CN204265280U - Total management system is unified in tower machine safety and operation - Google Patents

Total management system is unified in tower machine safety and operation Download PDF

Info

Publication number
CN204265280U
CN204265280U CN201420695454.0U CN201420695454U CN204265280U CN 204265280 U CN204265280 U CN 204265280U CN 201420695454 U CN201420695454 U CN 201420695454U CN 204265280 U CN204265280 U CN 204265280U
Authority
CN
China
Prior art keywords
tower machine
safety
unified
control cabin
indicator lamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420695454.0U
Other languages
Chinese (zh)
Inventor
杨勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU QIANZJ TECHNOLOGY Co Ltd
Original Assignee
CHENGDU QIANZJ TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU QIANZJ TECHNOLOGY Co Ltd filed Critical CHENGDU QIANZJ TECHNOLOGY Co Ltd
Priority to CN201420695454.0U priority Critical patent/CN204265280U/en
Application granted granted Critical
Publication of CN204265280U publication Critical patent/CN204265280U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to tower machine safety and total management system is unified in operation, it is characterized in that, comprise safety monitoring system, alarm control system, camera, alarm control system is connected with tower machine control cabin, camera, safety monitoring system are connected with tower machine control cabin by wireless communication module, tower machine control cabin is connected with data center, tower machine control cabin is connected with remote monitoring center network service by wire communication module, and remote monitoring center is connected with data memory system, data query system.The utility model is by arranging remote monitoring center, the job status of all tower machines in each building site in region and construction speed, goods and materials are unified, all sidedly information store, arrange, analyze, just can to each building site by goods and materials carry out unified, comprehensive management and distribution, resource is adequately and reasonably utilized, and can comprehensively analyze the potential safety hazard existed between each building site, determine the measure prevented.

