CN204360419U - Material requirement management system - Google Patents
Material requirement management system Download PDFInfo
- Publication number
- CN204360419U CN204360419U CN201420629873.4U CN201420629873U CN204360419U CN 204360419 U CN204360419 U CN 204360419U CN 201420629873 U CN201420629873 U CN 201420629873U CN 204360419 U CN204360419 U CN 204360419U
- Authority
- CN
- China
- Prior art keywords
- management system
- production
- time
- parts
- computer system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of material requirement management system, comprises materials warehouse, Bill of Material (BOM), the production schedule and computer system.For realizing JIT production on demand, providing under good service prerequisite to client, maximum lower-depot storage and inventory cost.For process and assemble type enterprise, determine that product produces quantity and time, just can determine the quantity of all parts and the production cycle of parts by the structural drawing of product, anti-release these parts time of producing and making time to retrodict out according to the product plan of producing the demand of correlative.
Description
Technical field
The utility model relates to a kind of computer aided production management, is specifically related to a kind of material requirement management system.
Background technology
In order to solve inventory control problem, there has been proposed order-up-to level, these class methods of order-up-to level are suitable for the more stable material of demand.But, in actual production, along with market environment changes, demand is usually unstable, uneven, use order-up-to level just to expose some obvious defects, a certain amount of stock of maintenance blindly in this case, cause part to overstock and coexist with shortage.
Summary of the invention
For overcoming above-mentioned technical matters, the utility model provides a kind of material requirement management system more suiting production.
For realizing above-mentioned technical purpose, the utility model realizes by the following technical solutions: the utility model comprises materials warehouse, Bill of Material (BOM), the production schedule and computer system.
Described materials warehouse comprises material turnover registering apparatus and material stores computing equipment.Described computer system comprises office terminal and communication terminal.The material turnover information of communication terminal accepted thing bin area and inventory information, and accept the information of the production schedule and Bill of Material (BOM), planned order is calculated by office terminal, namely product produces quantity and time and the difference between on-hand inventory and actual demand and need of production time, thus provides manufacturing order and purchase order.Namely calculate planned order by computer system, provide manufacturing order and purchase order by office terminal.
The beneficial effects of the utility model are to realize JIT production on demand, are providing under good service prerequisite, maximum lower-depot storage and inventory cost to client.For process and assemble type enterprise, determine that product produces quantity and time, just can determine the quantity of all parts and the production cycle of parts by the structural drawing of product, anti-release these parts time of producing and making time to retrodict out according to the product plan of producing the demand of correlative.
Accompanying drawing explanation
Fig. 1 is structural principle block diagram of the present utility model.
Embodiment
Be further detailed below in conjunction with accompanying drawing 1 pair of the utility model: as shown in Figure 1,
Workshop consumes stock in process of production, material stores the tank farm stock that computing equipment calculates instant warehouse, the material turnover information of communication terminal accepted thing bin area and inventory information, and accept the information of the production schedule and Bill of Material (BOM), computer system calculates planned order, namely product produces quantity and time and the difference between on-hand inventory and actual demand and need of production time, according to product demand quantity and Date Required, calculate Product Assembly quantity and assembling date further, calculate parts again produce quantity and produce the date, finally obtain needing quantity and needing the time of manufacturing recourses.Instead push away execution instruction, thus obtain plan manifest, manufacturing order and purchase order.
Claims (2)
1. a material requirement management system, comprise materials warehouse, Bill of Material (BOM), the production schedule and computer system, described computer system comprises office terminal and communication terminal, communication terminal accepts the information of the production schedule and Bill of Material (BOM), it is characterized in that to calculate planned order by computer system, provide manufacturing order and purchase order by office terminal.
2. a kind of material requirement management system according to claim 1, is characterized in that: materials warehouse comprises material turnover registering apparatus and material stores computing equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420629873.4U CN204360419U (en) | 2014-10-21 | 2014-10-21 | Material requirement management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420629873.4U CN204360419U (en) | 2014-10-21 | 2014-10-21 | Material requirement management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204360419U true CN204360419U (en) | 2015-05-27 |
Family
ID=53261875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420629873.4U Expired - Fee Related CN204360419U (en) | 2014-10-21 | 2014-10-21 | Material requirement management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204360419U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115526462A (en) * | 2022-09-13 | 2022-12-27 | 成都飞机工业(集团)有限责任公司 | Production line material matching method, device, equipment and medium |
-
2014
- 2014-10-21 CN CN201420629873.4U patent/CN204360419U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115526462A (en) * | 2022-09-13 | 2022-12-27 | 成都飞机工业(集团)有限责任公司 | Production line material matching method, device, equipment and medium |
CN115526462B (en) * | 2022-09-13 | 2024-04-16 | 成都飞机工业(集团)有限责任公司 | Material matching method, device, equipment and medium for production line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109146090B (en) | Component life cycle management method based on equipment digital twin management platform | |
Yang et al. | Cooperation and coordination in green supply chain with R&D uncertainty | |
CN108198093B (en) | CPS-based intelligent building system | |
EP2297686A4 (en) | Method, system, and computer program for providing a loyalty engine for automated cause management | |
CN103455490A (en) | Modeling processing method and system for air conditioner type selection | |
CN104463646A (en) | Invoice management system based on mobile electronic commerce | |
CN103793781A (en) | Industrial production management system based on bar code technology | |
CN104574024A (en) | ERP remote zero inventory supply chain management system | |
CN103761622A (en) | Information system based on supply chain management | |
CN110288361A (en) | A kind of have furniture made to order information tracking method and system based on Life cycle | |
CN104616131A (en) | Shelf management system and method | |
CN204463206U (en) | A kind of agricultural products storage management system | |
CN104599020A (en) | Store business management system | |
CN204360419U (en) | Material requirement management system | |
CN202870883U (en) | Remote clothing distribution device | |
Duchi et al. | Motivations and challenges for engineer-to-order companies moving toward mass customization | |
CN202563551U (en) | Novel manufacturing industry cloud management platform | |
Smagowicz et al. | A simulation model of power demand management by manufacturing enterprises under the conditions of energy sector transformation | |
Gan et al. | IoT-enabled energy efficiency monitoring and analysis method for energy saving in sheet metal forming workshop | |
CN114493153A (en) | Leveling production scheduling method | |
CN102495900A (en) | Slab production data processing method | |
CN202939638U (en) | Intelligent warehouse logistics system | |
CN103559579A (en) | Method for self-defining tracing procedures in organic food traceability system | |
KR20150014571A (en) | Steel plate managerial system based on supply chain | |
CN205281564U (en) | Production and operation information management system of enterprise based on GIS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150527 Termination date: 20161021 |