CN204298785U - Hua Chi afforests support wall - Google Patents

Hua Chi afforests support wall Download PDF

Info

Publication number
CN204298785U
CN204298785U CN201420726124.3U CN201420726124U CN204298785U CN 204298785 U CN204298785 U CN 204298785U CN 201420726124 U CN201420726124 U CN 201420726124U CN 204298785 U CN204298785 U CN 204298785U
Authority
CN
China
Prior art keywords
section
brick
fragment
matrix
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420726124.3U
Other languages
Chinese (zh)
Inventor
陈伯进
俞文虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420726124.3U priority Critical patent/CN204298785U/en
Application granted granted Critical
Publication of CN204298785U publication Critical patent/CN204298785U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of flower pond greening support wall, it comprises the matrix (1) of pouring concrete, packing section (8) is set in described matrix (1), the surface of the oblique section of triangle and the surface of packing section of matrix are provided with sand cushion (2), and the surface of sand cushion (2) is from inside to outside disposed with rubble layer of sand (3), block stone layer (4) and green layer (5).The utility model is used in hydraulic engineering, the good stability of ecological supporting structure, compliance is wider, not only capacity of anti-storm is higher, prevents erosion, and inside and outside water body energy free exchange, be beneficial to the procreation of aquatic organism, have ecological, environmental protective function, whole ecological supporting safety of structure is large, and landscape effect is good.

Description

Hua Chi afforests support wall
Technical field
The utility model relates to a kind of flower pond greening support wall, belongs to hydraulic engineering field.
Background technology
The harm of China's soil erosion has reached very serious degree, and it is one of principal element causing land resources dysequilibrium.River course is had influence on unimpeded at the slope protection works in river course.The space that the growth needs of plant is relatively soft, just has enough water and airs and ensures plant survival in soft space.Natural soil property Riparian Zone is due to easy avalanches of many factors joint effect such as the sourings by current before the seepage effect in slope and slope.And traditional support wall exists the defect of flower pond not easy care, traditional support wall does not possess the self-purification function to draining after rainfall yet, thus makes the pollution of river.Therefore, seek one and prevent erosion, Hua Chi is easy to safeguard, to the colored pond greening support wall of rainfall draining with self-purification function.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, provides one to prevent erosion, and Hua Chi is easy to safeguard, to the colored pond greening support wall of rainfall draining with self-purification function.
The purpose of this utility model is achieved in that
A kind of flower pond greening support wall, it comprises the matrix of pouring concrete, described matrix comprises the substrate of horizontal arrangement and is arranged at the rectangle section of erecting of land side in the oblique section of the triangle of water-wet side in substrate and substrate, the bottom righthand side of the oblique section of triangle is provided with place's vee, in vee, packing section is set, packing section comprises the filler bag of multiple cuboid, the filler bag of multiple cuboid is triangular in shape to be filled, the layer of non-woven fabric that triangular ramp is laid, filler handbag draws together inner light ceramic and the non-woven fabrics outer wrapping of light ceramic outer cladding, the surface of the oblique section of triangle and the surface of packing section are provided with sand cushion, the surface of sand cushion is from inside to outside disposed with rubble layer of sand, block stone layer and green layer, described green layer is laid by the fragment of brick of oblique layout and is formed, described fragment of brick comprises body of laying bricks, described body of laying bricks comprises hexagonal shell, the bottom of described shell is provided with fragment of brick collet, each sidewall center of described shell is provided with inside and outside through side opening, described fragment of brick collet is provided with multiple fragment of brick bottom outlets of up/down perforation, the top of described matrix is provided with Hua Chi, described colored pond comprises the multiple colored pool unit arranged along length thereof direction, described colored pool unit comprises colored pool unit collet and three fixation wall, three fixation wall are respectively on rear side of the front side being above connected to colored pool unit collet and land side, the inner side of the nearly water section of fixation wall of front side and rear side is provided with slot, the vertical plate arranged is provided with in slot.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is used in hydraulic engineering, Hua Chi afforests the good stability of support wall, compliance is wider, not only capacity of anti-storm is higher, prevents erosion, and inside and outside water body energy free exchange, be beneficial to the procreation of aquatic organism, have ecological, environmental protective function, whole ecological revetment safety is large, and landscape effect is good.In the maintenance process of flower pond, need regularly to clear up the plant in flower pool unit and soil and change, opening plate can directly take out plant and soil from the nearly water side of collet when clearing up and changing, easy to operate saving manpower.In the filler bag of packing section, light ceramic is set, the rainwater suspension in rainfall, total nitrogen, total phosphorus can be made effectively to be purified.Therefore greening support wall in this flower pond has and prevents erosion, and Hua Chi is easy to safeguard, to the advantage of rainfall draining with self-purification function.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model flower pond greening support wall.
Fig. 2 is the green layer fragment of brick top view of the utility model flower pond greening support wall.
Fig. 3 is the A-A sectional view of Fig. 2.
Fig. 4 is the colored pond top view in Fig. 1.
Wherein:
Matrix 1
Sand cushion 2
Rubble layer of sand 3
Block stone layer 4
Green layer 5
Fragment of brick 6, shell 6.1, fragment of brick collet 6.2, side opening 6.3, fragment of brick bottom outlet 6.4, anti-skidding salient point 6.5
Flower pond 7, flower pool unit collet 7.1, fixation wall 7.2, plate 7.3, flower pool unit bottom outlet 7.4
Packing section 8.
Detailed description of the invention
See Fig. 1 ~ Fig. 4, the one flower pond greening support wall that the utility model relates to, it comprises the matrix 1 of pouring concrete, described matrix 1 comprises the substrate of horizontal arrangement and is arranged at the rectangle section of erecting of land side in the oblique section of the triangle of water-wet side in substrate and substrate, the bottom righthand side of the oblique section of triangle is provided with place's vee, packing section 8 is set in vee, packing section 8 comprises the filler bag of multiple cuboid, the filler bag of multiple cuboid is triangular in shape to be filled, the layer of non-woven fabric that triangular ramp is laid, filler handbag draws together inner light ceramic and the non-woven fabrics outer wrapping of light ceramic outer cladding.The surface of the oblique section of triangle and the surface of packing section are provided with sand cushion 2, the surface of sand cushion 2 is from inside to outside disposed with rubble layer of sand 3, block stone layer 4 and green layer 5, described green layer 5 is laid by the fragment of brick 6 of oblique layout and is formed, described fragment of brick 6 comprises body of laying bricks, described body of laying bricks comprises hexagonal shell 6.1, the bottom of described shell 6.1 is provided with fragment of brick collet 6.2, each sidewall center of described shell 6.1 is provided with inside and outside through side opening 6.3, described fragment of brick collet 6.2 is provided with multiple fragment of brick bottom outlets 6.4 of up/down perforation, described fragment of brick bottom outlet 6.4 is six bottom outlets be circular layout, the soffit of described fragment of brick collet 6.2 is provided with uniform multiple anti-skidding salient point 6.5, laying bricks in body can splendid attire soil, for cultivated plant, improve the landscaping effect of dyke, also protect Seawall safety to a certain extent simultaneously, shell 6.1 adopts hexagonal structure to be the most firm shape in engineering science, is conducive to the safety of ecological embankment most, when several body heaps of laying bricks are built, its side opening 6.3 communicates, and the current of each body of laying bricks can distribute voluntarily.
The top of described matrix 1 is provided with Hua Chi 7, described colored pond 7 comprises the multiple colored pool unit arranged along matrix 1 length direction, described colored pool unit comprises colored pool unit collet 7.1 and three fixation wall 7.2, three fixation wall 7.2 are respectively on rear side of the front side being above connected to colored pool unit collet 7.1 and land side, the inner side of the nearly water section of fixation wall 7.2 of front side and rear side is provided with slot, is provided with the vertical plate 7.3 arranged in slot.The material of described colored pool unit collet 7.1 and three fixation wall 7.2 is concrete, and the material of described plate 7.3 is highstrenghtpiston.The lower semisection of described plate 7.3 is provided with multiple plate side opening, flower pool unit collet 7.1 is provided with the multiple colored pool unit bottom outlet 7.4 of up/down perforation, can splendid attire soil in flower pool unit, for cultivated plant.

Claims (1)

1. a colored pond greening support wall, it comprises the matrix (1) of pouring concrete, described matrix (1) comprises the substrate of horizontal arrangement and is arranged at the rectangle section of erecting of land side in the oblique section of the triangle of water-wet side in substrate and substrate, it is characterized in that the bottom righthand side of the oblique section of triangle is provided with place's vee, packing section (8) is set in vee, packing section (8) comprises the filler bag of multiple cuboid, the filler bag of multiple cuboid is triangular in shape to be filled, the layer of non-woven fabric that triangular ramp is laid, filler handbag draws together inner light ceramic and the non-woven fabrics outer wrapping of light ceramic outer cladding, the surface of the oblique section of triangle and the surface of packing section are provided with sand cushion (2), the surface of sand cushion (2) is from inside to outside disposed with rubble layer of sand (3), block stone layer (4) and green layer (5), described green layer (5) is laid by the fragment of brick (6) of oblique layout and is formed, described fragment of brick (6) comprises body of laying bricks, described body of laying bricks comprises hexagonal shell (6.1), the bottom of described shell (6.1) is provided with fragment of brick collet (6.2), each sidewall center of described shell (6.1) is provided with inside and outside through side opening (6.3), described fragment of brick collet (6.2) is provided with multiple fragment of brick bottom outlets (6.4) of up/down perforation, the top of described matrix (1) is provided with Hua Chi (7), described colored pond (7) comprises the multiple colored pool unit arranged along matrix (1) length direction, described colored pool unit comprises colored pool unit collet (7.1) and three fixation wall (7.2), three fixation wall (7.2) are respectively on rear side of the front side being above connected to colored pool unit collet (7.1) and land side, the inner side of the nearly water section of fixation wall (7.2) of front side and rear side is provided with slot, the vertical plate (7.3) arranged is provided with in slot.
CN201420726124.3U 2014-11-28 2014-11-28 Hua Chi afforests support wall Expired - Fee Related CN204298785U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420726124.3U CN204298785U (en) 2014-11-28 2014-11-28 Hua Chi afforests support wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420726124.3U CN204298785U (en) 2014-11-28 2014-11-28 Hua Chi afforests support wall

Publications (1)

Publication Number Publication Date
CN204298785U true CN204298785U (en) 2015-04-29

Family

ID=53104340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420726124.3U Expired - Fee Related CN204298785U (en) 2014-11-28 2014-11-28 Hua Chi afforests support wall

Country Status (1)

Country Link
CN (1) CN204298785U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106097925A (en) * 2015-05-01 2016-11-09 Seyeonens株式会社 Luminous, reflection dual-purpose sign board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106097925A (en) * 2015-05-01 2016-11-09 Seyeonens株式会社 Luminous, reflection dual-purpose sign board
CN106097925B (en) * 2015-05-01 2019-06-04 Seyeonens株式会社 It shines, reflection dual-purpose sign board

Similar Documents

Publication Publication Date Title
CN204510234U (en) A kind of embedded ecological revetment block
CN202989856U (en) Ecological riverway system of hydraulic engineering
CN106149625A (en) A kind of ecological self-purification type landscape revetment reconstruction structure and construction method thereof
CN204435394U (en) The hexagon hollowcore precast slope-protection block of energy protection against erosion
CN203866858U (en) Riverway revetment plant-growing retaining wall
CN103061310B (en) Ecological habitat revetment
CN204298785U (en) Hua Chi afforests support wall
CN203129085U (en) Hydraulic engineering ecological supporting structure
CN209873714U (en) River bank protection structure for urban mountain area
CN204023588U (en) A kind of pervious ecological protective slope structure
CN109794097A (en) A kind of subsurface stormwater filtering ponds convenient for harvesting
CN101649607A (en) Method for constructing ecological riverway slope
CN204298787U (en) Be beneficial to the water conservancy supporting and protection structure that Hua Chi safeguards
CN206070485U (en) Assembled ecological revetment
CN205276215U (en) Ecological block that kayser formula is piled up
CN204825787U (en) Gabion barricade protective structure
CN210151667U (en) A seepage prevention structure for city river course
CN212000886U (en) Ecological bank protection of water conservancy
CN208363029U (en) A kind of hard revetment restoration of the ecosystem structure
CN210887100U (en) City water environment view is with gentle slope manger plate structure
CN205839696U (en) A kind of ecology is laid bricks and lays bricks body of wall
CN203238591U (en) Manual eco-island for purifying city watercourse
CN203530994U (en) Stone slag field side slope ecological protection structure
CN208300421U (en) A kind of environmental and ecological wall construction of hydraulic engineering
CN203334244U (en) Ecological protecting slope with high wind wave resisting ability

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20191128