CN204326508U - There is the Outsourcing-type of balancing of stresses structure to clasp - Google Patents

There is the Outsourcing-type of balancing of stresses structure to clasp Download PDF

Info

Publication number
CN204326508U
CN204326508U CN201420763205.0U CN201420763205U CN204326508U CN 204326508 U CN204326508 U CN 204326508U CN 201420763205 U CN201420763205 U CN 201420763205U CN 204326508 U CN204326508 U CN 204326508U
Authority
CN
China
Prior art keywords
balancing
fastener body
subsider
fastener
outsourcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420763205.0U
Other languages
Chinese (zh)
Inventor
赵春波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG JIUHENG CONSTRUCTION SAFETY TECHNOLOGY Co Ltd
Original Assignee
ZHEJIANG JIUHENG CONSTRUCTION SAFETY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG JIUHENG CONSTRUCTION SAFETY TECHNOLOGY Co Ltd filed Critical ZHEJIANG JIUHENG CONSTRUCTION SAFETY TECHNOLOGY Co Ltd
Priority to CN201420763205.0U priority Critical patent/CN204326508U/en
Application granted granted Critical
Publication of CN204326508U publication Critical patent/CN204326508U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to the auxiliary spare part of construction implement, disclose a kind of Outsourcing-type with balancing of stresses structure to clasp, comprise fastener body, bolt, nut and pad, the two ends of fastener body arrange two pairs of engaging lugs, bolt insertion end engaging lug is provided with and can forms the subsider of interference fit with nuts, subsider is concentric with perforate, the inwall of fastener body is provided with the balancing of stresses structure that cross section is I-shaped groove, the inwall of balancing of stresses structure and fastener body forms double-layer tube wall and the joint being positioned at two steel pipes in fastener body is cut off by I-shaped groove.The utility model is that being arranged on of the balancing of stresses structure of I-shaped groove strengthens fixing for steel pipe in conjunction with both sides locking mechanism by cross section; decrease and form the concentrated hidden danger of stress because of unbalance stress; protect whole fastener equipment; decrease the generation of security incident, the setting party of subsider for the locking of fastener.

Description

There is the Outsourcing-type of balancing of stresses structure to clasp
Technical field
The utility model relates to the auxiliary spare part of construction implement, and especially a kind of Outsourcing-type for fixing scaffold equipment is to clasp.
Background technology
The equipment of setting up of current building operations building site scaffold mainly carries out connecting with fastener, fastener is as the link between steel pipe and steel pipe, for the safety of scaffold, fastness and convenience play vital effect, because steel pipe has certain length, therefore for needing head to head between steel pipe and steel pipe in putting into practice, the situation that tail connects tail is many, just need such to clasp, Outsourcing-type conventional is at present all monolateral locking to clasp, namely locking mechanism is set at the joint of two steel pipes, because sometimes steel pipe is long, when Outsourcing-type fastener be used for fixing after, if act on power on steel pipe not evenly or steel pipe stressed directly when the two ends of steel pipe, the stress that the joint of two steel pipes produces is just very huge, this huge stress not only can make the joint of steel pipe produce deformation, the locking position of Outsourcing-type fastener also can be made time serious to come off or split, cause security incident, moreover the locking of Outsourcing-type fastener of the prior art is all that needs two spanners carry out just can completing to screw bolt and nut simultaneously, it is more inconvenient to operate, therefore the structure for Outsourcing-type this in prior art must be improved the environment just can tackling complicated building operations building site.
Utility model content
The purpose of this utility model is overcome above-mentioned the deficiencies in the prior art and provide a kind of Outsourcing-type for fixing steel pipe to clasp, solves when Outsourcing-type of the prior art causes fastener locking position come off or split and lock clasp because of unbalance stress and operates cumbersome problem.
For achieving the above object, the technical solution adopted in the utility model is:
There is the Outsourcing-type of balancing of stresses structure to clasp, comprise fastener body and the bolt for fixing, nut and pad, the two ends of described fastener body arrange two pairs of engaging lugs, be respectively the nut check end engaging lug of bolt insertion end engaging lug and the jaw shape being provided with perforate, bolt insertion end engaging lug is provided with and can forms the subsider of interference fit with nuts, described subsider is concentric with perforate, the inwall of fastener body is provided with the balancing of stresses structure that cross section is I-shaped groove, described balancing of stresses structure and the inwall of fastener body form double-layer tube wall and the joint being positioned at two steel pipes in fastener body is cut off by I-shaped groove.
As preferably, described subsider is key shape groove, and corresponding bolt is tee T bolt.
As preferably, described subsider is hexagon groove, and corresponding bolt is hex bolts.
The technical program mainly solves when Outsourcing-type of the prior art comes off or splits the fastener locking position that clasp causes because of unbalance stress and lock and operates cumbersome problem, mainly by arranging the balancing of stresses structure that cross section is I-shaped groove in fastener body, the inwall of balancing of stresses structure and fastener is made to form double-layer tube wall structure, and original single side lock locking structure is changed into both sides locking and namely bolt insertion end engaging lug and nut check end engaging lug are set respectively at the two ends of Outsourcing-type fastener body, after steel pipe is inserted into Outsourcing-type fastener, two steel pipes just in time can be clamped in I-shaped groove, carrying out fastening in conjunction with both sides locking mechanism, so just steel pipe is defined well fixing, the potential safety hazard caused because of unbalance stress can be avoided, bolt insertion end engaging lug arranges subsider can conveniently for the locking of steel pipe, use spanner is only needed to tighten nut.
The beneficial effects of the utility model: be that being arranged on of the balancing of stresses structure of I-shaped groove strengthens fixing for steel pipe in conjunction with both sides locking mechanism by cross section; decrease and form the concentrated hidden danger of stress because of unbalance stress; protect whole fastener equipment; decrease the generation of security incident, the setting party of subsider for the locking of fastener.
Accompanying drawing explanation
Fig. 1 is the front view of embodiment;
Fig. 2 is the sectional view of embodiment;
Fig. 3 is the right view of embodiment;
Fig. 4 is the front view of fastener body in embodiment;
Fig. 5 is the A-A sectional view in Fig. 4;
Fig. 6 is that later schematic diagram loaded onto by steel pipe.
In figure: fastener body 1, balancing of stresses structure 2, bolt 3, pad 4, nut 5, bolt insertion end engaging lug 6, nut check end engaging lug 7, perforate 8, subsider 9.
Detailed description of the invention
In conjunction with the accompanying drawings, the present invention is further detailed explanation, and these accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model and operating principle is described in a schematic manner.
Embodiment 1
See Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, shown in Fig. 6, there is the Outsourcing-type of balancing of stresses structure to clasp, comprise fastener body 1 and the bolt 3 for fixing, nut 5 and pad 4, the two ends of described fastener body 1 arrange two pairs of engaging lugs, be respectively and be provided with the bolt insertion end engaging lug 6 of perforate 8 and the nut check end engaging lug 7 of jaw shape, bolt insertion end engaging lug 6 is provided with and can forms the subsider 9 of interference fit with nuts, described subsider 9 is concentric with perforate 8, the inwall of fastener body 1 is provided with the balancing of stresses structure 2 that cross section is I-shaped groove, described balancing of stresses structure 2 and the inwall of fastener body 1 form double-layer tube wall and the joint being positioned at two steel pipes in fastener body 1 is cut off by I-shaped groove.
Preferably, described subsider 9 is hexagon groove, and corresponding bolt 3 is hex bolts.
The utility model arranges the balancing of stresses structure that cross section is I-shaped groove in fastener body 1, make it to form double-layer tube wall structure with fastener body 1, after two steel pipes insert, steel pipe is just in time clamped in I-shaped groove, and the joint of two steel pipes is separated (as shown in Figure 6) by I-shaped groove, which reduces the interaction between two steel pipes, and adopt both sides locking mechanism, namely steel pipe is locked at the two ends of fastener body 1 after inserting fastener body 1, such structure just alleviates because masterpiece is used in the two ends of steel pipe and the very concentrated problem of the steel pipe joint stress that causes, what alleviate at steel pipe joint is stressed, effectively protect whole fastener equipment, when fastening, bolt 3 forms interference fit between nuts meeting and subsider 9 after being inserted into bolt insertion end engaging lug 6, only needs the nut 5 that screws up with a wrench.
It should be noted that the detailed description of the invention of above just a kind of situation of the utility model; the utility model also can have other embodiment; as adopted key shape subsider and tee T bolt or by other structure of balancing of stresses vibrational power flow; in a word, the structure made under the inspiration of the present embodiment of those skilled in the art or change in fixed form all belong to protection category of the present utility model.

Claims (3)

1. there is the Outsourcing-type of balancing of stresses structure to clasp, comprise fastener body and the bolt for fixing, nut and pad, it is characterized in that: the two ends of described fastener body arrange two pairs of engaging lugs, be respectively the nut check end engaging lug of bolt insertion end engaging lug and the jaw shape being provided with perforate, bolt insertion end engaging lug is provided with and can forms the subsider of interference fit with nuts, described subsider is concentric with perforate, the inwall of fastener body is provided with the balancing of stresses structure that cross section is I-shaped groove, described balancing of stresses structure and the inwall of fastener body form double-layer tube wall and the joint being positioned at two steel pipes in fastener body is cut off by I-shaped groove.
2. have the Outsourcing-type of balancing of stresses structure as claimed in claim 1 to clasp, it is characterized in that: described subsider is key shape groove, corresponding bolt is tee T bolt.
3. have the Outsourcing-type of balancing of stresses structure as claimed in claim 1 to clasp, it is characterized in that: described subsider is hexagon groove, corresponding bolt is hex bolts.
CN201420763205.0U 2014-12-08 2014-12-08 There is the Outsourcing-type of balancing of stresses structure to clasp Expired - Fee Related CN204326508U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420763205.0U CN204326508U (en) 2014-12-08 2014-12-08 There is the Outsourcing-type of balancing of stresses structure to clasp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420763205.0U CN204326508U (en) 2014-12-08 2014-12-08 There is the Outsourcing-type of balancing of stresses structure to clasp

Publications (1)

Publication Number Publication Date
CN204326508U true CN204326508U (en) 2015-05-13

Family

ID=53162881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420763205.0U Expired - Fee Related CN204326508U (en) 2014-12-08 2014-12-08 There is the Outsourcing-type of balancing of stresses structure to clasp

Country Status (1)

Country Link
CN (1) CN204326508U (en)

Similar Documents

Publication Publication Date Title
CN204326502U (en) There is the hinge type of both sides locking mechanism to clasp
CN204195602U (en) The adjustable T-shaped box spanner of a kind of length of connecting rod
CN204326508U (en) There is the Outsourcing-type of balancing of stresses structure to clasp
CN204308828U (en) The T-shaped antioverloading box spanner of a kind of connecting rod folding type
CN103423281A (en) Anti-drop bolt
CN204565984U (en) A kind of combination wrenches can twisting the screw-nut that gets rusty
CN202969731U (en) Specially-shaped sleeve for connection of steel bar
CN204195610U (en) A kind of telescopic handle connecting rod can bending box spanner
CN204326512U (en) There is the Outsourcing-type of balancing of stresses structure to clasp
CN204585099U (en) Multiplex can Lengthened wrench
CN203006799U (en) Standard knot coupling sleeve stop device of tower crane
CN204326510U (en) There is the Outsourcing-type of both sides locking mechanism to clasp
CN204308820U (en) The adjustable antioverloading box spanner of a kind of T-shaped load of connecting rod folding type
CN204492327U (en) A kind of Assembled safety enclosing railings
CN204308850U (en) A kind of telescopic sleeve screwdriver
CN202292548U (en) External hexagonal sleeve-screwing tool
CN204326513U (en) Jaw type Outsourcing-type is to clasp
CN106438627A (en) Fastening piece for unilateral bolt
CN203961088U (en) For the scaffolding steel pipe linkage of multistory building
CN204326514U (en) The Outsourcing-type of convenient locking is to clasp
CN204149081U (en) A kind of connecting rod can bending dual-purpose type antioverloading box spanner
CN204326509U (en) There is the Outsourcing-type of both sides locking mechanism to clasp
CN204108898U (en) A kind of bending dual-purpose type antioverloading box spanner
CN204263046U (en) A kind of bending dual-purpose type box spanner
CN205822814U (en) A kind of adjustable safety protection tube device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150513

Termination date: 20161208

CF01 Termination of patent right due to non-payment of annual fee