CN204257039U - High-tension switch cabinet operation Practical training equipment - Google Patents

High-tension switch cabinet operation Practical training equipment Download PDF

Info

Publication number
CN204257039U
CN204257039U CN201420702924.1U CN201420702924U CN204257039U CN 204257039 U CN204257039 U CN 204257039U CN 201420702924 U CN201420702924 U CN 201420702924U CN 204257039 U CN204257039 U CN 204257039U
Authority
CN
China
Prior art keywords
switch cabinet
tension switch
detection system
ground rod
electroscope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420702924.1U
Other languages
Chinese (zh)
Inventor
程宝山
李占武
范亮
赵煜
贾灵芝
王栋梁
陈华浦
袁新星
姜辉
张秋实
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN KEDIAO ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Jinzhong Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
WUHAN KEDIAO ELECTRIC POWER TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Jinzhong Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN KEDIAO ELECTRIC POWER TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, Jinzhong Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical WUHAN KEDIAO ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201420702924.1U priority Critical patent/CN204257039U/en
Application granted granted Critical
Publication of CN204257039U publication Critical patent/CN204257039U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model relates to a kind of high-tension switch cabinet operation Practical training equipment, this equipment comprises 10kV high-tension switch cabinet and touch control system, the PLC logic controller that described touch control system comprises touch-screen and is connected with described touch-screen, described touch-screen is located on the front cabinet door of 10kV high-tension switch cabinet, is provided with effect simulation system in described 10kV high-tension switch cabinet; Described 10kV high-tension switch cabinet is connected with insulating glove detection system, electroscope detection system and ground rod; Described alarm lamp, flashlamp, fog machine, insulating glove detection system, electroscope detection system and ground rod are connected with described PLC logic controller respectively.The utility model can not occur security incident, do not increase security risk precondition under, allow employee's maloperation or even pernicious maloperation, the negative pungency punishment of appropriate feedback simultaneously, thus make the harm realizing operation against rules that employee is intuitively vivid, improve the awareness of safety of employee.

