CN204276302U - Paint line wheel rim hanger bar - Google Patents

Paint line wheel rim hanger bar Download PDF

Info

Publication number
CN204276302U
CN204276302U CN201420704828.0U CN201420704828U CN204276302U CN 204276302 U CN204276302 U CN 204276302U CN 201420704828 U CN201420704828 U CN 201420704828U CN 204276302 U CN204276302 U CN 204276302U
Authority
CN
China
Prior art keywords
connecting rod
wheel rim
root
hanger bar
hanging ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420704828.0U
Other languages
Chinese (zh)
Inventor
罗军
何祖刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING FUJI MACHINE MANUFACTURING Co Ltd
Original Assignee
CHONGQING FUJI MACHINE MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING FUJI MACHINE MANUFACTURING Co Ltd filed Critical CHONGQING FUJI MACHINE MANUFACTURING Co Ltd
Priority to CN201420704828.0U priority Critical patent/CN204276302U/en
Application granted granted Critical
Publication of CN204276302U publication Critical patent/CN204276302U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coating Apparatus (AREA)

Abstract

The utility model discloses a kind of paint line wheel rim hanger bar, comprise the hanging ring (1) of connecting successively from top to bottom, upper connecting rod (2) and lower connecting rod (3), described hanging ring (1) becomes by steel plate bending " U " shape ring that Open Side Down, the lower end of hanging ring (1) is welded on the upper end of upper connecting rod (2), the lower end of upper connecting rod (2) is connected by screw thread with the upper end of lower connecting rod (3), on described, lower connecting rod (2, 3) middle part is respectively welded with the suspension pole (4) of a pair V-shaped layout, the root that every root hangs pole (4) is set with the root separation sleeve (5) of a foam and the wheel rim separation sleeve (6) of at least two foams.There is the features such as useful load is large, height adjustable, thus production efficiency when improving application and stock utilization.