Description

Total management system is unified in tower machine safety and operation
Technical field
The utility model relates to tower machine management system field, particularly, relates to a kind of tower machine safety and total management system is unified in operation.
Background technology
tower machine, namely " tower crane " is called for short, and also known as " tower crane ", is for the wherein equipment of the one in building operation.Tower machine operation belongs to a kind of high-risk operations, there is a lot of potential safety hazards in operation process, and such as tower machine is overweight; The inclination that tower machine is insecure to be caused, to collapse; High wind causes the instability of tower machine structure; And tower machine in operation process with collision of periphery object etc.In order to avoid above-mentioned potential safety hazard, therefore need to carry out security monitoring management to tower machine, the security monitoring of existing tower machine is all generally adopt to install some cameras on tower machine and in the scope of work of tower machine, camera is connected with the computer of Control Room by data line, staff judges the whether dangerous of operating environment by the handling situations on observation computer, by camera collection information, refer to site work environment and the handling situations of tower machine particularly, the optical imagery that camera lens generates is projected in image sensor surface, then electric signal is converted into, data image signal is become after analogue to digital conversion, deliver to processing process in digital signal processing chip again, computer process is transferred to again by USB interface, just image can be seen by telltale.Existing safety monitoring system, can not monitor hidden danger during tower machine operation accurately, comprehensively, timely.And, existing tower machine management system is all generally manage with safety the tower machine operation in same building site, monitoring and control can not be carried out to multiple building site simultaneously, therefore, unified distribution and management cannot be carried out to the goods and materials between building site, resource can not be made to obtain the most reasonably utilizing, and can not comprehensively analyze the potential safety hazard existed between each building site.
Utility model content
The utility model provides a kind of tower machine safety and operation to unify total management system, with overcome existing tower machine management system can not comprehensively analyze exist between each building site potential safety hazard, unified distribution and the problem of management cannot be carried out to the goods and materials between building site, the resource between each building site is made to obtain utilizing the most fully, realize the real-time management to multiple building sites towering machine information and safe condition, be convenient to safe condition and the goods and materials state of understanding each building site tower machine.
The technical scheme in the invention for solving the above technical problem is:
Total management system is unified in tower machine safety and operation, comprise safety monitoring system, alarm control system, camera, alarm control system is connected with tower machine control cabin, camera, safety monitoring system are connected with tower machine control cabin by wireless communication module, tower machine control cabin is connected with data center, tower machine control cabin is connected with remote monitoring center network service by wire communication module, and remote monitoring center is connected with data memory system, data query system.The utility model by existing equipment and software application to safety management system during tower machine operation, wherein safety monitoring system can monitor all processes and the step of tower machine operation in real time accurately, and monitored signal is passed to tower machine control cabin by wireless communication module, tower machine control cabin can by analyzing the classification of signal that receive and signal whether within safe range, thus judge whether to start alarm control system, if whole signals that tower machine control system receives are all within safe range, then do not start, if the signal that receives has a kind to be like outside safe range, to starting alarm control system, notify that operating personnel stops operation or changes operating mode, tower machine control cabin is also connected with data center, data center can record and preserve the signal arrived received by control center, data center sends the signal after preservation to remote monitoring center by wire communication module, the data memory system that remote monitoring center connects can by the signal storage filing received, remote monitoring center controls all tower machines in some building sites in whole region simultaneously, so, just all signals in data memory system can be analyzed, summary place tower machine is in the course of the work than being easier to the classification occurring danger signal, different measures is adopted to prevent danger according to different signal classifications, thus achieve tower machine operation by comprehensively, monitor in real time, eliminate the potential safety hazard of tower machine operation, camera is arranged on each corner in building site, the operation of the tower machine of real-time monitoring and the construction picture in building site, captured picture is sent to tower machine control cabin by wireless communication module, remote monitoring center is being sent to by wire communication module, data memory system is except the security monitoring signal of storage column machine, also want the situation of each building site All Jobs of stored record, such as production time, operating personnel, construction speed, the information of the site constructions such as construction material, can be all together and enter data query system, grasp the Construction State in each building site at any time, so, just can to each building site by goods and materials unify, comprehensive management and distribution, resource is adequately and reasonably utilized, and can comprehensively analyze the potential safety hazard existed between each building site, determine the measure prevented.
Described safety monitoring system comprises safety control instrument, and safety control instrument is connected with read-out, angular transducer, amplitude sensor, inclination sensor, air velocity transducer and Load Sensor by A/D module.Specifically, the cylinder of safety monitoring system is safety monitor, it is connected with read-out, read-out is arranged on the control cabin on tower machine, safety monitor is connected with angular transducer by A/D module, amplitude sensor, inclination sensor, air velocity transducer, and Load Sensor, A/D module is by angular transducer, amplitude sensor, inclination sensor, air velocity transducer, and Load Sensor, the analog signal received is converted into digital signal transfers to safety monitor by A/D module, safety monitor gives read-out signal feedback on the one hand, by Signal aspects on a display screen, tower machine operation person is just by the operating mode of the assurance oneself of the signal of read-out display, avoid occurring potential safety hazard, on the other hand safety detector by wireless communication module by signal transmission to tower machine control cabin, stored by tower machine control cabin and judge whether startup alarm control system after analyzing data.
Described alarm control system comprises alarm controller, alarm controller is connected with angle and holds indicator lamp, amplitude warning indicator lamp, inclination warning indicator lamp, wind speed warning indicator lamp and lifting warning indicator lamp tightly.The signal that tower machine control cabin is received by analysis, judges whether to start alarm control system, if the angle of tower machine offsets, and starting angular warning indicator lamp; If the amplitude of tower machine exceeds normal scope, start amplitude warning indicator lamp; If the degree of dip of tower machine exceeds safe range, start inclination warning indicator lamp; If wind speed during fruit operation exceeds safe range, threshold wind velocity warning indicator lamp; If tower machine hold goods weight exceed safe range, start lifting warning indicator lamp, by the alert notice operating personnel of different indicator lamp, the item of reporting to the police adjusted or stopped operation.
To sum up, the beneficial effects of the utility model are:
1, the utility model is by arranging remote monitoring center, the job status of all tower machines in each building site in region and construction speed, goods and materials are unified, all sidedly information store, arrange, analyze, just can to each building site by goods and materials carry out unified, comprehensive management and distribution, resource is adequately and reasonably utilized, and can comprehensively analyze the potential safety hazard existed between each building site, determine the measure prevented.
2, the utility model is by arranging safety monitor, in real time, comprehensively sense mode of operation during tower machine operation, and by the signal feedback that senses to read-out, enable operating personnel connect mode of operation and the working environment of tower machine always, have more the mode of operation of situation adjustment oneself.
3, the utility model sends signal to tower machine control cabin by wireless communication module by safety monitor, by tower machine control cabin analytic signal, judges whether to start alarm control system, avoids potential safety hazard.
Accompanying drawing explanation
Fig. 1 is fundamental diagram of the present utility model.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, to the detailed description further of the utility model do, but embodiment of the present utility model is not limited thereto.
Embodiment:
As shown in Figure 1, total management system is unified in tower machine safety and operation, comprise safety monitoring system, alarm control system, camera, alarm control system is connected with tower machine control cabin, camera, safety monitoring system are connected with tower machine control cabin by wireless communication module, tower machine control cabin is connected with data center, and tower machine control cabin is connected with remote monitoring center network service by wire communication module, and remote monitoring center is connected with data memory system, data query system; Described safety monitoring system comprises safety control instrument, and safety control instrument is connected with read-out, angular transducer, amplitude sensor, inclination sensor, air velocity transducer and Load Sensor by A/D module; Alarm control system comprises alarm controller, alarm controller is connected with angle and holds indicator lamp, amplitude warning indicator lamp, inclination warning indicator lamp, wind speed warning indicator lamp and lifting warning indicator lamp tightly.Tower machine operation personnel are by the read-out in observing tower machine, carry out understanding in real time, comprehensively to the working condition of tower machine, so that it is to a control of tower machine operation, by control center, the signal that it receives is analyzed, and judge whether to start alarm control system, notify which kind of potential safety hazard operating personnel's has occurred, and analyzed by the tower crane safety monitoring signal of data center to same building site, judge whether to start warning; By remote monitoring center, the job status of all tower machines to each building site in region and construction speed, goods and materials are unified, all sidedly information store, arrange, analyze, just can to each building site by goods and materials carry out unified, comprehensive management and distribution, resource is adequately and reasonably utilized, and can comprehensively analyze the potential safety hazard existed between each building site, determine the measure prevented.
As mentioned above, the utility model can be realized preferably.

Claims (3)

1. total management system is unified in tower machine safety and operation, it is characterized in that, comprise safety monitoring system, alarm control system, camera, alarm control system is connected with tower machine control cabin, camera, safety monitoring system are connected with tower machine control cabin by wireless communication module, tower machine control cabin is connected with data center, and tower machine control cabin is connected with remote monitoring center network service by wire communication module, and remote monitoring center is connected with data memory system, data query system.
2. total management system is unified in tower machine safety according to claim 1 and operation, it is characterized in that, described safety monitoring system comprises safety control instrument, and safety control instrument is connected with read-out, angular transducer, amplitude sensor, inclination sensor, air velocity transducer and Load Sensor by A/D module.
3. total management system is unified in tower machine safety according to claim 1 and 2 and operation, it is characterized in that, described alarm control system comprises alarm controller, alarm controller is connected with angle and holds indicator lamp, amplitude warning indicator lamp, inclination warning indicator lamp, wind speed warning indicator lamp and lifting warning indicator lamp tightly.
CN201420695454.0U 2014-11-19 2014-11-19 Total management system is unified in tower machine safety and operation Expired - Fee Related CN204265280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420695454.0U CN204265280U (en) 2014-11-19 2014-11-19 Total management system is unified in tower machine safety and operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420695454.0U CN204265280U (en) 2014-11-19 2014-11-19 Total management system is unified in tower machine safety and operation

