CN204256421U - A kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant - Google Patents

A kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant Download PDF

Info

Publication number
CN204256421U
CN204256421U CN201420681499.2U CN201420681499U CN204256421U CN 204256421 U CN204256421 U CN 204256421U CN 201420681499 U CN201420681499 U CN 201420681499U CN 204256421 U CN204256421 U CN 204256421U
Authority
CN
China
Prior art keywords
test
supervisory
resistance
control system
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420681499.2U
Other languages
Chinese (zh)
Inventor
邹桂丽
魏加富
王辉斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, State Grid Hunan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420681499.2U priority Critical patent/CN204256421U/en
Application granted granted Critical
Publication of CN204256421U publication Critical patent/CN204256421U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model discloses a kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant, the front end processor exported by responsible data acquisition and control and responsible data analysis and the control analysis machine sending steering order form; Front end processor and analytical engine communicate to connect; Front end processor comprises master control borad and signal conditioning circuit; Master control borad is based on the data acquisition of dsp controller, control and real time processing system.This condition monitoring system being used for Supervisory Computer Control System For Hydroelectic Power Plant is easy to implement, can realize multinomial test and monitoring function.

Description

A kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant
Technical field
The utility model relates to a kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant.
Background technology
Supervisory Computer Control System For Hydroelectic Power Plant is Hydropower Equipment control core, is the key equipment that hydroelectric power plant realizes source net cooperation control.Along with the deep and requirement of electrical network to source, the hydroelectric power plant net coordination ability that be unattended, few man on duty work is more and more higher, the importance of Supervisory Computer Control System For Hydroelectic Power Plant is more and more obvious.Once Supervisory Computer Control System For Hydroelectic Power Plant fault will have a strong impact on Hydropower Equipment safety even threaten power grid security.
Also there is no the special system integrating test analysis for Supervisory Computer Control System For Hydroelectic Power Plant exploitation at present.Prior art cannot complete the test of Temperature Quantity protective loop; The test of switching value and analog quantity protective loop also only has peer machine to have this additional function; SOE resolution test generally uses independent switching value lane testing instrument to complete test, and number of channels is few, inconvenient operation, and the program that can not realize exports.
Therefore, Supervisory Computer Control System For Hydroelectic Power Plant test analysis must being carried out for ensureing that Supervisory Computer Control System For Hydroelectic Power Plant is in good condition, providing basic data for realizing Supervisory Computer Control System For Hydroelectic Power Plant state evaluation.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant, and this condition monitoring system being used for Supervisory Computer Control System For Hydroelectic Power Plant is easy to implement, can realize multinomial test and monitoring function.
The technical solution of utility model is as follows:
For a condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant, the front end processor exported by responsible data acquisition and control and responsible data analysis and the control analysis machine sending steering order form; Front end processor and analytical engine communicate to connect;
Front end processor comprises master control borad and signal conditioning circuit;
Master control borad is based on the data acquisition of dsp controller, control and real time processing system;
Signal conditioning circuit is configured with:
(1) 32 tunnel is high-speed light disconnector amount output channel independently, adopts paster installing type high-speed small-size 4 footlights manifold type MOSFET relay; Most multipotency exports 32 way switch amounts simultaneously, for SOE resolution test and the test of switching value protective loop;
(2) 4 tunnels independently resistance output channel; (4 resistance output channels)
Resistance output channel is 4 identical, mutually isolated, to be made up of resistance programmed control relay convert resistance networks; Each resistance output channel comprises N number of resistance be connected in series successively and the corresponding N number of relay controlling this N number of resistance; N >=2; 2 ends that N number of resistance be connected in series successively is formed are 2 leading-out terminals of resistance output channel; DSP on master control borad controls each relay by latching with driving circuit (prior art); When the some actuating of relay, then corresponding with it resistance is shorted due to the connection of normally opened contact; Otherwise when some relays are failure to actuate, the resistance that this relay is corresponding is linked in this resistance output channel as effective resistance; (resistance output channel here is in fact accurate variable resistor.To realize this function and not by the restriction of service condition, traditional adjustable precision potentiometer can being adopted, also can adopt the weighting resistor structure that relay switches.The former realizes simply, but indicates difficulty and not easily programmed control.It is comparatively large that the latter realizes comparatively difficulty, volume, but accurately can realize the programmed control of resistance.Consider the convenience of user, that adopt in the present case is latter solution.The controlled range of resistance is 0 ~ 255.5 Europe, and controlled step-length is 0.5 Europe.) resistance output channel be used for the accuracy of verify calculation crane monitoring system thermometric passage and the test of Temperature Quantity protective loop; [resistance here adopts precision resistance, and precision is 0.5 Europe]
[specific works process is: first, original thermometric process realizes based on the corresponding relation of thermistor and temperature, the current signal that first computer supervisory control system collects the resistance bridge output including thermistor is scaled temperature value again, and in condition monitoring system of the present utility model, aforesaid current signal is introduced through come by the resistance output channel of here, realize the detection to this electric current, with the accuracy of the thermometric passage of verification computation crane monitoring system; In fact each resistance output channel is just equivalent to the adjustable measuring resistance of a resistance]
(3) 4 tunnels are light disconnector amount input channel independently: adopt Light Coupled Device (6N136 or 6N137) as its input stage; On-off signal passage is used for the on-off model at scene to introduce detecting and analysing system, for switching value protective loop and supervisory system power adjustments performance, supervisory system function and performance test analysis;
(4) 4 tunnels are 4 ~ 20mA electromagnetic isolation formula analog current signal output channel independently: adopt integrated magnetoelectric isolated form module; Current output channels exports 4 tunnel 4 ~ 20mA signals, for analog quantity channel detection, the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments;
(5) 1 tunnel 0 ~ 10V electromagnetic isolation formula analog voltage signal output channels: adopt integrated magnetoelectric isolated form module and power operational amplifier; The voltage signal exported is used for supervisory system function and the performance test analysises such as analog quantity channel detection, the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments;
(6) 4 tunnels are 4 ~ 20mA electromagnetic isolation formula analog current signal input channel independently, adopts the accurate module of integrated magnetoelectric isolated form.The current input signal of on-the-spot 4 ~ 20mA is introduced detecting and analysing system, for the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments by analog current input channel;
(7) 2 tunnels are 0 ~ 10V electromagnetic isolation formula analog voltage signal input channel independently, adopts integrated magnetoelectric isolated form module; The voltage input signal of on-the-spot 0 ~ 10V is introduced detecting and analysing system, for the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments by analog voltage input channel;
The temperature survey input channel of (8) 4 tunnels independently PT100 three-wire system electromagnetic isolation formula, adopts integrated magnetoelectric isolated form precision temperature measurement module, for realizing the temperature survey based on PT100 resistance temperature element; On-the-spot PT100 resistance signal is introduced detecting and analysing system, for test analysis computer supervisory control system thermometric channel performance by temperature survey input channel;
(9) 2 tunnels are isolated frequency signal output channel independently, 0.03 ~ 100Hz; Rate-adaptive pacemaker passage capable of being is used as frequency generator;
(10) 2 tunnels are isolated frequency signal input channel independently, 0.03 ~ 100Hz; Frequency input channel is used for measuring machine class frequency;
(11) 1 road sign accurate Ethernet 100M network interface, for connection control analytical engine or computer network.
Front end processor is connected by LAN (Local Area Network) or Internet with analytical engine.
Dsp controller adopts TMS320F28335 chip.
Master control borad is integrated with hardware protocol stacks W5300.
The Standard resistance range of each road resistance output channel is 0 ~ 255.5 ohm.
The utility model achieves the networking of measurement, instrument [i.e. front end processor] is positioned over the optional position on LAN (Local Area Network) or Internet, can completes required test and artificial tasks; That is, the communication distance of front end processor and analytical engine is unrestricted, as long as centre has LAN (Local Area Network) or Internet to connect.
Utilize this system can build hydroelectric power plant's computer monitoring professional training and contest emulation testing analysis platform.
All appts input, output signal are all connected with front end processor by the standard aviation plug of 10 mm dias.IO channel is connected by plug, but front end processor is connected by TCP/IP port with control analysis machine.
The described condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant has multichannel independently high-speed light disconnector amount output channel, bi-directional MOS FET electronic switch, can carry out the function of test analysis to multiple SOE module resolution simultaneously.Comprise the following steps: step 1: intelligent test analytic system front end processor multi-way switching values output channel being connected with SOE module input signal builds test analysis platform; Step 2: detect after meeting test condition, the parameters such as SOE trigger interval, trigger sequence are set at control analysis machine; Step 3: assign at control analysis machine and start to carry out SOE test instruction, records the SOE signal triggered time Supervisory Computer Control System For Hydroelectic Power Plant engineer station and sequentially draws test result; Step 4: arrange on control analysis machine and reduce SOE trigger interval or change trigger sequence, repeat step 2, until the Supervisory Computer Control System For Hydroelectic Power Plant unresolvable time interval only; Step 5: draw test result according to test result.Minimum interval 0.1mS; Delay time set-up mode: independent or interlock is arranged; The way of output: all passages simultaneously or time delay.
The described condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant possesses Supervisory Computer Control System For Hydroelectic Power Plant workstation picture refreshing time test analytic function.Output channel set-up mode: independent or interlock is arranged; The way of output: step, slope; Working method: single or circulation.
The described condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant possesses Supervisory Computer Control System For Hydroelectic Power Plant switching value protective loop response time test analysis function.
The described condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant possesses Supervisory Computer Control System For Hydroelectic Power Plant analog quantity protective loop response time and analog quantity channel check test and analog quantity record, storage, index analysis, backward read and real-time curve display analysis function.
The described condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant possesses Supervisory Computer Control System For Hydroelectic Power Plant Temperature Quantity protective loop response time and Temperature Quantity passage check test and analog quantity record, storage, index analysis, backward read and real-time curve display analysis function.
The utility model is by integral for the whole Item Sets needed for Supervisory Computer Control System For Hydroelectic Power Plant function and performance test, and all test events all can complete automatically, easy and simple to handle.
Test is generally carry out before computer supervisory control system puts into operation or after maintenance; other tests except supervisory system power adjustments performance test all should be carried out under unit is in stopped status; and test macro is only responsible for record ripple and analyzes during power adjustments performance test system, there is not potential safety hazard.
Although native system have employed DSP; but realize technique effect of the present utility model and do not rely on method and program; and just make use of the function of DSP device configuration itself; key improvements of the present utility model is the setting of peripheral circuit; the resistance via etc. of such as independently tape relay; therefore, condition monitoring system of the present utility model is the object of utility model protection.
Beneficial effect:
Condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant of the present utility model, integrate the several functions needed for the test of Supervisory Computer Control System For Hydroelectic Power Plant state evaluation, system is by being responsible for front end processor that data acquisition and control exports and responsible data analysis and the control analysis machine that sends steering order forms, the Supervisory Computer Control System For Hydroelectic Power Plant SOE module response time can be realized, the workstation picture refreshing time, the switching value protective loop response time, control command response time and execution time, analog quantity protective loop response time and analog quantity channel verification, the various functions test analysis needed for Supervisory Computer Control System For Hydroelectic Power Plant state evaluation such as Temperature Quantity protective loop response time and the verification of Temperature Quantity passage.The utility model is made up of front end processor and control analysis machine, front end processor receives the order of control analysis machine, perform real-time data acquisition and control output and switching value displacement and flutter tasks such as catching, and the information collected and necessary analysis processing result are sent to control analysis machine by LAN (Local Area Network) and ICP/IP protocol.Control analysis machine obtains the real time data of each input channel on the one hand from front end processor by communication interface, the setting command etc. of data acquisition command, switching value action command and analog quantity needed for sending to front end processor on the other hand.The Supervisory Computer Control System For Hydroelectic Power Plant state evaluation detecting and analysing system energy full test that the utility model provides evaluates computer supervisory control system running status, guarantees Supervisory Computer Control System For Hydroelectic Power Plant safe and stable operation.Utilize this system also can build hydroelectric power plant's computer monitoring professional training and contest emulation testing analysis platform, realize the emulation training to the senior maintainer in hydroelectric power plant and test.
