CN204311315U - New type colorful road kerb - Google Patents

New type colorful road kerb Download PDF

Info

Publication number
CN204311315U
CN204311315U CN201420800867.0U CN201420800867U CN204311315U CN 204311315 U CN204311315 U CN 204311315U CN 201420800867 U CN201420800867 U CN 201420800867U CN 204311315 U CN204311315 U CN 204311315U
Authority
CN
China
Prior art keywords
road kerb
trapezoidal
stereotyped
dull
kerb
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420800867.0U
Other languages
Chinese (zh)
Inventor
杨修志
徐光彩
陈志喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Shunchang Highway Maintenance Co Ltd
Original Assignee
Linyi Shunchang Highway Maintenance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi Shunchang Highway Maintenance Co Ltd filed Critical Linyi Shunchang Highway Maintenance Co Ltd
Priority to CN201420800867.0U priority Critical patent/CN204311315U/en
Application granted granted Critical
Publication of CN204311315U publication Critical patent/CN204311315U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

A kind of new type colorful road kerb, comprise dull and stereotyped road kerb and trapezoidal road kerb, dull and stereotyped road kerb is cube structure, trapezoidal road kerb is that upper bottom surface is square solid construction, dull and stereotyped road kerb upper surface is with highway sign pattern, and trapezoidal road kerb trapezoidal upper surface and four sides are with highway sign pattern; Dull and stereotyped road kerb and trapezoidal road kerb combine, and collect attractive in appearance, comfortable, are easy to maintenance, decrease machinery or hand sweeping workload, highway rainwater dispersion draining, avoids rainwater and soaks highway, can prevent again Summer Rainfall from washing out curb, side slope, extend highway application life.

Description

New type colorful road kerb
Technical field
The utility model relates to a kind of auxiliary highway facilities, specifically a kind of new type colorful road kerb.
Background technology
Current highway is commonly used road kerb and mostly is precast concrete road kerb, and precast curb installation requirement is higher, mounting process relative complex, existing cement concrete road kerb color is mostly dull, heaviness, uneconomical, frequent white waste of manpower, material resources in routine servicing process.Although the lithotome road kerbs such as marble are neatly aesthetic in appearance, its cost is too high, is often only limited to the powerful and influential sections such as urban road.This type of road kerb exceeds road surface 10 ~ 20cm usually, easy stop rubbish, very easily cause pavement garbage to assemble, not easy to clean, and easily hinder draining, cause pavement disease, its central drainage mode, very easily causes curb to wash away, for avoiding the curb that destroys by rush of water, need to set up concentrated spilled water hole, groove specially, add maintenance of surface cost.
Summary of the invention
For above-mentioned Problems existing, the utility model proposes and adopt the pigment such as iron oxide red, iron oxide yellow to make colored kerbstone.
The technical scheme taked for realizing above object is:
A kind of new type colorful road kerb, comprise dull and stereotyped road kerb and trapezoidal road kerb, described dull and stereotyped road kerb is cube structure, and described trapezoidal road kerb is lower end solid square body, the solid truncated rectangular pyramids structure in upper end; Described dull and stereotyped road kerb and described trapezoidal road kerb are colorful surface layer and basalis double-layer structure, and colorful surface layer attachment on the base layer; New type colorful road kerb saves material in the change of structure design, simultaneously through compression test, meets pouring.
Described dull and stereotyped road kerb size is equal with described trapezoidal road kerb lower end side body size.
Described dull and stereotyped road kerb has two kinds of sizes, and length is respectively: 40cm × 40cm × 5cm or 30cm × 30cm × 5cm; Described trapezoidal road kerb has two kinds of sizes, and upper end truncated rectangular pyramids upper bottom surface is 20cm × 20cm, bottom surface 40cm × 40cm, and height is 8.5cm, and lower end side's body length is respectively 40cm × 40cm × 5cm; Or upper end truncated rectangular pyramids upper bottom surface is 15cm × 15cm, bottom surface 30cm × 30cm, height is 8.5cm, and the length of lower end side's body is respectively 30cm × 30cm × 5cm; Novel curb carrying is light, and volume significantly reduces, and has saved preformed material.
Described dull and stereotyped road kerb and described trapezoidal road kerb are made by standard C 25 cement concrete; 28 days standard cube of concrete compressive strength is that on 25 Mp(state provincial highway arterial highways, basic unit's design strength is 3.5Mp), there is stronger compressive property.
Described dull and stereotyped road kerb upper surface is with highway sign pattern, and described trapezoidal road kerb trapezoidal upper surface and four sides are with highway sign pattern.
Described dull and stereotyped road kerb size and described trapezoidal road kerb are red.
Described dull and stereotyped road kerb size and described trapezoidal road kerb are yellow; Can corresponding change color according to actual conditions.
The beneficial effect that the utility model realizes is: dull and stereotyped road kerb and trapezoidal road kerb combine, collect attractive in appearance, comfortable, be easy to maintenance, it is concordant with road surface or a little less than road surface when dull and stereotyped road kerb is laid, change traditional road kerb and exceed highway pavement, block rubbish, hinder the drawbacks such as draining, distinct pavement edge, pavement garbage is at wind, the effect of rain and driving is descended to discharge road surface, decrease machinery or hand sweeping workload, highway rainwater dispersion draining, avoid rainwater and soak highway, can prevent again Summer Rainfall from washing out curb, side slope, extend highway application life, colored kerbstone overcomes dull coagulating cement ashen, at least reduces by twice road kerb every year white, saves maintenance costs, because this Novel curb controls by standard C 25 cement concrete, 28 days standard cube of concrete compressive strength is that on 25 Mp(state provincial highway arterial highways, basic unit's design strength is 3.5Mp), there is stronger compressive property, rolling of common vehicle can be resisted, doing so avoids common high road kerb because of vehicle collision, hang because of rise damage, displacement problem, every 500 silver pink of road kerb, yellow two kinds of colors are used alternatingly, and both sides color exchanges use, thus make road profile more clear, for taking into account isolation vehicle, the effect of protection greenbelt, in the middle of level road kerb plate, every 10 meter amperes fill one piece of trapezoidal colored projection road kerb, define yellow, red alternate, uneven colored kerbstone band, is conducive to alleviating driver and crew tired, embodies highway easypro, moulding changes the dull of traditional road kerb color and profile, has incorporated the micro-mark in road, embody the fashion of urban road, attractive in appearance, give U.S. of pleasing highway.
