CN102352768B - Gas drainage method and equipment with alternative drainage - Google Patents

Gas drainage method and equipment with alternative drainage Download PDF

Info

Publication number
CN102352768B
CN102352768B CN 201110317591 CN201110317591A CN102352768B CN 102352768 B CN102352768 B CN 102352768B CN 201110317591 CN201110317591 CN 201110317591 CN 201110317591 A CN201110317591 A CN 201110317591A CN 102352768 B CN102352768 B CN 102352768B
Authority
CN
China
Prior art keywords
ball valve
gas
tee ball
high pressure
gas pumping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110317591
Other languages
Chinese (zh)
Other versions
CN102352768A (en
Inventor
周福宝
刘应科
刘春�
高峰
王圣程
宋小林
史波波
庞叶青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN 201110317591 priority Critical patent/CN102352768B/en
Publication of CN102352768A publication Critical patent/CN102352768A/en
Priority to PCT/CN2012/080499 priority patent/WO2013056597A1/en
Application granted granted Critical
Publication of CN102352768B publication Critical patent/CN102352768B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a gas drainage method and equipment with alternative drainage, which are applicable to increasing the drainage diameter of a gas drainage drilling hole and improving the total gas drainage amount of the drilling hole. A main drainage pipeline at the front part and the rear part of a gas pump is connected with bypass pipelines in parallel by a front three-way ball valve anda rear three-way ball valve; the main drainage pipeline at the front part of the front three-way ball valve is connected with a high-pressure gas storage tank; the rear part of the high-pressure gas storage tank is connected with a gas filling pipeline controlled by a gas filling control ball valve; the gas filling pipeline is connected onto the main drainage pipeline between the rear three-way ball valve and the gas pump; a gas drainage pipe in the gas drainage drilling hole is connected with the main drainage pipeline to carry out gas drainage; in the operation process of the gas pump, by controlling the states of the front three-way ball valve, the rear three-way ball valve, the gas filling control ball valve and an outlet control ball valve, extracted gas flow and pressed-in gas flow occur alternatively on the gas drainage drilling hole, the cracks of coal bodies around the drilling hole are enlarged continuously under the action of alternative stress and develop gradually towardsthe deep part, so that the total gas drainage amount of the drilling hole is improved. The method and the equipment are simple, the operation is convenient and the cost is low.

