bar canister bolt of cover (44), pull bar (2) through the tie rod hole (45) on the fixed head of pull bar termination by nut on the screw thread of pull bar (2) end, described end bracing or strutting arrangement comprises flange beam stand (15), flange beam stand end diagonal bar (16), flange beam stand sidepiece diagonal bar (17), flange beam stand base (18), being arranged on annulus card (6) and the upper left, end first annulus fastener hole (25) be arranged on end first left annulus card (8) on end first is bolted fixing, being arranged on the upper and lower-left, end first annulus card fastener hole (26) be arranged on end first left annulus card (8) of first time, end annulus card (7) is bolted fixing, being arranged on the upper and upper left, end second annulus card fastener hole (27) be arranged on end second on annulus card (13), end second left annulus card (11) is bolted fixing, being arranged on the upper and lower-left, end second annulus card fastener hole (28) be arranged on the annulus card (14) of second time, end, end second left annulus card (11) is bolted fixing, being arranged on the end first upper right annulus fastener hole (29) of annulus card (6) above and on the first right annulus card (9) on end first is bolted fixing, being arranged on the upper and bottom right, end first annulus fastener hole (30) be arranged on end second on annulus card (13), end second right annulus card (12) is bolted fixing, being arranged on the annulus card (7) of first time, end and being arranged on end first right annulus card (9) is above bolted fixing with the second upper right annulus fastener hole (31), being arranged on second time second bottom right annulus fastener hole (32) of annulus card (14) above and on the second right annulus card (12) is bolted fixing, annulus card (6) on described end first, first time, end annulus card (7), end first left annulus card (8), the right annulus card (9) in end first are arranged on the inner side of bus bar canister end flange (10), and annulus card (13) on described end second left annulus card (11), the right annulus card (12) in end second, end second, second time, end annulus card (14) are arranged on the outside of bus bar canister end flange (10), fixing hole (19) on the flange beam stand being arranged on flange beam stand (15) upper end, to be arranged on first on end first on annulus card (6) annulus fixing hole (20) and to be arranged on annulus on second on end second on annulus card (13) and fasten hole (24) and be connected and fixed by spacer bolt, be arranged on the flange beam stand lower fixed hole (21) of flange beam stand (15) lower end, the second time annulus be arranged on the annulus card (14) of second time, end fastens hole (22) and the first time annulus be arranged on the annulus card (7) of first time, end is fastened hole (23) and be connected and fixed by spacer bolt (42).
2. GIS device bus bar canister end according to claim 1 and long draw bracing or strutting arrangement, it is characterized in that: described pull bar (2) is fixed on main bus bar transition bus cylinder (1) outside along main bus bar transition bus cylinder (1) is axially uniform, pull bar termination fixed head (4) is fixed in bus bar canister end flange (3) through the upper bus bar canister end cap fastener hole (46) arranged in transition bus cylinder pull bar termination fixed head (5) by bus bar canister bolt of cover (44), pull bar (2) through the tie rod hole (45) on transition bus cylinder pull bar termination fixed head (5) by nut on the screw thread of pull bar (2) end.
3. GIS device bus bar canister end according to claim 1 and long draw bracing or strutting arrangement, is characterized in that: described pull bar (2) length is equal with bus bar canister length.
4. GIS device bus bar canister end according to claim 1 and long draw bracing or strutting arrangement, it is characterized in that: described end bracing or strutting arrangement to arrange on first flute profile parallels (36) on flute profile parallels (34) and second on end first between annulus card (6) and flange beam stand (15) upper end, arrange first time flute profile parallels (38) and second time flute profile parallels (40) between first time, end annulus card (7) and flange beam stand (15) lower end.
5. the GIS device bus bar canister end according to claim 2 or 4 and long draw bracing or strutting arrangement, it is characterized in that: on described first, flute profile parallels (34) longitudinally arranges longitudinal rein forcement on first (35), on second, flute profile parallels (36) longitudinally arranges longitudinal rein forcement on second (37), described first time flute profile parallels (38) longitudinally arranges first time longitudinal rein forcement (39), and described second time flute profile parallels (40) longitudinally arranges second time longitudinal rein forcement (41).
6. GIS device bus bar canister end according to claim 2 and long draw bracing or strutting arrangement, it is characterized in that: annulus card (6) and end second adopt spacer bolt (42) to be fastenedly connected between annulus card (13) in described end first, between first time, described end annulus card (7) and second time, end annulus card (14), adopts spacer bolt (42) to be fastenedly connected.
CN201520011680.7U 2015-01-08 2015-01-08 A kind of GIS device bus bar canister end and long draw bracing or strutting arrangement Withdrawn - After Issue CN204407813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520011680.7U CN204407813U (en) 2015-01-08 2015-01-08 A kind of GIS device bus bar canister end and long draw bracing or strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520011680.7U CN204407813U (en) 2015-01-08 2015-01-08 A kind of GIS device bus bar canister end and long draw bracing or strutting arrangement

