CN204312863U - Building building cement grouting pipe chuck - Google Patents

Building building cement grouting pipe chuck Download PDF

Info

Publication number
CN204312863U
CN204312863U CN201420806435.0U CN201420806435U CN204312863U CN 204312863 U CN204312863 U CN 204312863U CN 201420806435 U CN201420806435 U CN 201420806435U CN 204312863 U CN204312863 U CN 204312863U
Authority
CN
China
Prior art keywords
intermediate plate
building
hole
chuck
handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420806435.0U
Other languages
Chinese (zh)
Inventor
石延明
马耀辉
胡希明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420806435.0U priority Critical patent/CN204312863U/en
Application granted granted Critical
Publication of CN204312863U publication Critical patent/CN204312863U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of building building cement grouting pipe chuck, described building building cement grouting pipe chuck comprises a suspension handle, the head of described suspension handle is provided with one first intermediate plate and one second intermediate plate, and the second described intermediate plate is connected with the first described intermediate plate rotationally.The advantage of building building cement grouting pipe chuck of the present utility model is: during use, user is when carrying out cement injection, as long as slip casting flexible pipe is directly stuck between the first intermediate plate and the second intermediate plate, and the handle hanging ring hanging handle is hanging on suitable girder steel.User can select the conduit chuck of fair amount according to the length of slip casting flexible pipe, flexible pipe is fixed by the path of slip casting flexible pipe.When slip casting flexible pipe works, pipe shaft is acutely shaken, and due to the restriction of chuck, effectively prevent the accidental of slip casting flexible pipe, improves the efficiency of cement injection.This building building cement grouting pipe chuck structure is simple, easy to adjust, uses various caliber, practical.

Description

Building building cement grouting pipe chuck
Technical field
The utility model relates to a kind of Architectural Equipment, or rather, is a kind of building building cement grouting pipe chuck.
Background technique
When building carries out cement injection, usually need the hand-held grouting pipe of workman, come off or be shifted to prevent grouting pipe from acutely shaking, the labor intensity of workman is very big.
Model utility content
The utility model mainly solves the technical problem existing for prior art, thus provides a kind of building building cement grouting pipe chuck.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals:
A kind of building building cement grouting pipe chuck, described building building cement grouting pipe chuck comprises a suspension handle, the head of described suspension handle is provided with one first intermediate plate and one second intermediate plate, the second described intermediate plate is connected with the first described intermediate plate rotationally, described suspension handle comprises handle hanging ring and a bar-shaped handle connecting rod of one " O " font, the head of described handle connecting rod is provided with leader's spiral shell head, the first described intermediate plate comprises a sheet of first clip body, the head of the first described clip body establishes the first chuck of one " Y " font, the first described clip body afterbody is provided with a pair first flange connectors, be provided with one first between the first described flange connector and connect pin rod, the first described clip body afterbody is provided with a connecting screw hole, described connecting screw hole matches with described handle spiral shell head, the middle part of the first described clip body is provided with a locking groove, a locking through hole is provided with in described locking groove, an adjusting portion is provided with in described locking through hole, the second described intermediate plate comprises a sheet of second clip body, the head of the second described clip body is provided with a second flat chuck, the afterbody of the second described clip body is provided with one second flange connector, the second described flange connector is provided with one second connecting through hole, the second described connecting through hole and described first is connected pin rod and matches, the afterbody of the second described clip body is provided with one first connecting through hole, the sidewall of the first described connecting through hole is provided with first connecting pin bores run through, described adjusting portion comprises a locking screw rod, described locking screw rod is provided with a damping cushion rubber and a dovetail nut, the bottom of described locking screw rod is provided with a screw rod pin-and-hole, one locking pin rod runs through described screw rod pin-and-hole and the first connecting pin bores respectively.
As the utility model preferred embodiment, the first described intermediate plate and the second intermediate plate are stainless steel and make.
The advantage of building building cement grouting pipe chuck of the present utility model is: during use, user is when carrying out cement injection, as long as slip casting flexible pipe is directly stuck between the first intermediate plate and the second intermediate plate, and the handle hanging ring hanging handle is hanging on suitable girder steel.User can select the conduit chuck of fair amount according to the length of slip casting flexible pipe, flexible pipe is fixed by the path of slip casting flexible pipe.When slip casting flexible pipe works, pipe shaft is acutely shaken, and due to the restriction of chuck, effectively prevent the accidental of slip casting flexible pipe, improves the efficiency of cement injection.This building building cement grouting pipe chuck structure is simple, easy to adjust, uses various caliber, practical.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technological scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the perspective view of building building cement grouting pipe chuck of the present utility model;
Fig. 2 is the stereochemical structure decomposing schematic representation of the building building cement grouting pipe chuck in Fig. 1;
Fig. 3 is the details enlarged diagram of the a-quadrant of building building cement grouting pipe chuck in Fig. 2;
Fig. 4 is the details enlarged diagram in the B region of building building cement grouting pipe chuck in Fig. 2;
Fig. 5 is the perspective view of the first intermediate plate of building building cement grouting pipe chuck in Fig. 2;
Fig. 6 is the stereochemical structure decomposing schematic representation of the adjusting portion in Fig. 2;
Wherein, 1, building building cement grouting pipe chuck; 2, handle is hung; 21, handle hanging ring; 22, handle connecting rod; 23, handle spiral shell head; 3, the first intermediate plate; 31, the first clip body; 32, the first chuck; 33, the first flange connector; 34, first connects pin rod; 35, connecting screw hole; 36, locking groove; 37, locking through hole; 4, the second intermediate plate; 41, the second clip body; 42, the second chuck; 43, the second flange connector; 44, the second connecting through hole; 45, the first connecting through hole; 46, the first connecting pin bores; 5, adjusting portion; 51, locking screw rod; 52, damping cushion rubber; 53, dovetail nut; 54, screw rod pin-and-hole; 55, locking pin rod.
Embodiment
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, to make advantage of the present utility model and feature can be easier to be readily appreciated by one skilled in the art, thus more explicit defining is made to protection domain of the present utility model.
As shown in Figures 1 to 6, building building cement grouting pipe chuck 1 of the present utility model comprises a suspension handle 2, the head of this suspension handle 2 is provided with one first intermediate plate 3 and one second intermediate plate 4, this second intermediate plate 4 is connected with this first intermediate plate 3 rotationally, this suspension handle 2 comprises handle hanging ring 21 and a bar-shaped handle connecting rod 22 of one " O " font, the head of this handle connecting rod 22 is provided with leader's spiral shell head 23, this first intermediate plate 3 comprises a sheet of first clip body 31, the head of this first clip body 31 establishes first chuck 32 of one " Y " font, this the first clip body 31 afterbody is provided with a pair first flange connectors 33, be provided with one first between this first flange connector 33 and connect pin rod 34, this the first clip body 31 afterbody is provided with a connecting screw hole 35, this connecting screw hole 35 matches with this handle spiral shell head 23, the middle part of this first clip body 31 is provided with a locking groove 36, a locking through hole 37 is provided with in this locking groove 36, an adjusting portion 5 is provided with in this locking through hole 37, this second intermediate plate 4 comprises a sheet of second clip body 41, the head of this second clip body 41 is provided with a second flat chuck 42, the afterbody of this second clip body 41 is provided with one second flange connector 43, this second flange connector 43 is provided with one second connecting through hole 44, this second connecting through hole 44 first is connected pin rod 34 with this and matches, the afterbody of this second clip body 41 is provided with one first connecting through hole 45, the sidewall of this first connecting through hole 45 is provided with first connecting pin bores 46 run through, this adjusting portion 5 comprises a locking screw rod 51, this locking screw rod 51 is provided with damping cushion rubber 52 and a dovetail nut 53, the bottom of this locking screw rod 51 is provided with a screw rod pin-and-hole 54, one locking pin rod 55 runs through this screw rod pin-and-hole 54 and the first connecting pin bores 46 respectively.
This first intermediate plate 3 and the second intermediate plate 4 are stainless steel and make.
During use, as depicted in figs. 1 and 2, the handle hanging ring 21 hanging handle 2, when carrying out cement injection, as long as be directly stuck in by slip casting flexible pipe between the first intermediate plate 3 and the second intermediate plate 4, and is hanging on suitable girder steel by user.User can select the conduit chuck 1 of fair amount according to the length of slip casting flexible pipe, flexible pipe is fixed by the path of slip casting flexible pipe.When slip casting flexible pipe works, pipe shaft is acutely shaken, and due to the restriction of chuck 1, effectively prevent the accidental of slip casting flexible pipe, improves the efficiency of cement injection.This building building cement grouting pipe chuck 1 structure is simple, easy to adjust, uses various caliber, practical.
Be not limited to this, any change of expecting without creative work or replacement, all should be encompassed within protection domain of the present utility model.Therefore, the protection domain that protection domain of the present utility model should limit with claims is as the criterion.

Claims (2)

1. a building building cement grouting pipe chuck, it is characterized in that, described building building cement grouting pipe chuck (1) comprises a suspension handle (2), the head of described suspension handle (2) is provided with one first intermediate plate (3) and one second intermediate plate (4), described the second intermediate plate (4) is connected with described the first intermediate plate (3) rotationally, described suspension handle (2) comprises handle hanging ring (21) and a bar-shaped handle connecting rod (22) of one " O " font, the head of described handle connecting rod (22) is provided with leader's spiral shell head (23), described the first intermediate plate (3) comprises a sheet of first clip body (31), the head of described the first clip body (31) establishes first chuck (32) of one " Y " font, described the first clip body (31) afterbody is provided with a pair first flange connectors (33), be provided with one first between described the first flange connector (33) and connect pin rod (34), described the first clip body (31) afterbody is provided with a connecting screw hole (35), described connecting screw hole (35) matches with described handle spiral shell head (23), the middle part of described the first clip body (31) is provided with a locking groove (36), a locking through hole (37) is provided with in described locking groove (36), an adjusting portion (5) is provided with in described locking through hole (37), described the second intermediate plate (4) comprises a sheet of second clip body (41), the head of described the second clip body (41) is provided with flat second chuck (42), the afterbody of described the second clip body (41) is provided with one second flange connector (43), described the second flange connector (43) is provided with one second connecting through hole (44), described the second connecting through hole (44) is connected pin rod (34) with described first and matches, the afterbody of described the second clip body (41) is provided with one first connecting through hole (45), the sidewall of described the first connecting through hole (45) is provided with first connecting pin bores (46) run through, described adjusting portion (5) comprises a locking screw rod (51), described locking screw rod (51) is provided with a damping cushion rubber (52) and a dovetail nut (53), the bottom of described locking screw rod (51) is provided with a screw rod pin-and-hole (54), one locking pin rod (55) runs through described screw rod pin-and-hole (54) and the first connecting pin bores (46) respectively.
2. building building cement grouting pipe chuck according to claim 1, is characterized in that, described the first intermediate plate (3) and the second intermediate plate (4) are stainless steel and make.
CN201420806435.0U 2014-12-19 2014-12-19 Building building cement grouting pipe chuck Expired - Fee Related CN204312863U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420806435.0U CN204312863U (en) 2014-12-19 2014-12-19 Building building cement grouting pipe chuck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420806435.0U CN204312863U (en) 2014-12-19 2014-12-19 Building building cement grouting pipe chuck

Publications (1)

Publication Number Publication Date
CN204312863U true CN204312863U (en) 2015-05-06

Family

ID=53135181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420806435.0U Expired - Fee Related CN204312863U (en) 2014-12-19 2014-12-19 Building building cement grouting pipe chuck

Country Status (1)

Country Link
CN (1) CN204312863U (en)

Similar Documents

Publication Publication Date Title
CN204312863U (en) Building building cement grouting pipe chuck
CN204015491U (en) A kind of paintbrush of replaceable brush head
CN204997116U (en) Fluted drill extension bar
CN208323194U (en) A kind of dismountable manual wrench of Wrench head
CN206157908U (en) A connection structure for building
CN205235886U (en) Muddler
CN204565374U (en) Telescopic electric welding pen
CN205367635U (en) Simple structure just has crow bar device of fulcrum
CN205044360U (en) Multifunctional pen for white board
CN205388187U (en) Construct pre -buried tub of advancing device
CN204493365U (en) A kind of novel hydraulic filter end cap
CN204221416U (en) Steel pipe locking device
CN204793862U (en) Tractor on power line cable
CN203796553U (en) Water outlet segment of deep well submersible pump
CN205253008U (en) A stirring rod for laboratory
CN203920196U (en) A kind of clay sculpture craftwork is made the cutter of use
CN205342927U (en) A novel hardware and tools for nut
CN205858984U (en) A kind of drive shaft transmission stabilizer sleeve
CN204191868U (en) A kind of detachable paintbrush
CN204487433U (en) A kind of sleeve
CN104879356A (en) Lock block for supporting square tubes
CN105332704A (en) Portable shovel for coal mine
CN204913670U (en) Knob insulator bonding instrument
CN105003512A (en) Anti-loose nail
CN204913858U (en) Novel quality of building engineering detects toolbox

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150506

Termination date: 20151219

EXPY Termination of patent right or utility model