Description

A kind of gas pumping method and equipment alternately of pressing of taking out
Technical field
The present invention relates to a kind of taking out and press gas pumping method and equipment alternately, be particularly useful for increasing the extraction radius of mash gas pumping drilling, the gas pumping total amount of raising boring.
Background technology
Gas pumping is that the negative pressure of utilizing the gas pump to produce is composed the gas that exists in the coal seam by the mash gas pumping drilling extraction.Through long-time extraction, coal-bed gas pressure, content all can reduce significantly, so gas pumping is the essential measure of control coal mine gas disaster accident.Threaten for eliminating gas, guarantee mine safety production, the projecting mine of China, highly gassy mine and part low gaseous mine have all been carried out gas pumping engineering widely.
Behind the mash gas pumping drilling construction, stress of certain limit coal body obtains discharging and deforming around it, produces the different crack of a large amount of geometrical properties in the coal body deformation process, and desorption of mash gas and the mobile condition that provides are provided.Gas permeability of coal seam in the cranny development scope is big, be the main gas source of extraction, but this scope is very little, and its radius generally is not more than 5 m.Coal seam outside the cranny development scope is original coal body, and gas permeability is poor, and its tax is deposited gas and is difficult to be drawn out of.Current, the negative pressure that the gas pump produces in the gas pumping process is the continuity negative pressure, namely only has the extraction air-flow that is flowed to the gas pump by the coal seam in gas pumping pipeline and extraction borehole.Therefore one-way gas flow makes the crack around the boring have tendencies toward shrinkage, has limited the crack and has grown to coal seam depth, causes apart from boring gas desorb and the extraction in a large number in original coal seam at a distance, causes the mash gas extraction source of holing less.Based on above-mentioned analysis and engineering practice, when adopting existing gas pumping method, the extraction radius of boring is little, and gas pumping flow and the concentration rate of decay are fast, and effectively the extraction time is shorter.For the coal seam of gas permeability difference, the problems referred to above are more remarkable.
For improving the boring gas permeability in coal seam on every side, mainly adopt technical methods such as fracturing, deep hole blasting at present, yet all have certain problem.As when adopting the fracturing method, though increased the crack in coal seam, after the coal body suction is saturated, its gas permeability reduces, can not accelerate flowing of desorb gas, coal body becomes cement paste that ponding is played in the crack after meeting water in addition, therefore can not improve the gas pumping amount.When adopting the deep hole blasting method, after the loosening blasting, boring gas pumping amount within a short period of time (maximum several days) can increase several times, but it is exhausted to descend soon, and the increase of total gas pumping amount of holing is not remarkable.
Summary of the invention
Technical problem: the objective of the invention is to overcome the weak point in the prior art, provide that a kind of method is simple, facility compact, the hole pumping and mining radius is big, extraction is effective takes out gas pumping method and the equipment alternately of pressing.
Technical scheme: of the present invention taking out pressed gas pumping method alternately, comprises the steps:
A. the extraction main line before and after the coal mine gas pump is by a forward and backward tee ball valve bypass pipe road in parallel, extraction main line in preceding tee ball valve front portion connects the high pressure tank that breather cheek valve is housed, and connect the rear portion connection of a control of export ball valve, high pressure tank in the front portion of high pressure tank by the tonifying Qi pipeline of tonifying Qi control ball valve control, on the extraction main line after the tonifying Qi pipeline is connected between tee ball valve and the gas pump;
B. the gas pumping pipe in the mash gas pumping drilling is connected with the extraction main line and carries out gas pumping;
C. control forward and backward tee ball valve, make that back tee ball valve path A and back tee ball valve path B are connected, preceding tee ball valve path A and preceding tee ball valve path B be connected, close tonifying Qi control ball valve and control of export ball valve, at this moment, gas in the coal seam is gone in the extraction main line through mash gas pumping drilling and gas pumping manifold afflux, then successively through after tee ball valve, gas pump and preceding tee ball valve flow in the high pressure tank;
When the gas pressure in the high pressure tank is elevated to 0.3 MPa, open the control of export ball valve, the gas in the high pressure tank is outwards carried through the extraction main line;
When the gas pressure of high pressure tank is reduced to 0.1 MPa, close the control of export ball valve;
