CN204370429U - A kind of foundation pit earth pressure-controlled structure - Google Patents

A kind of foundation pit earth pressure-controlled structure Download PDF

Info

Publication number
CN204370429U
CN204370429U CN201420764904.7U CN201420764904U CN204370429U CN 204370429 U CN204370429 U CN 204370429U CN 201420764904 U CN201420764904 U CN 201420764904U CN 204370429 U CN204370429 U CN 204370429U
Authority
CN
China
Prior art keywords
base plate
bracket
left end
cushion cap
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420764904.7U
Other languages
Chinese (zh)
Inventor
姬宇轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Civil Engineering and Architecture
Original Assignee
Beijing University of Civil Engineering and Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Civil Engineering and Architecture filed Critical Beijing University of Civil Engineering and Architecture
Priority to CN201420764904.7U priority Critical patent/CN204370429U/en
Application granted granted Critical
Publication of CN204370429U publication Critical patent/CN204370429U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of foundation pit earth pressure-controlled structure, at least comprises base plate cushion cap, timber, basement bottom board, support bracket, capping beam, built-in fitting, steel pipe skewed horizontal load part, B1 floor and concrete bracket; Described timber is arranged on base plate cushion cap left end; Described base plate cushion cap upper end is provided with concrete bracket; Described B1 floor left end is connected with load transfering strip; On the right side of described steel pipe skewed horizontal load part, bottom and concrete bracket overlap, and left upper end is connected with capping beam by built-in fitting; Described basement bottom board left end is connected with conveyer belt; This foundation pit earth pressure-controlled structure, the foundation excavation of silt large for some excavation areas, the degree of depth is little again, adopts in foundation ditch and is abound with the support cost that the design of horizontal inner support can increase foundation ditch undoubtedly greatly; Engineering practice shows, utilizes the remaining soils of foundation ditch inside and diagonal brace to assist the design and construction carrying out foundation ditch, can reduce support cost.Overall structure is simple, practical, easily manufactured, is easy to promote the use of.

