CN201826242U - Active powder concrete curb - Google Patents
Active powder concrete curb Download PDFInfo
- Publication number
- CN201826242U CN201826242U CN201020590760XU CN201020590760U CN201826242U CN 201826242 U CN201826242 U CN 201826242U CN 201020590760X U CN201020590760X U CN 201020590760XU CN 201020590760 U CN201020590760 U CN 201020590760U CN 201826242 U CN201826242 U CN 201826242U
- Authority
- CN
- China
- Prior art keywords
- road kerb
- road
- curb
- end rib
- rpc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses an active powder concrete curb that can be used as the road curb at two sides of a road, especially as the road curb in severe environment areas with deicing salt erosion, and belongs to the technical field of road construction. The curb is an integrally prefabricated block consisting of a top plate (1), an end rib plate (2), a side panel (3) and a bottom plate (4), wherein the top plate (1) is arranged on top of the curb; the end rib plate (2) is arranged at the left and right ends of the curb and provided with two round holes (5) from the top down; the bottom plate (4) is arranged at the bottom of the curb; and the top plate (1), the end rib plate (2), the side panel (3) and the bottom plate (4) form a slotted structure by enclosure. The curb is installed at side strips at both sides of the road. With the curb, the service life is prolonged, the maintenance and repair cost is reduced and meanwhile the attractive effect is ensured.
Description
Technical field
The utility model relates to a kind of road kerb of new concrete material, can be applicable to the road kerb of road both sides, particularly has the road road kerb in adverse circumstances areas such as deicer salts erosion.
Background technology
At present, the road kerb of road both sides generally is to adopt ordinary concrete prefabricated.Ordinary concrete is at sunshine, temperature, carbon dioxide, drying and watering cycle, alternating stresses, and the comprehensive function of inside and outside factor of cracking such as deicer salts erosion damages deterioration down easily, and particularly under the collision and scraping effect of vehicle, the part sustains damage easily; The ordinary concrete road kerb also owing to each other reasons such as collision, causes truncation arrisdefect etc. to damage phenomenon in making, transportation and installation process easily.These damage phenomenon not only influences the attractive in appearance of road, but also has reduced the functional performance and the endurance quality of road kerb.Therefore, the ordinary concrete road kerb generally needs regular maintenance, even changes, and has increased its maintenance costs greatly.Simultaneously, also there is the heavy and higher shortcoming of construction cost of quality in existing ordinary concrete road kerb.
Summary of the invention
For addressing the above problem, the utility model proposes a kind of new concrete material road kerb, it is that a kind of novel active powder concrete material of high-strength, high-durability that adopts replaces the road kerb of ordinary concrete material, and has specific shape.Adopt road kerb of the present utility model can effectively improve the endurance quality and the anti-scratch collision ability of road kerb, thereby increase the service life, reduce the maintenance cost, guarantee the attractive in appearance of road.Because its weight only is half of ordinary concrete road kerb weight, also can reduce construction cost simultaneously.
For achieving the above object, the utility model adopts following technical scheme:
A kind of RPC road kerb, described road kerb is one integral prefabricated, constitute by top board 1, end rib plate 2, side panel 3 and base plate 4, described top board 1 is arranged on the road kerb top, described end rib plate 2 is arranged at the end, the left and right sides of road kerb, and be provided with 2 circular holes 5 from top to bottom, base plate 4 is arranged at the road kerb bottom, and top board 1, end rib plate 2, side panel 3 and base plate 4 surround a trench structure.
Described road kerb is installed in the marginal strip of road both sides.
Vertically adjacent road kerb is connected and fixed at end rib plate place by 2 bolts, and bolt is arranged in the circular hole 5.Simultaneously, also be bonded together between adjacent road kerb by the jointing mortar.Other job practices is with the job practices of ordinary concrete road kerb.
The above-mentioned diameter of bolt that is used to connect is 20mm.
The material of described road kerb is a kind of RPC material of high-durability.The raw material of RPC are Portland cement, SiO
2Content is not less than 90% silicon ash, I level flyash, coarse sand, medium sand, high-efficiency water-reducing agent of poly-carboxylic acid and drinking water, and quality mixture ratio is: cement: silicon ash: coarse sand: medium sand: high efficiency water reducing agent: water=1: 0.25: 0.17: 1.14: 0.02: 0.25.
The RPC preparation methods is: 1. by the various raw material of match ratio requirement weighing; 2. coarse sand, medium sand are added mixer, dried stirring to evenly; 3. add that cement, silica flour and flyash are dried to be stirred to evenly; 4. water and high efficiency water reducing agent are mixed, add mixer, mix thoroughly and get final product.
