- Publication number
- CN204325301U CN204325301U CN201420741728.5U CN201420741728U CN204325301U CN 204325301 U CN204325301 U CN 204325301U CN 201420741728 U CN201420741728 U CN 201420741728U CN 204325301 U CN204325301 U CN 204325301U
- Authority
- CN
- China
- Prior art keywords
- bamboo charcoal
- communicated
- carbonizing kiln
- sidewall
- preparation facilities
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E50/00—Technologies for the production of fuel of non-fossil origin
- Y02E50/10—Biofuels, e.g. bio-diesel
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E50/00—Technologies for the production of fuel of non-fossil origin
- Y02E50/30—Fuel from waste, e.g. synthetic alcohol or diesel
Landscapes
- Coke Industry (AREA)
- Solid Fuels And Fuel-Associated Substances (AREA)
Abstract
The utility model relates to a kind of power-saving mechanism bamboo charcoal preparation facilities, comprise carbonizing kiln and cooling tank, top cover is provided with above described carbonizing kiln, heat preservation sandwich layer is provided with in carbonizing kiln sidewall, wherein a sidewall is provided with ventilation opening near upper shed place in carbonizing kiln, another sidewall relative with ventilation opening place sidewall in carbonizing kiln is provided with smoke outlet near bottom place, described carbonizing kiln inwall is provided with groove, aqueduct is laid with in described groove, aqueduct feed-water end is communicated with pump outlet, and aqueduct water side is communicated with inside of boiler; Described smoke outlet is communicated with the first fan inlet through smoke exhaust pipe, and the first fan out draft is communicated with boiler furnace.This power-saving mechanism bamboo charcoal preparation facilities had not only improve the quality of finished product bamboo charcoal and char yield rate but also had avoided the damage of bamboo resource, met environmental requirement, improved bamboo charcoal productivity and bamboo resource utilization ratio simultaneously, increase the economic benefit of bamboo charcoal industry.
Description
Technical field
The utility model relates to a kind of power-saving mechanism bamboo charcoal preparation facilities.
Background technology
In recent years, China's bamboo charcoal industry development is rapid, and in China, development time is short, and this industry is grown up by the transformation of traditional charcoal production process primarily of forest zone charcoal agriculture, and state of the art is lower.The scientific research of current bamboo charcoal industry is dark still not, although developed hundreds of series product, bamboo charcoal research is still in the starting stage generally, and industry ubiquity productivity effect is low, consumes the problems such as a large amount of bamboo resources.
Earth kiln method: China more than 95% is earth kiln." earth kiln method " cost of investment lower (every kiln invests about 0.5 ~ 0.6 ten thousand yuan), earth kiln is made charcoal and is had that cost is low, the feature such as convenient of putting up a kiln, but earth kiln method due to state of the art low, material of putting up a kiln mostly is common masonry, without technology content, the structure properties of kiln is poor, therefore, the char yield rate fired of putting up a kiln is lower, is generally only 18 ~ 20%, according to investigations, every charcoal kiln once can fire bamboo charcoal 0.7 ~ 1.0 ton, every kiln firing time is generally 18 ~ 23 days, and every kiln can be made charcoal 10-15 times for 1 year, and namely every kiln can fire bamboo charcoal about 7 ~ 15 tons every year.Fuel mostly is gathers materials on the spot, and causes significant wastage and destruction to local forest products resource.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of power-saving mechanism bamboo charcoal preparation facilities that effectively can improve bamboo charcoal productivity.
The utility model adopts following scheme to realize: a kind of power-saving mechanism bamboo charcoal preparation facilities, comprise carbonizing kiln and cooling tank, top cover is provided with above described carbonizing kiln, heat preservation sandwich layer is provided with in carbonizing kiln sidewall, wherein a sidewall is provided with ventilation opening near upper shed place in carbonizing kiln, another sidewall relative with ventilation opening place sidewall in carbonizing kiln is provided with smoke outlet near bottom place, described carbonizing kiln inwall is provided with groove, aqueduct is laid with in described groove, aqueduct feed-water end is communicated with pump outlet, and aqueduct water side is communicated with inside of boiler; Described smoke outlet is communicated with the first fan inlet through smoke exhaust pipe, and the first fan out draft is communicated with boiler furnace.