Publications (1)

Publication Number Publication Date
CN204407813U true CN204407813U (en) 2015-06-17

Family

ID=53431648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520011680.7U Withdrawn - After Issue CN204407813U (en) 2015-01-08 2015-01-08 A kind of GIS device bus bar canister end and long draw bracing or strutting arrangement

Country Status (1)

Country Link
CN (1) CN204407813U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104538912A (en) * 2015-01-08 2015-04-22 国家电网公司 Support device for end of GIS equipment bus-bar tube and long pull bar
CN109376487A (en) * 2018-12-04 2019-02-22 国网青海省电力公司电力科学研究院 A kind of calculation method of high altitude localities GIS long bus structure temperature deformation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104538912A (en) * 2015-01-08 2015-04-22 国家电网公司 Support device for end of GIS equipment bus-bar tube and long pull bar
CN109376487A (en) * 2018-12-04 2019-02-22 国网青海省电力公司电力科学研究院 A kind of calculation method of high altitude localities GIS long bus structure temperature deformation
CN109376487B (en) * 2018-12-04 2022-12-06 国网青海省电力公司电力科学研究院 Calculation method for temperature difference deformation of GIS long bus structure in high altitude region

Similar Documents

Publication Publication Date Title
CN104538911A (en) 110kV power transmission line GIS equipment bus bar supporting device
CN204407813U (en) A kind of GIS device bus bar canister end and long draw bracing or strutting arrangement
CN105606858A (en) Polycarbonate meter box fixing rack
CN204855599U (en) Electric energy meter installing support
CN204333846U (en) A kind of 110kV Power Transmission Line GIS equipment bus tube supporting device
CN203871745U (en) Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line
CN203218756U (en) Special-purpose tool for live-line replacement of disconnecting switch operating mechanism
CN104538912A (en) Support device for end of GIS equipment bus-bar tube and long pull bar
CN203260986U (en) Special framework for arrester and online monitoring instrument on 10kV bus bridge
CN204068110U (en) A kind of adjustable bus bridge frame
CN203367915U (en) Adjustable telescoping structure of conductor for isolated-phase closed bus
CN203850090U (en) General standardized mounting base for mutual inductors
CN103762933B (en) A kind of solar energy power generating mounting structure
CN103269027A (en) Special sunning test frame for power system steel structure
CN203948405U (en) A kind of equipment fixed pedestal being arranged on high voltage electric power line steel tower
CN203161459U (en) Fixing device used for fixing wind power generator tower barrel with platform
CN201886891U (en) Medium voltage electrode shielding device for 5000kV sulfur hexafluoride (SF6) current transformer
CN207376984U (en) A kind of rain pipe fixing piece suitable for Passive low-energy building
CN204435920U (en) A kind of safety guide rail
CN201637653U (en) Artificially simulated climate tank
CN202658866U (en) High altitude gate type rack maintenance platform
CN203871746U (en) Rod head fixture used for live change of linear insulator on steel pipe pole of 66kV line
CN204320030U (en) A kind of removable absorbing cylinder
CN104376979B (en) Supporting structure for transformer oil conservator
CN203504101U (en) Detachable bus device for thermal expansion and cold contraction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150617

Effective date of abandoning: 20170412

AV01 Patent right actively abandoned