A kind of steel work escape way Download PDFInfo
- Publication number
- CN204370835U CN204370835U CN201420816957.9U CN201420816957U CN204370835U CN 204370835 U CN204370835 U CN 204370835U CN 201420816957 U CN201420816957 U CN 201420816957U CN 204370835 U CN204370835 U CN 204370835U
- Authority
- CN
- China
- Prior art keywords
- steel
- escape way
- steel structure
- roof truss
- steel work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to facing builds steel work escape way, comprise steel work support body, steel structure roof truss and roof panel, described steel work support body comprises the column base plate be fixed in building gangway, column base plate fixes H profile steel, the toe portion four direction of H profile steel is all fixed with post gusset, standard width of a room in an old-style house direction, H profile steel top has connector to be connected with depth direction, each across depth direction angle steel carry out drawknot; Steel structure roof truss is connected with steel structure framework bolt, and junction is lined with steel plate, and roof panel is laid on steel structure roof truss.The utility model does steel work escape way at the scene, can the on-the-spot place of Appropriate application building gangway, increases secondary operations place, shortens secondary haul distance.Eliminate the potential safety hazard of construction.Construction material is stackable in escape way, has rainproof effect.
Description
Technical field
The utility model relates to a kind of construction and faces and build steel work escape way, and be mainly used in solving the problem that support personnel's dense field carries out every construction activities safety, use this technology can provide one deck security protection, site layout project is reasonable, convenient and safe construction.
Background technology
At present, highrise building, super highrise building have occupied very large construction market, and the various potential safety hazards in work progress become more, so the more important height of the safety management at scene along with highly increasing.High building project construction is to secondary structure, make secondary operations narrow field because various facility and material usage are large, now land used peak period just, twoth floor, high-rise underground garage top is at a distance of nearer, and vertical transport all will be installed between two balconys, the use of this passage is quite important.In addition, two balconys of passage both sides all will utilize passage to carry out vertical transport, and upper people's material loading causes passage place hidden danger to increase.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of make use of and facing of building gangway builds steel work escape way, thus reach the on-the-spot place of Appropriate application and safe construction object.
For solving above technical problem, the technical solution adopted in the utility model is:
One is faced and is built steel work escape way, comprise steel work support body, steel structure roof truss and roof panel, described steel work support body comprises the column base plate be fixed in building gangway, column base plate fixes H profile steel, the toe portion four direction of H profile steel is all fixed with post gusset, standard width of a room in an old-style house direction, H profile steel top has connector to be connected with depth direction, each across depth direction angle steel carry out drawknot; Steel structure roof truss is connected with steel structure framework bolt, and junction is lined with steel plate, and roof panel is laid on steel structure roof truss.
The utility model does steel work escape way at the scene, can the on-the-spot place of Appropriate application building gangway, increases secondary operations place, shortens secondary haul distance.Eliminate the potential safety hazard of construction.Construction material is stackable in escape way, has rainproof effect.
Accompanying drawing explanation
Fig. 1 is the structural representation that the utility model faces the standard width of a room in an old-style house direction building steel work escape way.
Fig. 2 is the structural representation that the utility model faces the depth direction building steel work escape way.
In figure, 1-steel structure roof truss, 2-column base plate, 3-H shaped steel, 4-post gusset, 5-angle steel, 6-vertical supporting, 7-channel-section steel bearing diagonal, 8-round steel.
Detailed description of the invention
In order to make those skilled in the art better understand the utility model, below in conjunction with accompanying drawing, explanation clear, complete is further done to the utility model.
One shown in Fig. 1 is faced and is built steel work escape way, comprise steel work support body, steel structure roof truss 1 and roof panel, described steel work support body comprises the column base plate 2 be fixed in building gangway, column base plate 2 is fixed H profile steel 3, the toe portion four direction of H profile steel 3 is all fixed with post gusset 4, standard width of a room in an old-style house direction, H profile steel 3 top has connector to be connected with depth direction, each across depth direction angle steel 5 carry out drawknot; Steel structure roof truss 1 is connected with steel structure framework bolt, and junction is lined with steel plate, and roof panel is laid on steel structure roof truss.
Here is that the concrete grammar building steel work escape way is faced in a more than construction, comprises step:
(1) steel work support body is set up
As shown in Figure 1, buried plate place is determined in building gangway, surveying setting-out is carried out in passage, draw the position of buried plate, each buried plate place chemical anchor bolts implant 6 screw rods, then on screw rod, fix 350*450mm column base plate 2 with double nut, and column base plate 2 welds H profile steel 3, height is determined by designing requirement, and in H profile steel 3 post angle part, the equal welded post gusset 4 of four direction is fixed; Standard width of a room in an old-style house direction, H profile steel 3 top channel-section steel connects, and depth direction round steel pipe connects, as Fig. 2, each across depth direction angle steel 5 carry out drawknot, during drawknot coupling part be bolt connect, such steel structure framework installation.
(2) steel structure roof truss is set up
Then carry out the installation of roof truss steel work, steel structure roof truss carries out lifting with mobile crane and connects after installation on ground completes.Layer Steel Structure height is 2600mm, and column and roof truss junction vertical supporting height are 500mm.Weld channel-section steel bearing diagonal 7 between the vertical supporting 6 of steel structure roof truss, be connected after having welded with steel structure framework, method of attachment is that bolt connects, and is connected, ensures the integral rigidity of steel work at H profile steel post with steel structure roof truss roof truss junction pad 30mm steel plate.Vertical supporting tie point welding one across channel-section steel level connection joint, in order to roof panel of mating formation, each across depth direction round steel 8 carry out drawknot.
(3) to mat formation roof panel
Because project subject stay in place formwork is changed, so on-the-spot waste and old template is a lot, these templates and the lumps of wood is layered on steel structure roof truss, then fixes color steel on roof panel top, form two-layer protection.Whole Steel Structure Installation completes, and material is thus formed steel work escape way.
After having constructed, site layout project is compact, reasonable, has saved soil.Utilize waste and old template to protect, save expense.Steel work carries out tool management, can utilize on ground, reduces by a Meteorological.Field control integration, solves the problem that on-the-spot Decentralization difficulty is large.
The claimed scope of the utility model is not limited to above detailed description of the invention; to those skilled in the art; the utility model can have various deformation and change, all in design of the present utility model and any amendment, the improvement done within principle be equal to replacement and all should be included within protection domain of the present utility model.
Claims (1)
1. a steel work escape way, it is characterized in that: comprise steel work support body, steel structure roof truss (1) and roof panel, described steel work support body comprises the column base plate (2) be fixed in building gangway, in the upper fixing H profile steel (3) of column base plate (2), the toe portion four direction of H profile steel (3) is all fixed with post gusset (4), standard width of a room in an old-style house direction, H profile steel (3) top has connector to be connected with depth direction, each across depth direction angle steel (5) carry out drawknot; Steel structure roof truss (1) is connected with steel structure framework bolt, and junction is lined with steel plate, and roof panel is laid on steel structure roof truss.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420816957.9U CN204370835U (en) | 2014-12-22 | 2014-12-22 | A kind of steel work escape way |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420816957.9U CN204370835U (en) | 2014-12-22 | 2014-12-22 | A kind of steel work escape way |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204370835U true CN204370835U (en) | 2015-06-03 |
Family
ID=53327066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420816957.9U Active CN204370835U (en) | 2014-12-22 | 2014-12-22 | A kind of steel work escape way |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204370835U (en) |
-
2014
- 2014-12-22 CN CN201420816957.9U patent/CN204370835U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235499A (en) | A kind of open cut hypogee Standard formula construction method | |
CN203795458U (en) | Bearing-platform-free lattice-type tower crane foundation device capable of traversing basement | |
CN104676110A (en) | On-site overhanging protection method of high-voltage cable bailey truss under condition of excavation of foundation pit | |
CN107090975A (en) | A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation | |
CN106869548B (en) | A kind of newel frame assembled underground parking structural system and construction method | |
CN102561690A (en) | Construction method for supporting structures on two sides of post-cast strip by use of brick column | |
CN103938634A (en) | Deep foundation pit supporting structure and construction method | |
CN104612412B (en) | A kind of construction method of steel construction escape way | |
CN110409624B (en) | Reverse calculation and construction method for large equipment installation and main body structure | |
CN109162741B (en) | Method for synchronous construction of shield penetrating piston air duct and upper structure of piston air duct | |
CN204326100U (en) | The Preserved node of covered back-digging side wall bar splice | |
CN203531005U (en) | Steel structure combined type tower crane base structure | |
CN206722378U (en) | A kind of pull-up manomelia is encorbelmented heavy frame | |
CN205369229U (en) | But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid | |
CN204370835U (en) | A kind of steel work escape way | |
CN107313628A (en) | A kind of basic digging-free assembled tower-type space garage and its construction method | |
CN209293068U (en) | A kind of open trench tunnel falsework system | |
CN104831928B (en) | High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method | |
CN203755171U (en) | Bridge back-pulling bearing construction support | |
CN203821399U (en) | Deep foundation pit supporting structure | |
CN206319597U (en) | A kind of cantilever steel girder erecting device | |
CN203429557U (en) | Anchor pole back beam applied to underpass bridge jacking construction | |
CN215101658U (en) | Tower crane embedded support leg reinforcing structure | |
CN105781088A (en) | Floor type scaffold of ultrahigh chemical tower | |
CN107780659A (en) | A kind of construction method of wire netting enclosure wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |