CN204346187U - A kind of accelerating cooling calcium carbide also reclaims the system of melting calcium carbide waste heat - Google Patents

A kind of accelerating cooling calcium carbide also reclaims the system of melting calcium carbide waste heat Download PDF

Info

Publication number
CN204346187U
CN204346187U CN201420783389.7U CN201420783389U CN204346187U CN 204346187 U CN204346187 U CN 204346187U CN 201420783389 U CN201420783389 U CN 201420783389U CN 204346187 U CN204346187 U CN 204346187U
Authority
CN
China
Prior art keywords
calcium carbide
collecting system
pipeline
cooler
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420783389.7U
Other languages
Chinese (zh)
Inventor
庞全法
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yixing Yulong Electric Furnace Complete Equipment Co Ltd
Original Assignee
Yixing Yulong Electric Furnace Complete Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yixing Yulong Electric Furnace Complete Equipment Co Ltd filed Critical Yixing Yulong Electric Furnace Complete Equipment Co Ltd
Priority to CN201420783389.7U priority Critical patent/CN204346187U/en
Application granted granted Critical
Publication of CN204346187U publication Critical patent/CN204346187U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • Y02P80/15On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

The utility model relates to a kind of accelerating cooling calcium carbide and reclaims the system of melting calcium carbide waste heat, it comprises collecting system, and be located at the heat pump of described collecting system one end, calcium carbide pot is provided with on described collecting system top, described collecting system is made up of heat collector unit, described heat collector unit comprises steel plate, and the heat pump fluid passage be located at below steel plate, described heat pump comprises compressor, described compressor is connected with side, cooler top by pipeline, described cooler top opposite side is connected with collecting system front portion by pipeline, the pipeline that described cooler is connected with collecting system front portion is provided with throttle expansion valve, described collecting system rear portion is connected with compressor by pipeline, demineralized water intake tunnel is provided with in side, described cooler bottom, in described cooler bottom, opposite side is provided with saturation water exhalant canal.Utility model works efficiency is high, and floor space is few, cooling and recovering effect good.

