CN204356917U - Freezer does operation heat preservation system inside every vapour entirely - Google Patents
Freezer does operation heat preservation system inside every vapour entirely Download PDFInfo
- Publication number
- CN204356917U CN204356917U CN201420827652.8U CN201420827652U CN204356917U CN 204356917 U CN204356917 U CN 204356917U CN 201420827652 U CN201420827652 U CN 201420827652U CN 204356917 U CN204356917 U CN 204356917U
- Authority
- CN
- China
- Prior art keywords
- insulation
- vapor barrier
- layer
- barrier layer
- boards
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004321 preservation Methods 0.000 title abstract description 5
- 238000009413 insulation Methods 0.000 claims abstract description 88
- 230000004888 barrier function Effects 0.000 claims abstract description 53
- 239000010410 layer Substances 0.000 claims description 79
- 238000009434 installation Methods 0.000 claims description 9
- 239000011241 protective layer Substances 0.000 claims description 9
- 239000011490 mineral wool Substances 0.000 claims description 6
- 239000003973 paint Substances 0.000 claims description 4
- 239000011491 glass wool Substances 0.000 claims description 3
- 239000011248 coating agent Substances 0.000 claims description 2
- 238000000576 coating method Methods 0.000 claims description 2
- 230000007774 longterm Effects 0.000 abstract description 3
- 230000003628 erosive effect Effects 0.000 abstract 1
- 239000011810 insulating material Substances 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 12
- 239000012774 insulation material Substances 0.000 description 7
- 239000004814 polyurethane Substances 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Chemical compound O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 230000002265 prevention Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229920002635 polyurethane Polymers 0.000 description 2
- 229920002943 EPDM rubber Polymers 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 229920006351 engineering plastic Polymers 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000003823 mortar mixing Methods 0.000 description 1
- 239000011368 organic material Substances 0.000 description 1
- 239000002861 polymer material Substances 0.000 description 1
- 229920000915 polyvinyl chloride Polymers 0.000 description 1
- 239000004800 polyvinyl chloride Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000005057 refrigeration Methods 0.000 description 1
- 239000005060 rubber Substances 0.000 description 1
- 239000000741 silica gel Substances 0.000 description 1
- 229910002027 silica gel Inorganic materials 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Building Environments (AREA)
- Thermal Insulation (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种冷库内保温系统,尤其是涉及一种冷库全隔汽干作业内保温系统及其施工方法。The utility model relates to an internal thermal insulation system of a cold storage, in particular to an internal thermal insulation system and a construction method thereof for full steam insulation and dry operation of the cold storage.
背景技术Background technique
随着冷链物流的发展,近年来我国冷库的建设速度突飞猛进,国家发改委最近公布《农产品冷链物流发展规划》,我国计划到2015年全国冷库总容量增加到1000万吨。由于制冷能耗费用占据个行费用近50%,冷库内部具有高湿度和低温度的特点,围护结构的保温、隔热、防水、隔汽等性能对降低运行能耗有着至关重要的影响。相对一般民用和工业建筑,冷库内部是密闭空间,一旦发生火灾,烟气不容易扩散,人员没有便捷的逃生通道,因此冷库发生火灾的后果特别严重。但冷库保温应用技术缺乏研究,长期以来没有很好的系统解决冷库保温、隔汽和防火等问题,目前主要以挤塑板为保温材料的薄抹灰系统和现场硬泡聚氨酯喷涂系统,存在以下问题:With the development of cold chain logistics, the construction speed of cold storage in my country has been advancing by leaps and bounds in recent years. The National Development and Reform Commission recently announced the "Agricultural Products Cold Chain Logistics Development Plan". As the cost of refrigeration energy consumption accounts for nearly 50% of personal expenses, the interior of the cold storage is characterized by high humidity and low temperature, and the performance of heat preservation, heat insulation, waterproof, and vapor insulation of the enclosure structure has a crucial impact on reducing operating energy consumption . Compared with ordinary civil and industrial buildings, the interior of the cold storage is a closed space. Once a fire occurs, the smoke is not easy to spread, and there is no convenient escape route for personnel. Therefore, the consequences of a fire in the cold storage are particularly serious. However, there is a lack of research on the application technology of cold storage insulation. For a long time, there has not been a good system to solve the problems of cold storage insulation, steam insulation and fire prevention. At present, the thin plastering system and the on-site hard foam polyurethane spraying system mainly use extruded board as insulation materials. There are the following question:
(1.)安装固定件时,隔汽层被破坏,没有完整的隔汽层,造成使用过程中水汽渗漏严重。(1.) When installing the fixing parts, the vapor barrier layer is destroyed, and there is no complete vapor barrier layer, resulting in serious water vapor leakage during use.