Description

High-tension switch cabinet operation Practical training equipment
Technical field
The utility model relates to a kind of training set, is specifically related to a kind of high-tension switch cabinet operation Practical training equipment, for simulating typical fault operating effect when 10kV high-tension switch cabinet runs turn maintenance and overhauls transhipment row.
Background technology
At present in China, the operation of high pressure switch cubicle, debug and undertaken by power supply department, the management of secure context has larger difficulty.Staff of electric power enterprises great majority are passed the lifting that the modes such as band and training realize self-technique and quality by side on post, but this mode of learning lacks the sense of reality, accident expection sense and experience sense, operating personnel are made not have directly perceived, concrete understanding to risk various in switch cubicle operating process, and the consequence to produce various maloperation is also without personal cognition, once enter in actual work, due to the various accidents that misoperation or awareness of safety weakness cause, great Personal Risk and property loss will be caused.
Summary of the invention
The utility model object is to overcome above-mentioned the deficiencies in the prior art and provides a kind of high-tension switch cabinet to operate Practical training equipment, this equipment can allow trainee realize the negative stimulation body sense of faulty operation feedback, thus the harm violating the regulations making student truly realize faulty operation to bring, improve self protection and awareness of safety.
The technical scheme realizing the employing of the utility model object is a kind of high-tension switch cabinet operation Practical training equipment, this equipment comprises 10kV high-tension switch cabinet and touch control system, the PLC logic controller that described touch control system comprises touch-screen and is connected with described touch-screen, described touch-screen is located on the front cabinet door of 10kV high-tension switch cabinet, be provided with effect simulation system in described 10kV high-tension switch cabinet, described effect simulation system comprises alarm lamp, flashlamp, fog machine; Be provided with switch operation mechanism and vacuum circuit breaker in described 10kV high-tension switch cabinet, described 10kV high-tension switch cabinet is connected with insulating glove detection system, electroscope detection system and ground rod; Described alarm lamp, flashlamp, fog machine, insulating glove detection system, electroscope detection system and ground rod are connected with described PLC logic controller respectively.
In technique scheme, described insulating glove detection system comprises three secondary insulating gloves, is respectively a secondary expired insulating glove do not examined, a secondary damaged insulating glove, the insulating glove that a pair is intact; Each gloves inside is provided with sensor, and when using different gloves, sensor can trigger different feedback signal.
In technique scheme, described electroscope detection system comprises the electroscope of damage and qualified electroscope.
In technique scheme, described ground rod detection system comprises ground rod, the ground terminal be connected with this ground rod and for responding to the sensor that described ground rod hangs or removes.
The utility model can not occur security incident, do not increase security risk precondition under, allow employee's maloperation or even pernicious maloperation, negative pungency punishment (sound cigarette effect, photoelectricity etc.) of appropriate feedback simultaneously, thus make the harm realizing operation against rules that employee is intuitively vivid, improve the awareness of safety of employee.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model high-tension switch cabinet operation Practical training equipment.
Fig. 2 is the structural representation of the utility model high-tension switch cabinet operation Practical training equipment.
In figure, 1-10kV high-tension switch cabinet, 2-touch control system, 3-vacuum circuit breaker, 4-audible-visual alarm lamp, 5-flashlamp, 6-switch operation mechanism, 7-fog machine, 8-customizes insulating glove, and 9-customizes electroscope, 10-ground rod.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As depicted in figs. 1 and 2, the utility model high-tension switch cabinet operation Practical training equipment comprises 10kV high-tension switch cabinet 1 and touch control system 2, the PLC logic controller that touch control system 2 comprises touch-screen and is connected with touch-screen, touch-screen is located on the front cabinet door of 10kV high-tension switch cabinet 1.The contacts status that PLC logic controller detects each switching device in high-tension switch cabinet feeds back to touch-screen, realizes the object of real-time display items display state.When single flow process project operation is correct, control system can enter next project automatically, can carry out items selection by touch-screen simultaneously.PLC logic controller is also connected to effect simulation system, insulating glove detection system, electroscope detection system and ground rod detection system.10kV high-tension switch cabinet 1 is also provided with switch operation mechanism 6 and vacuum circuit breaker 3, and this is set to conventional installation, repeats no more herein.
The utility model effect simulation system used comprises audible-visual alarm lamp 4, flashlamp 5 and fog machine 7, when the student that undergoes training carry out operation turn on-load broaching tool lock maloperation in inspection operation time, PLC logic controller controls triggering effect simulation system, show and drive flashlamp 5 to glimmer, there is dense smoke in fog machine 7, audible-visual alarm lamp 4 glimmers and sends harshness, and simultaneously voice broadcast makes a mistake operation, plays correct method of operating.
The utility model insulating glove detection system used forms by customizing insulating glove 8, capacitive transducer etc.The present embodiment arranges three secondary customization insulating gloves 8, be respectively a secondary expired insulating glove do not examined, one secondary damaged insulating glove, one secondary intact insulating glove, the inner sensor installation of every glove, when using different gloves, after the sensor in different insulative gloves detects information, different feedback signal can be triggered.Be sent to PLC logic controller after sensor in width customization insulating glove 8 detects coherent signal, PLC logic controller drives flashlamp 5 to glimmer according to the signal control effects simulation system detected, and audible-visual alarm lamp 4 glimmers and sends harshness.
The utility model electroscope detection system used is customization electroscope 9, comprises the electroscope of damage and qualified electroscope.Customization electroscope 9 is also connected with corresponding induction pick-up, when using customization to damage electroscope, pick-up unit meeting feedback analog effect signal is to PLC logic controller, PLC logic controller drives flashlamp 5 to glimmer according to the signal control effects simulation system detected, there is dense smoke in fog machine 7, audible-visual alarm lamp 4 glimmers and sends harshness.
Also be provided with sound broadcasting device in 10kV high-tension switch cabinet 1, sound broadcasting device can arrange voice messaging according to demand, and sound broadcasting device is connected with PLC logic controller.
The utility model ground rod detection system is by ground rod 10, the ground terminal be connected with ground rod 10 and for responding to the sensor that described ground rod hangs or removes.。Hang after electrical verification completes or remove ground rod order incorrect time, then can the effect simulation system such as trigger flashing lamp and alarm lamp.Correctly then next Item Practice Training is automatically entered into when hanging or remove ground rod order.
To undergo training student's power turn-on master switch as requested, then open front cabinet door upper part, opening control power supply, now touch control system 2 starting up.Switch cubicle switch operation mechanism 6 and vacuum circuit breaker 3 are reverted to the initial position that nursery needs by the student that undergoes training as requested, and the utility model relates to 6 practical training projects, and concrete use procedure is as follows:
(1) Section 1 in touch control system 2 bulleted list is selected, suitable protection tool is dressed according to standard operating procedure, the stage clip of pressure switch operation mechanism 6, to leave behind the disconnector of switch operation mechanism 6, now vacuum circuit breaker 3 is closing position, PLC logic controller triggers audible-visual alarm lamp 4, flashlamp 5 and fog machine 7 action, the short circuit simulate effects such as generation sound, light, cigarette.Next project is then entered according to correct sequential operation.
(2) student that undergoes training wears customization insulating glove 8 according to operation requirements, this Equipments Setting three overlaps customization insulating glove 8, student selects suitable gloves, when selecting expired or damaged customization insulating glove 8, the sensor of gloves inside is by the Signal transmissions of detection to PLC logic controller, and PLC logic controller triggers the sound broadcasting device in 10kV high-tension switch cabinet 1.Next project is then entered according to correct sequential operation.When selecting intact insulating glove, system enters next project automatically.
(3) busbar that student operates customization electroscope 9 pairs of 10kV high-tension switch cabinets 1 carries out electrical verification, when using expired or defective customization electroscope 9, PLC logic controller triggers the sound broadcasting device in audible-visual alarm lamp 4 and 10kV high-tension switch cabinet 1, when using qualified customization electroscope 9, then system enters next project automatically.
(4) busbar in ground rod 10 pairs of 10kV high-tension switch cabinets 1 is selected to hang ground rod, when student hangs ground rod 10 sequence error, sensor in ground rod detection system is by the Signal transmissions of detection to PLC logic controller, and PLC logic controller triggers the sound broadcasting device in audible-visual alarm lamp 4 and 10kV high-tension switch cabinet 1.Then next project is automatically entered when hanging ground rod 10 according to correct order.
(5), when removing ground rod 10 sequence error, the sensor in ground rod detection system is by the Signal transmissions of detection to PLC logic controller, and PLC logic controller triggers the sound broadcasting device in audible-visual alarm lamp 4 and 10kV high-tension switch cabinet 1.Then next project is automatically entered according to during correct orderly release ground rod 10.
(6) select switch operation mechanism 6 grounding knife switch, by lower platen, close earthing.Vacuum circuit breaker 4 in operation 10kV high-tension switch cabinet 1, makes its switch be in a point position, by the stored energy mechanism energy storage of vacuum circuit breaker 4.Student operates the switch knob of 10kV high-tension switch cabinet 1, and now vacuum circuit breaker 4 switch trips after closing a floodgate at once, triggers audible-visual alarm lamp 4, flashlamp 5 and fog machine 7 action, the short circuit simulate effects such as generation sound, light, cigarette simultaneously.First project is then automatically transferred to according to correct sequential operation.
Utilize above-mentioned Practical training equipment, simulation 10kV maintenance of high-voltage switch cabinet is on-the-spot, make the danger of student's personal understanding high-tension switch cabinet maloperation, idea careful, conscientious in formation work, grasp correct switch cubicle repair method simultaneously, greatly can reduce because maloperation consciousness is not enough and cause accident odds.
The utility model is described in detail, and provides the design apparatus structure of embodiment.Be interpreted as the foregoing is only specific embodiments of the invention, be not limited to the present invention.This instructions and accompanying drawing should be considered to illustrative implication, instead of restrictive meaning.Within the spirit and principles in the present invention all, any amendment made, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (4)

1. a high-tension switch cabinet operation Practical training equipment, it is characterized in that: comprise 10kV high-tension switch cabinet and touch control system, the PLC logic controller that described touch control system comprises touch-screen and is connected with described touch-screen, described touch-screen is located on the front cabinet door of 10kV high-tension switch cabinet, be provided with effect simulation system in described 10kV high-tension switch cabinet, described effect simulation system comprises alarm lamp, flashlamp, fog machine; Be provided with switch operation mechanism and vacuum circuit breaker in described 10kV high-tension switch cabinet, described 10kV high-tension switch cabinet is connected with insulating glove detection system, electroscope detection system and ground rod detection system; Described effect simulation system, insulating glove detection system, electroscope detection system and ground rod detection system are connected with described PLC logic controller respectively.
2. high-tension switch cabinet operates Practical training equipment according to claim 1, it is characterized in that: described insulating glove detection system comprises three secondary insulating gloves, is respectively a secondary expired insulating glove do not examined, a secondary damaged insulating glove, the insulating glove that a pair is intact; Every glove inside is provided with sensor, and when using different gloves, sensor can trigger different feedback signal.
3. high-tension switch cabinet operates Practical training equipment according to claim 1, it is characterized in that: described electroscope detection system comprises the electroscope of damage and qualified electroscope.
4. high-tension switch cabinet operation Practical training equipment according to claim 1, is characterized in that: described ground rod detection system comprises ground rod, the ground terminal be connected with this ground rod and for responding to the sensor that described ground rod hangs or removes.
CN201420702924.1U 2014-11-20 2014-11-20 High-tension switch cabinet operation Practical training equipment Active CN204257039U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420702924.1U CN204257039U (en) 2014-11-20 2014-11-20 High-tension switch cabinet operation Practical training equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420702924.1U CN204257039U (en) 2014-11-20 2014-11-20 High-tension switch cabinet operation Practical training equipment