Further, described ventilation opening is provided with switch, the exhanst gas outlet of described boiler furnace is communicated with the second fan inlet, and the second fan out draft is communicated with the inlet mouth of water dust scrubber, and the sewage outfalls setting of water dust scrubber has the blow-off pipe towards settling tank.
Further, described top cover is pyramidal structure, and top cover bottom side is provided with thermal insulation layer, and cap base is provided with the grapple in order to fixing thermal insulation layer, top cover is symmetrically arranged with a pair suspension hook.
Further, described cooling tank comprises cover body, and be provided with the base plate sealing cover body lower opening bottom described cover body, cover body top is symmetrically arranged with a pair hook.
Compared with prior art, the utility model has following beneficial effect: this power-saving mechanism bamboo charcoal preparation facilities is made charcoal, and degree of oxidation is high, char yield rate is high, improve unit output, in sintering procedure, use aqueduct and lagging material as refuge floor, and implement temperature and humidity double control, not only improve the quality of finished product bamboo charcoal and char yield rate but also avoided the damage of bamboo resource, meet environmental requirement, improve bamboo charcoal productivity and bamboo resource utilization ratio simultaneously, increase the economic benefit of bamboo charcoal industry.
Accompanying drawing explanation
Fig. 1 is the utility model embodiment organigram;
Fig. 2 is carbonizing kiln sectional view in the utility model embodiment;
Fig. 3 is top cover sectional view in the utility model embodiment;
Fig. 4 is cooling tank organigram in the utility model embodiment;
Number in the figure illustrates: 1-carbonizing kiln, 2-cooling tank, 3-top cover, 4-heat preservation sandwich layer, 5-ventilation opening, 6-smoke outlet, 7-groove, 8-aqueduct, 9-water pump, 10-boiler, 11-first induced draft fan, 12-second induced draft fan, 13-water dust scrubber, 14-thermal insulation layer, 15-grapple, 16-suspension hook, 17-cover body, 18-base plate, 19-hook, 20-settling tank.
Embodiment
For making the purpose of this utility model, technical scheme and advantage clearly understand, below by specific embodiment and relevant drawings, the utility model will be described in further detail.
As shown in Fig. 1 ~ 4, a kind of power-saving mechanism bamboo charcoal preparation facilities, comprise carbonizing kiln 1 and cooling tank 2, the length of carbonizing kiln 1, wide, height is respectively 2000mm, 1800mm, 1600mm, top cover 3 is provided with above described carbonizing kiln 1, top cover 3 and carbonizing kiln 1 upper shed are sealed and matched and guarantee that carbonization process is air tight, heat preservation sandwich layer 4 is provided with in carbonizing kiln 1 sidewall, wherein a sidewall is provided with ventilation opening 5 near upper shed place in carbonizing kiln 1, be responsible for the oxygen supply of Machine-made bamboo charcoal carbonization process, ventilation opening 5 has three and distance carbonizing kiln 1 upper shed 50mm, another sidewall relative with ventilation opening place sidewall in carbonizing kiln 1 is provided with smoke outlet 6 near bottom place, smoke outlet 6 be also three and distance carbonizing kiln 1 bottom 50mm, ventilation opening 5 and smoke outlet 6 are arranged on different lateral, prevent oxygen supply from differing and cannot carbonize.Described carbonizing kiln 1 inwall is provided with groove 7, is laid with aqueduct 8 in described groove 7, and aqueduct 8 adopts withstand voltage anticorrosion extraordinary 304H stainless steel, and aqueduct 8 feed-water end is communicated with water pump 9 water outlet, and aqueduct 8 water side is communicated with boiler 10 inner bag; Described smoke outlet 6 is communicated with the first induced draft fan 11 blast inlet through smoke exhaust pipe, first induced draft fan 11 air outlet and boiler 10 combustion chamber, wherein smoke exhaust pipe selects 304H or ND steel corrosion resistant material, the heat that normal-temperature water in aqueduct 8 takes away the generation of Machine-made bamboo charcoal carbonization process takes back boiler, reach UTILIZATION OF VESIDUAL HEAT IN, bamboo charcoal temperature of combustion can be controlled at zone of reasonableness simultaneously, guarantee bamboo charcoal sintering procedure quality; And the flue gas of carbonizing kiln 1 Nei Wenduda 270-300 DEG C also takes back boiler, also reaches heat recovery.