D. behind gas pumping 5~10 min, control forward and backward tee ball valve, make that back tee ball valve path A and back tee ball valve path C are connected, preceding tee ball valve path A and preceding tee ball valve path C be connected, open tonifying Qi control ball valve, close the control of export ball valve, make the gas in the high pressure tank enter the extraction main line through the tonifying Qi pipeline, again through gas pump, preceding tee ball valve, bypass line, after tee ball valve, extraction main line and gas pumping pipe oppositely be pressed in the mash gas pumping drilling, the time that is pressed into gas in the mash gas pumping drilling is 3~5min;
When the gas pressure in the high pressure tank during less than external air pressure, outside air enters in the high pressure tank by breather cheek valve, to satisfy the tolerance that oppositely is pressed in the mash gas pumping drilling;
E. repeating step c, d alternately implement to bleed and calm the anger, and make alternately to occur in mash gas pumping drilling and the gas pumping pipe extracting air-flow out and being pressed into air-flow, are reduced to below 16% until the gas density of extraction, stop to take out pressure.
The described pressure that is pressed into air-flow is 0.03MPa~0.2 MPa.
The gas pumping equipment alternately of pressing of taking out of the present invention, comprise the gas pumping pipe, the extraction main line that links to each other with the gas pumping pipe, be located at the gas pump on the extraction main line, before extraction main line in the front and back of described gas pump is provided with, back tee ball valve, before the warp, back tee ball valve is connected with the bypass line that is in parallel with the gas pump, be connected with high pressure tank on the extraction main line of preceding tee ball valve front portion, the high pressure tank front portion is installed on the control of export ball valve, the rear portion of high pressure tank is provided with and is connected the tonifying Qi pipeline on the extraction main line between back tee ball valve and the gas pump, the tonifying Qi pipeline is provided with tonifying Qi control ball valve, and the bottom of high pressure tank is provided with breather cheek valve.
Beneficial effect: the present invention can effectively increase the extraction radius of mash gas pumping drilling, improves the gas pumping total amount of boring.By the extraction air-flow in mash gas pumping drilling, alternately occurring and being pressed into air-flow, make the effect (alternating stresses) that pucker ﹠ bloat is born in the crack of coal body repeatedly around holing, local fracture takes place after coal body reaches fatigue limit, thereby the crack is constantly enlarged and grows gradually to the deep.After the gas permeability in original coal seam, deep increases, the desorb and being drawn out of gradually of its gas, thus increase the gas pumping radius of boring, and improve the gas pumping total amount of boring.The method and equipment are simple, and is easy to operate, and cost is low, not only increased the gas pumping radius of boring, and improved the gas pumping total amount of boring, has practicality widely.
Description of drawings
Fig. 1 is that of the present invention taking out pressed gas pumping structural representation alternately.
Among the figure: mash gas pumping drilling-1, extract air-flow-2 out, be pressed into air-flow-3, crack-4, gas pumping pipe-5, extraction main line-6, back tee ball valve-7, gas pump-8, bypass line-9, preceding tee ball valve-10, tonifying Qi pipeline-11, tonifying Qi control ball valve-12, high pressure tank-13, breather cheek valve-14, control of export ball valve-15.
The specific embodiment
Below in conjunction with accompanying drawing one embodiment of the present of invention are further described:
Of the present invention taking out pressed gas pumping method alternately, because after mash gas pumping drilling 1 construction finished, the coal body around it in certain limit produced a large amount of cracks 4 simultaneously owing to certain distortion takes place in release, is desorption of mash gas and the mobile condition that provides.At first before the extraction main line 6 of coal mine gas pump 8 front and back passes through, back tee ball valve 10,7 bypass lines 9 in parallel, extraction main line 6 in preceding tee ball valve 10 front portions connects high pressure tank 13, the front portion of high pressure tank 13 connects control of export ball valve 15, the rear portion of high pressure tank 13 connects the tonifying Qi pipeline 12 by 11 controls of tonifying Qi control ball valve, on the extraction main line 6 after tonifying Qi pipeline 12 is connected between tee ball valve 7 and the gas pump 8, breather cheek valve 14 is installed in the bottom of high pressure tank 13, after sending into gas pumping pipe 5 and carry out sealing of hole in the mash gas pumping drilling 1, gas pumping pipe 5 in the mash gas pumping drilling 1 is connected with extraction main line 6, begins to carry out gas pumping by gas pump 8.
Before the control, back tee ball valve 10,7, back tee ball valve path A and back tee ball valve path B are connected, preceding tee ball valve path A and preceding tee ball valve path B are connected, close tonifying Qi control ball valve 11 and control of export ball valve 15, gas in the coal seam is compiled in the inflow extraction main line 6 through mash gas pumping drilling 1 and gas pumping pipe 5, then successively through after tee ball valve 7, gas pump 8 and preceding tee ball valve 10 flow in the high pressure tank 13, the gas flow path is in the extraction system: crack 4 → mash gas pumping drilling, 1 → gas pumping pipe, 5 → extraction main line 6 → back tee ball valve 7 → gas pump 8 → preceding tee ball valve 10 → high pressure tank 13, be extraction air-flow 2 in gas pumping pipe 5 and the mash gas pumping drilling 1 this moment, and system is in the gas pumping state.Bleeding the initial stage in stage, control of export ball valve 15 is closed condition, along with constantly carrying out of extraction, the gas pressure of high pressure tank 13 constantly raises, when the gas pressure in the high pressure tank 13 is elevated to 0.3 MPa, open control of export ball valve 15, the gas in the high pressure tank 13 is outwards carried through extraction main line 6; When the gas pressure of high pressure tank 13 is reduced to 0.1 MPa, close control of export ball valve 15.
Behind gas pumping 5~10 min, before the control, back tee ball valve 10,7, back tee ball valve path A and back tee ball valve path C are communicated, preceding tee ball valve path A and preceding tee ball valve path C communicate, open tonifying Qi control ball valve 11, close control of export ball valve 15, make the gas in the high pressure tank 13 enter extraction main line 6 through tonifying Qi pipeline 12, again through gas pump 8, preceding tee ball valve 10, bypass line 9, back tee ball valve 7, extraction main line 6 and gas pumping pipe 5 oppositely are pressed into mash gas pumping drilling 1, the gas flow path is in the extraction system: high pressure tank 13 → tonifying Qi pipeline 12 → extraction main line 6 → gas pump 8 → preceding tee ball valve 10 → bypass line 9 → back tee ball valve 7 → extraction main line 6 → gas pumping pipe 5 → mash gas pumping drilling 1 → crack 4, in this moment gas pumping pipe 5 and the mash gas pumping drilling 1 for being pressed into air-flow 3, the pressure that is pressed into air-flow 3 is 0.03MPa~0.2 MPa, and the time that is pressed into gas in the mash gas pumping drilling 1 is 3~5min.Be pressed into source of the gas and be the mash gas extraction in the high pressure tank 13, be mainly and prevent that the next one from taking out the mash gas extraction concentration of pressure in the cycle and descending significantly.Gas pressure in high pressure tank 13 is less than external air pressure, and when namely negative pressure state occurring, outside air enters in the high pressure tank 13 by breather cheek valve 14, to satisfy the tolerance that oppositely is pressed in the mash gas pumping drilling 1.
Repeatedly pumping and calming the anger makes alternately to occur in mash gas pumping drilling 1 and the gas pumping pipe 5 extracting air-flows 2 out and being pressed into air-flow 3, is reduced to below 16% until the gas density of extraction, stops to take out pressure.
The gas pumping equipment alternately of pressing of taking out of the present invention, comprise gas pumping pipe 5, the extraction main line 6 that links to each other with gas pumping pipe 5, be located at the gas pump 8 on the extraction main line 6, before the front and back extraction main line 6 of gas pump 8 is provided with, back tee ball valve 10,7, before the warp, back tee ball valve 10,7 are connected with the bypass line 9 that is in parallel with gas pump 8, be connected with high pressure tank 13 on the extraction main line 6 of preceding tee ball valve 10 front portions, the front portion of high pressure tank 13 is installed on control of export ball valve 15, the rear portion of high pressure tank 13 is provided with and is connected the tonifying Qi pipeline 12 on the extraction main line 6 between back tee ball valve 7 and the gas pump 8, tonifying Qi pipeline 12 is provided with tonifying Qi control ball valve 11, be provided with breather cheek valve 14 in the bottom of high pressure tank 13, can realize outside air under certain condition to the one-way flow of high pressure tank 13, and the gas in the high pressure tank 13 can not flow out under any condition; The extraction main line 6 that control of export ball valve 15 connects is the pipeline of outwards carrying gas.Back tee ball valve 7, preceding tee ball valve 10, tonifying Qi control ball valve 11 and control of export ball valve 15 are the electric intelligent control valve, can realize that the state at different time interval is changed automatically.In gas pump 8 runnings, state conversion by back tee ball valve 7, preceding tee ball valve 10 and tonifying Qi control ball valve 11 can change the airflow direction in the extraction main line 6, realizes alternately occurring in gas pumping pipe 5 and the mash gas pumping drilling 1 extracting air-flow 2 out and being pressed into air-flow 3.Back tee ball valve 7 comprises back tee ball valve path A, back tee ball valve path B and back tee ball valve path C, and preceding tee ball valve 10 comprises preceding tee ball valve path A, preceding tee ball valve path B and preceding tee ball valve path C; Back tee ball valve path C is connected bypass line 9 with preceding tee ball valve path C, and back tee ball valve path B is connected with gas pump 8 by extraction main line 6 with preceding tee ball valve path A.

Claims (3)

1. take out pressure gas pumping method alternately for one kind, it is characterized in that comprising the steps:
A. before the extraction main line (6) before and after coal mine gas pump (8) passes through, back tee ball valve (10,7) a bypass pipe road (9) in parallel, in extraction main line (6) connection that preceding tee ball valve (10) is anterior the high pressure tank (13) of breather cheek valve (14) is housed, and connect a control of export ball valve (15) in the front portion of high pressure tank (13), the rear portion of high pressure tank (13) connects the tonifying Qi pipeline (12) by tonifying Qi control ball valve (11) control, on the extraction main line (6) after tonifying Qi pipeline (12) is connected between tee ball valve (7) and the gas pump (8);
B. the gas pumping pipe (5) in the mash gas pumping drilling (1) is connected with extraction main line (6) and carries out gas pumping;
C. control forward and backward tee ball valve (10,7), make that back tee ball valve path A and back tee ball valve path B are connected, preceding tee ball valve path A and preceding tee ball valve path B be connected, close tonifying Qi control ball valve (11) and control of export ball valve (15), at this moment, gas in the coal seam compiles through mash gas pumping drilling (1) and gas pumping pipe (5) and flows in the extraction main line (6), then successively in back tee ball valve (7), gas pump (8) and preceding tee ball valve (10) inflow high pressure tank (13);
When the gas pressure in the high pressure tank (13) is elevated to 0.3 MPa, open control of export ball valve (15), the gas in the high pressure tank (13) is outwards carried through extraction main line (6);
When the gas pressure of high pressure tank (13) is reduced to 0.1 MPa, close control of export ball valve (15);
D. behind gas pumping 5~10 min, before the control, back tee ball valve (10,7), back tee ball valve path A and back tee ball valve path C are connected, preceding tee ball valve path A and preceding tee ball valve path C are connected, open tonifying Qi control ball valve (11), close control of export ball valve (15), make the gas in the high pressure tank (13) enter extraction main line (6) through tonifying Qi pipeline (12), again through gas pump (8), preceding tee ball valve (10), bypass line (9), back tee ball valve (7), extraction main line (6) and gas pumping pipe (5) oppositely are pressed in the mash gas pumping drilling (1), and the time that is pressed into gas in the mash gas pumping drilling (1) is 3~5min;
When the gas pressure in the high pressure tank (13) during less than external air pressure, outside air enters in the high pressure tank (13) by breather cheek valve (14), to satisfy the tolerance that oppositely is pressed in the mash gas pumping drilling (1);
E. repeating step c, d alternately implement to bleed and calm the anger, and make alternately to occur extraction air-flow (2) in mash gas pumping drilling (1) and the gas pumping pipe (5) and be pressed into air-flow (3), are reduced to below 16% until the gas density of extraction, stop to take out pressure.
2. a kind of taking out according to claim 1 pressed gas pumping method alternately, and it is characterized in that: the described pressure that is pressed into air-flow (3) is 0.03MPa~0.2 MPa.
3. realize that taking out of the described method of claim 1 press gas pumping equipment alternately for one kind, comprise gas pumping pipe (5), the extraction main line (6) that links to each other with gas pumping pipe (5), be located at the gas pump (8) on the extraction main line (6), it is characterized in that: before the front and back extraction main line (6) of described gas pump (8) is provided with, back tee ball valve (10,7), before the warp, back tee ball valve (10,7) be connected with the bypass line (9) that is in parallel with gas pump (8), be connected with high pressure tank (13) on the extraction main line (6) of preceding tee ball valve (10) front portion, high pressure tank (13) front portion is installed on control of export ball valve (15), the rear portion of high pressure tank (13) is provided with and is connected the tonifying Qi pipeline (12) on the extraction main line (6) between back tee ball valve (7) and the gas pump (8), tonifying Qi pipeline (12) is provided with tonifying Qi control ball valve (11), and the bottom of high pressure tank (13) is provided with breather cheek valve (14).
CN 201110317591 2011-10-19 2011-10-19 Gas drainage method and equipment with alternative drainage Active CN102352768B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN 201110317591 CN102352768B (en) 2011-10-19 2011-10-19 Gas drainage method and equipment with alternative drainage
PCT/CN2012/080499 WO2013056597A1 (en) 2011-10-19 2012-08-23 Gas extraction method and device with alternating extraction and injection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110317591 CN102352768B (en) 2011-10-19 2011-10-19 Gas drainage method and equipment with alternative drainage

Publications (2)

Publication Number Publication Date
CN102352768A CN102352768A (en) 2012-02-15
CN102352768B true CN102352768B (en) 2013-09-11

Family

ID=45576399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110317591 Active CN102352768B (en) 2011-10-19 2011-10-19 Gas drainage method and equipment with alternative drainage

Country Status (2)

Country Link
CN (1) CN102352768B (en)
WO (1) WO2013056597A1 (en)

Families Citing this family (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562023B (en) * 2012-03-06 2014-06-25 中国矿业大学 System for improving air permeability of coal by using warm-pressing inert gas
CN102704984B (en) * 2012-04-28 2014-12-17 中国矿业大学 Borehole high-concentration gas extraction and drainage method and device thereof
CN102817632B (en) * 2012-08-20 2014-11-05 山西煤炭运销集团科学技术研究有限公司 Method for draining gas of mining layer of mine
CN102913274B (en) * 2012-11-07 2015-03-04 中国矿业大学 System for increasing yield of gas excavation borehole and method thereof
CN103352718B (en) * 2013-07-29 2015-07-15 河南理工大学 Fully-sealed wind power slagging gas-drainage deep well drilling system and method
CN103696800B (en) * 2013-12-18 2016-03-23 中国矿业大学 A kind of brill cuts pressure and takes out method
CN104832209A (en) * 2015-04-04 2015-08-12 西安科技大学 Roadway advanced borehole diversion drainage goaf gas technology
CN105041369A (en) * 2015-07-15 2015-11-11 贵州盘江精煤股份有限公司 Method for governing mining-coal bed gas
CN106645630A (en) * 2017-02-20 2017-05-10 中国矿业大学(北京) Tester for simulating change of gas permeability of coal seam caused by water drainage and permeability-increasing method
CN106939766B (en) * 2017-05-10 2023-03-07 河南理工大学 Hot-cold impact three-stage coal breaking device and implementation method
CN107420126B (en) * 2017-07-26 2024-03-29 柴兆喜 Pressure equalizing circulation mine gas extraction system
CN107476794B (en) * 2017-09-28 2019-05-07 徐州工程学院 Method for increasing coal gas permeability by injecting high-temperature nitrogen after liquid nitrogen gasification circulation
CN107859500B (en) * 2017-10-13 2023-06-09 大连理工大学 Mine rock drilling anti-reflection type gas plugging unit and measuring system
CN107725006B (en) * 2017-11-02 2023-05-12 西安科技大学 Coal seam drilling gas extraction simulation test device and method
CN107882586A (en) * 2017-12-12 2018-04-06 贵州盘江精煤股份有限公司 Water-bound and its construction method are blown in a kind of coal mine gas extraction
CN108561176B (en) * 2018-04-03 2023-06-23 焦作市美格安矿业科技有限公司 Automatic blocking and permeability-increasing device and method for gas extraction drilling
CN108757008B (en) * 2018-05-14 2019-11-26 华北科技学院 A method of this coal bed gas drainage efficiency is improved using magnetic fluid
CN108661696B (en) * 2018-05-14 2019-07-02 中国矿业大学 A kind of totally-enclosed gas drainage pump energy conserving system based on drag reduction working solution
CN109026129A (en) * 2018-08-15 2018-12-18 山东安益矿用设备有限公司 Height negative pressure line intelligent conversion control technique
CN109252890B (en) * 2018-12-06 2024-07-09 贵州大学 Leakage-proof gas discharge device for coal mining
CN109736878B (en) * 2019-01-11 2020-06-16 微山金源煤矿 Unmanned automatic gas extraction system
CN109989783B (en) * 2019-05-14 2023-08-15 河南理工大学 Supercritical carbon dioxide positive and negative pressure interaction combined gas extraction system and gas extraction method
CN110630318B (en) * 2019-10-22 2021-01-26 中煤科工集团重庆研究院有限公司 Full life cycle control method for underground gas drilling extraction
CN110907335A (en) * 2019-12-17 2020-03-24 华北科技学院 Coal bed gas permeability simulation experiment device and control method thereof
CN111219204A (en) * 2020-03-29 2020-06-02 张海轩 Gas extraction device and method for improving gas extraction concentration in coal mine roadway
CN111396028B (en) * 2020-03-30 2023-02-28 西安科技大学 Gas extraction standard-reaching equivalent quantitative evaluation method based on liquid CO2 fracturing permeability improvement and phase change driving
CN111502740B (en) * 2020-03-30 2024-06-04 北京科技大学 Unit circulation type pressure pumping integrated gas extraction system and method
CN113107460B (en) * 2021-04-08 2022-04-29 煤炭科学研究总院有限公司 Intelligent monitoring device for gas extraction drill hole and using method thereof
CN113266415B (en) * 2021-06-16 2024-06-11 陕西长武亭南煤业有限责任公司 Gas extraction equipment and method with alternate extraction and compression
CN113605866B (en) * 2021-08-25 2024-04-02 上海大屯能源股份有限公司孔庄煤矿 Dynamic regulation and control system and method for mine gas extraction
CN113738435B (en) * 2021-09-10 2023-05-19 湘潭大学 Enhanced anti-reflection extraction method for deep low-permeability high-gas coal seam area
CN114263449B (en) * 2021-12-14 2022-09-16 中国矿业大学 High-efficient gas drainage device based on hydraulic fracturing
CN114441216A (en) * 2021-12-22 2022-05-06 中煤科工集团西安研究院有限公司 Dry-type closed sampling method for underground deep hole of coal mine
CN114515506B (en) * 2022-01-04 2024-02-02 河南中煤矿业科技发展有限公司 Method for preparing and using gas digestive juice
CN114233370B (en) * 2022-01-18 2023-07-18 山东科技大学 Gas extraction borehole collapse repair and interconnection integrated extraction method
CN114607312B (en) * 2022-03-11 2022-11-15 中国矿业大学 Device and method for real-time multiple hole sealing
CN114592904A (en) * 2022-04-01 2022-06-07 安徽理工大学 Gas extraction device for high-gas coal mine
CN115110921B (en) * 2022-07-18 2023-07-14 中煤科工集团重庆研究院有限公司 Pressure-maintaining displacement extraction method for gas in permeable anisotropic coal seam
CN116122891B (en) * 2023-03-01 2024-06-25 中国矿业大学(北京) Device and method for improving extraction effect through secondary intelligent hole sealing of gas extraction drilling

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5417286A (en) * 1993-12-29 1995-05-23 Amoco Corporation Method for enhancing the recovery of methane from a solid carbonaceous subterranean formation
US5769165A (en) * 1996-01-31 1998-06-23 Vastar Resources Inc. Method for increasing methane recovery from a subterranean coal formation by injection of tail gas from a hydrocarbon synthesis process
US5944104A (en) * 1996-01-31 1999-08-31 Vastar Resources, Inc. Chemically induced stimulation of subterranean carbonaceous formations with gaseous oxidants
CN101012755A (en) * 2007-02-11 2007-08-08 杜志刚 Equipment for increasing gas exhaustion of coal mine bed by hole drilling
CN101012756A (en) * 2007-02-11 2007-08-08 杜志刚 Method for increasing gas exhaustion of coal mine bed by hole drilling
CN101122222A (en) * 2007-09-19 2008-02-13 中国科学院武汉岩土力学研究所 Down-hole horizontal hole exploitation system for mixing gas displacing coal gas, and the method
CN101280688B (en) * 2008-05-27 2011-05-04 河南理工大学 Reagional eliminating method for drilling along the top at prominent coal heading face
CN101705836B (en) * 2009-09-30 2011-08-10 中国矿业大学 Jet control device and method
RU2419723C1 (en) * 2010-02-02 2011-05-27 Александр Васильевич Булкин Degasation method of developed coal beds

Also Published As

Publication number Publication date
WO2013056597A1 (en) 2013-04-25
CN102352768A (en) 2012-02-15

Similar Documents

Publication Publication Date Title
CN102352768B (en) Gas drainage method and equipment with alternative drainage
CN103696800B (en) A kind of brill cuts pressure and takes out method
CN104653161B (en) The fracturing integrated anti-reflection drainage device of underground coal mine pulsed water slot and method
CN109505565B (en) Method for extracting coal seam gas by water injection and gas injection alternating displacement
CN104234740B (en) A kind of low middle pressure air displacement high pressure coal seam gas train and method thereof
CN105114116B (en) A kind of hydrothermal reaction coupling pressure break strengthening region gas pumping method
CN105114038A (en) System and method for increasing drainage quantity of coal bed gas of ground well drainage goaf
CN104481575B (en) A kind of vapours displacement gas improves the method for gas pumping efficiency
CN106930746B (en) Drilling acetone invades the alternative expression coal seam anti-reflection method combined with hydraulic fracturing
CN105888540B (en) A kind of drilling method of drilling
CN104989339A (en) Old goaf coalbed methane extracting and mining system and method
CN206957684U (en) A kind of roof fracturing system
CN104550142A (en) Wind and water linkage flushing device and wind and water linkage flushing method for mortar conveying pipeline
CN203531877U (en) Underground coal mine fracturing connecting device
CN205797931U (en) A kind of deep-well filling pipe automatic block clearing device
CN102230394B (en) Secondary hole sealing system for improving coal bed gas extraction concentration
CN104329114A (en) Underground drilling intermittent gas extraction method
CN102913274A (en) System for increasing yield of gas excavation borehole and method thereof
CN105003294B (en) One kind is based on hydrothermal reaction coupling pressure break coal body coal uncovering method
CN108561176B (en) Automatic blocking and permeability-increasing device and method for gas extraction drilling
CN206571473U (en) A kind of girdle extraction system based on microorganism gasification principle
CN104989325A (en) Method for producing gas by using production pipe column of parallel double-pipe gas well
CN109798095A (en) A kind of coal-bed-gas production-increase pressure disturbance device and method for increasing yield of coal bed gas
CN201763377U (en) Gas and water extraction device and system
CN107178388A (en) Pressure coal gas device is taken out in heading pulse

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant