CN204344157U - A kind of geomantic omen converter - Google Patents

A kind of geomantic omen converter Download PDF

Info

Publication number
CN204344157U
CN204344157U CN201420805310.6U CN201420805310U CN204344157U CN 204344157 U CN204344157 U CN 204344157U CN 201420805310 U CN201420805310 U CN 201420805310U CN 204344157 U CN204344157 U CN 204344157U
Authority
CN
China
Prior art keywords
geomantic omen
extraction
converter
arm
supervisor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420805310.6U
Other languages
Chinese (zh)
Inventor
陈进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420805310.6U priority Critical patent/CN204344157U/en
Application granted granted Critical
Publication of CN204344157U publication Critical patent/CN204344157U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of geomantic omen converter, comprise supervisor, two arms are connected on supervisor top, article one, arm is extraction link, another arm is geomantic omen link, and on two arms connection control switch, after the utility model adopts the use of extraction geomantic omen converter, from original two or three classes even the more time be reduced to only need within 30 minutes to 40 minutes, just can solve gas release problem, draw out methane concentration between 15 ﹪ to 20 ﹪ through actual measurement, again quarrel mouth yellow mud is shut and then carried out extraction, gas drainage results is more obvious, accelerate construction speed and improve worker's efficiency.

Description

A kind of geomantic omen converter
Technical field
The utility model relates to a kind of geomantic omen converter, belongs to coal seam technical field of construction.
Background technology
Guizhou is rich in a large amount of coal resource, and right most of colliery is all that high methane is projecting coal bed, and because ore deposit coal seam gas-bearing capacity is large, in work progress, bit freezing, crown drill phenomenon are very serious, cause great difficulty to construction.
Summary of the invention
The purpose of this utility model is: provide a kind of geomantic omen converter, and the method is mainly improved rig geomantic omen tail, realizes geomantic omen tail and extraction end can be changed mutually, realizes the object of pressure release, to overcome the deficiencies in the prior art.
The technical solution of the utility model
A kind of geomantic omen converter, comprises supervisor, and connect two arms on supervisor top, an arm is extraction link, and another arm is geomantic omen link, and on two arms connection control switch.
In the converter of aforesaid a kind of geomantic omen, supervisor arranges air pressure test point.
Owing to adopting technique scheme, compared with prior art, after the utility model adopts the use of extraction geomantic omen converter, suction arm negative pressure is utilized to carry out the gas release problem in the boring of deep hole extraction solution to boring, from original two or three classes even the more time be reduced to only need within 30 minutes to 40 minutes, just can solve gas release problem, draw out methane concentration between 15 ﹪ to 20 ﹪ through actual measurement, again quarrel mouth yellow mud is shut and then carried out extraction, gas drainage results is more obvious, accelerates construction speed and improves worker's efficiency.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing to the utility model with being described in further detail, but not as to any restriction of the present utility model.
Embodiment of the present utility model: a kind of coal seam deslagging construction method, wind deslagging or water deslagging mode is adopted to construct, large when running into coal-bed gas pressure, when construction is not entered or is not returned water, rig is shut down, close air intake water end (W.E.), geomantic omen converter other end extraction end is connected on extraction arm, gate valve is opened, be connected with extraction arm negative pressure, quarrel mouth yellow mud is shut simultaneously, utilize the negative pressure in extraction arm to carry out deep hole extraction to the boring of Hot work in progress, gas pressure in boring is discharged.
A kind of geomantic omen converter needed for said method, as shown in drawings, comprises supervisor 1, supervisor 1 arranges air pressure test point 4, connects two arms, 2, arm 2 on supervisor 1 top for extraction link, another arm 2 is geomantic omen link, and on two arms 2 connection control switch 3.
During concrete use
In construction, wind deslagging or water deslagging mode is only adopted to construct in advance, large when running into coal-bed gas pressure, when construction is not entered or is not returned water, rig is shut down, close air intake water end (W.E.), geomantic omen converter other end extraction end is connected on extraction arm, gate valve is opened, be connected with extraction arm negative pressure, " Four proofings apparatus " slag outlet yellow mud simultaneously my team now used is shut, the negative pressure in extraction arm is utilized to carry out deep hole extraction to the boring of Hot work in progress, gas pressure in boring is discharged, facts have proved, carrying out boring release at employing geomantic omen converter only needs normally intermittently to construct for 30 minutes to 60 minutes, solve bit freezing in boring, crown drill and do not return water problems, detect at the measuring point on the converter of extraction geomantic omen simultaneously, when deep hole extraction is carried out to boring, gas density can reach 60% ~ 80%.
After adopting the use of extraction geomantic omen converter, suction arm negative pressure is utilized to carry out the gas release problem in the boring of deep hole extraction solution to boring, from original two or three classes even the more time be reduced to only need within 30 minutes to 40 minutes, just can solve gas release problem, draw out methane concentration between 15 ﹪ to 20 ﹪ through actual measurement, shut slag-drip opening with yellow mud again and carry out extraction, gas drainage results is more obvious.Accelerate construction speed and improve worker's efficiency.
Wind deslagging or water deslagging mode is only adopted to construct, large when running into coal-bed gas pressure, when construction is not entered, rig is shut down, closes air intake water end (W.E.), geomantic omen converter other end extraction end is connected on extraction arm, gate valve is opened, be connected with extraction arm negative pressure, utilize the negative pressure in extraction arm to carry out deep hole extraction to the boring of Hot work in progress, gas pressure in boring is discharged.

Claims (2)

1. a geomantic omen converter, comprise supervisor (1), it is characterized in that: connect two arms (2) on supervisor (1) top, an arm (2) is extraction link, another arm (2) is geomantic omen link, and at the upper connection control switch (3) of two arms (2).
2. a kind of geomantic omen according to claim 1 converter, is characterized in that: on supervisor (1), arrange air pressure test point (4).
CN201420805310.6U 2014-12-19 2014-12-19 A kind of geomantic omen converter Expired - Fee Related CN204344157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420805310.6U CN204344157U (en) 2014-12-19 2014-12-19 A kind of geomantic omen converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420805310.6U CN204344157U (en) 2014-12-19 2014-12-19 A kind of geomantic omen converter

Publications (1)

Publication Number Publication Date
CN204344157U true CN204344157U (en) 2015-05-20

Family

ID=53227432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420805310.6U Expired - Fee Related CN204344157U (en) 2014-12-19 2014-12-19 A kind of geomantic omen converter

Country Status (1)

Country Link
CN (1) CN204344157U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104747102A (en) * 2014-12-19 2015-07-01 陈进 Coal seam deslagging construction method and wind and water converter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104747102A (en) * 2014-12-19 2015-07-01 陈进 Coal seam deslagging construction method and wind and water converter
CN104747102B (en) * 2014-12-19 2017-11-03 山东大东联石油设备有限公司 A kind of coal seam deslagging construction method and geomantic omen converter

Similar Documents

Publication Publication Date Title
CN102352768B (en) Gas drainage method and equipment with alternative drainage
CN104074494B (en) Combination type well casing gas recovery device
CN203145996U (en) Downward wet hole drainage
CN204344157U (en) A kind of geomantic omen converter
CN104747102A (en) Coal seam deslagging construction method and wind and water converter
CN205654320U (en) Simple and easy pneumatic hole sealing slip casting device
CN203035257U (en) Downward slant hole slag and water discharge device of downward drilling hole
CN106507862B (en) A kind of cleaning method drilled during in-situ leaching uranium
CN203570261U (en) Sliding block linkage drilling-free classification cement injector
CN203067014U (en) Hole sealing device for improving gas extraction concentration
CN203145842U (en) Self-moving type drilling machine stabilizing support device
CN202039898U (en) Device for automatically draining water in borehole in gas drainage
CN204174594U (en) Hydropower station construction ventilation well construction
CN203925355U (en) The automatically anti-strong spray apparatus in high prominent coal seam
CN201599051U (en) Device for increasing gas drainage amount
CN202832648U (en) Water discharging device for coal mine thousand-meter drilling
CN203335015U (en) Gas drainage coal seam water injection air-bag type hole sealing device
CN202866870U (en) Gas extraction pipeline
CN203111923U (en) Pneumatic suspended ore drawing chute device
CN205042828U (en) Tailings that automatic sand removal function of having of usefulness is filled in mine fills thick liquid system that makes
CN202990948U (en) Anti-spray orifice apparatus for gas control
CN202914792U (en) Oil detection valve
CN204511895U (en) The modifying device of centrifugal pump
CN219387866U (en) Slag remover of blowout preventer
CN203054246U (en) Rapid water injection device used for monitoring system for overlying strata water flowing fractured zone

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20151219

EXPY Termination of patent right or utility model