CN106940953A - A kind of equipment for simulating powered pull and grounding disconnecting link - Google Patents
A kind of equipment for simulating powered pull and grounding disconnecting link Download PDFInfo
- Publication number
- CN106940953A CN106940953A CN201710298183.3A CN201710298183A CN106940953A CN 106940953 A CN106940953 A CN 106940953A CN 201710298183 A CN201710298183 A CN 201710298183A CN 106940953 A CN106940953 A CN 106940953A
- Authority
- CN
- China
- Prior art keywords
- cement pole
- disconnecting link
- grounding
- audio amplifier
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B23/00—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
- G09B23/06—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics
- G09B23/18—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism
- G09B23/188—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism for motors; for generators; for power supplies; for power distribution
Landscapes
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Mathematical Analysis (AREA)
- Computational Mathematics (AREA)
- Algebra (AREA)
- Power Engineering (AREA)
- Mathematical Optimization (AREA)
- Mathematical Physics (AREA)
- Pure & Applied Mathematics (AREA)
- Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to safety in production field, specifically related to a kind of equipment for simulating powered pull and grounding disconnecting link, including cement pole, cement pole bottom is provided with foot-operated, it is foot-operated to be fixed on by fixing bolt on cement pole, it is foot-operated to be provided with pressure sensor, cement pole side is fixed with display screen, alarm lamp and the collar, the collar is provided with safety belt, the collar is fixedly arranged above mounting bracket on cement pole, mounting bracket is provided with voltage transformer and audio amplifier, mounting bracket is fixedly arranged above cross-arm on cement pole, cross-arm is provided with grounding switch, lightning rod is provided with the top of cement pole, controller is additionally provided with cement pole, the power line of audio amplifier passes through grounding switch;Technical scheme provided by the present invention can effectively overcome the student that undergoes training of can not make present in prior art to realize the defect of powered pull and grounding disconnecting link harm directly perceived, vividly.
Description
Technical field
The present invention relates to safety in production field, and in particular to a kind of equipment of the powered pull and grounding disconnecting link of simulation.
Background technology
As electric network composition is increasingly sophisticated, the security risk of power network seems more prominent.Traditional electric power safety theory training
Instruction, worker can not realize the harm of powered pull and grounding disconnecting link directly perceived, vividly, can not more perceive by powered pull and grounding knife
The danger and serious consequence of security incident caused by lock, lack the sense of reality and expected sense, thus can not effectively lift worker couple
The perceptual knowledge for importance of keeping the safety in production.
Therefore, it is necessary to which on the premise of ensuring to occur security incident, effectively lifting undergoes training student to safety in production
Perceptual knowledge.The powered pull and grounding disconnecting link error being likely to occur for staff of electric power enterprises in practical operation, can be adopted
With the form of in-site modeling, the student that makes to undergo training realizes violation operation institute more directly perceived during undergoing, vividly
The harm brought, further improves awareness of safety, and making to undergo training student's clear understanding may be to human body to powered pull and grounding disconnecting link
The harm that causes and how self-protection, strengthen risk management and control, it is ensured that operation process standardization, standardization, it is ensured that electric power duty
The safety of work and health.
The content of the invention
(1) technical problem solved
For the disadvantages mentioned above present in prior art, setting for powered pull and grounding disconnecting link is simulated the invention provides a kind of
It is standby, it can effectively overcome the student that undergoes training of can not make present in prior art to realize powered pull and grounding knife directly perceived, vividly
The defect of lock harm.
(2) technical scheme
To realize object above, the present invention is achieved by the following technical programs:
A kind of equipment for simulating powered pull and grounding disconnecting link, including cement pole, the cement pole bottom are described provided with foot-operated
Foot-operated to be fixed on by fixing bolt on cement pole, described foot-operated provided with pressure sensor, the cement pole side is fixed with
Display screen, alarm lamp and the collar, the collar are provided with the collar on safety belt, the cement pole and are fixedly arranged above mounting bracket, institute
Mounting bracket is stated provided with voltage transformer and audio amplifier, mounting bracket, which is fixedly arranged above on cross-arm, the cross-arm, on the cement pole sets
Have to be provided with lightning rod, the cement pole at the top of grounding switch, the cement pole and be additionally provided with controller, the power line of the audio amplifier
By grounding switch.
