CN204314381U - A kind of novel electric power loss measurement device - Google Patents
A kind of novel electric power loss measurement device Download PDFInfo
- Publication number
- CN204314381U CN204314381U CN201420864962.7U CN201420864962U CN204314381U CN 204314381 U CN204314381 U CN 204314381U CN 201420864962 U CN201420864962 U CN 201420864962U CN 204314381 U CN204314381 U CN 204314381U
- Authority
- CN
- China
- Prior art keywords
- module
- measurement
- line
- electrically connected
- demodular unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
Abstract
The utility model provides a kind of novel electric power loss measurement device, comprise circuit under test (1), be located at the measurement module (2) in circuit under test (1) at least two, each measurement module (2) connects a line of electric force PLC modulator-demodular unit (3) respectively, each line of electric force PLC modulator-demodular unit (3) accesses electric power network (4) respectively, and is electrically connected with host computer (6) by line of electric force PLC modulator-demodular unit (5); Host computer (6) is electrically connected with voice unit (7) and gsm communication module (8) respectively.The utility model can measure the power consumption value in certain period, effectively prevent the error result of the measurement that Time Inconsistency causes when testing, and when power consumption rate exceedes predetermined threshold value, form by voice is directly notified designated user mobile phone, and user can understand the proportion of goods damageds in time and to exceed standard situation.
Description
Technical field
The utility model relates to electric power observation and control technical field, particularly relates to a kind of novel electric power loss measurement device.
Background technology
Along with the raising of industrial automatization and the extensive popularization of technical ability consciousness, user has had new requirement for the electricity consumption situation from the equipment of use, they not only pay close attention to the electricity consumption situation of whole system, also need to understand to the energy consumption condition of single device in certain hour section, larger concern be there has also been for the equipment of oneself and the loss situation of circuit simultaneously.
At an enterprise or factories and miness with in the middle of electrical measuring systems, there is no the equipment directly circuit being carried out to loss measurement at present, main cause is distant between 2 that measure; For the measurement of transformer loss because need the electricity of the both sides gathering different electric pressure, have difficulties to a certain extent, the product that on market, other producers develop all takes the on high-tension side voltage of theory calculate, the mode of electric current is measured, there is certain error in this kind of mode, can not reflect the loss situation of transformer exactly.
Power line carrier communication is the communication of power system of the transmission medium taking transmission line of electricity as carrier signal.Because transmission line of electricity possesses very firmly supporting construction, and set up the conductor (generally having three-phase good conductor and one or two aerial earth wire) of more than 3, so while power transmission line conveying power current, the transmission carrier signal of use, not only economy but also very reliable.This comprehensive utilization becomes the peculiar means of communication that all power departments in the world preferentially adopt already.
Along with the fast development of Mobile solution terminal device such as Pad, smart mobile phone etc., the Mobile solution terminal device of various operating system is day by day universal, existing mobile terminal resource such as Pad, the smart mobile phone etc. how made full use of in client's hand realizes the partial function in power consumption remote measurement process, is significant.
Utility model content
The utility model aims to provide a kind of novel electric power loss measurement device, the loss instantaneous value of what this measurement device obtained is not circuit, transformer or miscellaneous equipment, but the power consumption value in certain period, effectively prevent the error result of the measurement that Time Inconsistency causes when testing, and when power consumption rate exceedes predetermined threshold value, designated user mobile phone can be notified in time.
To achieve these goals, the utility model adopts following technical scheme:
A kind of novel electric power loss measurement device, comprise circuit under test, be located at the measurement module in circuit under test at least two, each measurement module connects a line of electric force PLC modulator-demodular unit respectively, each line of electric force PLC modulator-demodular unit accesses electric power network respectively, and is electrically connected with host computer by line of electric force PLC modulator-demodular unit; Host computer is electrically connected with voice unit and gsm communication module respectively.
Further, measurement module comprises CPU processor, measures acquisition module, time module, power module and human-computer interaction module, the output terminal of measurement acquisition module, the output terminal of time module, the output terminal of power module are electrically connected with CPU processor respectively, and human-computer interaction module is electrically connected with CPU processor is two-way.
The beneficial effects of the utility model are:
1, easy to use, what obtained by this measurement device is not the loss instantaneous value of circuit, transformer or miscellaneous equipment, but the power consumption value in certain period, effectively prevent the error result of the measurement that Time Inconsistency causes when testing;
2, when power consumption rate exceedes predetermined threshold value, the form by voice is directly notified designated user mobile phone, user can understand the proportion of goods damageds in time and to exceed standard situation;
3, cost is low: this technology directly utilizes existing distribution network as transmission line, need not additionally connect up, and greatly reduces the investment of network, reduces cost;
4, scope is wide: line of electric force is the network that coverage is the widest, and its scale is that other any networks are incomparable;
5, convenient: as long as the controller of equipment is connected in any supply socket, just can have the express network that PLC brings immediately.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated:
Fig. 1 shows the structural representation of a kind of embodiment of the utility model power consumption measurement mechanism.
Fig. 2 shows the structural representation of a kind of embodiment of measurement module in the utility model power consumption measurement mechanism.
Embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Fig. 1 shows the structural representation of a kind of embodiment of the utility model power consumption measurement mechanism.As shown in Figure 1, comprise circuit under test 1, circuit under test 1 can be circuit or transformer, respectively measuring circuit loss or transformer loss; Also comprise at least two measurement modules 2 be located in circuit under test 1, each measurement module 2 connects a line of electric force PLC modulator-demodular unit 3 respectively, each line of electric force PLC modulator-demodular unit 3 accesses electric power network 4 respectively, and is electrically connected with host computer 6 by line of electric force PLC modulator-demodular unit 5; Host computer 6 is electrically connected with voice unit 7 and gsm communication module 8 respectively.
As shown in Figure 2, measurement module 2 comprises CPU processor 21, measures acquisition module 22, time module 23, power module 24 and human-computer interaction module 25, the output terminal of measurement acquisition module 22, the output terminal of time module 23, the output terminal of power module 24 are electrically connected with CPU processor 21 respectively, and human-computer interaction module 25 is electrically connected with CPU processor 21 is two-way.
Measure acquisition module 22 can adopt prior art to realize.Such as comprise A/D sampling A/D chip and the mutual inductor of MIX125, for gathering the measurement point voltage and current signal of circuit under test 1; Time module 23 can adopt PCF8583 clock chip, for providing timing signal; Power module 24 is for powering to the modules in measurement module 2; Human-computer interaction module 25 is for the communication between CPU processor 21 and Human-machine Control panel.
Host computer 6 passes through line of electric force PLC modulator-demodular unit 5, electric power network 4 and line of electric force PLC modulator-demodular unit 3 to information during the transmission pair of each measurement module 2, each measurement module 2 revises the value of its time module 23, operate when completing school, guarantee that the time of each device is run consistent; Host computer reads the markers electric energy of each measurement module 2 same time by line of electric force PLC modulator-demodular unit 5, electric power network 4 and line of electric force PLC modulator-demodular unit 3, by to the comparison of markers electric energy and analysis, the power consumption of circuit and transformer in certain period can be drawn accurately; Suppose to arrange 2 measurement modules in circuit, its power consumption measuring method comprises the steps:
When A, electric system normally run, the measurement module A2 and the measurement module B2 that are positioned at measured circuit or transformer two ends measure, and carry out calculating and the storage of markers electric energy according to the time interval set (the shortest is 1 second);
B, respectively markers energy data is uploaded to host computer 6 by line of electric force PLC modulator-demodular unit 3, electric power network 4 and line of electric force PLC modulator-demodular unit 5, measurement module A2 and measurement module B2;
The data analysis that C, host computer 6 are uploaded two measurement modules 2 and calculating, draw the proportion of goods damageds of circuit in a certain amount of time or transformer; The method calculated is:
The proportion of goods damageds calculated and the threshold value preset compare by D, host computer 6, if the proportion of goods damageds are greater than this threshold value, then the information such as these markers energy information, proportion of goods damageds are sent to voice unit 7 and generate voice messaging, host computer 6 sends AT instruction, sets up talking link by gsm communication module 8 with designated telephone user simultaneously, then this voice messaging is sent to designated user mobile phone by gsm communication module 8, reminds these markers proportion of goods damageds of designated user to exceed default threshold value.
Above-described embodiment, just in order to technical conceive of the present utility model and feature are described, its objective is and is one of ordinary skilled in the art can be understood content of the present utility model and implement according to this, can not limit protection domain of the present utility model with this.The change of every equivalence done by the essence of the utility model content or modification, all should be encompassed in protection domain of the present utility model.
Claims (2)
1. a novel electric power loss measurement device, comprise circuit under test (1), be located at the measurement module (2) in circuit under test (1) at least two, it is characterized in that: each measurement module (2) connects a line of electric force PLC modulator-demodular unit (3) respectively, each line of electric force PLC modulator-demodular unit (3) accesses electric power network (4) respectively, and is electrically connected with host computer (6) by line of electric force PLC modulator-demodular unit (5); Host computer (6) is electrically connected with voice unit (7) and gsm communication module (8) respectively.
2. novel electric power loss measurement device according to claim 1, it is characterized in that: measurement module (2) comprises CPU processor (21), measures acquisition module (22), time module (23), power module (24) and human-computer interaction module (25), the output terminal of measurement acquisition module (22), the output terminal of time module (23), the output terminal of power module (24) are electrically connected with CPU processor (21) respectively, and human-computer interaction module (25) is electrically connected with CPU processor (21) is two-way.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420864962.7U CN204314381U (en) | 2014-12-31 | 2014-12-31 | A kind of novel electric power loss measurement device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420864962.7U CN204314381U (en) | 2014-12-31 | 2014-12-31 | A kind of novel electric power loss measurement device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204314381U true CN204314381U (en) | 2015-05-06 |
Family
ID=53136687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420864962.7U Expired - Fee Related CN204314381U (en) | 2014-12-31 | 2014-12-31 | A kind of novel electric power loss measurement device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204314381U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105717398A (en) * | 2016-04-12 | 2016-06-29 | 国家电网公司 | Power distribution network power loss monitor and monitoring method thereof |
-
2014
- 2014-12-31 CN CN201420864962.7U patent/CN204314381U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105717398A (en) * | 2016-04-12 | 2016-06-29 | 国家电网公司 | Power distribution network power loss monitor and monitoring method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204156226U (en) | A kind of smart jack | |
CN105092961A (en) | Ammeter system using mobile terminal for positioning | |
CN205620502U (en) | Join in marriage net line fault positioner | |
CN204205306U (en) | Based on the Domestic distributing box of mobile module remote monitoring | |
CN207319431U (en) | A kind of intelligent meter data recording system based on NB-IoT | |
CN204314381U (en) | A kind of novel electric power loss measurement device | |
CN205002798U (en) | Direct current electromagnetic environment monitoring system based on zigBee | |
CN208422100U (en) | A kind of electric energy meter collector with remote failure monitoring function | |
CN202362901U (en) | Acquisition terminal of special transformer | |
CN203365573U (en) | Electric power parameter monitoring device for intelligent electrical network | |
CN203101505U (en) | Metering monitoring system based on wireless communication technology | |
CN104483591A (en) | Power transmission line traveling wave fault location monitoring device | |
CN204116503U (en) | Intelligent AC distribution equipment accurate monitoring device | |
CN203643536U (en) | Distribution line power monitoring system | |
CN204030723U (en) | Based on the distribution controller of CAN | |
CN203276525U (en) | Embedded test system convenient for near-field data transmission | |
CN202649795U (en) | A self-healing control terminal system of a power distribution network | |
CN202631628U (en) | Intelligent electric meter | |
CN205665867U (en) | Load control terminal micropower device of checking meter | |
CN204990661U (en) | Electric energy meter based on big dipper communication | |
CN205157660U (en) | Monitoring device | |
CN105510703A (en) | Urban network distribution metering system | |
CN203337813U (en) | A verifier | |
CN204330951U (en) | A kind of feeder line fault stadimeter | |
CN204009059U (en) | A kind of on-site calibration device with power consumption test |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150506 Termination date: 20151231 |
|