In the present embodiment, described ventilation opening 5 is provided with the switch controlling ventilation opening 5 keying, the exhanst gas outlet of described boiler 10 combustion chamber is communicated with the second induced draft fan 12 blast inlet, second induced draft fan 12 air outlet is communicated with the inlet mouth of water dust scrubber 13, the sewage outfalls setting of water dust scrubber 13 has the blow-off pipe towards settling tank 20, processed waste water is discharged by overflow weir bottom water dust scrubber 13 and is entered settling tank 20, recycles.
In the present embodiment, described top cover 3 is pyramidal structure, and top cover 3 bottom side is provided with thermal insulation layer 14, and thermal insulation layer uses the thick High-Alumina refractory castable of 300-500mm, be provided with the grapple 15 in order to fixing thermal insulation layer 14 bottom top cover 3, top cover 3 be symmetrically arranged with a pair suspension hook 16 so that driving lifting top cover 3.
In the present embodiment, described cooling tank 2 comprises cover body 17, is provided with the base plate 18 sealing cover body 17 lower opening bottom described cover body 17, and cover body 17 top is symmetrically arranged with a pair hook 19 for lifting of driving a vehicle.
The preparation process of this power-saving mechanism bamboo charcoal preparation facilities is: chase by compact arranged for Machine-made bamboo charcoal raw material loading chase, and lifts in carbonizing kiln 1 by (1); (2) top cover 3, opens ventilation opening, carbonizes in advance; (3) after carbonizing 110-126 hour, ventilation opening is closed smoulder 24 hours (4) and opens top cover 3, the chase of dress Machine-made bamboo charcoal is lifted airtight cooling in cooling tank.
Above-listed preferred embodiment; the purpose of this utility model, technical scheme and advantage are further described; be understood that; the foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (4)
1. a power-saving mechanism bamboo charcoal preparation facilities, it is characterized in that: comprise carbonizing kiln and cooling tank, top cover is provided with above described carbonizing kiln, heat preservation sandwich layer is provided with in carbonizing kiln sidewall, wherein a sidewall is provided with ventilation opening near upper shed place in carbonizing kiln, another sidewall relative with ventilation opening place sidewall in carbonizing kiln is provided with smoke outlet near bottom place, described carbonizing kiln inwall is provided with groove, aqueduct is laid with in described groove, aqueduct feed-water end is communicated with pump outlet, and aqueduct water side is communicated with inside of boiler; Described smoke outlet is communicated with the first fan inlet through smoke exhaust pipe, and the first fan out draft is communicated with boiler furnace.
2. power-saving mechanism bamboo charcoal preparation facilities according to claim 1, it is characterized in that: described ventilation opening is provided with switch, the exhanst gas outlet of described boiler furnace is communicated with the second fan inlet, second fan out draft is communicated with the inlet mouth of water dust scrubber, and the sewage outfalls setting of water dust scrubber has the blow-off pipe towards settling tank.
3. power-saving mechanism bamboo charcoal preparation facilities according to claim 2, is characterized in that: described top cover is pyramidal structure, and top cover bottom side is provided with thermal insulation layer, and cap base is provided with the grapple in order to fixing thermal insulation layer, top cover is symmetrically arranged with a pair suspension hook.
4. power-saving mechanism bamboo charcoal preparation facilities according to claim 1, is characterized in that: described cooling tank comprises cover body, and be provided with the base plate sealing cover body lower opening bottom described cover body, cover body top is symmetrically arranged with a pair hook.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420741728.5U CN204325301U (en) | 2014-12-02 | 2014-12-02 | A kind of power-saving mechanism bamboo charcoal preparation facilities |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420741728.5U CN204325301U (en) | 2014-12-02 | 2014-12-02 | A kind of power-saving mechanism bamboo charcoal preparation facilities |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204325301U true CN204325301U (en) | 2015-05-13 |
Family
ID=53161679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420741728.5U Expired - Fee Related CN204325301U (en) | 2014-12-02 | 2014-12-02 | A kind of power-saving mechanism bamboo charcoal preparation facilities |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204325301U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104445150A (en) * | 2014-12-02 | 2015-03-25 | 福建省卓越工贸有限公司 | Preparation method of machine-made bamboo charcoal |
CN107599111A (en) * | 2017-09-22 | 2018-01-19 | 城步佳能农林科技开发有限公司 | A kind of machine-made bamboo Improvement of Calcinator and its production technology |
-
2014
- 2014-12-02 CN CN201420741728.5U patent/CN204325301U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104445150A (en) * | 2014-12-02 | 2015-03-25 | 福建省卓越工贸有限公司 | Preparation method of machine-made bamboo charcoal |
CN104445150B (en) * | 2014-12-02 | 2016-03-30 | 福建省卓越工贸有限公司 | A kind of preparation method of Machine-made bamboo charcoal |
CN107599111A (en) * | 2017-09-22 | 2018-01-19 | 城步佳能农林科技开发有限公司 | A kind of machine-made bamboo Improvement of Calcinator and its production technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204162707U (en) | A kind of unpowered from stirring broken shell anaerobic ferment devices | |
CN104445150B (en) | A kind of preparation method of Machine-made bamboo charcoal | |
CN204325301U (en) | A kind of power-saving mechanism bamboo charcoal preparation facilities | |
CN204329319U (en) | Biomass Briquette Hot-blast Stove | |
CN201634430U (en) | Electric forging furnace for producing broken artificial graphite | |
CN204265644U (en) | Heat storage type lime rotary kiln | |
CN104329935B (en) | A kind of modified blast furnace | |
CN204356281U (en) | A kind of planer-type charring kiln | |
CN204400930U (en) | A kind of cooling structure of biomass gasifying furnace secondary air | |
CN103224801A (en) | Simple self-heat supply dry distillation apparatus | |
CN201882913U (en) | Tank type calcining furnace for preparing calcined petroleum coke | |
CN102911676B (en) | Dry distillation carbonization furnace with flue pipe and carbonization method | |
CN107022680B (en) | A kind of all cold charge blow-in method with waste heat boiler fuming furnace | |
CN206051939U (en) | A kind of biomass regenerate extraction element | |
CN204185534U (en) | A kind of diameter 40 meters of rotary hearth furnaces-molten point stove combined production line | |
CN204177181U (en) | A kind of modified Novel blast furnace | |
CN205295222U (en) | Straw is vertical porous gas retort in succession | |
CN204897827U (en) | Seal backfire carbomorphism kiln | |
CN204529935U (en) | A kind of novel oxygen enrichment reduction furnace | |
CN205227787U (en) | Environmental protection and energy saving type marsh gas boiler | |
CN204455257U (en) | Heat hot galvanizing kettle in a kind of combustion gas | |
CN204301042U (en) | biomass high-efficiency energy-saving boiler | |
CN202912953U (en) | Energy-saving biogas tank | |
CN203187621U (en) | Simple automatic heating dry distillation device | |
CN208684422U (en) | The box activation furnace of activated carbon for super capacitors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150513 Termination date: 20151202 |
|
EXPY | Termination of patent right or utility model |