Publications (1)

Publication Number Publication Date
CN204257039U true CN204257039U (en) 2015-04-08

Family

ID=52961322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420702924.1U Active CN204257039U (en) 2014-11-20 2014-11-20 High-tension switch cabinet operation Practical training equipment

Country Status (1)

Country Link
CN (1) CN204257039U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105070136A (en) * 2015-08-27 2015-11-18 临汾电力高级技工学校 Switch cabinet maintenance somatosensory system and method based on wireless data communication
CN105243938A (en) * 2015-11-05 2016-01-13 国网福建省电力有限公司 Switch cabinet test system and test method
CN106450963A (en) * 2016-12-07 2017-02-22 上海应用技术大学 Socket short circuit safe experience device
CN106940953A (en) * 2017-04-30 2017-07-11 国网江苏省电力公司职业技能训练基地 A kind of equipment for simulating powered pull and grounding disconnecting link
CN112562439A (en) * 2020-12-07 2021-03-26 国家电网有限公司华东分部 Electric power safety tool real object virtualization device
CN114373370A (en) * 2022-02-11 2022-04-19 国网江苏省电力有限公司技能培训中心 Electricity testing simulation device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105070136A (en) * 2015-08-27 2015-11-18 临汾电力高级技工学校 Switch cabinet maintenance somatosensory system and method based on wireless data communication
CN105243938A (en) * 2015-11-05 2016-01-13 国网福建省电力有限公司 Switch cabinet test system and test method
CN106450963A (en) * 2016-12-07 2017-02-22 上海应用技术大学 Socket short circuit safe experience device
CN106940953A (en) * 2017-04-30 2017-07-11 国网江苏省电力公司职业技能训练基地 A kind of equipment for simulating powered pull and grounding disconnecting link
CN112562439A (en) * 2020-12-07 2021-03-26 国家电网有限公司华东分部 Electric power safety tool real object virtualization device
CN114373370A (en) * 2022-02-11 2022-04-19 国网江苏省电力有限公司技能培训中心 Electricity testing simulation device

Similar Documents

Publication Publication Date Title
CN204257039U (en) High-tension switch cabinet operation Practical training equipment
CN202632491U (en) Live-line cabinet door mis-open voice alarm device
CN102364352B (en) Laser detection display for judging actual position of power knife switch
CN107833510A (en) 110kV power transformations interval body sense Practical training equipment and practical training method
CN204557890U (en) Flash burn body sense actual training device
CN105654821A (en) Fault simulation apparatus for electrical control system of transformer equipment
CN103792451A (en) Detection circuit and instrument for relay protective device protective outlet loop
CN204257085U (en) Converting equipment electric control system failure simulation device
CN205318662U (en) Electrician instructs switching operation examination analogue means in fact
CN104198926A (en) Anti-trip loop test device for breaker and control method thereof
CN207781032U (en) 110kV power transformation interval body sense Practical training equipments
CN209947134U (en) Simulation training platform for secondary control loop of medium-voltage switch cabinet
CN204348126U (en) A kind of KYN switch cubicle maintenance body sense equipment
CN203422430U (en) Transformer acceptance impact switching-on remote control security tester
CN205302776U (en) Reverse experience device of step voltage
CN205983758U (en) Ground wire suggestion device
CN204360669U (en) Switch cubicle simulated experiment control device
CN203673691U (en) Substation training device based on PLC control
CN210402779U (en) KYN training cabinet
CN209056099U (en) Line combined floodgate power transmission body-sensing device with ground
CN208861555U (en) Live connection of ground wire body-sensing device
CN203871927U (en) Breaker remote operation function monitoring device
CN202512749U (en) Training system for operating skill of debugging guest room illumination of high-speed motor train unit
CN205091986U (en) Cubical switchboard testing system
CN202871017U (en) Ground wire managing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant