CN204311337U - Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge - Google Patents

Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge Download PDF

Info

Publication number
CN204311337U
CN204311337U CN201420754601.7U CN201420754601U CN204311337U CN 204311337 U CN204311337 U CN 204311337U CN 201420754601 U CN201420754601 U CN 201420754601U CN 204311337 U CN204311337 U CN 204311337U
Authority
CN
China
Prior art keywords
pontic
emergent
gravity self
pivot joint
erecting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420754601.7U
Other languages
Chinese (zh)
Inventor
冷建兴
汪立之
姜雪
吴世海
徐关尧
吴家骅
梁涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd
Original Assignee
ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd filed Critical ZHONGSHAN HIGHWAY STEEL STRUCTURE MANUFACTURE CO Ltd
Priority to CN201420754601.7U priority Critical patent/CN204311337U/en
Application granted granted Critical
Publication of CN204311337U publication Critical patent/CN204311337U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses emergent the robbing of a kind of gravity self-balancing formula leads to fast from building bridge, comprise: pontic mechanism, comprise at least two pontic folded and intermediate junction devices, wherein a pontic top is provided with track, all the other pontic two ends are provided with the roller coordinated with track, intermediate junction device between two pontics set up, for connecting the pontic of both sides; Erecting device, sets up pontic for substep; Vehicle-carrying mechanism, deposits pontic mechanism and erecting device for transport, and in erection process, can be erecting device providing unit point counterweight; Described erecting device comprises folding lifting framework and a hoisting mechanism.Adopt the utility model of said structure one by one pontic can be installed by substep, and mounted pontic can be the pontic installed below and provides support, reduce the requirement to counterweight, the vehicle-carrying mechanism in the utility model is made to adopt common vehicle, simultaneously, the utility model installs rapid and convenient, is applicable to the pontic that weight is larger.

Description

Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge
Technical field
The utility model relates to emergent the robbing of a kind of gravity self-balancing formula and leads to fast from building bridge.
Background technology
Fast construction bridge on river or gully is in emergency circumstances needed at some, when bridge is longer, in order to ensure the structural strength of pontic, the weight of pontic can be comparatively large, therefore, special vehicle must be equipped with in the method for existing fast erecting bridge, this special vehicle needs to be equipped with a large amount of counterweight, and purchase and this special vehicle of long-time maintenance will produce a large amount of expense, simultaneously after pontic weight acquires a certain degree, straight line rises by its installation difficulty, causes installation cost also to rise by straight line.Based on above reason, the utility model provides emergent the robbing of a kind of gravity self-balancing formula to lead to fast from building bridge in order to solve the problem.
Utility model content
In order to solve the problem, the utility model provides emergent the robbing of a kind of gravity self-balancing formula to lead to fast from building bridge.
The utility model solves the technical scheme that its technical problem adopts:
Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge, and comprising:
Pontic mechanism, comprise at least two folding pontics and intermediate junction devices, wherein a pontic top is provided with track, and all the other pontic two ends are provided with the roller coordinated with track, intermediate junction device between two pontics set up, for connecting the pontic of both sides;
Erecting device, sets up pontic for substep;
Vehicle-carrying mechanism, deposits pontic mechanism and erecting device for transport, and in erection process, can be erecting device providing unit point counterweight;
Described erecting device comprises folding lifting framework and a hoisting mechanism.
Described hoisting mechanism comprises hoist engine, pulley and hawser, and described hoist engine is arranged on vehicle-carrying mechanism, and described pulley is arranged on lifting framework, and described hawser one end is connected with hoist engine, other end pile warp pulley.
Described lifting framework comprises under(-)chassis, vertically framework, the first oil cylinder and the second oil cylinder, vertical framework comprises upper frame and lower frame, described lower frame and under(-)chassis pivot joint, upper frame and lower frame pivot joint, described first oil cylinder one end and under(-)chassis pivot joint, the other end and lower frame pivot joint, described second oil cylinder one end and upper frame pivot joint, the other end and lower frame pivot joint.
Be connected with vehicle-carrying mechanism by some pull bars after described lifting framework launches.
The expanding unit for being launched completely from folded state by pontic is provided with in the middle part of described pontic.
Described expanding unit comprises one the 3rd oil cylinder and linkage, and described 3rd oil cylinder one end is arranged on pontic, and the other end acts on linkage, and linkage is arranged on pontic.
Described pontic two ends are all articulated with lapping plate.
Described intermediate junction device comprises some junction plates, and this junction plate one end and a pontic pivot joint, the other end can overlap with another pontic.
The beneficial effects of the utility model are: adopt the utility model of said structure can install pontic one by one by substep, and mounted pontic can be the pontic installed below and provides support, reduce the requirement to counterweight, the vehicle-carrying mechanism in the utility model is made to adopt common vehicle, simultaneously, the utility model installs rapid and convenient, is applicable to the pontic that weight is larger.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated:
Fig. 1 is schematic diagram of the present utility model;
Fig. 2 is the schematic diagram after the utility model erecting device launches;
Fig. 3 is the schematic diagram that pontic of the present utility model is in half deployed condition;
Fig. 4 is the schematic diagram that pontic of the present utility model is in full expand state;
Fig. 5 is the partial enlarged drawing A in Fig. 3;
Fig. 6 is the schematic diagram that the pontic of band roller relies in the installation process of the pontic of belt track.
Detailed description of the invention
With reference to Fig. 1 ~ Fig. 6, the utility model is that emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge, and comprising:
Pontic mechanism, comprise at least two pontic 1 folded and intermediate junction devices 7, wherein pontic 1 top is provided with track, all the other pontic 1 two ends are provided with the roller coordinated with track, pontic 1 quantity is set to two in the present embodiment, this intermediate junction device 7 is for connecting adjacent pontic 1, this intermediate junction device 7 comprises some junction plates, this junction plate one end and pontic 1 pivot joint, the other end can overlap with another pontic 1, this intermediate junction device 7 includes two-layer up and down, upper strata is netted, lower floor is rice font shape, can be pre-installed on pontic 1, after having set up pontic 1, its upset can be completed overlap joint,
Erecting device, for substep erection pontic 1;
Vehicle-carrying mechanism 3, deposits pontic mechanism and erecting device for transport, and in erection process, can be erecting device providing unit point counterweight;
Erecting device comprises folding lifting framework 2 and a hoisting mechanism.
The utility model of said structure is adopted first to be launched by erecting device, then by erecting device, the pontic 1 being provided with track is erected at desired location when setting up, other pontic 1 of this process and vehicle-carrying mechanism 3 are counterweight, because the weight of each pontic 1 is similar, therefore this process vehicle-carrying mechanism 3 is just as auxiliary counterweight, less demanding to it; And then by erecting device, other pontic 1 is sling one by one, on track on the pontic 1 roller on it being fallen into set up, in this hoisting process, born the role of counterweight by vehicle-carrying mechanism 3, this process is not high to counterweight requirements, and therefore vehicle-carrying mechanism 3 does not need special; Then rely on roller to be launched by other pontic 1 with coordinating of track, the weight of other pontic 1 of this process is born by the pontic 1 set up, and does not substantially need counterweight to support; Finally, roller and track is relied on to coordinate the pontic 1 set up to be moved to the side of the pontic 1 being provided with track by erecting device.Adopt the utility model of said structure one by one pontic 1 can be installed by substep, and mounted pontic 1 can be the pontic installed below and provides support, reduce the requirement to counterweight, the vehicle-carrying mechanism 3 in the utility model is made to adopt common vehicle, simultaneously, the utility model installs rapid and convenient, is applicable to the pontic that weight is larger.
As shown in the figure, hoist engine 41 structure comprises hoist engine 41, pulley 43 and hawser 42, hoist engine 41 is arranged on vehicle-carrying mechanism 3, pulley 43 is arranged on lifting framework 2, hawser 42 one end is connected with hoist engine 41, be connected with pontic 1 after other end pile warp pulley 43, rotated by hoist engine 41 and transfer pontic 1.
As shown in the figure, lifting framework 2 comprises under(-)chassis 21, vertically framework, the first oil cylinder 24 and the second oil cylinder 25, vertical framework comprises upper frame 22 and lower frame 23, lower frame 23 and under(-)chassis 21 pivot joint, upper frame 22 and lower frame 23 pivot joint, first oil cylinder 24 one end and under(-)chassis 21 pivot joint, the other end and lower frame 23 pivot joint, second oil cylinder 25 one end and upper frame 22 pivot joint, the other end and lower frame 23 pivot joint.Be connected with vehicle-carrying mechanism 3 by some pull bars 26 after lifting framework 2 launches.It is as follows that lifting framework 2 sets up engineering: start the first oil cylinder 24, underframe opposing floor portion framework 21 is driven to turn to vertical with under(-)chassis 21, then the second oil cylinder 25 is started, drive the relative underframe of upper frame 22 to turn to and be in same plane with underframe, then by pull bar 26, lifting framework 2 is connected with vehicle-carrying mechanism 3, increases the structural strength of lifting framework 2.
As shown in the figure, the expanding unit for being launched completely from folded state by pontic 1 is provided with in the middle part of pontic 1.Expanding unit comprises one the 3rd oil cylinder 51 and linkage the 52, three oil cylinder 51 one end is arranged on pontic 1, and the other end acts on linkage 52, and linkage 52 is arranged on pontic 1.Adopt the pontic 1 of said structure when needs launch by the 3rd oil cylinder 51 drive linkage 52 action, and then launched by two parts of connecting rod drive axle body 1, launch stable action noiselessness.
As shown in the figure, conveniently pontic 1 docks with ground, is all articulated with lapping plate 6 at pontic 1 two ends, is rotated by lapping plate 6 and overlap state to ground after pontic 1 sets up.In order to increase the intensity of pontic 1 and improve the security performance of pontic 1.
Above-described embodiment is preferred version of the present utility model, and the utility model also can have other embodiments.Those skilled in the art also can make equivalent variations or replacement under the prerequisite without prejudice to the utility model spirit, and these equivalent modification or replacement are all included in the scope set by the application's claim.

Claims (8)

1. emergent the robbing of gravity self-balancing formula is led to fast from building bridge, and it is characterized in that comprising:
Pontic mechanism, comprise at least two folding pontics and intermediate junction devices, wherein a pontic top is provided with track, and all the other pontic two ends are provided with the roller coordinated with track, intermediate junction device between two pontics set up, for connecting the pontic of both sides;
Erecting device, sets up pontic for substep;
Vehicle-carrying mechanism, deposits pontic mechanism and erecting device for transport, and in erection process, can be erecting device providing unit point counterweight;
Described erecting device comprises folding lifting framework and a hoisting mechanism.
2. a kind of gravity self-balancing formula as claimed in claim 1 is emergent robs logical quick bridge formation certainly, it is characterized in that described hoisting mechanism comprises hoist engine, pulley and hawser, described hoist engine is arranged on vehicle-carrying mechanism, described pulley is arranged on lifting framework, described hawser one end is connected with hoist engine, other end pile warp pulley.
3. a kind of gravity self-balancing formula as claimed in claim 1 is emergent robs logical quick bridge formation certainly, it is characterized in that described lifting framework comprises under(-)chassis, vertically framework, the first oil cylinder and the second oil cylinder, vertical framework comprises upper frame and lower frame, described lower frame and under(-)chassis pivot joint, upper frame and lower frame pivot joint, described first oil cylinder one end and under(-)chassis pivot joint, the other end and lower frame pivot joint, described second oil cylinder one end and upper frame pivot joint, the other end and lower frame pivot joint.
4. a kind of gravity self-balancing formula as claimed in claim 1 is emergent robs logical quick bridge formation certainly, it is characterized in that described lifting framework is connected with vehicle-carrying mechanism by some pull bars after launching.
5. a kind of gravity self-balancing formula as claimed in claim 1 is emergent robs logical quick bridge formation certainly, it is characterized in that the expanding unit be provided with in the middle part of described pontic for being launched completely from folded state by pontic.
6. a kind of gravity self-balancing formula as claimed in claim 5 is emergent robs logical quick bridge formation certainly, it is characterized in that described expanding unit comprises one the 3rd oil cylinder and linkage, described 3rd oil cylinder one end is arranged on pontic, and the other end acts on linkage, and linkage is arranged on pontic.
7. a kind of gravity self-balancing formula as claimed in claim 1 is emergent robs logical quick bridge formation certainly, it is characterized in that described pontic two ends are all articulated with lapping plate.
8. a kind of gravity self-balancing formula as claimed in claim 1 is emergent robs logical quick bridge formation certainly, and it is characterized in that described intermediate junction device comprises some junction plates, this junction plate one end and a pontic pivot joint, the other end can overlap with another pontic.
CN201420754601.7U 2014-12-03 2014-12-03 Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge Withdrawn - After Issue CN204311337U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420754601.7U CN204311337U (en) 2014-12-03 2014-12-03 Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420754601.7U CN204311337U (en) 2014-12-03 2014-12-03 Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge

Publications (1)

Publication Number Publication Date
CN204311337U true CN204311337U (en) 2015-05-06

Family

ID=53133661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420754601.7U Withdrawn - After Issue CN204311337U (en) 2014-12-03 2014-12-03 Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge

Country Status (1)

Country Link
CN (1) CN204311337U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499417A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Gravity self-balance type emergency rehabilitation rapid self-erection bridge
CN111172858A (en) * 2019-12-30 2020-05-19 中联重科股份有限公司 Mechanical bridge erecting mechanism, mechanical bridge erecting vehicle and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499417A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Gravity self-balance type emergency rehabilitation rapid self-erection bridge
CN104499417B (en) * 2014-12-03 2016-04-27 中山市公路钢结构制造有限公司 Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge
CN111172858A (en) * 2019-12-30 2020-05-19 中联重科股份有限公司 Mechanical bridge erecting mechanism, mechanical bridge erecting vehicle and method

Similar Documents

Publication Publication Date Title
CN104499417B (en) Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge
CN103437298B (en) Precast concrete box-beam hanging method and hanging apparatus
CN103556627B (en) A kind of hanging cage structure for large diameter bored pile reinforcing bar cage hoisting
CN102587645A (en) Climbing supporting mechanism having expansion and automatic meshing functions, and construction method thereof
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN104477788B (en) Spanning self-climbing type translational crane of wind power generation tower
CN203079590U (en) Tower crane and jacking device thereof
CN104762882A (en) Bridge segment lifting device and method
CN105256728A (en) Cable-stayed bridge warren steel truss cantilever erection method
CN103422662B (en) The integral movable type operation platform cast-in-place for elevator shaft and using method thereof
CN204311337U (en) Emergent the robbing of a kind of gravity self-balancing formula is led to fast from building bridge
CN203625889U (en) Hanging cage structure for large-diameter hole drilling cast pile reinforcement cage hanging
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN205100531U (en) Lift scaffold support body assembly
CN104495653B (en) A kind of multi-functional large-tonnage erecting crane and beam erecting method
CN103982141B (en) A kind of novel rapid transporting drilling machine derrick substructure structure
CN103552572A (en) Mobile vehicle-ride bridge
CN205802754U (en) A kind of steel structure hydraulic pressure lift construction auxiliary device
CN101979771A (en) Tower whole movement lifting device
CN104631897A (en) Chimney glass fiber reinforced plastic inner tube fast installation method
CN208594486U (en) A kind of anchor ear system of automatic lifting
CN203559356U (en) Bridge girder erection machine
CN205500626U (en) Climbing mechanism in tower crane
CN204384741U (en) A kind of portable hydraulic auxiliary erection automobile obstacle crossing device
CN206051351U (en) Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150506

Effective date of abandoning: 20160427

C25 Abandonment of patent right or utility model to avoid double patenting