The utility model has been filled up and set of system can not be utilized at present to complete the blank of test analysis to Supervisory Computer Control System For Hydroelectic Power Plant state evaluation, and the utility model has been successfully applied to state evaluation test analysis and hydroelectric power plant's computer monitoring specialty match among the masters emulation testing analysis of multiple Large Hydropower Plant computer supervisory control system.
Accompanying drawing explanation
Fig. 1 is the general structure block diagram of the condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant;
Fig. 2 is the front end processor theory diagram based on TMS320F28335 master control borad;
Fig. 3 is analog input channel structural principle schematic diagram;
Fig. 4 is analog output channel structural principle schematic diagram;
Fig. 5 is Temperature Quantity input channel structural principle schematic diagram;
Fig. 6 is switching value protective loop response time test wiring schematic diagram;
Fig. 7 is analog quantity protective loop response time test wiring schematic diagram;
Fig. 8 is Temperature Quantity protective loop response time test wiring schematic diagram;
Fig. 9 is workstation picture refreshing time test wiring schematic diagram;
Figure 10 is the schematic diagram that resistance output channel is connected with motherboard.
Embodiment
Below with reference to the drawings and specific embodiments, the utility model is described in further details:
Embodiment 1:
As Fig. 1-10, a kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant, the front end processor exported by responsible data acquisition and control and responsible data analysis and the control analysis machine sending steering order form; Front end processor and analytical engine communicate to connect;
Front end processor comprises master control borad and signal conditioning circuit;
Master control borad is based on the data acquisition of dsp controller, control and real time processing system;
Signal conditioning circuit is configured with:
(1) 32 tunnel is high-speed light disconnector amount output channel independently, adopts paster installing type high-speed small-size 4 footlights manifold type MOSFET relay; Most multipotency exports 32 way switch amounts simultaneously, for SOE resolution test and the test of switching value protective loop;
(2) 4 tunnels independently resistance output channel; (4 resistance output channels)
Resistance output channel is 4 identical, mutually isolated, to be made up of resistance programmed control relay convert resistance networks; Each resistance output channel comprises N number of resistance be connected in series successively and the corresponding N number of relay controlling this N number of resistance; N >=2; 2 ends that N number of resistance be connected in series successively is formed are 2 leading-out terminals of resistance output channel; DSP on master control borad controls each relay by latching with driving circuit (prior art); When the some actuating of relay, then corresponding with it resistance is shorted due to the connection of normally opened contact; Otherwise when some relays are failure to actuate, the resistance that this relay is corresponding is linked in this resistance output channel as effective resistance; (resistance output channel here is in fact accurate variable resistor.To realize this function and not by the restriction of service condition, traditional adjustable precision potentiometer can being adopted, also can adopt the weighting resistor structure that relay switches.The former realizes simply, but indicates difficulty and not easily programmed control.It is comparatively large that the latter realizes comparatively difficulty, volume, but accurately can realize the programmed control of resistance.Consider the convenience of user, that adopt in the present case is latter solution.The controlled range of resistance is 0 ~ 255.5 Europe, and controlled step-length is 0.5 Europe.) resistance output channel be used for the accuracy of verify calculation crane monitoring system thermometric passage and the test of Temperature Quantity protective loop; [resistance here adopts precision resistance, and precision is 0.5 Europe]
[specific works process is: first, original thermometric process realizes based on the corresponding relation of thermistor and temperature, the current signal that first computer supervisory control system collects the resistance bridge output including thermistor is scaled temperature value again, and in condition monitoring system of the present utility model, aforesaid current signal is introduced through come by the resistance output channel of here, realize the detection to this electric current, with the accuracy of the thermometric passage of verification computation crane monitoring system; In fact each resistance output channel is just equivalent to the adjustable measuring resistance of a resistance]
(3) 4 tunnels are light disconnector amount input channel independently: adopt Light Coupled Device (6N136 or 6N137) as its input stage; On-off signal passage is used for the on-off model at scene to introduce detecting and analysing system, for switching value protective loop and supervisory system power adjustments performance, supervisory system function and performance test analysis;
(4) 4 tunnels are 4 ~ 20mA electromagnetic isolation formula analog current signal output channel independently: adopt integrated magnetoelectric isolated form module; Current output channels exports 4 tunnel 4 ~ 20mA signals, for analog quantity channel detection, the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments;