Description

A kind of accelerating cooling calcium carbide also reclaims the system of melting calcium carbide waste heat
Technical field
The utility model relates to a kind of cooling and residual neat recovering system, is specifically related to the system of a kind of accelerating cooling calcium carbide and recovery calcium carbide waste heat.
Background technology
There is inefficiency in the cooling of existing calcium carbide and waste-heat recovery device, cooling and recovering effect undesirable, the working quantity of calcium carbide pot is more, thus adds cooling site area, does not meet actual operation requirements.
Summary of the invention
Goal of the invention: the purpose of this utility model is to overcome deficiency of the prior art, and provide a kind of operating efficiency high, floor space is few, cooling and the good accelerating cooling calcium carbide of recovering effect also reclaim the system of melting calcium carbide waste heat.
Technical scheme: in order to solve the problems of the technologies described above, a kind of accelerating cooling calcium carbide described in the utility model also reclaims the system of melting calcium carbide waste heat, it comprises collecting system, and be located at the heat pump of described collecting system one end, calcium carbide pot is provided with on described collecting system top, described collecting system is made up of heat collector unit, described heat collector unit comprises steel plate, and the heat pump fluid passage be located at below steel plate, described heat pump comprises compressor, described compressor is connected with side, cooler top by pipeline, described cooler top opposite side is connected with collecting system front portion by pipeline, the pipeline that described cooler is connected with collecting system front portion is provided with throttle expansion valve, described collecting system rear portion is connected with compressor by pipeline, demineralized water intake tunnel is provided with in side, described cooler bottom, in described cooler bottom, opposite side is provided with saturation water exhalant canal.
Described collecting system is at least made up of a heat collector unit.
Described collecting system is by heat collector units in series or compose in parallel.
Described calcium carbide pot is located at above steel plate.
Operation principle of the present utility model is: hot calcium carbide pot is placed on heat collector, and heat collector is made up of the heat pump fluid passage below steel plate and steel plate.Many groups heat collector can adopt serial or parallel connection mode to connect.Heat pump fluid is filled in passage.Hot calcium carbide pot by heat conduction to steel plate and working medium, working medium gasifies after being heated accumulation of heat, through compressor adiabatic compression, Temperature of Working raises becomes high temperature high pressure liquid, through condenser and demineralized water heat exchange, high-pressure liquid working medium becomes the saturated mixed working fluid of low-pressure gas-liquid and returns heat collector after throttle expansion valve adiabatic expansion.Demineralized water within the condenser after heat exchange temperature raise and become saturation water, going vaporizer to vaporize becomes saturated vapor.
Beneficial effect: the utility model compared with prior art, its remarkable advantage is: the utility model reasonable in design, overall operation is steadily reliable, and thermoelectricity stone, by the cooling device bottom calcium carbide pot, accelerates calcium carbide cooling, shorten cool time, the quantity of turnover calcium carbide pot can be reduced, thus save calcium carbide cooling site area, overall cooling and recovering effect good, operating efficiency is high, realistic instructions for use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further described.
As shown in Figure 1, a kind of accelerating cooling calcium carbide described in the utility model also reclaims the system of melting calcium carbide waste heat, it comprises collecting system, and be located at the heat pump of described collecting system one end, calcium carbide pot 1 is provided with on described collecting system top, described collecting system is made up of heat collector unit 2, described heat collector unit 2 comprises steel plate 3, and the heat pump fluid passage 4 be located at below steel plate 3, described heat pump comprises compressor 5, described compressor 5 is connected with side, cooler 6 top by pipeline, described cooler 6 top opposite side is connected with collecting system front portion by pipeline, the pipeline that described cooler 6 is connected with collecting system front portion is provided with throttle expansion valve 7, described collecting system rear portion is connected with compressor 5 by pipeline, demineralized water intake tunnel 8 is provided with in side, described cooler 6 bottom, in described cooler 6 bottom, opposite side is provided with saturation water exhalant canal 9, described collecting system is at least made up of a heat collector unit 2, described collecting system is made up of heat collector unit 2 serial or parallel connection, described calcium carbide pot 1 is located at above steel plate 3.The utility model reasonable in design, overall operation is steadily reliable, thermoelectricity stone is by the cooling device bottom calcium carbide pot, acceleration calcium carbide cools, and shortens cool time, can reduce the quantity of turnover calcium carbide pot, also calcium carbide cooling site area can be saved, overall cooling and recovering effect good, operating efficiency is high, realistic instructions for use.
The utility model provides a kind of thinking and method; the method and access of this technical scheme of specific implementation is a lot; the above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art, under the prerequisite not departing from the utility model principle, some improvements and modifications can also be made; these improvements and modifications also should be considered as protection domain of the present utility model, and all available prior art of each part not clear and definite in the present embodiment is realized.

Claims (4)

1. an accelerating cooling calcium carbide reclaim the system of melting calcium carbide waste heat, it is characterized in that: it comprises collecting system, and be located at the heat pump of described collecting system one end, calcium carbide pot (1) is provided with on described collecting system top, described collecting system is made up of heat collector unit (2), described heat collector unit (2) comprises steel plate (3), and be located at the heat pump fluid passage (4) of steel plate (3) below, described heat pump comprises compressor (5), described compressor (5) is connected with cooler (6) side, top by pipeline, described cooler (6) top opposite side is connected with collecting system front portion by pipeline, the pipeline that described cooler (6) is connected with collecting system front portion is provided with throttle expansion valve (7), described collecting system rear portion is connected with compressor (5) by pipeline, demineralized water intake tunnel (8) is provided with in described cooler (6) side, bottom, in described cooler (6) bottom, opposite side is provided with saturation water exhalant canal (9).
2. accelerating cooling calcium carbide according to claim 1 reclaim the system of melting calcium carbide waste heat, is characterized in that: described collecting system is at least made up of a heat collector unit (2).
3. accelerating cooling calcium carbide according to claim 1 reclaim the system of melting calcium carbide waste heat, is characterized in that: described collecting system is made up of heat collector unit (2) serial or parallel connection.
4. accelerating cooling calcium carbide according to claim 1 reclaim the system of melting calcium carbide waste heat, is characterized in that: described calcium carbide pot (1) is located at above steel plate (3).
CN201420783389.7U 2014-12-11 2014-12-11 A kind of accelerating cooling calcium carbide also reclaims the system of melting calcium carbide waste heat Withdrawn - After Issue CN204346187U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420783389.7U CN204346187U (en) 2014-12-11 2014-12-11 A kind of accelerating cooling calcium carbide also reclaims the system of melting calcium carbide waste heat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420783389.7U CN204346187U (en) 2014-12-11 2014-12-11 A kind of accelerating cooling calcium carbide also reclaims the system of melting calcium carbide waste heat

Publications (1)

Publication Number Publication Date
CN204346187U true CN204346187U (en) 2015-05-20

Family

ID=53229450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420783389.7U Withdrawn - After Issue CN204346187U (en) 2014-12-11 2014-12-11 A kind of accelerating cooling calcium carbide also reclaims the system of melting calcium carbide waste heat

Country Status (1)

Country Link
CN (1) CN204346187U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105737621A (en) * 2014-12-11 2016-07-06 宜兴市宇龙电炉成套设备有限公司 System for accelerating cooling of calcium carbide and recycling waste heat of melted calcium carbide

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105737621A (en) * 2014-12-11 2016-07-06 宜兴市宇龙电炉成套设备有限公司 System for accelerating cooling of calcium carbide and recycling waste heat of melted calcium carbide

Similar Documents

Publication Publication Date Title
CN205047261U (en) Critical CO2 heat pump and rankine cycle's coupled system strides based on waste heat recovery
CN102434907B (en) Secondary heat exchange station heating system based on jet type heat pump for recovering primary grid backwater complementary energy
CN200975813Y (en) Heat-reclaiming device of water chilling unit shell tube type condenser
CN204346187U (en) A kind of accelerating cooling calcium carbide also reclaims the system of melting calcium carbide waste heat
CN108194157B (en) Gravitational field acting heat-pipe apparatus and method
CN105737621B (en) A kind of system for accelerating cooling calcium carbide and reclaiming melting calcium carbide waste heat
CN203011006U (en) Waste heat recovery high-temperature hot water unit
CN202100286U (en) Low-pressure heating device of power plant
CN204535173U (en) For cooling the source pump of sterilization
CN203787752U (en) Laser water cooling unit
CN203396202U (en) Energy-saving nitrogen-cooled water pre-cooling system for air separation
CN205119544U (en) Cold storage refrigeration system
CN104018899A (en) Peak cooling device and method for air-cooling condenser in power plant
CN204492910U (en) A kind of exhaust steam residual heat reclaiming system based on absorption heat pump technology
CN204346188U (en) The shaping middle melting calcium carbide residual neat recovering system of a kind of small piece of calcium carbide
CN204100758U (en) A kind of northern dedicated for heat pump Drying unit
CN204511543U (en) The turbine discharge condenser system of the band turbine engine of cooling medium is made with carbon dioxide
CN210220275U (en) Pure CO2 rink refrigerating system
CN203949410U (en) High-temperature steam source pump
CN203053083U (en) Heat recovery type module type air-cooled water chilling unit
CN203730081U (en) Novel thermal power generation system
CN205090662U (en) Heating furnace cogeneration coupled system based on CO2 heat pump cycle
CN205119543U (en) Cold storage refrigeration system
CN205277478U (en) Compound cooling system based on heat pipe refrigeration
CN205383811U (en) Cooling systems

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150520

Effective date of abandoning: 20171208

AV01 Patent right actively abandoned