Accompanying drawing explanation
Fig. 1 is the trapezoidal road kerb schematic top plan view of utility model;
Fig. 2 is the trapezoidal road kerb schematic side view of utility model;
Fig. 3 is the structural representation of the dull and stereotyped road kerb of utility model.
As figure: 1, trapezoidal road kerb, 2, dull and stereotyped road kerb.
Detailed description of the invention
As shown in Figure 1, 2, 3, according to construction needs, novel level road kerb is divided into 40cm × 40cm usually by size, 30cm × 30cm two kinds.Usually be divided into dull and stereotyped road kerb, trapezoidal road kerb two kinds by shape, dull and stereotyped road kerb thickness is 5cm, and trapezoidal road kerb height is that 13.5cm(upper end trapezoidal portions height is 8.5cm, lower end rectangle part height is 5cm), concrete more than label C25.Trapezoidal road kerb upper bottom surface is 20cm(15cm) × 20cm (15cm), bottom surface is 40cm(30cm) × 40cm(30cm), color is divided into yellow, red two kinds of colors (also can make other colors as required) usually according to requirement of engineering, because this Novel curb controls by standard C 25 cement concrete, 28 days standard cube of concrete compressive strength is that on 25 Mp(state provincial highway arterial highways, basic unit's design strength is 3.5Mp).
1, the preparation of facility and material is produced
Produce facility and need cement concrete mixer, mortar mixer, shaking table, ZL30 loader, flat car etc.New type colorful road kerb, according to requirement of strength, selects high-quality free sand, rubble, 32.5 grades of high grade cements or white cement, pigment, brightener, clear water etc.
2, mold cleaning prepares
The mould used is cleared up one by one, thoroughly after cleaning, the even brushing mold oil of inner surface.
3, the mix of raw material
Mixing and stirring of colour plane layered material: by 32.5 grades of white cements, pigment, brightener, free sand, rubbles, by C25 concrete strength construction proportioning composition, can use after mortar mixer fully mixes and stirs 15 minutes.
Mixing and stirring of base material: by rubble, free sand, 32.5 grades of raw material such as high grade cement, brightener, uses after stirring by the preparation of C25 concrete strength.
4, jolt ramming is shaping
By in the mould that is placed on plane vibration platform, first add the colour plane layered material quantitatively mixed and stirred, then fill up mould with substrate concrete, and abundant jolt ramming.
5, the health of azulejo
Forward maintenance place after mould is filled up jolt ramming on request to, cover straw mat wet curing.
6, the azulejo demoulding
Wet curing, after 7 days, utilizes ingot stripper to carry out the demoulding, notes handling with care during the demoulding, prevents corner rib from coming off, and the azulejo code after the demoulding is put in storage together and continued to cover health, and preserving period can construction usage after reaching 30 days.
economic benefit
This new type colorful road kerb adopts factory building mechanized operation, and greatly improve production efficiency, product fine rate significantly improves, and has saved a large amount of maintenance costs after installation.
(1) improve operating efficiency, improve product fine rate.
Every linear meter(lin.m.) new type colorful dull and stereotyped road kerb cement concrete side amount: 0.02 m 3, trapezoidal 0.04125 m of every linear meter(lin.m.) new type colorful 3, traditional high road kerb every linear meter(lin.m.) cement concrete side measures: 0.06 m 3.Because small product size declines to a great extent, make light, production efficiency is organized per working day by three people and is produced traditional high road kerb 300 linear meter(lin.m.), and increase to and produce new type colorful road kerb 450 linear meter(lin.m.), production efficiency improves 50%.Due to new type colorful road kerb, can be light carry out the health of code side, save health place 300%, save health expense 50%.Because production mould adopts high-quality plastics mould, spoilage is reduced to 0.5% by original 3%.
(2) with the high road kerb (0.2 × 0.3m of tradition 2) compare, existing road road kerb 0.4 × 0.05m 2save:
1. amount of concrete is saved for every kilometer:
1000×2 ×(0.2×0.3-0.4×0.05) =80m 3
Economize on the use of funds for every kilometer:
80m3 × 380 yuan/m3=30400 unit
2. road kerb is saved white:
With traditional curing pattern ratio, road kerb is minimum every year will carry out once white, will save flat cost with 600 yuan for every kilometer.
3. road cleaning is saved:
With traditional curing pattern ratio, Novel curb at least reduces cleaning number of times 48 times every year, will save work, material expense 2000 yuan for every kilometer.

