CN204297948U - A kind of device for changing crane steel cable - Google Patents

A kind of device for changing crane steel cable Download PDF

Info

Publication number
CN204297948U
CN204297948U CN201420718758.4U CN201420718758U CN204297948U CN 204297948 U CN204297948 U CN 204297948U CN 201420718758 U CN201420718758 U CN 201420718758U CN 204297948 U CN204297948 U CN 204297948U
Authority
CN
China
Prior art keywords
pulley
steel cable
suspension
crane
changing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420718758.4U
Other languages
Chinese (zh)
Inventor
杨铁洞
杨俊平
唐易荣
李玉霞
何波
史宏伟
詹毅
陈善军
马德礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN201420718758.4U priority Critical patent/CN204297948U/en
Application granted granted Critical
Publication of CN204297948U publication Critical patent/CN204297948U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provides a kind of device for changing crane steel cable, comprises assembly pulley and two suspension holdfasts; Described two suspension holdfasts are symmetricly set in the both sides of the elevator counter-jib of described crane; Described assembly pulley is arranged between described two suspension holdfasts; Described suspension holdfast comprises orthogonal suspension arm and linking arm, wherein, described suspension arm is provided with pore structure, and described suspension holdfast is fixed on the counter-jib base of described crane by described linking arm; Described assembly pulley comprises pulley spindle and pulley, and wherein, described pulley sleeve is on described pulley spindle, and described pulley spindle is each passed through the described pore structure on the described suspension holdfast at two ends.

Description

A kind of device for changing crane steel cable
Technical field
The utility model relates to large tonnage crane technical field, particularly relates to a kind of device for changing crane steel cable.
Background technology
Usually, when replacing 180 tons, the large tonnage crane steel cables such as 200 tons, strict requirement is had to parking site, such as, plate hook will have sufficient space to place, and, monorail crane inspection platform to be had to hang coaster directly over crane, 4 steel cable heads are pulled, equally also will by operation crane to the position of coaster.The method being changed steel cable by coaster hanging point that prior art adopts, not only by the restriction of field condition, the steel cable on ground is also easily confused in motor-car process, be unfavorable for site examining and repairing, add maintenance difficulty and time, often motor-car also brings great unsafe factor to site examining and repairing simultaneously.
Utility model content
The utility model embodiment, by providing a kind of device for changing crane steel cable, solving prior art and changing the on-the-spot limited technical problem of replacing existing for steel cable by coaster hanging point.
The utility model embodiment provides a kind of device for changing crane steel cable, comprises assembly pulley and two suspension holdfasts;
Described two suspension holdfasts are symmetricly set in the both sides of the elevator counter-jib of described crane;
Described assembly pulley is arranged between described two suspension holdfasts;
Described suspension holdfast comprises orthogonal suspension arm and linking arm, wherein, described suspension arm is provided with pore structure, and described suspension holdfast is fixed on the counter-jib base of described crane by described linking arm;
Described assembly pulley comprises pulley spindle and pulley, and wherein, described pulley sleeve is on described pulley spindle, and described pulley spindle is each passed through the described pore structure on the described suspension holdfast at two ends.
Preferably, described assembly pulley also comprises bearing, and described bearing is arranged at the centre position on described pulley spindle, and described pulley is installed on described bearing.
Preferably, described assembly pulley also comprises two axle sleeves;
Described two axle sleeves are enclosed within described pulley spindle, and described two axle sleeves are positioned at the both sides of described pulley.
Preferably, described assembly pulley also comprises two logical lids;
Described two logical lids are installed on described pulley spindle, and described two logical lids lay respectively at the outside of described two axle sleeves.
Preferably, described pore structure is rectangle.
Preferably, the two ends of described pulley spindle are fixed by nut in described pore structure.
One or more technical schemes in the utility model embodiment, at least have following technique effect or advantage:
By installing suspension holdfast in the both sides of crane hoisting counter-jib, wherein, this suspension holdfast comprises orthogonal suspension arm and linking arm, and assembly pulley is installed additional between the suspension arm of two suspension holdfasts, thus easy fixed block is defined on crane body, when changing steel cable, ground elevator steel cable is moved on crane dolly, directly through assembly pulley, steel cable head is bound, aforesaid way is utilized to substitute the hang of coaster hanging point in prior art, the process changing steel cable is made no longer to be subject to the restriction of site environment, reduce difficulty and the unsafe factor of maintenance, simultaneously, also the time changing steel cable is shortened.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiment of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
Fig. 1 is for changing the half section schematic diagram of the device of crane steel cable in the utility model embodiment;
Fig. 2 is for changing the scheme of installation of the device of crane steel cable in the utility model embodiment;
Fig. 3 is the structural representation of suspension holdfast 1 in the utility model embodiment;
Wherein, 1 is suspension holdfast, and 1a is suspension arm, 1b is linking arm, and 2 is pulley spindle, and 3 is pulley, 4 is bearing, and 5 is axle sleeve, and 6 is logical lid, 7 is nut, and 8 is pore structure, and 9 is elevator counter-jib, 10 is counter-jib base, 11 is elevator counter-jib fixed pin shaft, and 12 fix the peach heart for steel cable head takes turns, and 13 is steel cable head.
Detailed description of the invention
In order to solve the on-the-spot limited technical problem of replacing existing for prior art replacing steel cable, the utility model embodiment provides a kind of device for changing crane steel cable, by installing suspension holdfast in the both sides of crane hoisting counter-jib, wherein, this suspension holdfast comprises orthogonal suspension arm and linking arm, and assembly pulley is installed additional between the suspension arm of two suspension holdfasts, thus easy fixed block is defined on crane body, the process changing steel cable is made no longer to be subject to the restriction of site environment, reduce difficulty and the unsafe factor of maintenance, simultaneously, also the time changing steel cable is shortened.
For making the object of the utility model embodiment, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
The application provides a kind of device for changing crane steel cable, and as shown in Figure 1, described device comprises assembly pulley and two suspension holdfasts 1.Wherein, suspension holdfast 1 comprises suspension arm 1a and linking arm 1b, and suspension arm 1a is mutually vertical with linking arm 1b, concrete, and suspension holdfast 1, in " 7 " font, the suspension arm 1a of suspension holdfast 1 is provided with pore structure 8.Assembly pulley comprises pulley spindle 2 and pulley 3, and pulley 3 is enclosed within pulley spindle 2.
Concrete, as shown in Figure 2, the elevator counter-jib 9 being installed on large tonnage crane body for the device changing crane steel cable of the application.Preferably, two described devices installed by an elevator counter-jib 9.Usually, a crane body there are two elevator counter-jibs 9, therefore, a crane body need installation 4 described devices.
Further, two suspension holdfasts 1 are symmetricly set in the both sides of elevator counter-jib 9, and are fixed by welding on counter-jib base 10.Wherein, suspension holdfast 1 is fixed on counter-jib base 10 by linking arm 1b.
Further, assembly pulley is arranged between two suspension holdfasts 1, and pulley spindle 2 is each passed through the pore structure 8 on the suspension holdfast 1 at two ends.
In addition, in this application, elevator counter-jib 9 is fixed on counter-jib base 10 by elevator counter-jib fixed pin shaft 11, and one end of elevator counter-jib 9 is provided with steel cable head and fixes peach heart wheel 12, and described device is positioned at the top of steel cable head 13.
When changing steel cable, ground elevator steel cable being moved on crane dolly, directly through the assembly pulley in described device, steel cable head being bound.Above-mentioned mode of installing simple and easy fixed block on crane body is utilized to carry out the hang of coaster hanging point in alternative prior art, the process changing steel cable is made no longer to be subject to the restriction of site environment, reduce difficulty and the unsafe factor of maintenance, simultaneously, also the time changing steel cable is shortened, adopt the coaster hanging point mode of prior art to change steel cable and need 8-9 hour, and adopt the device of the application replacing steel cable only to need 6-7 hour.
Preferably, in this application, as shown in Figure 3, pore structure 8 is rectangle, and pulley spindle 2 can move forward and backward in slot structure, by regulating the position of pulley spindle 2, realizes and steel cable head 13 contraposition in vertical direction.After being adjusted to correct position, the two ends of pulley spindle 2 are fixed by nut 7 in pore structure 8.
Preferably, assembly pulley also comprises bearing 4, and bearing 4 is arranged at the centre position on pulley spindle 2, and pulley 3 is installed on bearing 4, can reduce coefficient of friction and retainer shaft center is fixed by bearing 4.
Preferably, assembly pulley also comprises two axle sleeves 5 and two logical lids 6.Two axle sleeves 5 are enclosed within pulley spindle 2, and two axle sleeves 5 are positioned at the both sides of pulley 3.Two logical lids 6 are installed on pulley spindle 2, and two logical lids 6 lay respectively at the outside of two axle sleeves 5.
Concrete, the assembling process of assembly pulley is as follows: first bearing 4 is installed to pulley spindle 2 centre position, is then installed on bearing 4 by pulley 3, and overlap Upper shaft sleeve 4 respectively in the both sides of pulley 3, then loads onto logical lid 5 respectively in the outside of two axle sleeves 4.After assembling assembly pulley, assembly pulley passing hole structure 8 is attached between two suspension holdfasts 1, and is tightened with nut 7.
Technical scheme in above-mentioned the embodiment of the present application, at least has following technique effect or advantage:
By installing suspension holdfast 1 in the both sides of crane hoisting counter-jib 9, wherein, this suspension holdfast 1 comprises orthogonal suspension arm 1a and linking arm 1b, and assembly pulley is installed additional between the suspension arm 1a of two suspension holdfasts 1, thus easy fixed block is defined on crane body, when changing steel cable, ground elevator steel cable is moved on crane dolly, directly through assembly pulley, steel cable head 13 is bound, aforesaid way is utilized to substitute the hang of coaster hanging point in prior art, the process changing steel cable is made no longer to be subject to the restriction of site environment, reduce difficulty and the unsafe factor of maintenance, simultaneously, also the time changing steel cable is shortened,
By the pore structure 8 be rectangle, pulley spindle 2 can move forward and backward in slot structure 8, carries out regulating realizing steel cable head 13 contraposition in vertical direction to the position of pulley spindle 2;
By arranging bearing on pulley spindle 2, and pulley 3 being installed on bearing, coefficient of friction can being reduced and retainer shaft center is fixed.
Although described preferred embodiment of the present utility model, those skilled in the art once obtain the basic creative concept of cicada, then can make other change and amendment to these embodiments.So claims are intended to be interpreted as comprising preferred embodiment and falling into all changes and the amendment of the utility model scope.
Obviously, those skilled in the art can carry out various change and modification to the utility model and not depart from spirit and scope of the present utility model.Like this, if these amendments of the present utility model and modification belong within the scope of the utility model claim and equivalent technologies thereof, then the utility model is also intended to comprise these change and modification.

Claims (6)

1. for changing a device for crane steel cable, it is characterized in that, comprising assembly pulley and two suspension holdfasts;
Described two suspension holdfasts are symmetricly set in the both sides of the elevator counter-jib of described crane;
Described assembly pulley is arranged between described two suspension holdfasts;
Described suspension holdfast comprises orthogonal suspension arm and linking arm, wherein, described suspension arm is provided with pore structure, and described suspension holdfast is fixed on the counter-jib base of described crane by described linking arm;
Described assembly pulley comprises pulley spindle and pulley, and wherein, described pulley sleeve is on described pulley spindle, and described pulley spindle is each passed through the described pore structure on the described suspension holdfast at two ends.
2. as claimed in claim 1 for changing the device of crane steel cable, it is characterized in that, described assembly pulley also comprises bearing, and described bearing is arranged at the centre position on described pulley spindle, and described pulley is installed on described bearing.
3. as claimed in claim 2 for changing the device of crane steel cable, it is characterized in that, described assembly pulley also comprises two axle sleeves;
Described two axle sleeves are enclosed within described pulley spindle, and described two axle sleeves are positioned at the both sides of described pulley.
4. as claimed in claim 3 for changing the device of crane steel cable, it is characterized in that, described assembly pulley also comprises two logical lids;
Described two logical lids are installed on described pulley spindle, and described two logical lids lay respectively at the outside of described two axle sleeves.
5. as claimed in claim 1 for changing the device of crane steel cable, it is characterized in that, described pore structure is rectangle.
6. as claimed in claim 1 for changing the device of crane steel cable, it is characterized in that, the two ends of described pulley spindle are fixed by nut in described pore structure.
CN201420718758.4U 2014-11-25 2014-11-25 A kind of device for changing crane steel cable Expired - Fee Related CN204297948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420718758.4U CN204297948U (en) 2014-11-25 2014-11-25 A kind of device for changing crane steel cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420718758.4U CN204297948U (en) 2014-11-25 2014-11-25 A kind of device for changing crane steel cable

Publications (1)

Publication Number Publication Date
CN204297948U true CN204297948U (en) 2015-04-29

Family

ID=53103508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420718758.4U Expired - Fee Related CN204297948U (en) 2014-11-25 2014-11-25 A kind of device for changing crane steel cable

Country Status (1)

Country Link
CN (1) CN204297948U (en)

Similar Documents

Publication Publication Date Title
CN202829334U (en) Cable festoon
CN203855325U (en) Bridge magnet crane for heavy rail
MX352149B (en) Crane, in particular an overhead crane or gantry crane, having at least one crane girder.
CN102718142A (en) Cable towline
CN201634332U (en) Heavy girder gantry crane
CN102992203B (en) Simple hoisting device for steel structure bridge installation
CN204369357U (en) A kind of villa elevator Knapsack-rack
CN204297948U (en) A kind of device for changing crane steel cable
CN202390116U (en) High-intensity small-tonnage hoist
CN104627849B (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN203998733U (en) A kind of boom device and super starter pulley bracket thereof
CN203924820U (en) A kind of lifting structure of multi-storied garage
CN205328483U (en) Portablely dismantle small -size electric block
CN205653106U (en) Explosion -proof wire rope electric block
CN102730577B (en) Detachable propeller strut for crane
CN105006924A (en) Motor core-through device and core-through method thereof
CN205282958U (en) Portable joining in marriage becomes hoist and mount frame
CN204265223U (en) A kind of revolution ceiling crab
CN103879897A (en) Single beam portal crane
CN203612810U (en) Offshore platform skid hoisting structure
CN203754234U (en) Safety device for lifting hook assembly of pipe lifting machine
CN105417396B (en) Ship-building gantry crane lateral displacement method
CN203865858U (en) Lifting driving mechanism and split crane for moving bridge beams
CN205170253U (en) Detachable removal hoist device
CN201923761U (en) Adjustable lifting appliance device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170719

Address after: 430080 Qingshan District stock company of Hubei, Wuhan Province

Patentee after: Wuhan iron and Steel Company Limited

Address before: 430080 Friendship Avenue, Hubei, Wuhan, No. 999

Patentee before: Wuhan Iron & Steel (Group) Corp.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20191125

CF01 Termination of patent right due to non-payment of annual fee