CN204361674U - A kind of distribution network failure process, load safeguards system - Google Patents
A kind of distribution network failure process, load safeguards system Download PDFInfo
- Publication number
- CN204361674U CN204361674U CN201420742150.5U CN201420742150U CN204361674U CN 204361674 U CN204361674 U CN 204361674U CN 201420742150 U CN201420742150 U CN 201420742150U CN 204361674 U CN204361674 U CN 204361674U
- Authority
- CN
- China
- Prior art keywords
- distribution network
- load
- power distribution
- fault
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/52—Outage or fault management, e.g. fault detection or location
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
A kind of distribution network failure process, load safeguards system, comprise data acquisition system, fault processing module, load assurance module and the equipment that restores electricity; The network topology data of data acquisition system power distribution network, distribution network failure current data, power distribution network 10kV busbar voltage data and statistics; Fault processing module can carry out breakdown judge for the data of data acquisition system, and carry out fast processing, and can ensure that more load is powered and the power supply of important load as far as possible, can guarantee that system safety and the normal electricity consumption of user are not affected substantially; Load assurance module carries out according to the troubleshooting that fault processing module is made the load mating corresponding power distribution network; The equipment of restoring electricity takes appropriate measures when can recover after the process of load assurance module the safe and stable operation of safeguards system.The utility model can carry out fault section and isolation fast, can recover dead electricity load to greatest extent, accomplishes as far as possible not dead electricity, lacks dead electricity as far as possible.
Description
Technical field
The utility model relates to a kind of distribution network failure process, load safeguards system.
Background technology
In prior art to the precautionary measures of power distribution network and troubleshooting all fairly simple, be all utilize power distribution automation main station system to carry out remote monitoring, operation mostly, and practicality is not good enough, and for the treatment measures that some special circumstances do not have some complete.
Summary of the invention
Technical problem to be solved in the utility model is, overcomes the above-mentioned defect that prior art exists, provide a kind of fault section and isolation accurately, the distribution network failure process of good stability, load safeguards system.
It is that a kind of distribution network failure process, load safeguards system, comprise data acquisition system, fault processing module, load assurance module and the equipment that restores electricity that the utility model solves the technical scheme that its technical problem adopts;
The coordination and control of the network topology data of described data acquisition system power distribution network, distribution network failure current data, power distribution network 10kV busbar voltage data and statistics, functional module;
Described fault processing module can carry out breakdown judge for the data of data acquisition system, and carry out fast processing, and can ensure that more load is powered and the power supply of important load as far as possible, can guarantee that system safety and the normal electricity consumption of user are not affected substantially;
Described load assurance module carries out according to the troubleshooting that fault processing module is made the load mating corresponding power distribution network;
The described equipment of restoring electricity takes appropriate measures when can recover after the process of load assurance module the safe and stable operation of safeguards system.
Further, described fault processing module comprises for power distribution network internal fault, and the fault current information collected by terminal is accurately located power distribution network internal fault, and the switch at rapid open failure two ends, fault is isolated; For power distribution network 10kV busbar fault, judge whether power distribution network 10kV bus breaks down by judging whether 10kV busbar voltage sharply declines, if broken down, the connecting valve disconnecting power distribution network and bulk power grid makes power distribution network and bulk power grid depart from.
Further, described load assurance module is for power distribution network internal fault, and by cut-offfing of operation interconnection switch, the load that power distribution network is lost is minimum; For power distribution network 10kV busbar fault, ensured the power supply of load by the islet operation of distributed power source.
Compared with prior art, the utility model structure is simple, low cost of manufacture; Fault section and isolation, distributed generator islanding run and combine, fault section and isolation can be carried out fast, dead electricity load can be recovered to greatest extent, accomplish not dead electricity of trying one's best, lack dead electricity as far as possible, the safe and stable operation of the safeguards system that simultaneously can take appropriate measures when service restoration, agrees with the needs of power distribution network actual motion.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model one embodiment.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described further.
Embodiment
With reference to accompanying drawing 1, this enforcement comprises data acquisition system 1, fault processing module 2, load assurance module 3 and the equipment 4 that restores electricity;
Data acquisition system 1 gathers the coordination and control of the network topology data of power distribution network, distribution network failure current data, power distribution network 10kV busbar voltage data and statistics, each functional module;
The data that fault processing module 2 can gather for data acquisition system 1 carry out breakdown judge, and carry out fast processing, and can ensure that more load is powered and the power supply of important load as far as possible, can guarantee that system safety and the normal electricity consumption of user are not affected substantially; By the data that data acquisition system 1 gathers, carry out breakdown judge, if collect distribution network failure current data, power distribution network inside there occurs fault, if the 10kV busbar voltage data gathered are far below numerical value under normal circumstances, namely there occurs voltage collapse, then power distribution network 10kV bus there occurs fault; Crucial part of the present invention is that distribution network failure electric current and the rapid drawdown of 10kV busbar voltage can not occur simultaneously, utilizes this feature well can carry out the judgement of fault.
Load assurance module 3 carries out according to the troubleshooting that fault processing module 2 is made the load mating corresponding power distribution network;
Restore electricity the safe and stable operation of safeguards system of taking appropriate measures when equipment 4 can recover after the process of load assurance module.
Fault processing module 2 comprises for power distribution network internal fault, and the fault current information collected by data acquisition system 1 is accurately located power distribution network internal fault, and the switch at rapid open failure two ends, fault is isolated; For power distribution network 10kV busbar fault, judge whether power distribution network 10kV bus breaks down by judging whether 10kV busbar voltage sharply declines, if broken down, the connecting valve disconnecting power distribution network and bulk power grid makes power distribution network and bulk power grid depart from;
Load assurance module 4 is for power distribution network internal fault, and by cut-offfing of operation interconnection switch, the load that power distribution network is lost is minimum; For power distribution network 10kV busbar fault, ensured the power supply of load by the islet operation of distributed power source.
The utility model integrates distribution network failure process and load ensures, fault section and isolation can be carried out as early as possible, dead electricity load can be recovered to greatest extent, accomplish not dead electricity of trying one's best, lack dead electricity as far as possible, the safe and stable operation of the safeguards system that simultaneously can take appropriate measures when recovering, agrees with the needs of power distribution network actual motion.
Claims (3)
1. distribution network failure process, a load safeguards system, is characterized in that, comprises data acquisition system, fault processing module, load assurance module and the equipment that restores electricity;
The network topology data of described data acquisition system power distribution network, distribution network failure current data, power distribution network 10kV busbar voltage data;
Described fault processing module can carry out troubleshooting for the data of data acquisition system;
Described load assurance module carries out according to the troubleshooting that fault processing module is made the load mating corresponding power distribution network;
The described equipment of restoring electricity takes appropriate measures when can recover after the process of load assurance module the safe and stable operation of safeguards system.
2. distribution network failure process according to claim 1, load safeguards system, it is characterized in that, described fault processing module comprises for power distribution network internal fault, by the fault current information that terminal collects, power distribution network internal fault is accurately located, and the switch at rapid open failure two ends, fault is isolated; For power distribution network 10kV busbar fault, judge whether power distribution network 10kV bus breaks down by judging whether 10kV busbar voltage sharply declines, if broken down, the connecting valve disconnecting power distribution network and bulk power grid makes power distribution network and bulk power grid depart from.
3. distribution network failure process according to claim 2, load safeguards system, is characterized in that, described load assurance module is for power distribution network internal fault, and by cut-offfing of operation interconnection switch, the load that power distribution network is lost is minimum.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420742150.5U CN204361674U (en) | 2014-12-02 | 2014-12-02 | A kind of distribution network failure process, load safeguards system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420742150.5U CN204361674U (en) | 2014-12-02 | 2014-12-02 | A kind of distribution network failure process, load safeguards system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204361674U true CN204361674U (en) | 2015-05-27 |
Family
ID=53263121
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420742150.5U Expired - Fee Related CN204361674U (en) | 2014-12-02 | 2014-12-02 | A kind of distribution network failure process, load safeguards system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204361674U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105353267A (en) * | 2015-09-29 | 2016-02-24 | 贵州电网公司信息通信分公司 | Detection method of restorable loads of distribution network in fault |
CN106872854A (en) * | 2017-01-26 | 2017-06-20 | 南京陇源汇能电力科技有限公司 | The fault handling method of power distribution automation equipment in a kind of distribution system |
-
2014
- 2014-12-02 CN CN201420742150.5U patent/CN204361674U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105353267A (en) * | 2015-09-29 | 2016-02-24 | 贵州电网公司信息通信分公司 | Detection method of restorable loads of distribution network in fault |
CN105353267B (en) * | 2015-09-29 | 2018-01-12 | 贵州电网公司信息通信分公司 | A kind of distribution network failure can recover load testing method |
CN106872854A (en) * | 2017-01-26 | 2017-06-20 | 南京陇源汇能电力科技有限公司 | The fault handling method of power distribution automation equipment in a kind of distribution system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105470928A (en) | Zoned and layered load transferring method based on urban power transmission network fault recovery | |
CN205429687U (en) | Heavy switching -on device of distribution lines of small power station | |
CN103558502A (en) | Single-phase earth fault detection circuit, method and system | |
CN203572909U (en) | Single-phase ground fault detection circuit and system | |
CN104242467A (en) | Intelligent self-healing controlling method of feeder line of distribution network | |
CN205792453U (en) | A kind of distributed photovoltaic system online insulation against ground safety monitoring assembly | |
CN204361674U (en) | A kind of distribution network failure process, load safeguards system | |
CN102611196A (en) | 10KV power grid state monitoring and fault process automation system | |
CN102306930A (en) | Trip system of total residual current operated protector of distribution area and application method thereof | |
CN202696288U (en) | Rapid on site self-healing apparatus and system for power distribution network fault | |
CN104113002A (en) | High-voltage cable cross interconnection grounding system transfer device | |
CN104485745A (en) | Internet of things based solar power generation monitoring system | |
CN203967762U (en) | A kind of novel intelligent photovoltaic generating system | |
CN203233229U (en) | Share-based power supply operation and support system of seafloor observation network | |
CN204359858U (en) | The device of a kind of monitoring station institute terminal self drain conditions | |
CN204154852U (en) | Transmission and distribution network fault location system | |
CN204789872U (en) | Distribution system trouble on -line monitoring system | |
CN203871916U (en) | Intelligent mining explosive-proof and intrinsic safety type DC voltage stabilizing power supply | |
CN202231421U (en) | Total residual current action protector tripping system in distribution desk area | |
CN203812997U (en) | Accumulator remote maintenance system | |
CN208508580U (en) | A kind of online accumulator cell charging and discharging equipment | |
CN208092188U (en) | Free-standing direct current split screen insulating monitoring circuit | |
CN202632514U (en) | Oil well working motor control system based on remote terminal unit (RTU) device | |
CN106026370A (en) | PLC-based 110kV transformer substation DC power supply system backup device | |
CN204721045U (en) | A kind of UPS storage battery automatic discharge circuit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150527 Termination date: 20151202 |
|
EXPY | Termination of patent right or utility model |