CN204271737U - Two small power supplies are simultaneously to the wiring construction of a Large Electrolytic Aluminium series power - Google Patents

Two small power supplies are simultaneously to the wiring construction of a Large Electrolytic Aluminium series power Download PDF

Info

Publication number
CN204271737U
CN204271737U CN201420862933.7U CN201420862933U CN204271737U CN 204271737 U CN204271737 U CN 204271737U CN 201420862933 U CN201420862933 U CN 201420862933U CN 204271737 U CN204271737 U CN 204271737U
Authority
CN
China
Prior art keywords
bus
power factor
section
subsequent use
rectification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420862933.7U
Other languages
Chinese (zh)
Inventor
舒茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201420862933.7U priority Critical patent/CN204271737U/en
Application granted granted Critical
Publication of CN204271737U publication Critical patent/CN204271737U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of two small power supplies simultaneously to the wiring construction of a Large Electrolytic Aluminium series power, the utility model adopts a Rectification Power Factor for subsequent use, as the Rectification Power Factor public for subsequent use of two groups of Power supply sections; When wherein one group of Power supply section with a motor-generator set organize a performance maintenance time, public Rectification Power Factor for subsequent use just accesses this group Power supply section, ensures the need for electricity of electrolysis tank.The utility model achieves the object that two small power supplies are powered to a large Electrolytic Aluminum Series simultaneously, and the technical solution of the utility model, without the need to increasing Rectification Power Factor in addition, can play again the effect that two Power supply sections have Rectification Power Factor for subsequent use.Therefore, considerable equipment investment has been saved, also without the need to increasing floor space.The utility model reversed process is easy to operate without the need to particular arrangement, can meet the power reguirements of Large Electrolytic Aluminium series, safe and reliable in using.

Description

Two small power supplies are simultaneously to the wiring construction of a Large Electrolytic Aluminium series power
Technical field
the utility model relates to a kind of two small power supplies simultaneously to the wiring construction of a Large Electrolytic Aluminium series power, belongs to electrolytic aluminium factory Large Electrolytic Aluminium series power technical field.
Background technology
in the direct current electricity consumption of electrolytic aluminium factory Electrolytic Aluminum Series by multiple stage Rectification Power Factor parallel operation.Rectification Power Factor generally adopts N+1 mode to configure, and N+1 platform machine set technology parameter is completely the same, and any unit all can be used as unit for subsequent use; When wherein unit needs maintenance, remaining Rectification Power Factor also 100% can meet electrolytic series need for electricity, and whole Rectification Power Factor is by one group of Power supply, and one group of power supply comprises the using and the reserved two power supplys, and main electrical scheme is the double-bus form of band mother.But along with electrolysis series electric current is increasing, some electrolytic series production capacity even reaches more than 200kt/a, more than burden with power 320MW, and power supply voltage is at more than 110kV.When a power supply capacity is less than a Large Electrolytic Aluminium series required electric power, can be powered by two groups of power supplys, often organize power supply and comprise the using and the reserved two power supplys, main electrical scheme is the structure of two double-bus band mothers, comprises four sections of ac bus simultaneously.Often organize power supply to be respectively partial rectification unit and to power.Now, no matter a Rectification Power Factor for subsequent use is by that group Power supply, another group Rectification Power Factor that power supply is with will without Rectification Power Factor for subsequent use, if when having a Rectification Power Factor to need to overhaul without Rectification Power Factor side for subsequent use, this side power supply capacity will reduce, and when having the power supply of Rectification Power Factor side for subsequent use enough not large, electrolytic aluminium direct current need for electricity can not be met.If each Power supply section configures a Rectification Power Factor for subsequent use; then need the switch of an increase supply cell and proterctive equipment, voltage regulating rectifier transformer, two rectifier cabinets, a set of pure water cooling unit, four D.C. high-current switches, two direct-current measuring devices, two reverse current protection devices, a set of branch DC buss; and need the equipment of increase by 90 × 16 square metres that land used is installed, invest increase by more than 3,000 ten thousand yuan.
Utility model content
the purpose of this utility model is, there is provided a kind of two small power supplies simultaneously to the wiring construction of a Large Electrolytic Aluminium series power, Rectification Power Factor for subsequent use need not be increased, the effect that two groups of Power supply sections have unit for subsequent use can be played again, guaranteeing to reduce cost of investment in the reliable situation of power supply safety, thus overcoming the deficiencies in the prior art.
the technical solution of the utility model is achieved in that
wiring construction to a Large Electrolytic Aluminium series power while of a kind of two small power supplies of the present utility model is that this wiring construction comprises a-power supply group and B-source group; A-power supply group is connected with A section ac bus, and A section ac bus is connected with A Rectification Power Factor ac input end, and A Rectification Power Factor positive pole exports and is connected with positive bus-bar, and A Rectification Power Factor negative pole exports and is connected with negative busbar; B-source group is connected with B section ac bus, and B section ac bus is connected with B Rectification Power Factor ac input end, and B Rectification Power Factor positive pole exports and is connected with positive bus-bar, and B Rectification Power Factor negative pole exports and is connected with negative busbar; C section ac bus is provided with between A section ac bus and B section ac bus, C section ac bus is connected with public Rectification Power Factor ac input end for subsequent use, public Rectification Power Factor positive pole for subsequent use exports and is connected with positive bus-bar, and public Rectification Power Factor negative pole for subsequent use exports and is connected with negative busbar; Negative busbar is connected with the negative pole of Large Electrolytic Aluminium series, and positive bus-bar is connected with the positive pole of Large Electrolytic Aluminium series; C section ac bus two ends are connected with A section ac bus or B section ac bus through diverter switch respectively.
compared with prior art, the utility model achieves the object that two small power supplies are powered to a large Electrolytic Aluminum Series simultaneously, the technical solution of the utility model, without the need to increasing Rectification Power Factor in addition, can play again the effect that two Power supply sections have Rectification Power Factor for subsequent use.Therefore, considerable equipment investment has been saved, also without the need to increasing floor space.The utility model hand-over process operations is convenient can meet the power reguirements of Large Electrolytic Aluminium series without the need to particular arrangement, safe and reliable in using.
Accompanying drawing explanation
fig. 1 is mode of connection schematic diagram of the present utility model.
being labeled as in figure: 1-A power pack, 2-B power pack, 3-A section ac bus, 4-C section ac bus, 5-B section ac bus, 6-A Rectification Power Factor, the public Rectification Power Factor for subsequent use of 7-, 8-B Rectification Power Factor, 9-positive bus-bar, 10-negative busbar, 11-Large Electrolytic Aluminium series, 12-diverter switch.
Embodiment
below in conjunction with drawings and Examples, the utility model is described in further detail, but not as to any restriction of the present utility model.
the utility model be according to following a kind of two small power supplies simultaneously to a Large Electrolytic Aluminium series power method constructed by, as shown in Figure 1, the method adopts a Rectification Power Factor for subsequent use, as the Rectification Power Factor 7 public for subsequent use of two groups of Power supply sections; When wherein one group of Power supply section with a Rectification Power Factor maintenance time, public Rectification Power Factor 7 for subsequent use just accesses this group Power supply section, ensures the need for electricity of electrolysis tank.Concrete grammar is between two ac bus of two groups of Power supply sections, increase by one section of two ac bus, and the two ac bus of this section is connected with public Rectification Power Factor 7 for subsequent use; One section that increases two ac bus is connected with two ac bus of two groups of Power supply sections respectively by four diverter switches 12; When two groups of Power supply sections any one section with a Rectification Power Factor maintenance time, by diverter switch 12, public Rectification Power Factor 7 for subsequent use is accessed this section, disconnects the connection with another section of bus simultaneously.By circuit breaker or isolating switch, public Rectification Power Factor for subsequent use is accessed this section, disconnect the connection with another section of bus simultaneously, its handover operation process is: public Rectification Power Factor for subsequent use had a power failure, then first disconnect the block switch run and drop into the block switch being about to run again, Rectification Power Factor for subsequent use is switched to the power-feed section of opposite side under unloaded condition from the power-feed section of side, transmission operation again after having switched.
of the present utility model a kind of two small power supplies formed according to said method are simultaneously to the wiring construction of a Large Electrolytic Aluminium series power, and as shown in Figure 1, this wiring construction comprises a-power supply group 1 and B-source group 2; A-power supply group 1 is connected with A section ac bus 3, and A section ac bus 3 is connected with A Rectification Power Factor 6 ac input end, and A Rectification Power Factor 6 positive pole exports and is connected with positive bus-bar 9, and A Rectification Power Factor 6 negative pole exports and is connected with negative busbar 10; B-source group 2 is connected with B section ac bus 5, and B section ac bus 5 is connected with B Rectification Power Factor 8 ac input end, and B Rectification Power Factor 8 positive pole exports and is connected with positive bus-bar 9, and B Rectification Power Factor 8 negative pole exports and is connected with negative busbar 10; C section ac bus 4 is provided with between A section ac bus 3 and B section ac bus 5, C section ac bus 4 is connected with public Rectification Power Factor 7 ac input end for subsequent use, public Rectification Power Factor for subsequent use 7 positive pole exports and is connected with positive bus-bar 9, and public Rectification Power Factor 7 negative pole for subsequent use exports and is connected with negative busbar 10; Negative busbar 10 is connected with the negative pole of Large Electrolytic Aluminium series 11, and positive bus-bar 9 is connected with the positive pole of Large Electrolytic Aluminium series 11; C section ac bus 4 two ends are connected with A section ac bus 3 and B section ac bus 5 through diverter switch 12 respectively.
Embodiment
when the electricity consumption of Large Electrolytic Aluminium series is greater than the power supply capacity of a small power supply, can as shown in Figure 1, adopt two small power supplies to be a Large Electrolytic Aluminium series power simultaneously.Adopt a unit for subsequent use own in the Rectification Power Factor of N+1 configuration, as the Rectification Power Factor public for subsequent use of two Power supply sections, therefore without the need to increasing Rectification Power Factor in addition.This example adopts two groups of Power supplies, often organizes power supply and comprises the using and the reserved two power supplys, so one has four power supplys.Main wiring mode is the structure of double-bus band mother, when certain power supply with unit one maintenance time, unit for subsequent use just accesses this mains side, still can make full use of the power supply capacity of this power supply, ensures the need for electricity of electrolysis tank.Specific practice is in the middle of four sections of buses of two Power supplies, increase by two sections of buses, increase bus section, busbar section and only connect the public for subsequent use unit of a unit as two Power supply sections, increase bus section, busbar section to be connected by four circuit breakers or isolating switch and other four sections of buses, mode of operation when this mode of connection switches unit for subsequent use is: public Rectification Power Factor for subsequent use had a power failure, then first disconnect the block switch run and drop into the block switch being about to run again, after unit for subsequent use is switched to opposite side from side under unloaded condition, unit for subsequent use transmission operation again, this operational mode makes the relaying protection of switching circuit breaker without the need to particular arrangement.This example solves two small power supplies and powers to a large Electrolytic Aluminum Series simultaneously, and do not increase unit for subsequent use, can play again two Power supply sections has unit for subsequent use.This patent investment reduction, power supply safety is reliable, easy to operate.

Claims (1)

1. two small power supplies are simultaneously to a wiring construction for a Large Electrolytic Aluminium series power, it is characterized in that: comprise a-power supply group (1) and B-source group (2); A-power supply group (1) is connected with A section ac bus (3), A section ac bus (3) is connected with A Rectification Power Factor (6) ac input end, A Rectification Power Factor (6) positive pole exports and is connected with positive bus-bar (9), and A Rectification Power Factor (6) negative pole exports and is connected with negative busbar (10); B-source group (2) is connected with B section ac bus (5), B section ac bus (5) is connected with B Rectification Power Factor (8) ac input end, B Rectification Power Factor (8) positive pole exports and is connected with positive bus-bar (9), and B Rectification Power Factor (8) negative pole exports and is connected with negative busbar (10); C section ac bus (4) is provided with between A section ac bus (3) and B section ac bus (5), C section ac bus (4) is connected with public Rectification Power Factor for subsequent use (7) ac input end, public Rectification Power Factor for subsequent use (7) positive pole exports and is connected with positive bus-bar (9), and public Rectification Power Factor for subsequent use (7) negative pole exports and is connected with negative busbar (10); Negative busbar (10) is connected with the negative pole of Large Electrolytic Aluminium series (11), and positive bus-bar (9) is connected with the positive pole of Large Electrolytic Aluminium series (11); C section ac bus (4) two ends are connected with A section ac bus (3) or B section ac bus (5) through diverter switch (12) respectively.
CN201420862933.7U 2014-12-31 2014-12-31 Two small power supplies are simultaneously to the wiring construction of a Large Electrolytic Aluminium series power Active CN204271737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420862933.7U CN204271737U (en) 2014-12-31 2014-12-31 Two small power supplies are simultaneously to the wiring construction of a Large Electrolytic Aluminium series power

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420862933.7U CN204271737U (en) 2014-12-31 2014-12-31 Two small power supplies are simultaneously to the wiring construction of a Large Electrolytic Aluminium series power

Publications (1)

Publication Number Publication Date
CN204271737U true CN204271737U (en) 2015-04-15

Family

ID=52806582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420862933.7U Active CN204271737U (en) 2014-12-31 2014-12-31 Two small power supplies are simultaneously to the wiring construction of a Large Electrolytic Aluminium series power

Country Status (1)

Country Link
CN (1) CN204271737U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104505930A (en) * 2014-12-31 2015-04-08 贵阳铝镁设计研究院有限公司 Method for synchronously supplying power to large electrolytic aluminum series through two small power supplies and wiring structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104505930A (en) * 2014-12-31 2015-04-08 贵阳铝镁设计研究院有限公司 Method for synchronously supplying power to large electrolytic aluminum series through two small power supplies and wiring structure
CN104505930B (en) * 2014-12-31 2017-09-12 贵阳铝镁设计研究院有限公司 Two groups of power supplys are simultaneously to the method and wiring construction of Large Electrolytic Aluminium series power

Similar Documents

Publication Publication Date Title
CN107732894B (en) Three-terminal direct current transmission system and control method of converter station thereof
CN104319815B (en) Grid connection/disconnection seamless switching method for micro-grid converter
CN104104143A (en) Parallel-connected quiescent voltage restorer for isolating transient voltage fault of power system
CN103475032A (en) Intelligent power distribution and utilization flexible control system
CN105652116B (en) Back-to-back test circuit based on DC/DC converter
CN206077059U (en) A kind of terminal lightning protection HVDC no-break power unit
CN203747494U (en) Emergency power supply device
CN204271737U (en) Two small power supplies are simultaneously to the wiring construction of a Large Electrolytic Aluminium series power
CN202906774U (en) High-power photovoltaic inverter with automatic power-off auxiliary power supply circuit
CN201623436U (en) Direct-current ice melting device capable of being multiplexed into TSC
CN110739701A (en) low-voltage distribution network line low-voltage treatment system and treatment method
CN204012719U (en) A kind of two main transformer intelligent operation/cutting measure and control device
CN107171270B (en) Intensive deicing device constant current, constant pressure modularization dynamic passive compensation component
CN207010251U (en) A kind of new double-bus electrokinetic cell forming and capacity dividing energy saving system
CN207603211U (en) A kind of three end DC transmission systems
CN104505930B (en) Two groups of power supplys are simultaneously to the method and wiring construction of Large Electrolytic Aluminium series power
CN207490512U (en) A kind of three end DC transmission systems
CN211183415U (en) DC line reformed by same-tower double-circuit AC line
CN103414242A (en) Electrified railway in-phase power supplying method and standby machine structure
CN203522604U (en) Redundant medium-voltage AC-DC-AC frequency conversion device of double-winding synchronous motor of mine hoist
CN203787789U (en) T and pi mixed net rack wiring structure applied to high voltage distribution
CN203942277U (en) Traction Substation of Electric Railway power supply based on SPWM technology
CN203481758U (en) Output switching system of direct current ice-melting device
CN103516046B (en) Mobile substation photovoltaic and super capacitor AC/DC integrated power supply
CN108270362B (en) Combined intermediate frequency power supply based on DSP and FPGA parallel machine control

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant