CN204374959U CN201420762066.XU CN201420762066U CN204374959U CN 204374959 U CN204374959 U CN 204374959U CN 201420762066 U CN201420762066 U CN 201420762066U CN 204374959 U CN204374959 U CN 204374959U
Authority
CN
China
Prior art keywords
server
working environment
input
power equipment
output terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420762066.XU
Other languages
Chinese (zh)
Inventor
秦衡
谢清玉
王贵明
王乃玉
王文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid of China Technology College
Original Assignee
State Grid Corp of China SGCC
State Grid of China Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid of China Technology College filed Critical State Grid Corp of China SGCC
Priority to CN201420762066.XU priority Critical patent/CN204374959U/en
Application granted granted Critical
Publication of CN204374959U publication Critical patent/CN204374959U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a kind of power equipment operating simulation system, this system comprises working environment emulation server, storage server, monitoring server, input/output terminal and alarm lamp.Wherein, working environment emulation server is connected with input/output terminal respectively by network with storage server, storage server is also connected to working environment emulation server, storage server connects monitoring server by monitor node, monitoring server is also connected to working environment emulation server, and alarm lamp is connected with monitoring server.User is from input/output terminal input service environmental information and interactive control information, described working environment information and interactive control information are sent to working environment emulation server, working environment emulation server utilizes described working environment information and interactive control information to carry out the generation of three-dimensional scenic and corresponding interactive controlling process to the working environment that power equipment runs, storage server is saved in after data after process being sent to monitoring server examination & verification, the virtual view simultaneously showing working environment in input/output terminal carries out interactive operation for user, in the review process of monitoring server, if draw the conclusion of power equipment operation exception, alarm lamp generation flicker is warned.Power equipment operating simulation system of the present utility model can meet safety training demand, various power equipment, line environment can be simulated, electric power worker is by using this system, working specification and the safety notice of each specialty can be familiar with, thus the generation of minimizing accident to greatest extent in routine duties.

Description

A kind of power equipment operating simulation system
Technical field
The utility model relates to power equipment working train family emulation technology, particularly relates to a kind of power equipment operating simulation system.
Background technology
In recent years, due to the input in succession of business application system, the quantity of application system server is in continuous increase, and the corresponding network equipment is also constantly increasing, and cause machine room area inadequate, electricity consumption of equipment amount increases, and machine room load is also in increase.In addition, the training of current electric system still rests on theory and tells about the relatively backward stage such as training, handbook training, these mode training cycles are long, fund input is large, student's experience property is poor, adopt classroom lectures, courseware and picture coordinate demonstration or look for independently equipment to operate among a small circle more, but a lot of equipment is charging operation, dangerous property and uncertainty, the spoilage of equipment is high, then student can not carry out effective practical operation in learning process.Therefore, be necessary to set up a kind of effective power equipment operating simulation system, make student can simulate actual working environment truly, be familiar with environment and equipment, operate those complexity and the equipment that can not make mistakes, and then the workmanship of trainee can meet the requirement of power equipment professional operator as early as possible, reduce the fault rate of neophyty operation, can configure a lot of relevant device less when actual environment is drilled, the purchase reducing hardware device needs simultaneously.
Utility model content
The utility model provides a kind of power equipment operating simulation system, user is from input/output terminal input service environmental information and interactive control information, described working environment information and interactive control information are sent to working environment emulation server, working environment emulation server utilizes described working environment information and interactive control information to carry out the generation of three-dimensional scenic and corresponding interactive controlling process to the working environment that power equipment runs, storage server is saved in after data after process being sent to monitoring server examination & verification, the virtual view simultaneously showing working environment in input/output terminal carries out interactive operation for user, in the review process of monitoring server, if draw the conclusion of power equipment operation exception, alarm lamp generation flicker is warned.
For solving the problems of the technologies described above, power equipment operating simulation system of the present utility model comprises working environment emulation server, storage server, monitoring server, input/output terminal and alarm lamp, it is characterized in that:
Working environment emulation server is connected with input/output terminal respectively by network with storage server, storage server is also connected to working environment emulation server, storage server connects monitoring server by monitor node, monitoring server is also connected to working environment emulation server, and alarm lamp is connected with monitoring server;
User is from input/output terminal input service environmental information and interactive control information, described working environment information and interactive control information are sent to working environment emulation server, working environment emulation server utilizes described working environment information and interactive control information to carry out the generation of three-dimensional scenic and corresponding interactive controlling process to the working environment that power equipment runs, storage server is saved in after data after process being sent to monitoring server examination & verification, the virtual view simultaneously showing working environment in input/output terminal carries out interactive operation for user, in the review process of monitoring server, if draw the conclusion of power equipment operation exception, alarm lamp generation flicker is warned.
Wherein, working environment emulation server is the high-performance server after virtualization process, on it, establishment has multiple stage independently virtual machine, every platform virtual machine has independently CPU, internal memory, hard disk, CD-ROM drive, network interface card, video card, each network card configuration IP separately, be connected with physical network by virtual switch, and each virtual machine is provided with different operating system, carrys out managing virtual computing machine by virtual management platform or remote desktop.
The beneficial effects of the utility model are: be different from prior art, power equipment operating simulation system of the present utility model can meet safety training demand, various power equipment, line environment can be simulated, electric power worker is by using this system, working specification and the safety notice of each specialty can be familiar with, thus the generation of minimizing accident to greatest extent in routine duties.Wherein, working environment emulation server adopts Intel Virtualization Technology, Intel Virtualization Technology can make full use of the hardware resources of server, save hardware cost, reduce the quantity of server, solve problem in computer rooms preferably, also solve the problem of the host of server application system backup simultaneously, virtual server also can be utilized to be backed up by whole application server.
Accompanying drawing explanation
The formation schematic diagram of Fig. 1 power equipment operating simulation system of the present utility model
The test for intersection schematic diagram of Fig. 2 AABB in X-axis
Fig. 3 bounding box projection sequence grouping schematic diagram
Fig. 4 triangle intersect testing process
Embodiment
As shown in Figure 1, this system comprises working environment emulation server 1, storage server 2, monitoring server 3, input/output terminal 5 to the formation of the power equipment operating simulation system that the utility model provides.
Wherein, working environment emulation server 1 is connected with multiple input/output terminal 5 respectively by network 4 with storage server 2, storage server 2 is also connected to working environment emulation server 1, storage server 2 connects monitoring server 3 by monitor node, monitoring server 3 is also connected to working environment emulation server 1, and monitoring server 3 is also connected with alarm lamp (not shown).
User is from input/output terminal input service environmental information and interactive control information, described working environment information and interactive control information are sent to working environment emulation server, working environment emulation server utilizes described working environment information and interactive control information to carry out the generation of three-dimensional scenic and corresponding interactive controlling process to the working environment that power equipment runs, storage server is saved in after data after process being sent to monitoring server examination & verification, the virtual view simultaneously showing working environment in input/output terminal carries out interactive operation for user, in the review process of monitoring server, if draw the conclusion of power equipment operation exception, alarm lamp generation flicker is warned.
