CN104404921B - Long apart from standard section gravity flow canal increasing water delivery flow apparatus - Google Patents
Long apart from standard section gravity flow canal increasing water delivery flow apparatus Download PDFInfo
- Publication number
- CN104404921B CN104404921B CN201410661074.XA CN201410661074A CN104404921B CN 104404921 B CN104404921 B CN 104404921B CN 201410661074 A CN201410661074 A CN 201410661074A CN 104404921 B CN104404921 B CN 104404921B
- Authority
- CN
- China
- Prior art keywords
- canal
- flow
- flow device
- plug flow
- gravity flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B1/00—Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B13/00—Irrigation ditches, i.e. gravity flow, open channel water distribution systems
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
Abstract
The invention discloses a kind of long apart from standard section gravity flow canal increasing water delivery flow apparatus, comprise the turbine plug flow device be arranged on described gravity flow canal easy backwater section canal lower supporter, the delivery port of described turbine plug flow device is arranged towards Parallel to the flow direction, the housing two side of turbine plug flow device is symmetrical in its center line and is fixed with horizontal support arms respectively, described two horizontal support arms are plugged in upper shed locating slot corresponding on described canal lower supporter respectively; Be positioned at above turbine plug flow device and be provided with arched girder, described arched girder is fixed with the foundation pile being arranged on canal both sides of flowing automatically across above gravity flow canal, on arched girder, interval is hinged with connecting rod and telescopic hydraulic cylinder, a free bearing on the lower end of described connecting rod and turbine plug flow device housing is hinged, and piston rod end and the free bearing be fixed in the middle part of connecting rod of described telescopic hydraulic cylinder are hinged.The invention has the advantages that reaching dredging channel water rate of flow of fluid increases, and realizes maximum conveyance capacity.
Description
Technical field
The present invention relates to the long distance standard section gravity flow canal in hydraulic engineering, especially relate to long apart from standard section gravity flow canal increasing water delivery flow apparatus.
Technical background
Along with work, Water Consumption in Agriculture are increasing, supply deficiency because of water has seriously constrained the development of national economy, taking long apart from standard section gravity flow canal to regulate the watering balance between abundance of water region and lack of water region, is the important means that hydraulic engineering adopts.Apart from standard section gravity flow canal, water head site, due to the impact of natural objective condition, has wet season and dry season long, there is water level and to fluctuate up and down situation.When the water level of water head site is lower than design diversion position, even if the head gate full open state of gravity flow canal, its water diversion still also can decline.In addition, there is the situation affecting flow section water level by various factors interference along the line in gravity flow canal, the flow section water-level fluctuation etc. that the flow section water-level fluctuation that bleeder place, the canal stage casing head gate that such as flows automatically opens and closes the flow section water-level fluctuation caused, severe strong wind weather causes, rainstorm weather cause, gravity flow canal stage casing carrying capacity is declined relatively, and then causes the conveyance power of water in its downstream to decline.Above-mentioned condition can have a strong impact on the performance of project benefit, and especially the reduction of the long distance of ultra-large type, large discharge gravity flow canal diversion works conveyance power of water, will be huge on the impact of its social benefit.
Summary of the invention
The object of the invention is to provide a kind of long apart from standard section gravity flow canal increasing water delivery flow apparatus, to solve the problem of gravity flow canal water supply capacity deficiency when water level reduces, also can strengthen gravity flow canal water supply capacity in the water head site wet season.
For achieving the above object, the present invention takes following technical proposals:
Of the present invention long apart from standard section gravity flow canal increasing water delivery flow apparatus, comprise the turbine plug flow device be arranged on described gravity flow canal easy backwater section canal lower supporter, the delivery port of described turbine plug flow device is arranged towards Parallel to the flow direction, the housing two side of turbine plug flow device is symmetrical in its center line and is fixed with horizontal support arms respectively, described two horizontal support arms are plugged in upper shed locating slot corresponding on described canal lower supporter respectively; Be positioned at above turbine plug flow device and be provided with arched girder, described arched girder is fixed with the foundation pile being arranged on canal both sides of flowing automatically across above gravity flow canal, on arched girder, interval is hinged with connecting rod and telescopic hydraulic cylinder, a free bearing on the lower end of described connecting rod and turbine plug flow device housing is hinged, and piston rod end and the free bearing be fixed in the middle part of connecting rod of described telescopic hydraulic cylinder are hinged.
Described turbine plug flow device, canal lower supporter, connecting rod and telescopic hydraulic cylinder are be symmetrical in two covers that gravity flow canal center line is arranged side by side.
The work-pump station of described telescopic hydraulic cylinder and the frequency-conversion control cabinet of turbine plug flow device are arranged in gravity flow canal side on the bank.
The invention has the advantages that when occur along gravity flow canal section overcurrent water level height change inequality, cause declining along gravity flow canal backwater section conveyance power of water time, drop into the work of described turbine plug flow device, reach dredging channel water rate of flow of fluid and increase, realize maximum conveyance capacity.When turbine plug flow device runs, equipment pulls the plug, and rises and fixes with the arched girder be positioned at above turbine plug flow device, do not affect normal channel water stream flow regime when turbine plug flow device is out of service from water.
Accompanying drawing explanation
Fig. 1 is arrangement schematic diagram of the present invention.
Fig. 2 is the I portion enlarged drawing of Fig. 1.
Detailed description of the invention
As shown in Figure 1, 2, of the present invention long apart from standard section gravity flow canal increasing water delivery flow apparatus, comprise and be arranged on the easy turbine plug flow device 3 produced on backwater section canal lower supporter 2 of described gravity flow canal 1, the delivery port of described turbine plug flow device 3 is arranged towards Parallel to the flow direction, the housing two side of turbine plug flow device 3 is symmetrical in its longitudinal midline and is fixed with horizontal support arms 4 respectively, described two horizontal support arms 4 are plugged in upper shed locating slot corresponding on described canal lower supporter 2 respectively; Be positioned at above turbine plug flow device 3 and be provided with arched girder 5, described arched girder 5 is fixed with the foundation pile 6 being arranged on canal 1 both sides of flowing automatically across above gravity flow canal 1, on arched girder 5, interval is hinged with connecting rod 7 and telescopic hydraulic cylinder 8, a free bearing on the lower end of described connecting rod 7 and turbine plug flow device 5 housing is hinged, and piston rod 9 end and the free bearing be fixed in the middle part of connecting rod 7 of described telescopic hydraulic cylinder 8 are hinged.Two covers that described turbine plug flow device 3, canal lower supporter 2, connecting rod 7 and telescopic hydraulic cylinder 8 are arranged side by side for being symmetrical in gravity flow canal center line 10, the work-pump station of telescopic hydraulic cylinder 8 and the frequency-conversion control cabinet of turbine plug flow device 3 are arranged in gravity flow canal 1 side on the bank.
Claims (3)
1. one kind long is strengthened water delivery flow apparatus apart from standard section gravity flow canal, it is characterized in that: comprise the turbine plug flow device be arranged on described gravity flow canal easy backwater section canal lower supporter, the delivery port of described turbine plug flow device is arranged towards Parallel to the flow direction, the housing two side of turbine plug flow device is symmetrical in its center line and is fixed with horizontal support arms respectively, described two horizontal support arms are plugged in upper shed locating slot corresponding on described canal lower supporter respectively; Be positioned at above turbine plug flow device and be provided with arched girder, described arched girder is fixed with the foundation pile being arranged on canal both sides of flowing automatically across above gravity flow canal, on arched girder, interval is hinged with connecting rod and telescopic hydraulic cylinder, a free bearing on the lower end of described connecting rod and turbine plug flow device housing is hinged, and piston rod end and the free bearing be fixed in the middle part of connecting rod of described telescopic hydraulic cylinder are hinged.
2. according to claim 1ly long strengthen water delivery flow apparatus apart from standard section gravity flow canal, it is characterized in that: described turbine plug flow device, canal lower supporter, connecting rod and telescopic hydraulic cylinder are be symmetrical in two covers that gravity flow canal center line is arranged side by side.
3. according to claim 1 and 2 long apart from standard section gravity flow canal increasing water delivery flow apparatus, it is characterized in that: the work-pump station of described telescopic hydraulic cylinder and the frequency-conversion control cabinet of turbine plug flow device are arranged in gravity flow canal side on the bank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410661074.XA CN104404921B (en) | 2014-11-19 | 2014-11-19 | Long apart from standard section gravity flow canal increasing water delivery flow apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410661074.XA CN104404921B (en) | 2014-11-19 | 2014-11-19 | Long apart from standard section gravity flow canal increasing water delivery flow apparatus |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104404921A CN104404921A (en) | 2015-03-11 |
CN104404921B true CN104404921B (en) | 2016-01-27 |
Family
ID=52642581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410661074.XA Active CN104404921B (en) | 2014-11-19 | 2014-11-19 | Long apart from standard section gravity flow canal increasing water delivery flow apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104404921B (en) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT386853B (en) * | 1985-05-09 | 1988-10-25 | Oestreicher Purator | SLIDER TO BLOCK OR REGULATING THE WATER RUN IN A GUTTER |
JP3722932B2 (en) * | 1996-11-29 | 2005-11-30 | 三菱化工機株式会社 | Dust remover basket |
FR2862723B1 (en) * | 2003-11-20 | 2006-04-28 | Jacques Fonkenell | TURBINE AND HYDRAULIC POWER PLANT FOR VERY LOW FALL |
BR112013027238A2 (en) * | 2011-04-27 | 2016-12-27 | Jouni Jokela | turbine for hydraulic power generation and hydroelectric power plant |
CN204252079U (en) * | 2014-11-19 | 2015-04-08 | 黄河勘测规划设计有限公司 | Long apart from standard section gravity flow canal increasing water delivery flow apparatus |
-
2014
- 2014-11-19 CN CN201410661074.XA patent/CN104404921B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104404921A (en) | 2015-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204039988U (en) | Lying type flap gate | |
CN204080768U (en) | Dirty device is blocked in a kind of Reservoir of Hydropower Station | |
CN204252079U (en) | Long apart from standard section gravity flow canal increasing water delivery flow apparatus | |
CN106930252A (en) | A kind of Novel flush storage station water system | |
CN203625860U (en) | Full-automatic bed-type flap gate | |
CN109267549A (en) | A kind of diversion tunnel structure | |
CN104404921B (en) | Long apart from standard section gravity flow canal increasing water delivery flow apparatus | |
CN201077978Y (en) | Low head movable dam | |
CN204435470U (en) | The prefabricated pumping plant of a kind of novel many pit shafts glass fiber reinforced plastic | |
CN104358304A (en) | Volute device for realizing orderly water drainage and waterlogging prevention in cities | |
CN204282317U (en) | Power station free pressure flow replaces tailrace tunnel | |
CN203008100U (en) | Drainage network of barrier-free drainage facility | |
CN207469194U (en) | Lift adjustment dropping equipment | |
CN203034425U (en) | Automatic watering lubrication gate | |
CN205742110U (en) | A kind of arrangement improving long diversion system power station unit operational flexibility | |
CN204343385U (en) | A kind of combined type water intake pumping station | |
CN204961149U (en) | Make full use of water resource improves hydroelectric power generation system of generating capacity | |
CN209194485U (en) | A kind of diversion tunnel structure | |
CN204194743U (en) | A kind of sheet billet continuous casting cooling water system defroster | |
CN203247536U (en) | Ecological water compensation structure utilizing non-pressure hole | |
CN204370381U (en) | A kind of waterpower self-control drag-line checkdam | |
CN202065197U (en) | Diving electric pump capable of simultaneously realizing three using functions of working vertically, obliquely and transversely | |
CN202672118U (en) | Channel type generation device for reutilization of hydropower in hydropower station | |
CN205296092U (en) | Two -sided hydraulic pressure dam | |
CN203960825U (en) | A kind of waterpower self-control one-way check panel turnover mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd. Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee before: Yellow River Engineering Consulting Co., Ltd. |