Above-mentioned RPC road kerb manufacture craft is: 1. mounting template; 2. with the inboard brushing release agent of template; 3. in template, build the RPC for preparing; 4. the moulding of on vibroplatform, vibrating; 5. put into mark and support chamber maintenance 24 hours, form removal then; 6. put into 80 ℃ steam-cured 72 hours of stream curing environment.After steam-cured the finishing, then the RPC road kerb is made and is finished.
The beneficial effects of the utility model are: the novel active powder concrete material that the utility model adopts has advantages such as superhigh intensity, high tenacity, high-durability, high-wearing feature, high impact properties.The RPC road kerb utilizes the superhigh intensity of this kind material, can reduce the volume and the deadweight of road kerb, is easy to transportation and construction, reduces construction cost; Utilize the high-durability of this kind material, can reduce of the erosion of adverse circumstances such as deicer salts road kerb; Utilize the high-wearing feature of this kind material, can prevent the phenomenons such as truncation arrisdefect in the work progress, and can weaken vehicle, thereby increase the service life, reduce the maintenance expense, can guarantee aesthetic simultaneously the road kerb collsion damage of swiping.Affiliated road kerb is applicable to the road kerb of road both sides.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is an I-I generalized section among Fig. 1;
Fig. 3 is an II-II generalized section among Fig. 1;
Fig. 4 is the vertical connection diagram of the utility model road kerb;
Fig. 5 is the horizontal scheme of installation of the utility model road kerb;
Among the figure: 1, top board; 2, end rib plate; 3, side panel; 4, base plate; 5, circular hole; 6, bolt; 7, jointing mortar; 8, road kerb; 9, earth shoulder; 10, top course; 11, face basic unit; 12, roadbed.
The specific embodiment
Below in conjunction with specific embodiment the utility model is described further:
Shown in Fig. 1-5, a kind of RPC road kerb of present embodiment is one integral prefabricated, constitute by top board 1, end rib plate 2, side panel 3 and base plate 4, top board 1 is arranged on the road kerb top, end rib plate 2 is arranged at the end, the left and right sides of road kerb, and be provided with 2 circular holes 5 from top to bottom, base plate 4 is arranged at the road kerb bottom; Top board 1, end rib plate 2, side panel 3 and base plate 4 surround a trench structure.
Road kerb is installed in road both sides marginal strip, and adjacent road kerb is that 20mm bolt 6 is connected and fixed at end rib plate 2 places by 2 diameters, and bolt 6 is arranged in the circular hole 5.Also pour into jointing mortar 7 between adjacent road kerb and be linked to be integral body.
The material of road kerb adopts high-durability RPC material.Quality mixture ratio is: cement: silicon ash: coarse sand: medium sand: high efficiency water reducing agent: water=1: 0.25: 0.17: 1.14: 0.02: 0.25.The RPC preparation methods is: 1. by the various raw material of match ratio requirement weighing; 2. coarse sand, medium sand and steel fibre are added mixer, dried stirring to evenly; 3. add that cement and silica flour are dried to be stirred to evenly; 4. water and high efficiency water reducing agent are mixed, add mixer, mix thoroughly and get final product.
The concrete manufacture craft of RPC road kerb is: 1. with the inboard brushing release agent of template; 2. mounting template; 3. in template, build the RPC for preparing; 4. the moulding of on vibroplatform, vibrating; 5. put into mark and support chamber maintenance 24 hours, form removal then; 6. put into 80 ℃ steam-cured 72 hours of stream curing environment.After steam-cured the finishing, then the RPC bridge kerbstone is made and is finished.
The utility model road kerb volume is little, and light weight is convenient to transportation and installation, can reduce construction cost; Good endurance can reduce the erosion of adverse circumstances such as deicer salts to road kerb; Abrasion resistance is good, and anti-scratch collision ability is strong, can increase the service life, and reduces the maintenance expense, can guarantee aesthetic simultaneously, so applied range.
More than be an exemplary embodiments of the present utility model, enforcement of the present utility model is not limited thereto.
Claims (4)
1. RPC road kerb, described road kerb is one integral prefabricated, constitute by top board (1), end rib plate (2), side panel (3) and base plate (4), it is characterized in that: described top board (1) is arranged on the road kerb top, described end rib plate (2) is arranged at the end, the left and right sides of road kerb, and be provided with 2 circular holes (5) from top to bottom, base plate (4) is arranged at the road kerb bottom, and top board (1), end rib plate (2), side panel (3) and base plate (4) surround a trench structure.
2. a kind of RPC road kerb according to claim 1, it is characterized in that: it is installed in the marginal strip of road both sides.
3. according to claim 1 or the described a kind of RPC road kerb of claim 2, it is characterized in that: vertically adjacent road kerb is connected and fixed at end rib plate place by 2 bolts, and bolt is arranged in the circular hole (5); Simultaneously, also be bonded together between adjacent road kerb by the jointing mortar.
4. a kind of RPC road kerb according to claim 3 is characterized in that: the described diameter of bolt that is used to connect is 20mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020590760XU CN201826242U (en) | 2010-10-29 | 2010-10-29 | Active powder concrete curb |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020590760XU CN201826242U (en) | 2010-10-29 | 2010-10-29 | Active powder concrete curb |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201826242U true CN201826242U (en) | 2011-05-11 |
Family
ID=43964789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201020590760XU Expired - Fee Related CN201826242U (en) | 2010-10-29 | 2010-10-29 | Active powder concrete curb |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201826242U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104926225A (en) * | 2015-05-19 | 2015-09-23 | 中国矿业大学 | Formula of sulfate-corrosion-resisting concrete curb and production method of curb |
CN104926222A (en) * | 2015-05-19 | 2015-09-23 | 中国矿业大学 | Formula of salt-frost-resistant crushed stone aggregate concrete curb and preparation method of curb |
CN115094703A (en) * | 2022-06-21 | 2022-09-23 | 成都城投城建科技有限公司 | Groove type curb and production method thereof |
-
2010
- 2010-10-29 CN CN201020590760XU patent/CN201826242U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104926225A (en) * | 2015-05-19 | 2015-09-23 | 中国矿业大学 | Formula of sulfate-corrosion-resisting concrete curb and production method of curb |
CN104926222A (en) * | 2015-05-19 | 2015-09-23 | 中国矿业大学 | Formula of salt-frost-resistant crushed stone aggregate concrete curb and preparation method of curb |
CN115094703A (en) * | 2022-06-21 | 2022-09-23 | 成都城投城建科技有限公司 | Groove type curb and production method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201526024U (en) | Reactive powder concrete anti-collision guardrail | |
CN103864374B (en) | Semi-flexible pavement base material and preparation method thereof | |
CN102180645B (en) | Concrete ingredient and fast hardening concrete | |
CN109824321B (en) | Carbon dioxide curing prefabricated pervious concrete and preparation method thereof | |
CN105130368A (en) | Water-permeable floor material and preparation method thereof | |
CN104402392A (en) | Preparation method of metakaolin-based magnesium oxide type rapid repair material | |
CN201826242U (en) | Active powder concrete curb | |
CN103613338A (en) | Remote procedure call (RPC) design-based inorganic synthetic quartz plate and preparation technology thereof | |
CN104890123A (en) | Automatic-feeding and uniform-discharging cement mixer with conveying belt | |
CN102809050A (en) | Rubber concrete component of steel pipe | |
CN114855542A (en) | UHPC hollow curb and construction method thereof | |
CN102797316B (en) | Flat roof fireproof and thermal insulating brick | |
CN106007523A (en) | Preparation method of noctilucent terrazzo | |
CN105297778A (en) | Nodular cast iron fiber well lid and preparation method thereof | |
CN105330230A (en) | Resin-cement composite non-sintered water-permeable floor tile | |
CN204139015U (en) | The prefabricated road slab of a kind of assembling RPC unreinforced | |
CN112777978B (en) | High-performance anti-layering pavement rubber concrete | |
CN103896539A (en) | Prefabticated silicon-aluminum-based environment-friendly cement concrete two-way hole hollow template and manufacturing method thereof | |
CN106758647B (en) | A kind of method of asphalt pavement pit repairing | |
CN106517902A (en) | Steel slag washing dust mud based geopolymer self-leveling mortar for mine backfilling and preparation method thereof | |
CN115124302B (en) | Low-temperature-rise anti-cracking corrosion-resistant large-volume concrete preparation technology and cooling-water-pipe-free construction method | |
CN103360001B (en) | The complete thick formula repairing high-early-strength type concrete of cement concrete pavement | |
CN204510264U (en) | A kind of manhole mouth structure | |
CN201883700U (en) | Structure for reinforcing floor boards or roof boards of building structures | |
CN203320691U (en) | Light steel and concrete house building system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110511 Termination date: 20111029 |