Hydroelectric installation
Technical field
The utility model relates to electrical production field, particularly relates to a kind of hydroelectric installation.
Background technique
At present, hydroelectric power is with one of important way becoming electrical production, and the mode that existing hydroelectric power mainly relies on barrage (river) to build a dam carries out hydroelectric power, has and is limited to natural condition, the shortcoming that costly, construction period is longer.
Model utility content
To achieve these goals, an object of the present utility model is to provide a kind of hydroelectric installation, to solve the problem.
The utility model provides a kind of hydroelectric installation, comprising: the protective body be made up of gravity wall and substrate, is provided with multiple bottoms wet pit in protective body, and each bottom wet pit connects a top wet pit by water pump and the first aqueduct; Top wet pit is connected with turbogenerator by the second aqueduct; Turbogenerator is connected with bottom wet pit by the 3rd aqueduct; Turbogenerator is connected with outside wet pit by the 4th aqueduct; Top wet pit is higher than outside wet pit and turbogenerator; Outside wet pit and turbogenerator are higher than bottom wet pit.
Further, the periphery of gravity wall is leaning structure.
Further, the 4th aqueduct runs through gravity wall and is connected with outside wet pit.
Further, the quantity of turbogenerator is two groups, often organizes turbogenerator correspondence and connects an outside wet pit.
Further, supporting frame is connected with between the first aqueduct.
Compared with prior art the beneficial effects of the utility model are: do not limit by physical environment, can in office where district constructs, and have the advantages that cost is low, the construction period is short.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of the utility model hydroelectric installation;
Fig. 2 is the structural representation of the another kind of embodiment of the utility model hydroelectric installation.
Embodiment
Also by reference to the accompanying drawings the utility model is described in further detail below by specific embodiment.
As shown in Figure 1 and Figure 2, Fig. 1 is the structural representation of a kind of embodiment of the utility model hydroelectric installation; Fig. 2 is the structural representation of the another kind of embodiment of the utility model hydroelectric installation.
Present embodiments provide a kind of hydroelectric installation, comprise the protective body be made up of gravity wall 102 and substrate 105, be provided with multiple bottoms wet pit 106 in protective body, each bottom wet pit 106 connects a top wet pit 110 by water pump 124 and the first aqueduct 108; Top wet pit 110 is connected with turbogenerator 120 by the second aqueduct 112; Turbogenerator 120 is connected with bottom wet pit 106 by the 3rd aqueduct 133; Turbogenerator 120 is connected with outside wet pit 202 by the 4th aqueduct 132; Top wet pit 110 is higher than outside wet pit 202 and turbogenerator 120; Outside wet pit 202 and turbogenerator 120 are higher than bottom wet pit 106.
The hydroelectric installation that the present embodiment provides does not limit by physical environment, can in office where district constructs, and has the advantages that cost is low, the construction period is short, can utilize limited water resources circulating generation.
In the present embodiment, the periphery of gravity wall 102 is designed to leaning structure, can reduce water hammer.
In the present embodiment, the 4th aqueduct 132 runs through gravity wall 102 and is connected with outside wet pit 202.
In the present embodiment, the quantity of turbogenerator 120 is two groups, often organizes turbogenerator 120 correspondence and connects an outside wet pit 202.
In the present embodiment, be connected with supporting frame 152 between the first aqueduct 108, play firm effect.
A series of detailed description listed is above only illustrating for feasibility mode of execution of the present utility model; they are also not used to limit protection domain of the present utility model, all do not depart from the utility model skill equivalent implementations of doing of spirit or change all should be included within protection domain of the present utility model.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any reference character in claim should be considered as the claim involved by limiting.