CN204252079U - Long apart from standard section gravity flow canal increasing water delivery flow apparatus - Google Patents

Long apart from standard section gravity flow canal increasing water delivery flow apparatus Download PDF

Info

Publication number
CN204252079U
CN204252079U CN201420694928.XU CN201420694928U CN204252079U CN 204252079 U CN204252079 U CN 204252079U CN 201420694928 U CN201420694928 U CN 201420694928U CN 204252079 U CN204252079 U CN 204252079U
Authority
CN
China
Prior art keywords
canal
flow
flow device
plug flow
gravity flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420694928.XU
Other languages
Chinese (zh)
Inventor
闫新
闫观清
张亚辉
孙国强
邬向红
张艳锋
杨宇东
张新伟
胡会永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201420694928.XU priority Critical patent/CN204252079U/en
Application granted granted Critical
Publication of CN204252079U publication Critical patent/CN204252079U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of long apart from standard section gravity flow canal increasing water delivery flow apparatus, comprise the turbine plug flow device be arranged on described gravity flow canal easy backwater section canal lower supporter, the delivery port of described turbine plug flow device is arranged towards Parallel to the flow direction, the housing two side of turbine plug flow device is symmetrical in its center line and is fixed with horizontal support arms respectively, described two horizontal support arms are plugged in upper shed locating slot corresponding on described canal lower supporter respectively; Be positioned at above turbine plug flow device and be provided with arched girder, described arched girder is fixed with the foundation pile being arranged on canal both sides of flowing automatically across above gravity flow canal, on arched girder, interval is hinged with connecting rod and telescopic hydraulic cylinder, a free bearing on the lower end of described connecting rod and turbine plug flow device housing is hinged, and piston rod end and the free bearing be fixed in the middle part of connecting rod of described telescopic hydraulic cylinder are hinged.The utility model advantage is that reaching dredging channel water rate of flow of fluid increases, and realizes maximum conveyance capacity.