Description

A kind of foundation pit earth pressure-controlled structure
Technical field
The utility model relates to foundation pit earth laminated structure applied technical field, especially a kind of foundation pit earth pressure-controlled structure.
Background technology
The foundation excavation of silt large for some excavation areas, the degree of depth is little again, adopts in foundation ditch and is abound with the support cost that the design of horizontal inner support can increase foundation ditch undoubtedly greatly.Engineering practice shows, utilizes the remaining soils of foundation ditch inside and diagonal brace to assist the design and construction carrying out foundation ditch, can reduce support cost.
For these actual conditions of foundation ditch that area is larger, being abound with reinforced concrete inner support system if adopted, to encircle for protection greatly increasing foundation ditch the cost of engineering undoubtedly, and developer being in order to make full use of soil, foundation ditch surrounding headspace is greatly reduced, puts slope mode so often also cannot adopt.For solving this ~ problem, when carrying out large-scale excavation excavation, when conditions permit, adopt the mode of reserved soil in foundation ditch to carry out mode that design of foundation pit and construction are a kind of economical rationality.
Prior art can not meet the needs of people, and for making up prior art deficiency, the utility model aims to provide a kind of foundation pit earth pressure-controlled structure.
For achieving the above object, the utility model is by the following technical solutions: a kind of foundation pit earth pressure-controlled structure, at least comprises base plate cushion cap, timber, basement bottom board, support bracket, capping beam, built-in fitting, steel pipe skewed horizontal load part, B1 floor and concrete bracket; Described timber is arranged on base plate cushion cap left end; Described base plate cushion cap upper end is provided with concrete bracket; Described B1 floor left end is connected with load transfering strip; On the right side of described steel pipe skewed horizontal load part, bottom and concrete bracket overlap, and left upper end is connected with capping beam by built-in fitting; Described basement bottom board left end left end is connected with conveyer belt.
Further, described steel pipe skewed horizontal load part is when making: after basement bottom board and bracket reach 80% of design strength, can carry out Two bors d's oeuveres 0609mm steel pipe support and install.Measure bracing members installed height mark and horizontal level, the concrete laitance on the pre-embedded steel slab on capping beam and base plate is cleaned out, measure the clear spacing of pre-embedded steel slab between capping beam and underplate concrete bracket, adjust assembled bearing length.Through review errorless after, then steel end wall bracket is set on bracket, carries out welding procedure.For ensureing base pit stability, should be installed by most weak spot, namely carrying out welding procedure from middle part, limit, hole to both sides.
Compared with prior art, the beneficial effects of the utility model are: this foundation pit earth pressure-controlled structure, the foundation excavation of silt large for some excavation areas, the degree of depth is little again, adopt in foundation ditch and are abound with the support cost that the design of horizontal inner support can increase foundation ditch undoubtedly greatly; Engineering practice shows, utilizes the remaining soils of foundation ditch inside and diagonal brace to assist the design and construction carrying out foundation ditch, can reduce support cost.Overall structure is simple, practical, easily manufactured, is easy to promote the use of.
Utility model content
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is the utility model foundation pit structure schematic diagram;
Wherein: 1, base plate cushion cap, 2, timber, 3, basement bottom board, 4, support bracket, 5, capping beam, 6, built-in fitting, 7, steel pipe skewed horizontal load part, 8, B1 floor, 9, concrete bracket.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1 ~ 2, in the utility model embodiment, a kind of foundation pit earth pressure-controlled structure, at least comprises base plate cushion cap 1, timber 2, basement bottom board 3, support bracket 4, capping beam 5, built-in fitting 6, steel pipe skewed horizontal load part 7, B1 floor 8 and concrete bracket 9; Described timber 2 is arranged on base plate cushion cap 1 left end; Described base plate cushion cap 1 upper end is provided with concrete bracket 9; Described B1 floor 8 left end is connected with load transfering strip; On the right side of described steel pipe skewed horizontal load part 7, bottom and concrete bracket 9 overlap, and left upper end is connected with capping beam 5 by built-in fitting 6; Described basement bottom board 3 left end left end is connected with conveyer belt.
Further, described steel pipe skewed horizontal load part 7 is when making: after basement bottom board and bracket reach 80% of design strength, can carry out Two bors d's oeuveres 0609mm steel pipe support and install.Measure bracing members installed height mark and horizontal level, the concrete laitance on the pre-embedded steel slab on capping beam and base plate is cleaned out, measure the clear spacing of pre-embedded steel slab between capping beam and underplate concrete bracket, adjust assembled bearing length.Through review errorless after, then steel end wall bracket is set on bracket, carries out welding procedure.For ensureing base pit stability, should be installed by most weak spot, namely carrying out welding procedure from middle part, limit, hole to both sides.
After basement bottom board and bracket reach 80% of design strength, Two bors d's oeuveres 0609mm steel pipe support can be carried out and install.Measure bracing members installed height mark and horizontal level, the concrete laitance on the pre-embedded steel slab on capping beam and base plate is cleaned out, measure the clear spacing of pre-embedded steel slab between capping beam and underplate concrete bracket, adjust assembled bearing length.Through review errorless after, then steel end wall bracket is set on bracket, carries out welding procedure.
For ensureing base pit stability, should be installed by most weak spot, namely carrying out welding procedure from middle part, limit, hole to both sides.In capping beam work progress, the location of built-in fitting must accurately, and this engineering controls according to deviation < 5mm.Consider pressure Xiang Liang at the scene in work progress likely because built-in fitting causes relatively large off normal, so in the work progress of follow-up bracket, require that measuring personnel should locate the relative position of diagonal brace bracket according to the position of pressure item beam built-in fitting, to ensure to press the built-in fitting in Xiang Liang and bracket to keep just to state.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any Reference numeral in claim should be considered as the claim involved by limiting.
The above; be only preferred embodiment of the present utility model; not in order to limit the utility model, every above embodiment is done according to technical spirit of the present utility model any trickle amendment, equivalently replace and improve, within the protection domain that all should be included in technical solutions of the utility model.

Claims (1)

1. a foundation pit earth pressure-controlled structure, at least comprises base plate cushion cap (1), timber (2), basement bottom board (3), support bracket (4), capping beam (5), built-in fitting (6), steel pipe skewed horizontal load part (7), B1 floor (8) and concrete bracket (9); It is characterized in that: described timber (2) is arranged on base plate cushion cap (1) left end; Described base plate cushion cap (1) upper end is provided with concrete bracket (9); Described B1 floor (8) left end is connected with load transfering strip; Described steel pipe skewed horizontal load part (7) bottom, right side and concrete bracket (9) overlap, and left upper end is connected with capping beam (5) by built-in fitting (6); Described basement bottom board (3) left end left end is connected with conveyer belt.
CN201420764904.7U 2014-12-08 2014-12-08 A kind of foundation pit earth pressure-controlled structure Expired - Fee Related CN204370429U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420764904.7U CN204370429U (en) 2014-12-08 2014-12-08 A kind of foundation pit earth pressure-controlled structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420764904.7U CN204370429U (en) 2014-12-08 2014-12-08 A kind of foundation pit earth pressure-controlled structure

Publications (1)

Publication Number Publication Date
CN204370429U true CN204370429U (en) 2015-06-03

Family

ID=53326661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420764904.7U Expired - Fee Related CN204370429U (en) 2014-12-08 2014-12-08 A kind of foundation pit earth pressure-controlled structure

Country Status (1)

Country Link
CN (1) CN204370429U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104975606A (en) * 2015-06-29 2015-10-14 上海市基础工程集团有限公司 Method for handling high-low strides at adjacent parts of reverse building foundation pit and adjacent foundation pit
CN106930297A (en) * 2017-04-25 2017-07-07 宁波市政工程建设集团股份有限公司 A kind of foundation pit steel support bracket pre-embedded device and construction method
CN107386299A (en) * 2017-08-21 2017-11-24 中国二十冶集团有限公司 Foundation ditch supports concrete construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104975606A (en) * 2015-06-29 2015-10-14 上海市基础工程集团有限公司 Method for handling high-low strides at adjacent parts of reverse building foundation pit and adjacent foundation pit
CN106930297A (en) * 2017-04-25 2017-07-07 宁波市政工程建设集团股份有限公司 A kind of foundation pit steel support bracket pre-embedded device and construction method
CN106930297B (en) * 2017-04-25 2022-05-20 宁波市政工程建设集团股份有限公司 Foundation pit steel support bracket pre-embedding device and construction method
CN107386299A (en) * 2017-08-21 2017-11-24 中国二十冶集团有限公司 Foundation ditch supports concrete construction method

Similar Documents

Publication Publication Date Title
CN203821412U (en) Supporting structure with scattered row piles and continuous walls
CN203034464U (en) Truss type foundation pit supporting structure
CN202559361U (en) Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure
CN204370429U (en) A kind of foundation pit earth pressure-controlled structure
CN206829148U (en) A kind of combined type shaped steel, concrete square pile bearing diagonal foundation pit enclosure structure
CN204456133U (en) A kind of foundation pit earth pressure-controlled structure
CN208251113U (en) A kind of anti-collapse device of building foundation pit
CN102619214B (en) U-shaped interface steel sheet pile and application thereof in enclosure for foundation pit
CN203007955U (en) Supporting structure for foundation pit next to protected and greened soft soil area
CN204510351U (en) A kind of recharge well structure
CN202509502U (en) Soft soil area composite soil nailing wall
CN205024712U (en) Modular tower crane basis
CN206591525U (en) Pipe trench entirety punching block suspension device
CN204098597U (en) A kind of vertical rod base
CN201169781Y (en) Cap digging pit structure
CN203795437U (en) Reinforced steel plate pile foundation pit
CN203603162U (en) Construction elevator load basic system based on foundation pit edge
CN203364947U (en) A weighbridge level console
CN201695399U (en) Supporting structure
CN207419508U (en) Direct burial body of rod basis
CN207017169U (en) A kind of high-filled subgrade culvert off-loading structure
CN204238222U (en) Foundation pit structure
CN203238637U (en) Cement mixing pile structural steel locating structure
CN204418189U (en) A kind of pit backfill structure
CN204343300U (en) A kind of power transmission line foundation pit excavation steel baffle system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20151208

EXPY Termination of patent right or utility model