CN204360419U - Material requirement management system - Google Patents

Material requirement management system Download PDF

Info

Publication number
CN204360419U
CN204360419U CN201420629873.4U CN201420629873U CN204360419U CN 204360419 U CN204360419 U CN 204360419U CN 201420629873 U CN201420629873 U CN 201420629873U CN 204360419 U CN204360419 U CN 204360419U
Authority
CN
China
Prior art keywords
management system
production
time
parts
computer system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420629873.4U
Other languages
Chinese (zh)
Inventor
张怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420629873.4U priority Critical patent/CN204360419U/en
Application granted granted Critical
Publication of CN204360419U publication Critical patent/CN204360419U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of material requirement management system, comprises materials warehouse, Bill of Material (BOM), the production schedule and computer system.For realizing JIT production on demand, providing under good service prerequisite to client, maximum lower-depot storage and inventory cost.For process and assemble type enterprise, determine that product produces quantity and time, just can determine the quantity of all parts and the production cycle of parts by the structural drawing of product, anti-release these parts time of producing and making time to retrodict out according to the product plan of producing the demand of correlative.

Description

Material requirement management system
Technical field
The utility model relates to a kind of computer aided production management, is specifically related to a kind of material requirement management system.
Background technology
In order to solve inventory control problem, there has been proposed order-up-to level, these class methods of order-up-to level are suitable for the more stable material of demand.But, in actual production, along with market environment changes, demand is usually unstable, uneven, use order-up-to level just to expose some obvious defects, a certain amount of stock of maintenance blindly in this case, cause part to overstock and coexist with shortage.
Summary of the invention
For overcoming above-mentioned technical matters, the utility model provides a kind of material requirement management system more suiting production.
For realizing above-mentioned technical purpose, the utility model realizes by the following technical solutions: the utility model comprises materials warehouse, Bill of Material (BOM), the production schedule and computer system.
Described materials warehouse comprises material turnover registering apparatus and material stores computing equipment.Described computer system comprises office terminal and communication terminal.The material turnover information of communication terminal accepted thing bin area and inventory information, and accept the information of the production schedule and Bill of Material (BOM), planned order is calculated by office terminal, namely product produces quantity and time and the difference between on-hand inventory and actual demand and need of production time, thus provides manufacturing order and purchase order.Namely calculate planned order by computer system, provide manufacturing order and purchase order by office terminal.
The beneficial effects of the utility model are to realize JIT production on demand, are providing under good service prerequisite, maximum lower-depot storage and inventory cost to client.For process and assemble type enterprise, determine that product produces quantity and time, just can determine the quantity of all parts and the production cycle of parts by the structural drawing of product, anti-release these parts time of producing and making time to retrodict out according to the product plan of producing the demand of correlative.
Accompanying drawing explanation
Fig. 1 is structural principle block diagram of the present utility model.
Embodiment
Be further detailed below in conjunction with accompanying drawing 1 pair of the utility model: as shown in Figure 1,
Workshop consumes stock in process of production, material stores the tank farm stock that computing equipment calculates instant warehouse, the material turnover information of communication terminal accepted thing bin area and inventory information, and accept the information of the production schedule and Bill of Material (BOM), computer system calculates planned order, namely product produces quantity and time and the difference between on-hand inventory and actual demand and need of production time, according to product demand quantity and Date Required, calculate Product Assembly quantity and assembling date further, calculate parts again produce quantity and produce the date, finally obtain needing quantity and needing the time of manufacturing recourses.Instead push away execution instruction, thus obtain plan manifest, manufacturing order and purchase order.

Claims (2)

1. a material requirement management system, comprise materials warehouse, Bill of Material (BOM), the production schedule and computer system, described computer system comprises office terminal and communication terminal, communication terminal accepts the information of the production schedule and Bill of Material (BOM), it is characterized in that to calculate planned order by computer system, provide manufacturing order and purchase order by office terminal.
2. a kind of material requirement management system according to claim 1, is characterized in that: materials warehouse comprises material turnover registering apparatus and material stores computing equipment.
CN201420629873.4U 2014-10-21 2014-10-21 Material requirement management system Expired - Fee Related CN204360419U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420629873.4U CN204360419U (en) 2014-10-21 2014-10-21 Material requirement management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420629873.4U CN204360419U (en) 2014-10-21 2014-10-21 Material requirement management system

Publications (1)

Publication Number Publication Date
CN204360419U true CN204360419U (en) 2015-05-27

Family

ID=53261875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420629873.4U Expired - Fee Related CN204360419U (en) 2014-10-21 2014-10-21 Material requirement management system

Country Status (1)

Country Link
CN (1) CN204360419U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115526462A (en) * 2022-09-13 2022-12-27 成都飞机工业(集团)有限责任公司 Production line material matching method, device, equipment and medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115526462A (en) * 2022-09-13 2022-12-27 成都飞机工业(集团)有限责任公司 Production line material matching method, device, equipment and medium
CN115526462B (en) * 2022-09-13 2024-04-16 成都飞机工业(集团)有限责任公司 Material matching method, device, equipment and medium for production line

Similar Documents

Publication Publication Date Title
CN109146090B (en) Component life cycle management method based on equipment digital twin management platform
Yang et al. Cooperation and coordination in green supply chain with R&D uncertainty
CN108198093B (en) CPS-based intelligent building system
EP2297686A4 (en) Method, system, and computer program for providing a loyalty engine for automated cause management
CN103455490A (en) Modeling processing method and system for air conditioner type selection
CN104463646A (en) Invoice management system based on mobile electronic commerce
CN103793781A (en) Industrial production management system based on bar code technology
CN104574024A (en) ERP remote zero inventory supply chain management system
CN103761622A (en) Information system based on supply chain management
CN110288361A (en) A kind of have furniture made to order information tracking method and system based on Life cycle
CN104616131A (en) Shelf management system and method
CN204463206U (en) A kind of agricultural products storage management system
CN104599020A (en) Store business management system
CN204360419U (en) Material requirement management system
CN202870883U (en) Remote clothing distribution device
Duchi et al. Motivations and challenges for engineer-to-order companies moving toward mass customization
CN202563551U (en) Novel manufacturing industry cloud management platform
Smagowicz et al. A simulation model of power demand management by manufacturing enterprises under the conditions of energy sector transformation
Gan et al. IoT-enabled energy efficiency monitoring and analysis method for energy saving in sheet metal forming workshop
CN114493153A (en) Leveling production scheduling method
CN102495900A (en) Slab production data processing method
CN202939638U (en) Intelligent warehouse logistics system
CN103559579A (en) Method for self-defining tracing procedures in organic food traceability system
KR20150014571A (en) Steel plate managerial system based on supply chain
CN205281564U (en) Production and operation information management system of enterprise based on GIS

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150527

Termination date: 20161021