Description

Long apart from standard section gravity flow canal increasing water delivery flow apparatus
Technical field
The utility model relates to the long distance standard section gravity flow canal in hydraulic engineering, especially relates to long apart from standard section gravity flow canal increasing water delivery flow apparatus.
Technical background
Along with work, Water Consumption in Agriculture are increasing, supply deficiency because of water has seriously constrained the development of national economy, taking long apart from standard section gravity flow canal to regulate the watering balance between abundance of water region and lack of water region, is the important means that hydraulic engineering adopts.Apart from standard section gravity flow canal, water head site, due to the impact of natural objective condition, has wet season and dry season long, there is water level and to fluctuate up and down situation.When the water level of water head site is lower than design diversion position, even if the head gate full open state of gravity flow canal, its water diversion still also can decline.In addition, there is the situation affecting flow section water level by various factors interference along the line in gravity flow canal, the flow section water-level fluctuation etc. that the flow section water-level fluctuation that bleeder place, the canal stage casing head gate that such as flows automatically opens and closes the flow section water-level fluctuation caused, severe strong wind weather causes, rainstorm weather cause, gravity flow canal stage casing carrying capacity is declined relatively, and then causes the conveyance power of water in its downstream to decline.Above-mentioned condition can have a strong impact on the performance of project benefit, and especially the reduction of the long distance of ultra-large type, large discharge gravity flow canal diversion works conveyance power of water, will be huge on the impact of its social benefit.
Summary of the invention
The utility model object is to provide a kind of long apart from standard section gravity flow canal increasing water delivery flow apparatus, to solve the problem of gravity flow canal water supply capacity deficiency when water level reduces, also can strengthen gravity flow canal water supply capacity in the water head site wet season.
For achieving the above object, the utility model takes following technical proposals:
Described in the utility model long apart from standard section gravity flow canal increasing water delivery flow apparatus, comprise the turbine plug flow device be arranged on described gravity flow canal easy backwater section canal lower supporter, the delivery port of described turbine plug flow device is arranged towards Parallel to the flow direction, the housing two side of turbine plug flow device is symmetrical in its center line and is fixed with horizontal support arms respectively, described two horizontal support arms are plugged in upper shed locating slot corresponding on described canal lower supporter respectively; Be positioned at above turbine plug flow device and be provided with arched girder, described arched girder is fixed with the foundation pile being arranged on canal both sides of flowing automatically across above gravity flow canal, on arched girder, interval is hinged with connecting rod and telescopic hydraulic cylinder, a free bearing on the lower end of described connecting rod and turbine plug flow device housing is hinged, and piston rod end and the free bearing be fixed in the middle part of connecting rod of described telescopic hydraulic cylinder are hinged.
Described turbine plug flow device, canal lower supporter, connecting rod and telescopic hydraulic cylinder are be symmetrical in two covers that gravity flow canal center line is arranged side by side.
The work-pump station of described telescopic hydraulic cylinder and the frequency-conversion control cabinet of turbine plug flow device are arranged in gravity flow canal side on the bank.
The utility model advantage be when occur along gravity flow canal section overcurrent water level height change inequality, cause declining along gravity flow canal backwater section conveyance power of water time, drop into the work of described turbine plug flow device, reach dredging channel water rate of flow of fluid and increase, realize maximum conveyance capacity.When turbine plug flow device runs, equipment pulls the plug, and rises and fixes with the arched girder be positioned at above turbine plug flow device, do not affect normal channel water stream flow regime when turbine plug flow device is out of service from water.
Accompanying drawing explanation
Fig. 1 is arrangement schematic diagram of the present utility model.
Fig. 2 is the I portion enlarged drawing of Fig. 1.
Detailed description of the invention
As shown in Figure 1, 2, described in the utility model long apart from standard section gravity flow canal increasing water delivery flow apparatus, comprise and be arranged on the easy turbine plug flow device 3 produced on backwater section canal lower supporter 2 of described gravity flow canal 1, the delivery port of described turbine plug flow device 3 is arranged towards Parallel to the flow direction, the housing two side of turbine plug flow device 3 is symmetrical in its longitudinal midline and is fixed with horizontal support arms 4 respectively, described two horizontal support arms 4 are plugged in upper shed locating slot corresponding on described canal lower supporter 2 respectively; Be positioned at above turbine plug flow device 3 and be provided with arched girder 5, described arched girder 5 is fixed with the foundation pile 6 being arranged on canal 1 both sides of flowing automatically across above gravity flow canal 1, on arched girder 5, interval is hinged with connecting rod 7 and telescopic hydraulic cylinder 8, a free bearing on the lower end of described connecting rod 7 and turbine plug flow device 5 housing is hinged, and piston rod 9 end and the free bearing be fixed in the middle part of connecting rod 7 of described telescopic hydraulic cylinder 8 are hinged.Two covers that described turbine plug flow device 3, canal lower supporter 2, connecting rod 7 and telescopic hydraulic cylinder 8 are arranged side by side for being symmetrical in gravity flow canal center line 10, the work-pump station of telescopic hydraulic cylinder 8 and the frequency-conversion control cabinet of turbine plug flow device 3 are arranged in gravity flow canal 1 side on the bank.

Claims (3)

1. one kind long is strengthened water delivery flow apparatus apart from standard section gravity flow canal, it is characterized in that: comprise the turbine plug flow device be arranged on described gravity flow canal easy backwater section canal lower supporter, the delivery port of described turbine plug flow device is arranged towards Parallel to the flow direction, the housing two side of turbine plug flow device is symmetrical in its center line and is fixed with horizontal support arms respectively, described two horizontal support arms are plugged in upper shed locating slot corresponding on described canal lower supporter respectively; Be positioned at above turbine plug flow device and be provided with arched girder, described arched girder is fixed with the foundation pile being arranged on canal both sides of flowing automatically across above gravity flow canal, on arched girder, interval is hinged with connecting rod and telescopic hydraulic cylinder, a free bearing on the lower end of described connecting rod and turbine plug flow device housing is hinged, and piston rod end and the free bearing be fixed in the middle part of connecting rod of described telescopic hydraulic cylinder are hinged.
2. according to claim 1ly long strengthen water delivery flow apparatus apart from standard section gravity flow canal, it is characterized in that: described turbine plug flow device, canal lower supporter, connecting rod and telescopic hydraulic cylinder are be symmetrical in two covers that gravity flow canal center line is arranged side by side.
3. according to claim 1 and 2 long apart from standard section gravity flow canal increasing water delivery flow apparatus, it is characterized in that: the work-pump station of described telescopic hydraulic cylinder and the frequency-conversion control cabinet of turbine plug flow device are arranged in gravity flow canal side on the bank.
CN201420694928.XU 2014-11-19 2014-11-19 Long apart from standard section gravity flow canal increasing water delivery flow apparatus Expired - Fee Related CN204252079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420694928.XU CN204252079U (en) 2014-11-19 2014-11-19 Long apart from standard section gravity flow canal increasing water delivery flow apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420694928.XU CN204252079U (en) 2014-11-19 2014-11-19 Long apart from standard section gravity flow canal increasing water delivery flow apparatus

Publications (1)

Publication Number Publication Date
CN204252079U true CN204252079U (en) 2015-04-08

Family

ID=52956404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420694928.XU Expired - Fee Related CN204252079U (en) 2014-11-19 2014-11-19 Long apart from standard section gravity flow canal increasing water delivery flow apparatus

Country Status (1)

Country Link
CN (1) CN204252079U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404921A (en) * 2014-11-19 2015-03-11 黄河勘测规划设计有限公司 Water delivery flow increasing device for long-distance standard section auto-flow trench
CN106522153A (en) * 2016-12-20 2017-03-22 河南省水利勘测设计研究有限公司 Energy-gathering rotary accelerating silt removal method for long-distance standard-section artesian ditch

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404921A (en) * 2014-11-19 2015-03-11 黄河勘测规划设计有限公司 Water delivery flow increasing device for long-distance standard section auto-flow trench
CN106522153A (en) * 2016-12-20 2017-03-22 河南省水利勘测设计研究有限公司 Energy-gathering rotary accelerating silt removal method for long-distance standard-section artesian ditch
CN106522153B (en) * 2016-12-20 2018-05-18 河南省水利勘测设计研究有限公司 It is long to accelerate cleaning silt method away from standard section gravity flow canal cumulative convolution

Similar Documents

Publication Publication Date Title
CN204039988U (en) Lying type flap gate
CN204080768U (en) Dirty device is blocked in a kind of Reservoir of Hydropower Station
CN204252079U (en) Long apart from standard section gravity flow canal increasing water delivery flow apparatus
CN203625860U (en) Full-automatic bed-type flap gate
CN109267549A (en) A kind of diversion tunnel structure
CN104179159A (en) Hydropower station free-surface-pressurized flow tail water system
CN104404921B (en) Long apart from standard section gravity flow canal increasing water delivery flow apparatus
CN201077978Y (en) Low head movable dam
CN204282317U (en) Power station free pressure flow replaces tailrace tunnel
CN104358304A (en) Volute device for realizing orderly water drainage and waterlogging prevention in cities
CN204435470U (en) The prefabricated pumping plant of a kind of novel many pit shafts glass fiber reinforced plastic
CN203008100U (en) Drainage network of barrier-free drainage facility
CN207469194U (en) Lift adjustment dropping equipment
CN203034425U (en) Automatic watering lubrication gate
CN204961149U (en) Make full use of water resource improves hydroelectric power generation system of generating capacity
CN204343385U (en) A kind of combined type water intake pumping station
CN204860391U (en) Gardens irrigation equipment
CN209194485U (en) A kind of diversion tunnel structure
CN204385710U (en) Two-way opened enclosed blocks bleaching device
CN204370381U (en) A kind of waterpower self-control drag-line checkdam
CN105544474A (en) Floating net vortex eliminating method applied in front of water inlet
CN203247536U (en) Ecological water compensation structure utilizing non-pressure hole
CN202672118U (en) Channel type generation device for reutilization of hydropower in hydropower station
CN208899441U (en) Power plant building arragement construction for hydro-electric power project
CN205296092U (en) Two -sided hydraulic pressure dam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150408

Termination date: 20161119

CF01 Termination of patent right due to non-payment of annual fee