CN205388187U - Construct pre -buried tub of advancing device - Google Patents
Construct pre -buried tub of advancing device Download PDFInfo
- Publication number
- CN205388187U CN205388187U CN201521049222.9U CN201521049222U CN205388187U CN 205388187 U CN205388187 U CN 205388187U CN 201521049222 U CN201521049222 U CN 201521049222U CN 205388187 U CN205388187 U CN 205388187U
- Authority
- CN
- China
- Prior art keywords
- ejector sleeve
- pipe
- mounting groove
- guide holder
- guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a construct pre -buried tub of advancing device, including the guide holder, the guide holder is equipped with the mounting groove, and the mounting groove setting is in the lateral wall position of guide holder, the guide holder is equipped with the ejector sleeve, and the ejector sleeve is installed in the mounting groove position, and the one end of ejector sleeve is the free end, and the other end of ejector sleeve is equipped with and pushes away the cap, and the cross section appearance that pushes away the cap is regular hexagon, and the axial that pushes away the cap is equipped with the fluting, the mounting groove is equipped with the stand pipe, and the stand pipe is the tubular structure, and fastening nut is equipped with at the axial position of stand pipe, ejector sleeve cover to the ejector sleeve setting, fastening nut and stand pipe butt joint, and fastening nut sets up in the mounting groove, be equipped with the fixed pin between fastening nut and the stand pipe, the one end setting of fixed pin contacts in fastening nut and with the ejector sleeve, the tip of the other end of fixed pin is detained on fastening nut's lateral wall. The utility model discloses a convenient pre -buried pipe of building that promotes of ejector sleeve, make things convenient for the construction.
Description
Technical field
This utility model relates to a kind of apparatus for building, builds built-in pipe propulsion plant particularly to one.
Background technology
Built-in pipe is pipeline embedding in advance for subsequent structural and construction technology in architectural engineering, and general cast-in-place structural, when assembling reinforcement, is fixed on conduit on template and reinforcing bar, and after pouring concrete, pipe is just in structural elements.The existing built-in pipe inconvenience degree of depth is installed, and efficiency of construction is low.
Utility model content
This utility model mainly solves the technical problem existing for prior art, thus providing one can be arranged on construction site by this device, ejector sleeve alignment building built-in pipe can be passed through, user can pass through to push away cap and push directly on ejector sleeve, ejector sleeve can realize moving horizontally along guide pipe, ejector sleeve can be made to move horizontally stability by guide pipe better, promote building built-in pipe by ejector sleeve is convenient;Facilitate the building built-in pipe propulsion plant of construction.
Above-mentioned technical problem of the present utility model is addressed mainly by following technical proposals:
A kind of building built-in pipe propulsion plant, including guide holder, guide holder is provided with mounting groove, and mounting groove is arranged on the sidewall locations of guide holder;Guide holder is provided with ejector sleeve, and ejector sleeve is arranged on mounting groove position, and one end of ejector sleeve is free end, and the other end of ejector sleeve is provided with and pushes away cap, and the cross-sectional profile pushing away cap is regular hexagon, and what push away cap is axially arranged with fluting;Mounting groove is provided with guide pipe, and guide pipe is tubular structure, and ejector sleeve is arranged on the axial location of guide pipe, and ejector sleeve is set with clamp nut, and clamp nut docks with guide pipe, and clamp nut is arranged in mounting groove;Being provided with steady pin between clamp nut and guide pipe, one end of steady pin is arranged in clamp nut and contacts with ejector sleeve;The end of the other end of steady pin is buckled on the lateral wall of clamp nut.
Further, the outer peripheral face of described guide pipe is provided with stopper slot.
Further, described guide holder is provided with fixing hole.
Further, described guide holder is provided with projection.
Further, described projection and guide holder are structure as a whole.
Adopt the building built-in pipe propulsion plant of technique scheme, can this device be arranged on construction site, ejector sleeve alignment building built-in pipe can be passed through, user can pass through to push away cap and push directly on ejector sleeve, ejector sleeve can realize moving horizontally along guide pipe, ejector sleeve can be made to move horizontally stability by guide pipe better, promote building built-in pipe by ejector sleeve is convenient;Facilitate construction.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structural representation of this utility model building built-in pipe propulsion plant;
Fig. 2 is the exploded view of this utility model building built-in pipe propulsion plant;
Fig. 3 is the structural representation of guide holder described in the utility model;
Fig. 4 is A-A profile in Fig. 3.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, so that advantage of the present utility model and feature can be easier to be readily appreciated by one skilled in the art, thus protection domain of the present utility model being made apparent clear and definite defining.
As shown in Figures 1 to 4, a kind of building built-in pipe propulsion plant, including guide holder 1, guide holder 1 is provided with mounting groove 3, and mounting groove 3 is arranged on the sidewall locations of guide holder 1;Guide holder 1 is provided with ejector sleeve 4, and ejector sleeve 4 is arranged on mounting groove 3 position, and one end of ejector sleeve 4 is free end, and the other end of ejector sleeve 4 is provided with and pushes away cap 5, and the cross-sectional profile pushing away cap 5 is regular hexagon, and what push away cap 5 is axially arranged with fluting 6;Mounting groove 3 is provided with guide pipe 7, and guide pipe 7 is tubular structure, and ejector sleeve 4 is arranged on the axial location of guide pipe 7, and ejector sleeve 4 is set with clamp nut 9, and clamp nut 9 docks with guide pipe 7, and clamp nut 9 is arranged in mounting groove 3;Being provided with steady pin 10 between clamp nut 9 and guide pipe 7, one end of steady pin 10 is arranged in clamp nut 9 and contacts with ejector sleeve 4;The end of the other end of steady pin 10 is buckled on the lateral wall of clamp nut 9;The outer peripheral face of guide pipe 7 is provided with stopper slot 8, and guide holder 1 is provided with fixing hole 2, and guide holder 1 is provided with projection 11, and projection 11 and guide holder 1 are structure as a whole.
This utility model building built-in pipe propulsion plant, can this device be arranged on construction site, ejector sleeve 4 alignment building built-in pipe can be passed through, user can pass through to push away cap 5 and push directly on ejector sleeve 4, ejector sleeve 4 can realize moving horizontally along guide pipe 7, ejector sleeve 4 can be made to move horizontally stability by guide pipe 7 better, promote building built-in pipe by ejector sleeve 4 is convenient;Facilitate construction.
Wherein, the outer peripheral face of guide pipe 7 is provided with stopper slot 8, it is possible to guide pipe 7 is played spacing effect, and guide pipe 7 can be made to be more firmly mounted.
Wherein, guide holder 1 is provided with fixing hole 2, so convenient, guide holder 1 is fixed installation.
Wherein, guide holder 1 is provided with projection 11, and projection 11 and guide holder 1 are structure as a whole, so the stability of guide holder 1 can be greatly improved.
The above, be only detailed description of the invention of the present utility model, but protection domain of the present utility model be not limited thereto, any change expected without creative work or replacement, all should be encompassed within protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with claims protection defined.
Claims (5)
1. a building built-in pipe propulsion plant, including guide holder, it is characterised in that: guide holder is provided with mounting groove, and mounting groove is arranged on the sidewall locations of guide holder;Guide holder is provided with ejector sleeve, and ejector sleeve is arranged on mounting groove position, and one end of ejector sleeve is free end, and the other end of ejector sleeve is provided with and pushes away cap, and the cross-sectional profile pushing away cap is regular hexagon, and what push away cap is axially arranged with fluting;Mounting groove is provided with guide pipe, and guide pipe is tubular structure, and ejector sleeve is arranged on the axial location of guide pipe, and ejector sleeve is set with clamp nut, and clamp nut docks with guide pipe, and clamp nut is arranged in mounting groove;Being provided with steady pin between clamp nut and guide pipe, one end of steady pin is arranged in clamp nut and contacts with ejector sleeve;The end of the other end of steady pin is buckled on the lateral wall of clamp nut.
2. building built-in pipe propulsion plant according to claim 1, it is characterised in that: the outer peripheral face of guide pipe is provided with stopper slot.
3. building built-in pipe propulsion plant according to claim 1, it is characterised in that: guide holder is provided with fixing hole.
4. building built-in pipe propulsion plant according to claim 1, it is characterised in that: guide holder is provided with projection.
5. building built-in pipe propulsion plant according to claim 4, it is characterised in that: projection and guide holder are structure as a whole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521049222.9U CN205388187U (en) | 2015-12-16 | 2015-12-16 | Construct pre -buried tub of advancing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521049222.9U CN205388187U (en) | 2015-12-16 | 2015-12-16 | Construct pre -buried tub of advancing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205388187U true CN205388187U (en) | 2016-07-20 |
Family
ID=56382910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521049222.9U Expired - Fee Related CN205388187U (en) | 2015-12-16 | 2015-12-16 | Construct pre -buried tub of advancing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205388187U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106678447A (en) * | 2017-02-16 | 2017-05-17 | 高佳 | Anti-explosion fixing device for gas collecting pipe |
-
2015
- 2015-12-16 CN CN201521049222.9U patent/CN205388187U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106678447A (en) * | 2017-02-16 | 2017-05-17 | 高佳 | Anti-explosion fixing device for gas collecting pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205388187U (en) | Construct pre -buried tub of advancing device | |
CN203755662U (en) | Split fixing device for beam column form | |
CN204059967U (en) | Fixed building template taper split bolt assembly | |
CN203755663U (en) | Split fixing device for wall column form | |
CN204343677U (en) | A kind of removable ferrule mold of construction site reserving hole | |
CN203755676U (en) | Perpendicularity control tool for wall column | |
CN203654747U (en) | Tapered opposite-pull screw apparatus | |
CN106885046A (en) | One kind building built-in pipe propulsion plant | |
CN205348757U (en) | Take building wall template of sleeve pipe constant head tank | |
CN201507516U (en) | Length-extensible drive rod | |
CN203961262U (en) | The adjustable device for erecting pole of a kind of scaffold | |
CN202416576U (en) | Pre-embedded casing | |
CN107143116B (en) | U.S. seam grooving apparatus | |
CN203947773U (en) | A kind of for fixed form to support to draw rod device | |
CN205424096U (en) | Supplementary installation device of embedded pipe for building | |
CN106545158B (en) | A kind of square column concrete component Wood-plastic formwork reinforces fixture and its application method | |
CN204920222U (en) | Tapered wall pole of wearing | |
CN204402022U (en) | The floor template of slot type embedded part can be fixed | |
CN203213603U (en) | Whole set screw rod | |
CN204012418U (en) | A kind of cable testing bridge mounting auxiliary | |
CN204001739U (en) | A kind of building connector through walls | |
CN203247602U (en) | Directly buried bolt installation device | |
CN211341831U (en) | Beam-penetrating sleeve mounting and fixing structure | |
CN204459676U (en) | A kind of guide rod fixed support structure of adjustable distance | |
CN205558279U (en) | Building mount for planker |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160720 Termination date: 20161216 |