Description

Paint line wheel rim hanger bar
Technical field
The utility model relates to a kind of wheel rim hanger bar being exclusively used in paint line, belongs to apparatus for production line assembly.
Background technology
Wheel rim is again wheel hub, wheel, tire bell, be the drum-shaped of wide support tire in tire, center is contained in metal parts on axle.At present, wheel rim paint line is primarily of automatic cycle carrier chain, the coating room being with coating equipment and wheel rim suspension assembly composition.Wheel rim suspension assembly is arranged along circulating conveyor chain interval, the lower end of wheel rim suspension assembly is provided with hook, automotive rim hangs on wheel rim suspension assembly by hook, each wheel rim suspension assembly can only hang an automotive rim, production efficiency and coating material utilization rate all very low.
Utility model content
For above-mentioned technical problem, intend providing a kind of wheel rim hanger bar of large useful load, to improve stock utilization during production efficiency and the application of paint line.
For this reason, the technical scheme that the utility model adopts is: a kind of paint line wheel rim hanger bar, comprise the hanging ring (1) of connecting successively from top to bottom, upper connecting rod (2) and lower connecting rod (3), described hanging ring (1) becomes by steel plate bending " U " shape ring that Open Side Down, the lower end of hanging ring (1) is welded on the upper end of upper connecting rod (2), the lower end of upper connecting rod (2) is connected by screw thread with the upper end of lower connecting rod (3), on described, lower connecting rod (2, 3) middle part is respectively welded with the suspension pole (4) of a pair V-shaped layout, the root that every root hangs pole (4) is set with the root separation sleeve (5) of a foam and the wheel rim separation sleeve (6) of at least two foams.
Preferred as such scheme, often couple of angle α hanging pole (4) is 140 ~ 160 °, effectively can ensure that wheel rim can not landing on suspension pole, be unlikely to again to take upper and lower space too much, affect the layout that all the other hang poles.
Further, the lower end of described upper connecting rod (2) is provided with screwed hole (2a), the upper end of lower connecting rod (3) is provided with screw rod (3a), and described screw rod (3a) to insert in screwed hole (2a) thus achieves upper connecting rod (2) and is connected with the screw thread of lower connecting rod (3).
The beneficial effects of the utility model: every root hangs pole all for hanging wheel rim, first the foam separation sleeve of root is put, avoid wheel rim in course of conveying to produce with suspension mobile jib to collide, every root hangs on pole can hang at least three wheel rims successively, is separated avoid producing collision between adjacent wheel rim in course of conveying between adjacent wheel rim by wheel rim separation sleeve.Hang pole to be in tilted layout, wheel rim can be avoided in course of conveying from the outboard end slippage of hanging pole.Upper connecting rod is connected with lower connecting rod screw thread, can adjust the height of hanger bar, avoid touching ground bottom wheel rim according to space requirement.Assuming that upper suspension 3 wheel rims of each suspension pole, then each wheel rim suspension assembly can hang at least 12 wheel rims, the hook structure before comparing, and under the prerequisite not increasing manufacturing cost, conveying capacity significantly promotes; The wheel rim simultaneously being carried out application by conveying assembly feeding coating room is many, improves the stock utilization of application.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the part A solution schematic diagram of Fig. 1.
Fig. 3 is the scheme of installation of the utility model on circulating conveyor chain.
Detailed description of the invention
Below by embodiment also by reference to the accompanying drawings, the utility model is described in further detail:
The wheel rim hanger bar of paint line as shown in Figure 1, comprises hanging ring 1, upper connecting rod 2, lower connecting rod 3, hangs the compositions such as pole 4, root separation sleeve 5 and wheel rim separation sleeve 6.Hanging ring 1, upper connecting rod 2 and lower connecting rod 3 are cascaded from top to bottom successively, hanging ring 1 becomes by steel plate bending " U " shape ring that Open Side Down, for being sleeved on circulating conveyor chain, the lower end of hanging ring 1 is welded on the upper end of upper connecting rod 2, and the lower end of upper connecting rod 2 is connected by screw thread with the upper end of lower connecting rod 3.Preferably, the lower end of upper connecting rod 2 is provided with screwed hole 2a, and the upper end of lower connecting rod 3 is provided with screw rod 3a, and screw rod 3a to insert in screwed hole 2a thus achieves upper connecting rod 2 and is connected with the screw thread of lower connecting rod 3.Certainly, also screw rod can be arranged on upper connecting rod 2, screwed hole is arranged on lower connecting rod 3.By being screwed into screw thread of back-outing, adjusting the length of wheel rim hanger bar, avoiding touching ground bottom wheel rim.
Respectively be welded with the suspension pole 4 of a pair V-shaped layout in the middle part of upper and lower connecting rod 2,3, the root that every root hangs pole 4 is set with the root separation sleeve 5 of a foam and the wheel rim separation sleeve 6 of at least two foams.Preferably, often couple of angle α hanging pole 4 is 140 ~ 160 °.
Shown in composition graphs 2, wheel rim hanger bar is arranged along circulating conveyor chain interval, drives wheel rim hanger bar to move along delivery track by circulating conveyor chain.

Claims (3)

1. a paint line wheel rim hanger bar, comprise the hanging ring (1) of connecting successively from top to bottom, upper connecting rod (2) and lower connecting rod (3), described hanging ring (1) becomes by steel plate bending " U " shape ring that Open Side Down, the lower end of hanging ring (1) is welded on the upper end of upper connecting rod (2), the lower end of upper connecting rod (2) is connected by screw thread with the upper end of lower connecting rod (3), on described, lower connecting rod (2, 3) middle part is respectively welded with the suspension pole (4) of a pair V-shaped layout, the root that every root hangs pole (4) is set with the root separation sleeve (5) of a foam and the wheel rim separation sleeve (6) of at least two foams.
2. according to paint line wheel rim hanger bar according to claim 1, it is characterized in that: often couple of angle α hanging pole (4) is 140 ~ 160 °.
3. according to the wheel rim hanger bar of the paint line described in claim 1 or 2, it is characterized in that: the lower end of described upper connecting rod (2) is provided with screwed hole (2a), the upper end of lower connecting rod (3) is provided with screw rod (3a), and described screw rod (3a) to insert in screwed hole (2a) thus achieves upper connecting rod (2) and is connected with the screw thread of lower connecting rod (3).
CN201420704828.0U 2014-11-17 2014-11-17 Paint line wheel rim hanger bar Expired - Fee Related CN204276302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420704828.0U CN204276302U (en) 2014-11-17 2014-11-17 Paint line wheel rim hanger bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420704828.0U CN204276302U (en) 2014-11-17 2014-11-17 Paint line wheel rim hanger bar

Publications (1)

Publication Number Publication Date
CN204276302U true CN204276302U (en) 2015-04-22

Family

ID=52859501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420704828.0U Expired - Fee Related CN204276302U (en) 2014-11-17 2014-11-17 Paint line wheel rim hanger bar

Country Status (1)

Country Link
CN (1) CN204276302U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104338659A (en) * 2014-11-17 2015-02-11 重庆富吉机械制造有限公司 Rim suspension rod used for coating line
CN105274479A (en) * 2015-10-26 2016-01-27 西安航空动力股份有限公司 Combined tool used for turbine blade multi-arc ion coating and use method of combined tool
CN105457799A (en) * 2016-02-04 2016-04-06 镇江市黄墟锚链有限公司 Anchor chain suspension bracket

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104338659A (en) * 2014-11-17 2015-02-11 重庆富吉机械制造有限公司 Rim suspension rod used for coating line
CN105274479A (en) * 2015-10-26 2016-01-27 西安航空动力股份有限公司 Combined tool used for turbine blade multi-arc ion coating and use method of combined tool
CN105457799A (en) * 2016-02-04 2016-04-06 镇江市黄墟锚链有限公司 Anchor chain suspension bracket
CN105457799B (en) * 2016-02-04 2018-06-01 镇江市黄墟锚链有限公司 A kind of anchor chain hanger bracket

Similar Documents

Publication Publication Date Title
CN204276302U (en) Paint line wheel rim hanger bar
CN104338659A (en) Rim suspension rod used for coating line
CN204237880U (en) A kind of electrophoresis hanger
CN204280518U (en) The workpiece rack of spraying
CN204276220U (en) Be applicable to the wheel hub automatic coating line of different-diameter specification
CN204280519U (en) For the workpiece suspension frame of automatic conveyer chain
CN204276299U (en) Energy-saving efficient automotive rim paint line
CN204096426U (en) Metallic membrane storage rack
CN204276222U (en) The wheel rim conveying assembly of paint line
CN204078414U (en) Tire barrow
CN204276221U (en) Workpiece conveying mechanism on automotive hub spraying coating line
CN204276301U (en) The annular workpieces paint line of large useful load
CN202071865U (en) Cable transportation trolley
CN204276249U (en) Be exclusively used in the spraying coating line of automotive hub
CN104353580A (en) Special spray coating line for automobile hub
CN203254299U (en) Support for rust removal and abrasive blasting of trench surface plate
CN204276219U (en) Spraying coating line wheel hub suspension assembly
CN104401653A (en) Automatic transmission mechanism of general hub
CN104401655A (en) Workpiece suspension bracket used for automatic conveying chain
CN104384080A (en) Energy-saving high-efficiency automotive rim coating line
CN104401656A (en) Workpiece storage frame used for spray coating
CN104437933B (en) A kind of spraying coating line wheel hub suspension assembly
CN207670437U (en) Transport charka
CN205848551U (en) A kind of scalable duck erecting by overhang
CN206375974U (en) Multi-functional not specification shaped steel hanger

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

Termination date: 20161117