Input/output terminal can comprise the input media such as keyboard, mouse for user's input information and control command, can also comprise the display device of such as liquid crystal display (LCD).
Wherein, working environment emulation server is the high-performance server after virtualization process, on it, establishment has multiple stage independently virtual machine, every platform virtual machine has independently CPU, internal memory, hard disk, CD-ROM drive, network interface card, video card, each network card configuration IP separately, be connected with physical network by virtual switch, and each virtual machine is provided with different operating system, carrys out managing virtual computing machine by virtual management platform or remote desktop.
Represent in equipment virtual machine mode at user side, carry out initialization and the loading of equipment in the mode of carry in the POOL of equipment pond, user side is namely dynamic after proposing device request creates a newly connection in equipment POOL, complete the initialization of virtual unit information and the loading of associated traffic data simultaneously, after user operation uses this equipment, discharge this immediately connect and reclaim relevant resource, equipment Foundations storehouse realizes the storage of basic data of all hardware equipment, the network equipment, carries out form definition and the persistence of hardware data with the form of XML file or DB.
Modeling tool is adopted to complete the generation of three-dimensional scenic, working environment information is utilized to set up model of place database, the fundamental node of model of place database comprises group node, object node, face node and some node, utilize node by all models in whole scene logically structure organization be inverted level tree structure.
After Modling model database, initialization realizes the d engine calling, show and control to model, comprising: arrange three-dimensional picture pixel format, determines the figure place of each impact damper; Initialization passage viewport size, the parameters of illumination model, background color, eye coordinates; Create frame buffer and title is set; Create camera, passage and illumination model, to illumination model assignment; Create scene, illumination model is added scene, determines camera position, and camera is connected with scene; For passage assignment determination size, erasing look, and by scene and camera and expanding channels; Passage is added frame buffer.After initial work completes, dynamic importing three-dimensional model, then an object callback function is set for each object (i.e. three-dimensional model), concrete control routine is write in call back function, the drafting of each frame animation is realized by call back function, when object discharges, call back function also terminates immediately.
Interactive controlling process comprises collision detection, three-dimensional body motion control, three dimensional object pickup.
So-called collision, is exactly in the several objects at a time, in space, there is the space occupied between one or more pairs of object and be in the critical point overlapped.In reciprocal process, in order to the authenticity simulated, multiple method must be adopted to be limited the object of which movement in the interbehavior of user and virtual world.Collision detection is a kind of conventional method, and the mistake as appearance can be avoided through walls to the collision detection of buildings, can avoid the generation of object fusion phenomenon, thus reach the true effect in real world to the collision detection of mobile object.Collision detection is the interactive basis in virtual reality between dynamic object and stationary body or between dynamic object and dynamic object.
Translation, rotation, convergent-divergent are the most basic motor patterns, and in interactive controlling, the operation carried out entity and viewpoint can be converted into the combination of the geometric transformations such as translation, rotation and convergent-divergent.By the geometric transformation of object in three dimensions, Fast transforms can be carried out to object, thus obtain the Dynamic Announce effect of object in reciprocal process.
Three dimensional object hit detect function can be picked up by object names, also can be realized by the collision checking method of X-ray detection X, as follows by the collision checking method of X-ray detection X: according to the matrix used in virtual environment inverse transformation is done to projection ray and and model carry out test for intersection and pick up object.Its process clicks somewhere with mouse on screen, obtain the screen coordinate of mouse clicking point, the coordinate of subpoint is obtained again by vision area conversion, so obtain one to be starting point with viewpoint and through the ray of subpoint, if crossing with certain model in scene after this ray being done projective transformation, viewing transformation, then represent that pickup is to this model.
Encircle sphere is defined as the smallest sphere comprising object.The maximal value of object vertex coordinate and the average of minimum value can be used for determining the centre of sphere of encircle sphere.For two encircle sphere, if centre of sphere distance is less than two radius of a ball sums, then two encircle sphere intersect.Utilize spheroid to build the level encircle sphere tree of object, the detection between node and node can be carried out, but its compactedness of surrounding object is inadequate fastly, the intersection testing between the encircle sphere that can there is bulk redundancy.
Axial bounding box (AABB) be defined as each bar limit be all parallel to coordinate axis and comprise this object minimum side's rectangular parallelepiped.Calculate the AABB bounding box that the minimum value of x, y, z coordinate on summit in all geometric elements of composition object and maximal value just can determine object.Test for intersection between AABB bounding box is also fairly simple, and when all intersecting when between the projection in zone of two AABB bounding boxs in three coordinate axis, they are just crossing.According to this characteristic, three-dimensional can be asked friendship abbreviation to turn to one dimension and ask friendship problem.Hand over, as long as the test for intersection therefore between AABB does 6 comparison operations at most because two articles AABB bounding box intersects the homogeneous phase that must project in three coordinate axis.AABB bounding box calculates simple, but compactedness is poor.As shown in Figure 2, suppose there is two AABB bounding box A and B, the central point of A and B is respectively C aand C b, X-axis is projection coordinate's axle, some C aand C bprojection in X-axis is respectively P aand P b.The half of the projected length of bounding box A and B in X-axis is respectively R aand R b.If C ac b≤ P ap b, then in X-axis, A and B is non-intersect, otherwise A and B intersects in X-axis.
Different due to geometric object in scene, there will be distinct effect when different object carrys out approximate simulation with different bounding boxs, unreasonable use bounding box can make collision detection efficiency significantly reduce.Such as, if a spheroid AABB simulates, there will be larger error, and a strip object encircle sphere is simulated, the precision of collision detection also can be very poor.
Alternatively, in collision detection of the present utility model, shape according to different object uses different bounding box approximate simulations to different object, namely the object that encircle sphere analog approximation is spherical is used, all the other objects adopt AABB bounding box to carry out analog approximation, first encircle sphere and the projection of AABB bounding box are sorted and divided into groups, the object pair that rapid eliminating can not collide, then test for intersection is carried out to the potential collision detection collection in each group, now collision detection is converted into the test for intersection of encircle sphere and encircle sphere, test for intersection between the test for intersection of encircle sphere and AABB bounding box and AABB bounding box, finally carry out collision detection of high precision.
As shown in Figure 2, use heapsort method to the projection access order on a certain axle, and fix dividing the sub-section boundary of rear projection for the first time, projection subsegment is referred to as " group ", and after being upgraded by Moving Objects afterwards, the projection value of bounding box compares with the boundary value of bounding box place group before, if still within border, then continue to stay in this group, otherwise the boundary value organized with next compares, the like, until find new ownership group; Then sort in real time to projection value often organizing interior use heapsort method, getting rid of fast does not have overlapping object pair; Finally, to overlapping object to carrying out test for intersection, wherein has one at least to liking dynamically, as long as compare with this group and adjacent sets during bounding box grouping, and test for intersection only carries out in the group having dynamic object to exist, and which greatly enhances the efficiency of detection.This algorithm should be noted that following problem: (1) has entered the new projection subsegment of people when a part for a certain bounding box, and another part is when still staying former projection subsegment (as shown in dotted box in Fig. 2), bounding box is organized and is all needed to participate in collision detection belonging to two projection subsegments.In addition, two parts are all divided into, when carrying out test for intersection to x-axis corresponding to two object left-hand component and y-axis sublist when certain two intersected object divides the stage in coordinate axis, know that two objects are overlapping, algorithm just no longer carries out test for intersection to the projection of the right-hand component of two objects, thus reduces the execution time of algorithm; (2) if there is the very large object of volume in scene, first object must be decomposed into the sub-block of small volume before performing collision detection, more each sub-block is carried out crash tests respectively.
Wherein, the test for intersection of encircle sphere and AABB bounding box is as follows:
If the coordinate of point is (x, y, z) in AABB bounding box, the length of side of bounding box is H, and the centre coordinate of bounding box is (X b, Y b, Z b), suppose that central point is positioned at true origin, then the equation of constraint of AABB bounding box is
{(x,y,z)|0<x,y,z<H}
Equally, if the coordinate of point is (x, y, z) in encircle sphere, the radius of encircle sphere is R s, sphere centre coordinate is (X 0, Y 0, Z 0), then the equation of constraint of encircle sphere is
{ ( x , y , z ) | ( x - X 0 ) 2 + ( y - Y 0 ) 2 + ( z - Z 0 ) 2 < R S 2 }
Suppose that AABB bounding box is positioned at true origin (0,0,0), order wherein X 0non-vanishing, then the distance between AABB bounding box and encircle sphere is
If the angle of the line of AABB bounding box and encircle sphere central point and Z coordinate axis is θ, then have: work as Y 0>0 and X 0during >0, work as Y 0>0 and X 0during <0, work as Y 0<0 and X 0during >0, work as Y 0<0 and X 0during <0,
Only need to compare θ × dist and | Z 0| the crossing situation of two bounding boxs can be obtained, if θ × dist is < | Z 0|, then AABB bounding box is crossing with encircle sphere, otherwise non-intersect.
Collision detection of high precision comprises two stages, the collision detection of high precision process of first stage is as follows: polygon is projected to XOY plane, obtain a plane polygon, if polygon intersects, straight line must be had simultaneously all crossing with two polygons, around this principle, two parallel axis are done based on two central point subpoints, if intersected, must occur between two axis, specification error value ρ, n bar mean line is done, if existence m article of mean line and wherein two polygons intersect at point (X between the axis that two are parallel to y-axis 1, Y 1) and point (X 2, Y 2), wherein n, m are natural number and m is less than or equal to n, if | Y 1-Y 2| < ρ, then collide, and enters the collision detection of high precision of subordinate phase, the collision detection of high precision namely between element figure.
Crossing detection between element figure is the final tache of collision detection, element figure is triangle or tetrahedron, when element figure is tetrahedron, because tetrahedron is made up of four triangles, be leg-of-mutton test for intersection by tetrahedral test for intersection abbreviation, collision detection of high precision then between element figure is in fact the crossing detection between triangle, the test for intersection flow process between triangle as shown in Figure 4, if two, space triangle is respectively T1 (V 0, V 1, V 2) and T2 (U 0, U 1, U 2), then the test for intersection process between triangle and triangle is as follows:
S1: calculate the plane equation N1 at triangle T 1 place and the plane equation N2 at triangle T 2 place respectively;
S2: three summits calculating triangle T 1 respectively to three summits of the distance dv0 of plane N 2, dvl, dv2 and triangle T 2 to the distance du0 of plane N 1, dul, du2;
S3: if V 0, V 1, V 2three points are all positioned at the same side of N2, and so triangle T I and T2 is non-intersect, or U 0, U 1, U 2three points are all positioned at the same side of N1, and triangle T 1 and T2 are also non-intersect;
S4: if dv0*dvl=0 and dv0*dv2=0 sets up or du0*dul=0 and du0*du2=0 sets up simultaneously simultaneously, then triangle n and T2 is coplanar, forwards in plane and goes in two leg-of-mutton test for intersection subprocess;
S5: if there is one to be 0 in dv0, dv1, dv2, and two other symbol is identical, then a summit must be had in triangle T 1 to be positioned at triangle T 2 institute in the plane, and now problem is converted into a point and leg-of-mutton relation in Judge plane.If fruit dot is in triangle T 2 or on limit, so triangle T l and T2 intersects, otherwise non-intersect;
S6: if there are two to be 0 in dv0, dvl, dv2, then triangle T l must have a limit to be positioned in the plane of triangle T 2, and now problem is converted into the relation in Judge plane between a line segment and a triangle;
S7: removing several situation above, triangle T l and triangle T 2 place Plane intersects, try to achieve crossing line segment, now problem change into Judge plane middle conductor whether with triangle intersect.
In the utility model, working environment emulation server adopts Intel Virtualization Technology, Intel Virtualization Technology can make full use of the hardware resources of server, save hardware cost, reduce the quantity of server, solve problem in computer rooms preferably, also solve the problem of the host of server application system backup simultaneously, virtual server also can be utilized to be backed up by whole application server.
Above embodiment is only for illustration of the utility model; and be not limitation of the utility model; the those of ordinary skill of relevant technical field; when not departing from spirit and scope of the present utility model; can also make a variety of changes and modification; therefore all equivalent technical schemes also belong to category of the present utility model, and scope of patent protection of the present utility model should be defined by the claims.

Claims (1)

1. a power equipment operating simulation system, this system comprises working environment emulation server, storage server, monitoring server, input/output terminal and alarm lamp, it is characterized in that:
Working environment emulation server is connected with input/output terminal respectively by network with storage server, storage server is also connected to working environment emulation server, storage server connects monitoring server by monitor node, monitoring server is also connected to working environment emulation server, and alarm lamp is connected with monitoring server;
User is from input/output terminal input service environmental information and interactive control information, described working environment information and interactive control information are sent to working environment emulation server, working environment emulation server utilizes described working environment information and interactive control information to carry out the generation of three-dimensional scenic and corresponding interactive controlling process to the working environment that power equipment runs, storage server is saved in after data after process being sent to monitoring server examination & verification, the virtual view simultaneously showing working environment in input/output terminal carries out interactive operation for user, in the review process of monitoring server, if draw the conclusion of power equipment operation exception, alarm lamp generation flicker is warned,
Wherein, working environment emulation server is the high-performance server after virtualization process, on it, establishment has multiple stage independently virtual machine, every platform virtual machine has independently CPU, internal memory, hard disk, CD-ROM drive, network interface card, video card, each network card configuration IP separately, be connected with physical network by virtual switch, and each virtual machine is provided with different operating system, carrys out managing virtual computing machine by virtual management platform or remote desktop.
CN201420762066.XU 2014-12-05 2014-12-05 A kind of power equipment operating simulation system Expired - Fee Related CN204374959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420762066.XU CN204374959U (en) 2014-12-05 2014-12-05 A kind of power equipment operating simulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420762066.XU CN204374959U (en) 2014-12-05 2014-12-05 A kind of power equipment operating simulation system

Publications (1)

Publication Number Publication Date
CN204374959U true CN204374959U (en) 2015-06-03

Family

ID=53331160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420762066.XU Expired - Fee Related CN204374959U (en) 2014-12-05 2014-12-05 A kind of power equipment operating simulation system

Country Status (1)

Country Link
CN (1) CN204374959U (en)

Similar Documents

Publication Publication Date Title
CN104461690A (en) Power equipment operation simulation system
CN104462688A (en) Operation simulation system of power grid information equipment
CN111192354A (en) Three-dimensional simulation method and system based on virtual reality
CN102289845B (en) Three-dimensional model drawing method and device
CN102426424B (en) Visual emulation method of near-space flying vehicle based on distributed framework
CN107464286B (en) Method, device, equipment and readable medium for repairing holes in three-dimensional city model
CN112530005B (en) Three-dimensional model linear structure recognition and automatic restoration method
CN105205860A (en) Display method and device for three-dimensional model scene
Banu Augmented Reality system based on sketches for geometry education
CN107978018A (en) Construction method, device, electronic equipment and the storage medium of solid figure model
CN104090953A (en) Map display method and device for LED lamp on virtual display terminal
CN112667072A (en) Virtual system and method for training development of professional behavior habits of college students
CN204374959U (en) A kind of power equipment operating simulation system
CN204374948U (en) A kind of power equipment operating simulation system
CN108053492A (en) Expansion process rendering method, device, equipment and the storage medium of solid figure
CN113570256A (en) Data processing method and device applied to city planning, electronic equipment and medium
CN106599501A (en) OGRE engine-based large ship diesel main engine virtual reality system
Bai et al. The improvement of interactive learning efficiency based on virtual simulation technology
Zhang Application of 3D Digital Technology in Virtual Laboratory Training
Chen et al. Research and application of immersive virtual reality system based on 3D geographic information system
CN112820158A (en) Virtual reality-based network teaching method and system, storage medium and platform
Eiris et al. Applying 360-degree virtual reality for construction safety training
Chen et al. Industrial Operation Training Technology Based on Panoramic Image and Augmented Reality
Shi et al. Reliability Analysis of 3D Light Rail Landscape Interactive Design Teaching System Based on Virtual Reality
da Silva et al. NEW DIMENSIONS OF LEARNING SPACE–IMMERSIVE TRAINING SYSTEMS

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20161205