Preferably, the pressure sensor, be respectively arranged with wireless communication module in controller.
Preferably, the display screen is connected by video line with controller.
Preferably, the alarm lamp is connected by wire with controller.
Preferably, the audio amplifier is USB flash disk audio amplifier.
(3) beneficial effect
Compared with prior art, a kind of equipment for simulating powered pull and grounding disconnecting link provided by the present invention, it is had
The power line of audio amplifier pass through grounding switch, when trainee simulates powered pull and grounding disconnecting link, equivalent to connecting audio amplifier
Power line, audio amplifier can send explosive sound, so as to simulate the situation after powered pull and grounding disconnecting link, make trainee more straight
See, vivid the harm for realizing powered pull and grounding disconnecting link, effectively perceptual knowledge of the lifting trainee to safety in production;Peace
Full band can form effective protection with foot-operated to trainee, it is to avoid trainee is injured because falling;Undergone training when riding
When student receives simulated training, display screen and alarm lamp can be reminded, and prevent that other students that undergo training are close, it is to avoid be occurred not
Necessary security incident.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described.It should be evident that drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is schematic structural view of the invention;
In figure:
1st, cement pole;2nd, ride;3rd, fixing bolt;4th, pressure sensor;5th, controller;6th, display screen;7th, the collar;8th, report
Warning lamp;9th, safety belt;10th, mounting bracket;11st, voltage transformer;12nd, audio amplifier;13rd, cross-arm;14th, grounding switch;15th, lightning rod.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is
A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art
The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
A kind of equipment for simulating powered pull and grounding disconnecting link, as shown in figure 1, including cement pole 1, the bottom of cement pole 1 is provided with
Foot-operated 2, foot-operated 2 are fixed on cement pole 1 by fixing bolt 3, are ridden 2 and are provided with pressure sensor 4, cement pole 1 is solid sideways
Surely there are display screen 6, alarm lamp 8 and the collar 7, the collar 7 is provided with the collar 7 on safety belt 9, cement pole 1 and is fixedly arranged above mounting bracket
10, mounting bracket 10 is provided with mounting bracket 10 on voltage transformer 11 and audio amplifier 12, cement pole 1 and is fixedly arranged above cross-arm 13, cross-arm
13 are provided with grounding switch 14, and the top of cement pole 1 is provided with lightning rod 15, cement pole 1 and is additionally provided with controller 5, the electricity of audio amplifier 12
Source line passes through grounding switch 14.
Wireless communication module is respectively arranged with pressure sensor 4, controller 5, display screen 6 passes through video line and the phase of controller 5
Even, alarm lamp 8 is connected by wire with controller 5, and audio amplifier 12 is USB flash disk audio amplifier.
In use, allowing trainee station on foot-operated 2, and trainee is fixed with safety belt 9, safety belt 9 and pin
Effective protection can be formed to trainee by stepping on 2, it is to avoid trainee is injured because falling.Because the power line of audio amplifier 12 passes through
Grounding switch 14, therefore when trainee simulates powered pull and grounding disconnecting link 14, equivalent to the power line for connecting audio amplifier 12, sound
Case 12 can send explosive sound, so as to simulate the situation after powered pull and grounding disconnecting link 14, make trainee more directly perceived, true
Realize the harm of powered pull and grounding disconnecting link 14 with cutting, effectively perceptual knowledge of the lifting trainee to safety in production.Can thing
First in the memory storage explosive sound of USB flash disk audio amplifier 12, so that audio amplifier 12 can send explosive sound after the line that switches on power.
The student station that has been capable of detecting whether to undergo training of pressure sensor 4 receives simulated training on foot-operated 2, and passes through channel radio
Letter module sends the data to controller 5.Undergone training on foot-operated 2 student when, controller 5 receives pressure sensor 4 and provided
Data after control alarm lamp 8 enter line flicker prompting, while light display screen 6 carry out roll titles prompting, prevent that other from undergoing training
Student is close to cement pole 1, it is to avoid occur unnecessary security incident.
In addition, the data provided using pressure sensor 4 are controlled to alarm lamp 8 and display screen 6 and belong to control field
Conventional technical means, circuit structure involved by it is also very simple, be circuit field person skilled it is known often
Know, therefore do not add description herein.Controller 5 can realize aforesaid operations using STM32 chips.
A kind of equipment for simulating powered pull and grounding disconnecting link provided by the present invention, the power line warp of its audio amplifier
Grounding switch is crossed, when trainee simulates powered pull and grounding disconnecting link, equivalent to the power line for connecting audio amplifier, audio amplifier can be sent out
Go out explosive sound, so as to simulate the situation after powered pull and grounding disconnecting link, trainee is realized band more directly perceived, vividly
The harm of electric pull and grounding disconnecting link, effectively perceptual knowledge of the lifting trainee to safety in production;Safety belt and it is foot-operated can be right
Trainee forms effective protection, it is to avoid trainee is injured because falling;Receive simulated training when riding the student that undergoes training
When, display screen and alarm lamp can be reminded, and prevent that other students that undergo training are close, it is to avoid occur unnecessary security incident.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments
The present invention is described in detail, it will be understood by those within the art that:It still can be to foregoing each implementation
Technical scheme described in example is modified, or carries out equivalent to which part technical characteristic;And these modification or
Replace, the essence of appropriate technical solution can't be made to depart from the spirit and scope of various embodiments of the present invention technical scheme.
Claims (5)
1. a kind of equipment for simulating powered pull and grounding disconnecting link, it is characterised in that:Including cement pole (1), cement pole (1) bottom
Portion is provided with foot-operated (2), and foot-operated (2) are fixed on cement pole (1) by fixing bolt (3), and described foot-operated (2) are provided with pressure
Force snesor (4), the cement pole (1) is fixed with display screen (6), alarm lamp (8) and the collar (7), the collar (7) sideways
Provided with safety belt (9), the collar (7) is fixedly arranged above mounting bracket (10) on the cement pole (1), and the mounting bracket (10) is provided with
Mounting bracket (10) is fixedly arranged above cross-arm (13), the cross-arm on voltage transformer (11) and audio amplifier (12), the cement pole (1)
(13) it is provided with to be provided with lightning rod (15), the cement pole (1) at the top of grounding switch (14), the cement pole (1) and is additionally provided with
Controller (5), the power line of the audio amplifier (12) passes through grounding switch (14).
2. the equipment of the powered pull and grounding disconnecting link of simulation according to claim 1, it is characterised in that:The pressure sensor
(4), it is respectively arranged with wireless communication module in controller (5).
3. the equipment of the powered pull and grounding disconnecting link of simulation according to claim 1, it is characterised in that:The display screen (6)
It is connected by video line with controller (5).
4. the equipment of the powered pull and grounding disconnecting link of simulation according to claim 1, it is characterised in that:The alarm lamp (8)
It is connected by wire with controller (5).
5. the equipment of the powered pull and grounding disconnecting link of simulation according to claim 1, it is characterised in that:The audio amplifier (12) is
USB flash disk audio amplifier.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710298183.3A CN106940953A (en) | 2017-04-30 | 2017-04-30 | A kind of equipment for simulating powered pull and grounding disconnecting link |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710298183.3A CN106940953A (en) | 2017-04-30 | 2017-04-30 | A kind of equipment for simulating powered pull and grounding disconnecting link |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106940953A true CN106940953A (en) | 2017-07-11 |
Family
ID=59463425
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710298183.3A Pending CN106940953A (en) | 2017-04-30 | 2017-04-30 | A kind of equipment for simulating powered pull and grounding disconnecting link |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106940953A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110992789A (en) * | 2019-11-19 | 2020-04-10 | 宁海县雁苍山电力建设有限公司 | Live-line replacement tension rod insulator string training device |
CN112002178A (en) * | 2020-09-25 | 2020-11-27 | 中国矿业大学(北京) | Live-line work simulation experiment device and method |
CN114613217A (en) * | 2022-02-28 | 2022-06-10 | 国网江苏省电力有限公司技能培训中心 | Transformer substation main transformer grounding switch accident simulation system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120059102A (en) * | 2010-11-30 | 2012-06-08 | 주식회사 케이티이엔지 | electric power transformation testing apparatus of solar power |
CN103198741A (en) * | 2013-04-19 | 2013-07-10 | 国家电网公司 | Small corner electric pole analog device used for live-working practical training |
CN203673718U (en) * | 2013-10-30 | 2014-06-25 | 贵州电力职业技术学院 | 10kV circuit on-load switch-closing somatosensory apparatus |
CN204257039U (en) * | 2014-11-20 | 2015-04-08 | 国家电网公司 | High-tension switch cabinet operation Practical training equipment |
CN204375300U (en) * | 2015-01-29 | 2015-06-03 | 国网冀北电力有限公司唐山供电公司 | A kind of anti-mis-logical practice device |
CN204557890U (en) * | 2015-03-20 | 2015-08-12 | 武汉科迪奥电力科技有限公司 | Flash burn body sense actual training device |
-
2017
- 2017-04-30 CN CN201710298183.3A patent/CN106940953A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120059102A (en) * | 2010-11-30 | 2012-06-08 | 주식회사 케이티이엔지 | electric power transformation testing apparatus of solar power |
CN103198741A (en) * | 2013-04-19 | 2013-07-10 | 国家电网公司 | Small corner electric pole analog device used for live-working practical training |
CN203673718U (en) * | 2013-10-30 | 2014-06-25 | 贵州电力职业技术学院 | 10kV circuit on-load switch-closing somatosensory apparatus |
CN204257039U (en) * | 2014-11-20 | 2015-04-08 | 国家电网公司 | High-tension switch cabinet operation Practical training equipment |
CN204375300U (en) * | 2015-01-29 | 2015-06-03 | 国网冀北电力有限公司唐山供电公司 | A kind of anti-mis-logical practice device |
CN204557890U (en) * | 2015-03-20 | 2015-08-12 | 武汉科迪奥电力科技有限公司 | Flash burn body sense actual training device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110992789A (en) * | 2019-11-19 | 2020-04-10 | 宁海县雁苍山电力建设有限公司 | Live-line replacement tension rod insulator string training device |
CN112002178A (en) * | 2020-09-25 | 2020-11-27 | 中国矿业大学(北京) | Live-line work simulation experiment device and method |
CN114613217A (en) * | 2022-02-28 | 2022-06-10 | 国网江苏省电力有限公司技能培训中心 | Transformer substation main transformer grounding switch accident simulation system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203552553U (en) | Power line step voltage body sensing device | |
CN106940953A (en) | A kind of equipment for simulating powered pull and grounding disconnecting link | |
CN104158115B (en) | A test device that is used for many rotor unmanned aerial vehicle capability test of transmission line tour | |
CN106910410A (en) | A kind of equipment of simulated altitude pendant thing strike | |
CN104715661A (en) | Step voltage demonstration training system and method | |
CN106952514B (en) | A kind of equipment that simulation substation is operated every hotline maintenance | |
CN204615503U (en) | A kind of prepared auto restart experiment simulator | |
CN106920445A (en) | A kind of equipment of comprehensive simulation electricity harm | |
CN107038921A (en) | A kind of equipment for simulating powered drawing disconnecting switch | |
CN206602344U (en) | It is a kind of to prevent the core-bunched strain clamp of accumulated snow icing | |
CN106920444B (en) | A kind of equipment of analog line single-phase earthing | |
CN203746272U (en) | Radio station simulated training system architecture | |
CN204926448U (en) | Students' dormitory electrical safety monitoring alarm system | |
CN205302776U (en) | Reverse experience device of step voltage | |
CN204597632U (en) | A kind of link-down alarm device based on power network dispatching system | |
CN203117278U (en) | Multi-loop residual current detection circuit | |
CN104091481B (en) | Comprehensive skill training system for secondary equipment of electric system | |
CN110992795A (en) | Multifunctional live working training system | |
CN207380882U (en) | Dewaterer halt alarm device | |
CN205302709U (en) | Device is felt to high altitude perpendicular cat ladder body | |
CN110992789A (en) | Live-line replacement tension rod insulator string training device | |
CN205722641U (en) | A kind of interruption maintenance circuit temporary mark board apparatus | |
CN202871177U (en) | Automated screen reverse experiencing system | |
CN205428114U (en) | High pressure power transmission and transformation conflagration early warning system | |
CN205050400U (en) | Cubical switchboard overhauls body sense system based on wireless data communication |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170711 |
|
RJ01 | Rejection of invention patent application after publication |