CN204343277U - Pile foundation construction structure - Google Patents

Pile foundation construction structure Download PDF

Info

Publication number
CN204343277U
CN204343277U CN201420808206.2U CN201420808206U CN204343277U CN 204343277 U CN204343277 U CN 204343277U CN 201420808206 U CN201420808206 U CN 201420808206U CN 204343277 U CN204343277 U CN 204343277U
Authority
CN
China
Prior art keywords
steel
platform
pile foundation
foundation construction
bearing platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420808206.2U
Other languages
Chinese (zh)
Inventor
季岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420808206.2U priority Critical patent/CN204343277U/en
Application granted granted Critical
Publication of CN204343277U publication Critical patent/CN204343277U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of pile foundation construction structure, comprise steel structure platform, steel structure platform is connected with steel pipe post, steel pipe post top extends in steel structure platform, a steel plate is each passed through and a bearing platform extends in a retaining wall bottom it, steel plate is arranged on below steel structure platform, bearing platform is arranged on lower surface of steel plate, and weld between bearing platform with steel plate, and bearing platform is provided with steel pile casting near two sides place, be fixedly connected with between steel pile casting with bearing platform, retaining wall is positioned on bearing platform soffit, and the steel pipe post being positioned at retaining wall is provided with stake, interior stake is applied on steel pipe post.This pile foundation construction structure can better carry out pile foundation construction, ensure that pile foundation construction operation does not affect by water level, and pile foundation construction complete after in cofferdam installation platform upper mould, ensure that quick sequential production operation, and energy-conserving and environment-protective, significantly improve execution control and level of security, dependable performance is durable.

Description

Pile foundation construction structure
Technical field
The utility model relates to a kind of constructing structure, particularly a kind of pile foundation construction structure.
Background technology
Rivers embankment pile foundation construction on the bank often adopts the method identical with shallow water area pile foundation construction owing to being subject to dry season with the impact in flood season, i.e. construction with artificial island method and steel platform construction method, although construction with artificial island method construction construction operation is fast, engineering cost is low, but it affects greatly in the wet season by water level, be only applicable to carry out construction operation dry season, adopt steel platform construction method, although do not affect by water level, but the construction of steel platform method can only complete pile foundation construction, but general pile foundation can't better meet this demand, if it is improper to design, probably cause the generation of safe condition.
Utility model content
The technical problems to be solved in the utility model is: overcome the problems referred to above, provides one to carry out pile foundation construction, ensure that pile foundation construction operation does not affect by water level, and pile foundation construction complete after in cofferdam the pile foundation construction structure of installation platform upper mould.
To achieve these goals, the technical solution adopted in the utility model is such: pile foundation construction structure of the present utility model, comprise steel structure platform, steel structure platform is connected with steel pipe post, steel pipe post top extends in steel structure platform, a steel plate is each passed through and a bearing platform extends in a retaining wall bottom it, steel plate is arranged on below steel structure platform, bearing platform is arranged on lower surface of steel plate, and weld between bearing platform with steel plate, and bearing platform is provided with steel pile casting near two sides place, be fixedly connected with between steel pile casting with bearing platform, retaining wall is positioned on bearing platform soffit, and the steel pipe post being positioned at retaining wall is provided with stake, interior stake is applied on steel pipe post.
Further, as a kind of concrete form of structure, steel structure platform thickness described in the utility model is between one to two millimeter.
Further, as a kind of concrete form of structure, steel pipe post described in the utility model is at least two.
Further, as a kind of concrete form of structure, Interal fixation described in the utility model is on bearing platform.
Further, as a kind of concrete form of structure, steel pile casting described in the utility model is coated with anti oxidation layer.
Further, as a kind of concrete form of structure, retaining wall height described in the utility model is greater than bearing platform height.
Compared with prior art, the utility model has the advantage of: this pile foundation construction structure can better carry out pile foundation construction, ensure that pile foundation construction operation does not affect by water level, and pile foundation construction complete after in cofferdam installation platform upper mould, ensure that quick sequential production operation, and energy-conserving and environment-protective, significantly improve execution control and level of security, dependable performance is durable.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model;
In figure: 1. steel structure platform; 2. steel pipe post; 3. steel plate; 4. bearing platform; 5. stake in; 6. steel pile casting; 7. retaining wall.
Detailed description of the invention
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
The preferred embodiment of the utility model pile foundation construction structure as shown in Figure 1, comprise steel structure platform 1, steel structure platform 1 is connected with steel pipe post 2, steel pipe post 2 top extends in steel structure platform 1, a steel plate 3 is each passed through and a bearing platform 4 extends in a retaining wall 7 bottom it, steel plate 3 is arranged on below steel structure platform 1, bearing platform 4 is arranged on steel plate 3 soffit, and weld between bearing platform 4 with steel plate 3, and bearing platform 4 is provided with steel pile casting 6 near two sides place, be fixedly connected with between steel pile casting 6 with bearing platform 4, retaining wall 7 is positioned on bearing platform 4 soffit, and the steel pipe post 2 being positioned at retaining wall 7 is provided with stake 5, interior stake 5 is applied on steel pipe post 2, described steel structure platform 1 thickness is between one to two millimeter, described steel pipe post 2 is at least two, described steel plate 3 is fixed on bearing platform 4, described steel pile casting 6 is coated with anti oxidation layer, described retaining wall 7 is highly greater than bearing platform 4 height.
Pile foundation construction structure of the present utility model can better carry out pile foundation construction, ensure that pile foundation construction operation does not affect by water level, and pile foundation construction complete after in cofferdam installation platform upper mould, ensure that quick sequential production operation, and energy-conserving and environment-protective, significantly improve execution control and level of security, dependable performance is durable.Described steel structure platform 1 thickness is between one to two millimeter, and described steel pipe post 2 is at least two, can better play support performance, and durable in use; Described steel pile casting 6 is coated with anti oxidation layer, and steel pile casting 6 can better be protected not oxidized; Described retaining wall 7 is highly greater than bearing platform 4 height, makes its pile foundation more firm, and does not affect its functional performance.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to right.

Claims (6)

1. a pile foundation construction structure, comprise steel structure platform, it is characterized in that: steel structure platform is connected with steel pipe post, steel pipe post top extends in steel structure platform, a steel plate is each passed through and a bearing platform extends in a retaining wall bottom it, steel plate is arranged on below steel structure platform, bearing platform is arranged on lower surface of steel plate, and weld between bearing platform with steel plate, and bearing platform is provided with steel pile casting near two sides place, be fixedly connected with between steel pile casting with bearing platform, retaining wall is positioned on bearing platform soffit, and the steel pipe post being positioned at retaining wall is provided with stake, interior stake is applied on steel pipe post.
2. pile foundation construction structure according to claim 1, is characterized in that: described steel structure platform thickness is between one to two millimeter.
3. pile foundation construction structure according to claim 1, is characterized in that: described steel pipe post is at least two.
4. pile foundation construction structure according to claim 1, is characterized in that: described Interal fixation is on bearing platform.
5. pile foundation construction structure according to claim 1, is characterized in that: described steel pile casting is coated with anti oxidation layer.
6. pile foundation construction structure according to claim 1, is characterized in that: described retaining wall height is greater than bearing platform height.
CN201420808206.2U 2014-12-19 2014-12-19 Pile foundation construction structure Expired - Fee Related CN204343277U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420808206.2U CN204343277U (en) 2014-12-19 2014-12-19 Pile foundation construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420808206.2U CN204343277U (en) 2014-12-19 2014-12-19 Pile foundation construction structure

Publications (1)

Publication Number Publication Date
CN204343277U true CN204343277U (en) 2015-05-20

Family

ID=53226555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420808206.2U Expired - Fee Related CN204343277U (en) 2014-12-19 2014-12-19 Pile foundation construction structure

Country Status (1)

Country Link
CN (1) CN204343277U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563076A (en) * 2014-12-19 2015-04-29 成都聚智工业设计有限公司 Pile foundation construction structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563076A (en) * 2014-12-19 2015-04-29 成都聚智工业设计有限公司 Pile foundation construction structure

Similar Documents

Publication Publication Date Title
CN104805854B (en) A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment
CN204023501U (en) A remove dangerous and consolidate prevention of seepage processing structure for earth and rockfill dam
CN203569579U (en) Building foundation
CN104234013B (en) Reservoir dam
CN103526721B (en) A kind of permeable pile foundation groynes
CN104480899A (en) Hydraulic lifting water-retaining wall
CN104631396A (en) Superposed water taking gate
CN103174150B (en) Gravity type foundation sinking device and application method thereof
CN203977437U (en) The anti-cofferdam structure of breaking through water under a kind of built hydropower complex dam
CN204343277U (en) Pile foundation construction structure
CN204803913U (en) Take raft board combined type marine wind power fan single pile basis
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
CN206233272U (en) A kind of anti-floating of underground building structure
CN205296130U (en) Steel sheet pile supporting construction
CN203821399U (en) Deep foundation pit supporting structure
CN203625872U (en) Pile foundation construction platform
CN207484405U (en) A kind of concrete cut
CN202626963U (en) Water-borne conversion platform for installation and construction of prefabricated parts in off-sea intertidal zone
CN206887980U (en) A kind of integrated bracket basis of antifreeze pile
CN205399346U (en) Shore protection scour protection structure
CN204401555U (en) Gate dam crest wave wall structure
CN104563076A (en) Pile foundation construction structure
CN204370459U (en) The outer precipitation system of high sensitivity soil deep foundation pit support foundation ditch
CN204000745U (en) A kind of bulwark
CN204212171U (en) marine sandwich steel pipe pile foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20151219

EXPY Termination of patent right or utility model