Claims (5)

1. a new type colorful road kerb, comprises dull and stereotyped road kerb (1) and trapezoidal road kerb (2), it is characterized in that: described dull and stereotyped road kerb (1) is cube structure, and described trapezoidal road kerb (2) is lower end solid square body, the solid truncated rectangular pyramids structure in upper end; Described dull and stereotyped road kerb (1) and described trapezoidal road kerb (2) are colorful surface layer and basalis double-layer structure, and colorful surface layer attachment on the base layer.
2. new type colorful road kerb according to claim 1, is characterized in that: described dull and stereotyped road kerb (1) size is equal with described trapezoidal road kerb (2) lower end side body size.
3. new type colorful road kerb according to claim 1, is characterized in that: described dull and stereotyped road kerb (1) has two kinds of sizes, and length is respectively: 40cm × 40cm × 5cm or 30cm × 30cm × 5cm; Described trapezoidal road kerb (2) has two kinds of sizes, and upper end truncated rectangular pyramids upper bottom surface is 20cm × 20cm, bottom surface 40cm × 40cm, and height is 8.5cm, and the length of lower end side's body is respectively 40cm × 40cm × 5cm; Or the upper bottom surface of upper end truncated rectangular pyramids is 15cm × 15cm, bottom surface 30cm × 30cm, height is 8.5cm, and lower end side's body length is respectively 30cm × 30cm × 5cm.
4. new type colorful road kerb according to claim 1, is characterized in that: described dull and stereotyped road kerb (1) and described trapezoidal road kerb (2) are made by standard C 25 cement concrete.
5. new type colorful road kerb according to claim 1, is characterized in that: described dull and stereotyped road kerb (1) upper surface is with highway sign pattern, and described trapezoidal road kerb (2) trapezoidal upper surface and four sides are with highway sign pattern.
CN201420800867.0U 2014-12-16 2014-12-16 New type colorful road kerb Expired - Fee Related CN204311315U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420800867.0U CN204311315U (en) 2014-12-16 2014-12-16 New type colorful road kerb

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420800867.0U CN204311315U (en) 2014-12-16 2014-12-16 New type colorful road kerb

Publications (1)

Publication Number Publication Date
CN204311315U true CN204311315U (en) 2015-05-06

Family

ID=53133639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420800867.0U Expired - Fee Related CN204311315U (en) 2014-12-16 2014-12-16 New type colorful road kerb

Country Status (1)

Country Link
CN (1) CN204311315U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604788A (en) * 2017-10-12 2018-01-19 潍坊市市政工程股份有限公司 Cement concrete L-type kerbstone preparation method and its method for paving

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604788A (en) * 2017-10-12 2018-01-19 潍坊市市政工程股份有限公司 Cement concrete L-type kerbstone preparation method and its method for paving

Similar Documents

Publication Publication Date Title
CN101451336A (en) Permeable pavement bricks
CN202482730U (en) Permeable brick
CN105297778A (en) Nodular cast iron fiber well lid and preparation method thereof
CN204311315U (en) New type colorful road kerb
CN204097832U (en) Multi-functional pavement bricks
CN204432218U (en) A kind of multipurpose emulation garden landscape connection with production of structures instrument
CN207110169U (en) A kind of arrangement of reinforcement formula fiber knitted net concrete floor
CN2311510Y (en) Grass-planting paving brick
CN201826242U (en) Active powder concrete curb
CN200971460Y (en) Color grain anti-slip porous two-layer brick
CN202809431U (en) Road-edge stone
CN108863193A (en) A kind of pavement brick modelled after an antique and preparation method thereof
CN208250855U (en) Saturating storage functional surface brick based on building waste crushed material
CN107447619B (en) S-shaped standing stone, press forming die and machining process thereof
CN201883700U (en) Structure for reinforcing floor boards or roof boards of building structures
CN204715501U (en) The interim water draw-off of Assembled environmental type
CN206143788U (en) Movable concrete structure
CN205741827U (en) A kind of anti-pressure and abrasion-proof type drainage pavement brick
CN216427881U (en) Grouting pavement
CN211772507U (en) Polymer permeable clay-concrete brick
CN201485770U (en) Antiskid concrete modular brick
CN215976679U (en) Environment-friendly steel slag recycled concrete interpenetration pavement brick and preparation mold thereof
CN2302296Y (en) Composite material gully
CN1292132C (en) Reinforced manhole cover and its making method
CN202945522U (en) Stone slab facing integrated oversize road assembling block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150506

Termination date: 20161216

CF01 Termination of patent right due to non-payment of annual fee