Publications (1)

Publication Number Publication Date
CN204265280U true CN204265280U (en) 2015-04-15

Family

ID=52800159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420695454.0U Expired - Fee Related CN204265280U (en) 2014-11-19 2014-11-19 Total management system is unified in tower machine safety and operation

Country Status (1)

Country Link
CN (1) CN204265280U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104555740A (en) * 2014-11-19 2015-04-29 成都嵌智捷科技有限公司 Safety management system for monitoring operation of tower crane in real time
CN106006418A (en) * 2016-08-12 2016-10-12 安徽中杰信息科技有限公司 Tower-type crane structure wind-induced fatigue safety protection system
CN106081958A (en) * 2016-07-26 2016-11-09 潘燕 A kind of derrick crane on-line monitoring system
CN106429842A (en) * 2016-09-28 2017-02-22 山东华旗新能源科技有限公司 Safe and intelligent unmanned tower crane system and method
CN106957020A (en) * 2017-05-11 2017-07-18 深圳市柘叶红实业有限公司 Safety of tower crane management system and management method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104555740A (en) * 2014-11-19 2015-04-29 成都嵌智捷科技有限公司 Safety management system for monitoring operation of tower crane in real time
CN106081958A (en) * 2016-07-26 2016-11-09 潘燕 A kind of derrick crane on-line monitoring system
CN106006418A (en) * 2016-08-12 2016-10-12 安徽中杰信息科技有限公司 Tower-type crane structure wind-induced fatigue safety protection system
CN106429842A (en) * 2016-09-28 2017-02-22 山东华旗新能源科技有限公司 Safe and intelligent unmanned tower crane system and method
CN106429842B (en) * 2016-09-28 2018-11-20 山东华旗新能源科技有限公司 Safe and intelligent unmanned tower crane system and method
CN106957020A (en) * 2017-05-11 2017-07-18 深圳市柘叶红实业有限公司 Safety of tower crane management system and management method

Similar Documents

Publication Publication Date Title
CN204265280U (en) Total management system is unified in tower machine safety and operation
CN104555740A (en) Safety management system for monitoring operation of tower crane in real time
CN203148460U (en) Iron tower monitoring system
CN211110736U (en) Novel tower crane safety and video monitoring system
CN206620231U (en) One kind visualization production link system
AU2015395790B2 (en) System and method for monitoring motion state of bucket of construction vertical shaft
CN106690632A (en) Intelligent helmet and intelligent helmet system
CN210691346U (en) Automatic identification system based on construction site hidden danger
US10994970B2 (en) Crane risk logic apparatus and system and method for use of same
CN103916638A (en) Coal mine safety comprehensive monitoring platform
CN104555739A (en) Tower crane monitoring system
CN107202569A (en) One kind detection, monitoring railway communication steel tower system
CN206975532U (en) warehouse monitoring system based on wireless GSM
CN207424584U (en) A kind of intelligence hanging basket monitoring system
CN104326360B (en) High pedestal jib crane holographic measuring method
CN110127526B (en) Intelligent early warning system for tower crane
CN204251243U (en) Region tower machine safety integrated management system
CN106657915B (en) Working method of safety data and video integrated monitoring and management system for hoisting machinery
CN205408031U (en) Defeated power transformation and distribution device's intelligent monitoring system
CN113960953A (en) Intelligent construction site application system based on Internet of things technology and use method thereof
CN206181212U (en) Multi -functional security protection control pole setting
CN208054752U (en) A kind of safety of gantry crane monitoring system
CN206427946U (en) Tower crane monitoring system
CN102902256A (en) ZigBee-based safety defending system for inspection workshop staffs
CN214652802U (en) System for recognizing unfair elevator taking behavior of elevator passengers

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

Termination date: 20161119

CF01 Termination of patent right due to non-payment of annual fee