(2.)中国地域辽阔,库温和气温的高低会随季节变化发生转化,单向高温侧隔汽无法满足各种工作环境,造成保温材料受潮,保温性能急剧下降。(2.) China has a vast territory, and the storage temperature and temperature will change with the seasons. The one-way high-temperature side steam insulation cannot meet various working environments, causing the insulation material to be damp and the insulation performance to drop sharply.
(3.)采用多层保温板时,需逐层打钉固定,严重破坏基层墙体。(3.) When using multi-layer insulation boards, nails need to be fixed layer by layer, which seriously damages the base wall.
(4.)由于高湿度环境,只能采用吸水率相对较小的有机保温材料,同时没有很好的系统防火措施,带来火灾隐患。(4.) Due to the high humidity environment, only organic thermal insulation materials with relatively small water absorption can be used, and there are no good system fire prevention measures, which brings fire hazards.
(5.)现场湿作业施工,砂浆等材料浪费严重,现场施工环境恶劣。(5.) On-site wet construction, the waste of mortar and other materials is serious, and the on-site construction environment is harsh.
实用新型内容Utility model content
本实用新型的目的是克服现存方案的缺点,提供技术可靠,经济合理,施工方便的新型冷库全隔汽干作业内保温系统及其施工方法。实现上述目的的技术方案如下:The purpose of this utility model is to overcome the shortcomings of the existing solutions, to provide a new type of cold storage full-steam insulation and dry operation internal heat preservation system and its construction method with reliable technology, reasonable economy and convenient construction. The technical scheme for realizing the above-mentioned purpose is as follows:
冷库全隔汽干作业内保温系统,以基层墙体为基础,在基层墙体外设置保温层,其特征在于:基层墙体与保温层之间设置内隔汽层,固定件一端固定在基层墙体内,固定件另一端依次穿过内隔汽层、保温层,在固定件的末端连接锁定件,其中锁定件的外侧连接外隔汽层,外隔汽层的外端设置防护层。The internal thermal insulation system of the cold storage with full steam insulation and dry operation is based on the base wall, and an insulation layer is set outside the base wall. Inside the wall, the other end of the fixing part passes through the inner vapor barrier layer and the insulation layer in sequence, and the end of the fixing part is connected with the locking part, wherein the outer side of the locking part is connected with the outer vapor barrier layer, and the outer end of the outer vapor barrier layer is provided with a protective layer.
优选的,固定件使用一根或者数根,所述固定件具有杆身、安装头,所述安装头连接在杆身的一侧,同时安装头埋置在墙体内,杆身的另一侧,在杆身轴心具有一螺丝孔,螺丝孔内配置螺丝,锁定件通过螺丝与杆身连接在一起,从而通过固定件将内隔汽层、保温层固定在一块。Preferably, one or several fixing parts are used, and the fixing part has a shaft and an installation head, and the installation head is connected to one side of the shaft, while the installation head is embedded in the wall, and the other side of the shaft On the side, there is a screw hole in the axis of the shaft, and a screw is arranged in the screw hole, and the locking part is connected with the shaft through the screw, so that the inner vapor barrier layer and the thermal insulation layer are fixed together by the fixing part.
优选的,所述锁定件为龙骨,其中外隔汽层、防护层内也穿过螺丝与龙骨固定连接。Preferably, the locking member is a keel, wherein the outer vapor barrier layer and the inside of the protective layer are fixedly connected to the keel through screws.
优选的,保温层与内隔汽层之间,在固定件上套接弹性垫片,龙骨与外隔汽层之间,螺丝上套接弹性垫片。Preferably, between the thermal insulation layer and the inner vapor barrier layer, elastic gaskets are sleeved on the fixing parts, and between the keel and the outer vapor barrier layer, elastic gaskets are sleeved on the screws.
优选的,内隔汽层为隔汽涂料或者隔汽膜,所述保温层为一层或者多层保温板,所述保温层为有机保温板或者无机保温板,所述有机保温板选用PU、XPS、EPS中的任一种;所述无机保温板选自矿棉板、岩棉板、玻璃棉板中的任一种。Preferably, the inner vapor barrier layer is a vapor barrier coating or a vapor barrier film, and the thermal insulation layer is one or more layers of thermal insulation boards, and the thermal insulation layer is an organic thermal insulation board or an inorganic thermal insulation board, and the organic thermal insulation board is selected from PU, Any one of XPS and EPS; the inorganic insulation board is selected from any one of mineral wool boards, rock wool boards, and glass wool boards.
优选的,当采用多层保温板时,阴阳拐角处板与板之间采用错缝铺设,层与层之间横向保温板和竖向保温板错缝铺设。Preferably, when multi-layer insulation boards are used, the boards at the corners of the yin and yang are laid with staggered seams, and the horizontal insulation boards and vertical insulation boards are laid with staggered seams between layers.
优选的,所述内隔汽层为PE膜或涂料,所述外隔汽层为PE膜。Preferably, the inner vapor barrier layer is PE film or paint, and the outer vapor barrier layer is PE film.
冷库全隔汽干作业内保温系统的施工方法,其特征在于:首先验收基层墙体,验收合格后将固定件的安装头固定在基层墙体内部,使固定件的杆身垂直基层墙面向外引出,然后依次在固定件上安装内隔汽层、保温层,之后使用连接件,例如螺丝将锁定件与杆身连接,之后再在锁定件外侧连接外隔汽层,最后在外隔汽层外侧连接防护层。The construction method of the internal heat preservation system for the full steam-proof dry operation of the cold storage is characterized in that: firstly, the base wall is accepted, and after the acceptance is passed, the installation head of the fixing part is fixed inside the base wall, so that the shaft of the fixing part is perpendicular to the base wall. Then install the inner vapor barrier and insulation layer on the fixing part in turn, and then use the connecting parts, such as screws, to connect the locking part with the shaft, then connect the outer vapor barrier layer on the outside of the locking part, and finally install the outer vapor barrier layer The outer connection protective layer.
所述安装头采用预埋式或粘贴的方式固定在基层墙体上,或者采用在基层墙体钻孔的方式固定安装头。The installation head is fixed on the base wall by pre-embedding or pasting, or the installation head is fixed by drilling holes in the base wall.
由于保温层的内、外两侧都有隔汽层,保证在任何气候条件下和各种冷库环境中,保温层不受潮气侵蚀,保持了保温材料长期的保温性能。Since the inner and outer sides of the insulation layer have vapor barrier layers, it is guaranteed that the insulation layer will not be eroded by moisture under any climatic conditions and in various cold storage environments, and the long-term insulation performance of the insulation material is maintained.
附图说明Description of drawings
图1为本实用新型示意图Fig. 1 is a schematic diagram of the utility model
图2为图1的局部放大图Figure 2 is a partial enlarged view of Figure 1
图3为龙骨截面示意图Figure 3 is a schematic diagram of the keel section
图4为固定件剖面示意图Figure 4 is a schematic cross-sectional view of the fixture
附图序号说明:基层墙体1、内隔汽层2、保温层3、外隔汽层4、防护层5、固定件6、龙骨7、弹性垫圈8、Description of the serial numbers of the drawings: base wall 1, inner vapor barrier layer 2, thermal insulation layer 3, outer vapor barrier layer 4, protective layer 5, fixing piece 6, keel 7, elastic washer 8,
具体实施方式Detailed ways
下面结合附图对本实用新型做详细的说明。Below in conjunction with accompanying drawing, the utility model is described in detail.
图中,冷库全隔汽干作业内保温系统由内向外依次为基层墙体1、内隔汽层2、保温层3、外隔汽层4、防护层5,垂直于墙面的固定件6从基层墙体引出,依次贯穿了内隔汽层2、保温层3,固定件6的末端连接锁定件,所述锁定件为专用龙骨7(龙骨为本领域内的常规部件),龙骨的外侧通过螺丝与外隔汽层4、防护层5固定连接在一起,由于龙骨的中心具有通孔,因此龙骨中心的通孔也穿过螺丝,通过螺丝将龙骨连接在固定件的末端。In the figure, the internal thermal insulation system of the cold storage full vapor barrier dry operation is the base wall 1, the internal vapor barrier layer 2, the thermal insulation layer 3, the external vapor barrier layer 4, the protective layer 5, and the fixing piece 6 perpendicular to the wall from the inside to the outside. Leading from the base wall, it runs through the inner vapor barrier 2 and the thermal insulation layer 3 successively. The end of the fixing part 6 is connected to the locking part. The outer vapor barrier layer 4 and the protective layer 5 are fixedly connected together by screws. Since the center of the keel has a through hole, the through hole in the center of the keel also passes through the screw, and the keel is connected to the end of the fixture by the screw.
所述固定件具有安装头6-1、杆身6-2,所述安装头连接在杆身的一侧,同时安装头埋置在墙体内,杆身的另一侧,在杆身轴心具有一螺丝孔6-3,螺丝孔内配置螺丝,龙骨通过螺丝与杆身连接在一起,本实用新型中固定件可以根据需要使用一根或者数根。固定件由硬质工程塑料制成,在固定件穿透隔气层的地方,采用了弹性垫片8或弹性垫条进行密封,弹性垫片8或弹性垫条由具有弹性的有机材料制成,包括但不限于橡胶、硅胶、PVC、聚氨酯、三元乙丙等高分子材料等,弹性垫片8或弹性垫条的厚度为1.5~3毫米,安装头可以采用预埋式或粘贴的方式固定在基层墙体上,也可以是事先在基层墙体上进行钻孔来固定安装头。The fixture has a mounting head 6-1 and a shaft 6-2, the mounting head is connected to one side of the shaft, and the mounting head is embedded in the wall, and the other side of the shaft is on the shaft axis. Heart has a screw hole 6-3, disposes screw in the screw hole, and keel is connected together with shaft by screw, and fixing part can use one or several as required in the utility model. The fixing part is made of hard engineering plastics, and the place where the fixing part penetrates the air barrier layer is sealed with an elastic gasket 8 or elastic gasket, and the elastic gasket 8 or elastic gasket is made of elastic organic material , including but not limited to polymer materials such as rubber, silica gel, PVC, polyurethane, EPDM, etc. The thickness of the elastic gasket 8 or elastic pad is 1.5-3 mm, and the installation head can be embedded or pasted. It can be fixed on the base wall, or it can be drilled on the base wall in advance to fix the installation head.
内隔汽层可以采用隔汽涂料,也可以采用隔汽膜,保温层可以是一层保温板,也可以是多层保温板,当采用多层保温板时,阴阳拐角处板与板之间错缝铺设,层与层之间横向保温板和竖向保温板也错缝铺设,总之无论怎么放置,保温板之间的对缝处不要设置在一起,避免保温效果变差。保温层可以采用有机保温板,如PU、XPS、EPS等,也可以采用无机保温板,如矿棉板、岩棉板、玻璃棉板等。The inner vapor barrier layer can use vapor barrier paint or vapor barrier film. The thermal insulation layer can be a layer of thermal insulation board or a multi-layer thermal insulation board. Staggered laying, horizontal insulation boards and vertical insulation boards between layers are also laid with staggered seams. In short, no matter how they are placed, the opposite seams between insulation boards should not be set together to avoid poor insulation effect. The insulation layer can use organic insulation boards, such as PU, XPS, EPS, etc., or inorganic insulation boards, such as mineral wool boards, rock wool boards, glass wool boards, etc.
由于在龙骨的凸面预先开有长条形的槽(即用来螺丝穿过的通孔),方向和专用龙骨长度方向一致,方便观察固定件的位置,容易安装。其中专用龙骨、弹性垫片、保温层的内外两侧都有隔汽层,在任何条件下保证保温材料处于干燥状态。Because the convex surface of the keel is pre-opened with a strip-shaped groove (that is, a through hole for the screw to pass through), the direction is consistent with the length direction of the special keel, which is convenient for observing the position of the fixing part and is easy to install. Among them, there are vapor barrier layers on the inner and outer sides of the special keel, elastic gasket, and thermal insulation layer to ensure that the thermal insulation material is in a dry state under any conditions.
本实用新型的施工工艺步骤:验收基层墙体→弹控制线→钻孔或开凹槽→安装固定件→安装内隔汽层(涂料或PE膜)→安装弹性垫片→安装保温层(一层或多层)→固定专用龙骨→贴弹性垫条;→贴挂外隔汽层(PE)膜→安装防护层。The construction process steps of the utility model: check and accept the base wall → play the control line → drill or open the groove → install the fixing part → install the inner vapor barrier layer (paint or PE film) → install the elastic gasket → install the insulation layer (one layer or multiple layers) → fix the special keel → paste the elastic gasket; → paste the outer vapor barrier (PE) film → install the protective layer.
具体的说本实用新型的施工方法如下:Concretely the construction method of the present utility model is as follows:
在基层墙体验收合格后,首先采用钻孔、预埋式或粘贴等方式,从基层墙面引出垂直向外的长杆状固定件,然后依次在固定件上安装内隔汽层,弹性垫片、保温层(一层或多层),龙骨,再在龙骨外侧安装弹性垫条和外隔汽层,最后在龙骨上固定无机板材,形成防护层。After the base wall is accepted, first use drilling, pre-embedding or pasting to draw out the long rod-shaped fixing parts vertically outward from the base wall, and then install the inner vapor barrier layer and the elastic pad on the fixing parts in turn. sheet, insulation layer (one or more layers), keel, and then install elastic pads and outer vapor barrier on the outside of the keel, and finally fix inorganic plates on the keel to form a protective layer.
本实用新型技术方案带来的有益效果:Beneficial effects brought by the technical solution of the utility model:
(1.)保温层的内、外两侧都有隔汽层,保证在任何气候条件下和各种冷库环境中,保温层不受潮气侵蚀,保持了保温材料长期的保温性能。(1.) There are vapor barrier layers on the inner and outer sides of the insulation layer to ensure that the insulation layer is not eroded by moisture under any climatic conditions and in various cold storage environments, and the long-term insulation performance of the insulation material is maintained.
(2.)可以同时安装多层保温材料,不需要逐层打钉固定,不破坏任何一层隔汽层,保证水汽不渗漏。(2.) Multi-layer insulation materials can be installed at the same time, without nailing and fixing layer by layer, without destroying any layer of vapor barrier to ensure that water vapor does not leak.
(3.)由于采用了双层隔汽,可以选用任何材质的保温板,而不局限在有机保温板,可以把防火性能更好的无机保温板应用在冷库中,提高了冷库的整体防火性能。(3.) Due to the use of double-layer steam insulation, insulation boards of any material can be used, not limited to organic insulation boards, and inorganic insulation boards with better fire resistance can be applied to cold storage, improving the overall fire resistance of cold storage .
(4.)最外层的无机防护板材有效地防止撞击破坏保护,同时起到防火和装饰作用。(4.) The outermost inorganic protective plate effectively prevents impact damage protection, and at the same time plays the role of fire prevention and decoration.
(5.)弹性垫片和弹性垫条可以有效地弥补固定引起的隔汽层局部破坏,阻隔水汽渗漏。(5.) Elastic gaskets and elastic pads can effectively compensate for the local damage of the vapor barrier caused by fixing, and block water vapor leakage.
(6.)干作业施工,杜绝了砂浆在现场搅拌和抹灰,节约了材料,改善了施工环境,提高了施工进度。(6.) Dry operation construction eliminates mortar mixing and plastering on site, saves materials, improves construction environment, and increases construction progress.
以上仅为本实用新型实施例的较佳实施例而已,并不用以限制本实用新型实施例,凡在本实用新型实施例的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型实施例的保护范围内。The above is only a preferred embodiment of the utility model embodiment, and is not intended to limit the utility model embodiment. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model embodiment, All should be included in the protection scope of the embodiments of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420827652.8U CN204356917U (en) | 2014-12-23 | 2014-12-23 | Freezer does operation heat preservation system inside every vapour entirely |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420827652.8U CN204356917U (en) | 2014-12-23 | 2014-12-23 | Freezer does operation heat preservation system inside every vapour entirely |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204356917U true CN204356917U (en) | 2015-05-27 |
Family
ID=53258395
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420827652.8U Expired - Lifetime CN204356917U (en) | 2014-12-23 | 2014-12-23 | Freezer does operation heat preservation system inside every vapour entirely |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204356917U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104452986A (en) * | 2014-12-23 | 2015-03-25 | 江苏卧牛山保温防水技术有限公司 | Refrigeration house whole-vapor-insulation dry operation internal thermal insulation system and construction method thereof |
| CN110159317A (en) * | 2019-05-11 | 2019-08-23 | 中国建筑东北设计研究院有限公司 | Waterproof, heat preservation in low-temperature tunnel, slider and its reverse construction method every vapour |
-
2014
- 2014-12-23 CN CN201420827652.8U patent/CN204356917U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104452986A (en) * | 2014-12-23 | 2015-03-25 | 江苏卧牛山保温防水技术有限公司 | Refrigeration house whole-vapor-insulation dry operation internal thermal insulation system and construction method thereof |
| CN110159317A (en) * | 2019-05-11 | 2019-08-23 | 中国建筑东北设计研究院有限公司 | Waterproof, heat preservation in low-temperature tunnel, slider and its reverse construction method every vapour |
| CN110159317B (en) * | 2019-05-11 | 2024-03-05 | 中国建筑东北设计研究院有限公司 | Waterproof, heat-insulating and steam-isolating isolator in low-temperature tunnel and reverse construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204491855U (en) | The anti-heat bridge structure of a kind of building wall pipe | |
| CN104452986B (en) | Freezer is complete to do operation heat preservation system inside and its construction method every vapour | |
| CN204356917U (en) | Freezer does operation heat preservation system inside every vapour entirely | |
| CN201915514U (en) | Metal skinned waterproof rock wool heat insulation composite plate | |
| CN203515151U (en) | Composite aluminum-wrapped wood window thermal insulating device | |
| CN202577792U (en) | Foamed polycarbamate heat preservation waterproof roof | |
| CN205776867U (en) | A kind of ultralow heat conduction fire preventing steel structure construction wall | |
| CN201649510U (en) | Energy-saving thermal insulation fireproof decorative board | |
| CN204899051U (en) | Thermal insulation core sandwich board anti cold bridge node | |
| CN203049812U (en) | Rigid foam polyurethane composite board used for wall heat preservation | |
| CN202509652U (en) | Insulating decorative compound wall suitable for different energy-saving requirements | |
| CN201649327U (en) | fireproof insulation board for building | |
| CN205777002U (en) | A kind of roof structure in passive type house | |
| CN205776869U (en) | A kind of passive type house wall structure | |
| CN204804164U (en) | Building that keeps warm exterior wall cladding | |
| CN203834703U (en) | External thermal insulation fireproof barrier of building | |
| CN202519801U (en) | Building fire prevention composite insulation board | |
| CN203008152U (en) | Aerogel heat-insulating plate thin plastered insulation system | |
| CN202450634U (en) | Novel A-level insulation board | |
| CN204491857U (en) | A kind of insulation layer being applicable to the winter construction of nontransparent curtain wall exterior wall | |
| CN208733944U (en) | A kind of metal roofing structure | |
| CN206818574U (en) | An experimental device for measuring and controlling building materials | |
| CN204573348U (en) | Passive room wall-passing pipe Water-proof air-tight structure | |
| CN204940572U (en) | A kind of exterior-wall heat insulation rock wool-steel plywood | |
| CN107401228A (en) | A kind of passive type house wall structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee | ||
| CP02 | Change in the address of a patent holder |
Address after: 211111 Jiangsu Province, Nanjing Zijin (Jiangning) technology start-ups in particular communities (Jiangning District moling Street Mo Zhou Road No. 12) Patentee after: JIANGSU WONIUSHAN THERMAL INSULATION AND WATERPROOF TECHNOLOGY CO.,LTD. Address before: 210000 Xuanwu Avenue, Xuanwu District, Jiangsu, Nanjing 699-1 Patentee before: JIANGSU WONIUSHAN THERMAL INSULATION AND WATERPROOF TECHNOLOGY CO.,LTD. |
|
| CP03 | Change of name, title or address |
Address after: 211111 No.12, East Zhuzhou Road, Jianling street, Jiangning District, Nanjing City, Jiangsu Province Patentee after: Jiangsu Funiushan building energy saving Technology Co.,Ltd. Address before: 211111 Jiangsu Province, Nanjing Zijin (Jiangning) technology start-ups in particular communities (Jiangning District moling Street Mo Zhou Road No. 12) Patentee before: JIANGSU WONIUSHAN THERMAL INSULATION AND WATERPROOF TECHNOLOGY Co.,Ltd. |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 211100 No. 12, Mazhou East Road, Mau Ling Street, Jiangning District, Nanjing, Jiangsu Patentee after: Woniushan building energy saving Co.,Ltd. Address before: 211111 No.12, Dongzhou Road, Zhenling street, Jiangning District, Nanjing City, Jiangsu Province Patentee before: Jiangsu Funiushan building energy saving Technology Co.,Ltd. |
|
| CP03 | Change of name, title or address | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150527 |
|
| CX01 | Expiry of patent term |