(5) 1 tunnel 0 ~ 10V electromagnetic isolation formula analog voltage signal output channels: adopt integrated magnetoelectric isolated form module and power operational amplifier; The voltage signal exported is used for supervisory system function and the performance test analysises such as analog quantity channel detection, the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments;
(6) 4 tunnels are 4 ~ 20mA electromagnetic isolation formula analog current signal input channel independently, adopts the accurate module of integrated magnetoelectric isolated form.The current input signal of on-the-spot 4 ~ 20mA is introduced detecting and analysing system, for the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments by analog current input channel;
(7) 2 tunnels are 0 ~ 10V electromagnetic isolation formula analog voltage signal input channel independently, adopts integrated magnetoelectric isolated form module; The voltage input signal of on-the-spot 0 ~ 10V is introduced detecting and analysing system, for the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments by analog voltage input channel;
The temperature survey input channel of (8) 4 tunnels independently PT100 three-wire system electromagnetic isolation formula, adopts integrated magnetoelectric isolated form precision temperature measurement module, for realizing the temperature survey based on PT100 resistance temperature element; On-the-spot PT100 resistance signal is introduced detecting and analysing system, for test analysis computer supervisory control system thermometric channel performance by temperature survey input channel;
(9) 2 tunnels are isolated frequency signal output channel independently, 0.03 ~ 100Hz; Rate-adaptive pacemaker passage capable of being is used as frequency generator;
(10) 2 tunnels are isolated frequency signal input channel independently, 0.03 ~ 100Hz; Frequency input channel is used for measuring machine class frequency;
(11) 1 road sign accurate Ethernet 100M network interface, for connection control analytical engine or computer network.
Front end processor is connected by LAN (Local Area Network) or Internet with analytical engine.
Dsp controller adopts TMS320F28335 chip.
Master control borad is integrated with hardware protocol stacks W5300.
The Standard resistance range of each road resistance output channel is 0 ~ 255.5 ohm.
Aforesaid condition monitoring system is adopted to implement status monitoring; Comprise following status monitoring project:
(1) SOE resolution test: the switching value time sequential pulse being sent controllable precise by output switch parameter passage, implements the test to monitoring system events ordinal response temporal resolution; Detecting and analysing system triggers SOE module by setting order and setting-up time intervening sequences output multi-channel (maximum 32 tunnels) on-off model, recorded by comparison supervisory system SOE and the order of detecting and analysing system outputting standard signal and the difference in the time interval, whether checking supervisory system SOE records accurate; Progressively reduce the detecting and analysing system output signal time interval (minimum 0.1 millisecond), until supervisory system accurately can not differentiate (the signal that tester sends, for the same, the time that supervisory system shows then judges that supervisory system can not be differentiated, the signal sent as tester is separated by 1 millisecond, and the data display time that supervisory system collects is identical, then judge that supervisory system can not reach the resolution of 1 millisecond), the minimum interval that supervisory system can accurately be differentiated is supervisory system SOE resolution; (abbreviation of SOE:sequence ofevent: the record referring to critical event and generation moment and sequencing);
(2) switching value protection act test: send controlled switching value assembled pulse by output switch parameter passage, implements to test the logic of supervisory system measuring and protecting/interlock circuit and response time; Detecting and analysing system exports the input channel of one or more switching value to switching value protective loop, trigger switch amount protection act logic, detecting and analysing system On-off signal passage is introduced in switching value protective loop action outlet, the mistiming of the saltus step of detecting and analysing system output switch parameter and On-off signal saltus step is the switching value protective loop response time, and whether energy check valve amount relay protective scheme is correct simultaneously;
(3) analog quantity protection act test: the analog quantity being sent controlled step amplitude by analog output channel, implements to test the logic of supervisory system analog quantity protective loop and response time; Detecting and analysing system exports the input channel of one or more analog quantity to analog quantity protective loop; trigger mode analog quantity protection act logic; detecting and analysing system On-off signal passage is introduced in analog quantity protective loop action outlet; whether the mistiming of the change of detecting and analysing system analog output and On-off signal saltus step is the analog quantity protective loop response time, analog quantity relay protective scheme can be checked correct simultaneously.
(4) Temperature Quantity protection act test: by sending the Temperature Quantity (PT100 resistance value) of controlled step amplitude, implements to test the logic of supervisory system Temperature Quantity protective loop and response time; Detecting and analysing system exports the input channel of one or more Temperature Quantity to Temperature Quantity protective loop, trigger temperatures amount protection act logic, detecting and analysing system On-off signal passage is introduced in Temperature Quantity protective loop action outlet, whether the mistiming of detecting and analysing system Temperature Quantity exporting change and On-off signal saltus step is the Temperature Quantity protective loop response time, temperature protection logic can be checked correct simultaneously;
(5) workstation picture refreshing test: send controlled step amplitude and the analog signals in the time interval by analog output channel, the test function to the supervisory system workstation picture refreshing time is provided; The picture of a width containing certain analog quantity is recalled at supervisory system workstation, detecting and analysing system one road analog output is caused this analog input channel of supervisory system, detecting and analysing system triggers the saltus step of supervisory system analog quantity, and the mistiming of observing workstation picture refreshing and analog quantity generation saltus step is the workstation picture refreshing time.
Front end processor
Front end processor consists predominantly of signal condition part and master control borad two large divisions (see Fig. 2) part.Wherein signal condition part realizes input, the isolation of output signal and level translation, and master control borad is for realizing the collection of signal, process, control and the communication with host computer.With regard to circuit design, consider the convenience in systemic-function, performance and realization, whole hardware circuit is mainly divided into again master control borad, resistance output board, analog input and output conditioning plate, On-off signal to export conditioning plate and some additional auxiliary circuit boards.
Master control borad
Master control borad is independently based on the high-performance data collection of the up-to-date Floating-point DSP controller TMS320F28335 of American TI Company (Texas Instruments), control and real time processing system.Its structural principle as shown in Figure 2.
This plate is primarily of a following youngster part composition:
TMS320F28335 float-point DSP and peripheral circuit;
Communication interface and auxiliary circuit (main communication chip is TCP/IP hardware protocol stacks W5300, and communication for subsequent use is standard serial RS-232C/MAX3221);
Extend out RAM circuit (256KX16/IS61LV25616AL or 512KX16/IS61LV51216AL);
Extend out D/A translation circuit (12 X 8 tunnels, TLV5630, SPI interface);
Extend out CPLD circuit (XC95144XL-144); CPLD is programmable logic device (PLD), for the programming Control of I/O passage and clock, greatly can be improved the dirigibility of the multiplexing feature of TMX320F28335 chip general digital I/O (I/O) by CPLD programming Control.Such as, can be general digital quantity input conveniently by these pins of configuration, introduce the on-off model of input, or be configured to CAP pin function, introduce the signal needing Measuring Time.
Corresponding power supply.
Different from most of embedded system, the mode of hardware protocol stacks (W5300 in Fig. 2) has been selected in the network communication of system.The great advantage of this mode is the support without the need to the general-purpose operating system, avoids Software Protocol Stack taking cpu resource in the past, and software programming is easier, the construction cycle is shorter, better reliability.
Analog input and output conditioning plate
System is arranged on one piece of circuit board to all analog input signals (comprising the input of PT100 Temperature Quantity) and the conditioning of output signal, is called for short analog input and output conditioning plate.No matter in principle or structurally all passages, all follow modular principle.Passage is inputed or outputed for each, all adopts ripe industrialization module product, to realize Isolation to signal and level conversion, thus ensure under the on-the-spot complex electromagnetic environment of power plant, measure and the accuracy that controls and reliability.Fig. 3, Fig. 4 and Fig. 5 respectively illustrate the theory structure schematic diagram of analog input, analog output and Temperature Quantity input channel.
The main function of conditioning plate comprises:
(1) electrical isolation between signal and front end processor is realized;
(2) isolation between each signalling channel is realized;
(3) different input signals is converted to 0 ~ 3V voltage signal that is unified, that be adapted to 28335A/D load module;
(4) to signal realization hardware filtering (cutoff frequency is 2KHz) to a certain degree.
(5) 0 ~ 2.408V voltage signal that DA passage exports is isolated and converted satisfactory electric current (4 ~ 20mA) or voltage signal (0 ~ 10V) to.
After analog channel signal adopts above-mentioned hardware handles technology, there is following superiority:
(1) solving sensor or instrument Rig up error or transmission line insulation shielding makes signal introduce the problem of common mode interference not;
(2) solution multiple signals enter same DSP mainboard and interfere with each other problem.Input signal can be connected into single ended mode after conditioning;
(3) all signals that inputs or outputs can be independently connected to external sensor or equipment, without the need to considering common ground problem, overcome distributed collection, the interference of ground circuit that long distance of signal transmission is brought, forceful electric power interference problem, also can avoid the damage that false wiring may cause instrument and equipment;
(4) prevent the signal with strong jamming and dangerous potential from directly entering front end processor.

Claims (4)

1. for a condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant, it is characterized in that, the front end processor exported by responsible data acquisition and control and responsible data analysis and the control analysis machine sending steering order form; Front end processor and analytical engine communicate to connect;
Front end processor comprises master control borad and signal conditioning circuit;
Master control borad is based on the data acquisition of dsp controller, control and real time processing system;
Signal conditioning circuit is configured with:
(1) 32 tunnel is high-speed light disconnector amount output channel independently, adopts paster installing type high-speed small-size 4 footlights manifold type MOSFET relay; Most multipotency exports 32 way switch amounts simultaneously, for SOE resolution test and the test of switching value protective loop;
(2) 4 tunnels independently resistance output channel;
Resistance output channel is 4 identical, mutually isolated, to be made up of resistance programmed control relay convert resistance networks; Each resistance output channel comprises N number of resistance be connected in series successively and the corresponding N number of relay controlling this N number of resistance; N >=2; 2 ends that N number of resistance be connected in series successively is formed are 2 leading-out terminals of resistance output channel; DSP on master control borad controls each relay by latching with driving circuit; When the some actuating of relay, then corresponding with it resistance is shorted due to the connection of normally opened contact; Otherwise when some relays are failure to actuate, the resistance that this relay is corresponding is linked in this resistance output channel as effective resistance; Resistance output channel is used for the accuracy of verify calculation crane monitoring system thermometric passage and the test of Temperature Quantity protective loop;
(3) 4 tunnels are light disconnector amount input channel independently: adopt Light Coupled Device as its input stage; On-off signal passage is used for the on-off model at scene to introduce detecting and analysing system, for switching value protective loop and supervisory system power adjustments performance, supervisory system function and performance test analysis;
(4) 4 tunnels are 4 ~ 20mA electromagnetic isolation formula analog current signal output channel independently: adopt integrated magnetoelectric isolated form module; Current output channels exports 4 tunnel 4 ~ 20mA signals, for analog quantity channel detection, the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments;
(5) 1 tunnel 0 ~ 10V electromagnetic isolation formula analog voltage signal output channels: adopt integrated magnetoelectric isolated form module and power operational amplifier; The voltage signal exported is used for supervisory system function and the performance test analysises such as analog quantity channel detection, the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments;
(6) 4 tunnels are 4 ~ 20mA electromagnetic isolation formula analog current signal input channel independently, adopts the accurate module of integrated magnetoelectric isolated form.The current input signal of on-the-spot 4 ~ 20mA is introduced detecting and analysing system, for the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments by analog current input channel;
(7) 2 tunnels are 0 ~ 10V electromagnetic isolation formula analog voltage signal input channel independently, adopts integrated magnetoelectric isolated form module; The voltage input signal of on-the-spot 0 ~ 10V is introduced detecting and analysing system, for the test of analog quantity protective loop, computer supervisory control system picture refreshing time test, the performance test of supervisory system power adjustments by analog voltage input channel;
The temperature survey input channel of (8) 4 tunnels independently PT100 three-wire system electromagnetic isolation formula, adopts integrated magnetoelectric isolated form precision temperature measurement module, for realizing the temperature survey based on PT100 resistance temperature element; On-the-spot PT100 resistance signal is introduced detecting and analysing system, for test analysis computer supervisory control system thermometric channel performance by temperature survey input channel;
(9) 2 tunnels are isolated frequency signal output channel independently, 0.03 ~ 100Hz; Rate-adaptive pacemaker passage capable of being is used as frequency generator;
(10) 2 tunnels are isolated frequency signal input channel independently, 0.03 ~ 100Hz; Frequency input channel is used for measuring machine class frequency;
(11) 1 road sign accurate Ethernet 100M network interface, for connection control analytical engine or computer network.
2. the condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant according to claim 1, is characterized in that, front end processor is connected by LAN (Local Area Network) or Internet with analytical engine.
3. the condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant according to claim 2, is characterized in that, dsp controller adopts TMS320F28335 chip.
4. the condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant according to any one of claim 1-3, is characterized in that, master control borad is integrated with hardware protocol stacks W5300.
CN201420681499.2U 2014-11-10 2014-11-10 A kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant Withdrawn - After Issue CN204256421U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420681499.2U CN204256421U (en) 2014-11-10 2014-11-10 A kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420681499.2U CN204256421U (en) 2014-11-10 2014-11-10 A kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant

Publications (1)

Publication Number Publication Date
CN204256421U true CN204256421U (en) 2015-04-08

Family

ID=52960708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420681499.2U Withdrawn - After Issue CN204256421U (en) 2014-11-10 2014-11-10 A kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant

Country Status (1)

Country Link
CN (1) CN204256421U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104391501A (en) * 2014-11-10 2015-03-04 国家电网公司 State monitoring system and method for computer monitoring system of hydraulic power plant

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104391501A (en) * 2014-11-10 2015-03-04 国家电网公司 State monitoring system and method for computer monitoring system of hydraulic power plant

Similar Documents

Publication Publication Date Title
CN104391501A (en) State monitoring system and method for computer monitoring system of hydraulic power plant
CN105785199B (en) Multifunctional ligand electric terminals integrated test system and its working method
CN103414251B (en) A kind of substation network communication analogue system based on IEC61850
CN101403777B (en) Resistive current tester for great current zinc oxide lightning arrester
CN102072996B (en) System for realizing automatic digital protection and closed loop moving die test
CN102332709B (en) Equivalent high-voltage direct-current transmission direct-current protection digital simulation method and system
CN103019940B (en) A kind of electric energy meter embedded software half simulation testing device
CN103869190A (en) Real time simulation system-based power distribution terminal automatic closed-loop test platform
CN106970276A (en) Relay protection device of intelligent substation intelligent test system and its method of testing
CN104007978B (en) A kind of secondary equipment of intelligent converting station logical simulation system
CN103235277B (en) The integrated debugging apparatus of Intelligent transformer station capacitive apparatus on-line monitoring system
CN103018664A (en) Equipment for monitoring switching-off and on time of high-voltage circuit breaker on line
CN110008647A (en) The twin simulator of number and the twin analogue system of number
CN209624731U (en) One or two fusion panel switches integration transmission agency detection systems
CN103439592A (en) Method for intelligently testing intelligent substation on site
CN103631690A (en) Electric power collecting and copying device RS485 interface handheld type tester and testing method thereof
CN105823981A (en) On-line monitoring system of high-voltage circuit breaker and data processing method thereof
CN2845017Y (en) Signal analyzer
CN106872886A (en) A kind of Intellectualized Switchgear detection debugging apparatus, system and joint debugging method
CN103941138B (en) OPGW line monitoring diagnosis system and monitoring, diagnosing method completely
CN106443414A (en) Detection device for single-phase voltage self-resetting module
CN103728510B (en) Excitation unit on-site test system and method
CN205608171U (en) Digital electric energy measurement system's testing arrangement
CN204256421U (en) A kind of condition monitoring system for Supervisory Computer Control System For Hydroelectic Power Plant
CN101441240A (en) Intelligent state monitoring method of medium-pressure switch apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20150408

Effective date of abandoning: 20170926