CN204250065U - Steel pipe pallet - Google Patents
Steel pipe pallet Download PDFInfo
- Publication number
- CN204250065U CN204250065U CN201420752629.7U CN201420752629U CN204250065U CN 204250065 U CN204250065 U CN 204250065U CN 201420752629 U CN201420752629 U CN 201420752629U CN 204250065 U CN204250065 U CN 204250065U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- transport
- hurdle
- underframe
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pallets (AREA)
Abstract
The utility model relates to a kind of circular goods transport anti-slip reinforcement device, belongs to the auxiliary device of the transport loading and reinforcing business such as train, especially a kind of steel pipe pallet reinforced for train transport steel pipe.The utility model relates to a kind of circular goods transport anti-slip reinforcement device, belongs to the auxiliary device of the transport loading and reinforcing business such as train, especially a kind of steel pipe pallet reinforced for train transport steel pipe.The utility model can effectively fix many steel pipe transmissions, and can not move at lade with in running.Flexibly and easily, fixing steel pipe is simple, and entrucking is fast, it is convenient, fast to lift by crane.Can fold when not placing steel tubes and be put into, not take up room.Overcome prior art and transport placement easily skew and the easy loosening shortcoming of binding in many steel pipe processes, when carrying out many steel pipe transmissions, handling are more quick, and transport is fixed more reliably, and reduces loadingunloading time and cost of transportation.
Description
Technical field
The utility model relates to a kind of circular goods transport anti-slip reinforcement device, belongs to the auxiliary device of the transport loading and reinforcing business such as train, especially a kind of steel pipe pallet reinforced for train transport steel pipe.
Background technology
At present in the steel products of train transport, the transport ratio of steel pipe is very large, especially the container shipping of many steel pipes, railway is when transporting steel pipe, be mostly steel pipe be upside down in accumulation is piled up in compartment after carry out reinforcing transport with steel rope, reinforcing mode or handling sequence is time-consuming, effort, in transportation, steel pipe easily loosens, and there is safety hazard.
Summary of the invention
The purpose of this utility model be to provide a kind of structure simple, can effectively fix many steel pipes, and the steel pipe pallet that can conveniently place and transport safely.Which overcome the deficiency that prior art exists.
In order to realize above-mentioned utility model object, the technical solution adopted in the utility model is: described steel pipe pallet is made up of the steel plate arranging in length and breadth and square tubes soldering, the end of underframe is provided with front hurdle, the both sides of underframe are provided with hurdle, side, framework folding shaft active link is passed through on underframe in described hurdle, side and the two ends on front hurdle, described underframe is equipped with end lower bracket, is provided with middle layer bracket between described hurdle, both sides, upper and lower support can be placed in the top on hurdle, both sides.
Described front hurdle and hurdle, side are provided with connection botton of frame.
Described underframe can place upper and lower support.
The corner of described underframe is provided with block or tied hook.
The bottom of described upper and lower support is provided with block.
The step matched with underframe is arranged at the bottom at described lower bracket two ends, end.
The boss of described end lower bracket, middle layer bracket and upper and lower support is provided with and is connected and fixed hole.
The beneficial effect of the technical scheme that the utility model provides is: be welded into square tube by quality steel plate, and degree simple to operate, easy to use, safe is high, highly versatile, can effectively fix many steel pipe transmissions, and can not move at lade with in running.Flexibly and easily, fixing steel pipe is simple, and entrucking is fast, it is convenient, fast to lift by crane.Can fold when not placing steel tubes and be put into, not take up room.The corner of underframe is provided with block or tied hook, can effective fixed frame, makes it can not longitudinal direction and shifted laterally.This overcome prior art transport the easy skew of placement in many steel pipe processes and bundle easily loosening, being not easy the shortcoming of fixing, when carrying out many steel pipe transmissions, loading and unloading more quick, transport is fixing more reliable, and reduces loadingunloading time and cost of transportation.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is using state figure of the present utility model;
Fig. 3 is folded state diagram of the present utility model;
Fig. 4 is lateral plan of the present utility model;
Fig. 5 is steel pipe collection of the present utility model dress schematic diagram;
Fig. 6 is upper and lower support of the present utility model;
Fig. 7 is end of the present utility model lower bracket;
Fig. 8 is middle layer bracket of the present utility model.
Detailed description of the invention
Steel pipe pallet of the present utility model includes underframe 1, hurdle, side 2, front hurdle 3 etc., specifically be made up of the steel plate arranging in length and breadth and square tubes soldering, front hurdle 3 is provided with in the end of underframe 1, vertically moving of steel pipe can be prevented, the both sides of underframe 1 are provided with hurdle, side 2, its objective is the impact resistance power in order to strengthen front hurdle 3, middle layer bracket 5 can also be fixed by the two ends of middle layer bracket 5 simultaneously.Described hurdle, side 2 and the two ends on front hurdle 3 by framework folding shaft 9 active link on underframe 1, after steel pipe unloads can offside hurdle 2 and front hurdle 3 folding respectively after horizontal on underframe 1, so no longer take up room, be also convenient to transport.Described underframe 1 is equipped with end lower bracket 8, also can places upper and lower support 6 as required.Between described hurdle, both sides 2, middle layer bracket 5 is installed, upper and lower support 6 can be placed in the top on hurdle, both sides 2, upper and lower support 6 structure is identical, can make as required during use groove upwards or groove form lower bracket or upper bracket downwards, being used for card puts fixing steel pipe and makes its not sway, upper and lower support 6 can be provided with block 12 bottom during lower bracket, is stuck in the groove on train platform body 10 during use, fixing lower bracket.Be provided with on the boss of end lower bracket 8, middle layer bracket 5 and upper and lower support 6 according to the needs of transport steel pipe and be connected and fixed hole, with steel rope 7 with the use of fixing steel pipe.
Because end lower bracket 8 is directly contained on underframe 1, so the step matched with underframe 1 is arranged at the bottom at its two ends.It is upper outside that removing end lower bracket 8 can be contained in underframe 1, on, lower bracket 6 and middle layer bracket 5 can according to the length of the fixing steel pipe of transport, many groups of corresponding uses, first upper during use, lower bracket 6 groove is placed on the floor of train platform body upward, support can be fixed according to the needs of carrying, the steel pipe of the required transport of rear placement put well by support, if transport one deck steel pipe only need be placed, now directly fix steel pipe 14 with steel rope 7, be placed on platform body two ends be used for fixing steel pipe steel pipe pallet can before, rear activity translation is to be fixed the end of steel pipe, it is made to be fixed better.If need to transport many steel pipes 14, middle layer bracket 5 can be placed on the steel pipe corresponding with upper and lower support 6, stentplacement is well rear to be continued required transport steel pipe to put, finally upper and lower support 6 groove being detained down is placed on steel pipe 14, fixes steel pipe 14 by steel rope 7 and the hole that is connected and fixed on support.
Described front hurdle 3 and hurdle, side 2 are provided with connection botton of frame 4, front hurdle 3 and hurdle, side 2 can be connected and fixed and be integrated, increase its stability, take off connection botton of frame 4 when needing folding, folding front hurdle 3 and hurdle, side 2.
Described underframe 1 can place upper and lower support 6.
The corner of described underframe 1 is provided with block 12 or tied hook 13, block 12 is stuck in the groove of car bottom, and tied hook 13 is fixed by the hook of rope and platform body 10 two bottom sides, can effective fixed frame, make it can not longitudinal direction and shifted laterally, wheel 11 be arranged on platform body 10.
The oad of steel pipe pallet of the present utility model and shape, can determine concrete size, shape according to actual needs.The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (7)
1. a steel pipe pallet, it is characterized in that: described steel pipe pallet is made up of the steel plate arranged in length and breadth and square tubes soldering, the end of underframe (1) is provided with front hurdle (3), the both sides of underframe (1) are provided with hurdle, side (2), framework folding shaft (9) active link is passed through on underframe (1) in described hurdle, side (2) and the two ends of front hurdle (3), described underframe (1) is equipped with end lower bracket (8), between described hurdle, both sides (2), middle layer bracket (5) is installed, the top on hurdle, both sides (2) is placed, lower bracket (6).
2. steel pipe pallet according to claim 1, is characterized in that: described front hurdle (3) and hurdle, side (2) are provided with connection botton of frame (4).
3. steel pipe pallet according to claim 1, is characterized in that: described underframe (1) is upper places upper and lower support (6).
4. steel pipe pallet according to claim 1, is characterized in that: the corner of described underframe (1) is provided with block (12) or tied hook (13).
5. steel pipe pallet according to claim 1, is characterized in that: the bottom of described upper and lower support (6) is provided with block (12).
6. steel pipe pallet according to claim 1, is characterized in that: the step matched with underframe (1) is arranged at the bottom at described end lower bracket (8) two ends.
7. steel pipe pallet according to claim 1, is characterized in that: the boss of described end lower bracket (8), middle layer bracket (5) and upper and lower support (6) is provided with and is connected and fixed hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420752629.7U CN204250065U (en) | 2014-12-05 | 2014-12-05 | Steel pipe pallet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420752629.7U CN204250065U (en) | 2014-12-05 | 2014-12-05 | Steel pipe pallet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204250065U true CN204250065U (en) | 2015-04-08 |
Family
ID=52954397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420752629.7U Expired - Fee Related CN204250065U (en) | 2014-12-05 | 2014-12-05 | Steel pipe pallet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204250065U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104843024A (en) * | 2015-06-10 | 2015-08-19 | 中南大学 | Railway large-diameter long steel pipe transnational transportation device |
CN107618774A (en) * | 2016-07-13 | 2018-01-23 | 南通中集特种运输设备制造有限公司 | Transport support and there is its container |
-
2014
- 2014-12-05 CN CN201420752629.7U patent/CN204250065U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104843024A (en) * | 2015-06-10 | 2015-08-19 | 中南大学 | Railway large-diameter long steel pipe transnational transportation device |
CN107618774A (en) * | 2016-07-13 | 2018-01-23 | 南通中集特种运输设备制造有限公司 | Transport support and there is its container |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2018212935C1 (en) | A container | |
CN104284851B (en) | Support for storing and/or transporting large-size glass plate | |
CN106536359A (en) | Transport aid device and method for the use thereof | |
WO2015054956A1 (en) | Frame of tank container | |
CN204250065U (en) | Steel pipe pallet | |
CN205010819U (en) | Tank type container | |
CN205601678U (en) | A on -vehicle handling device for container loading and unloading | |
CN205168745U (en) | Heavy freight transportation tricycle carriage | |
CN103072734A (en) | Multifunctional logistics tray | |
CN203047670U (en) | Multifunctional logistics tray | |
CN104003209A (en) | Container mobile loading and unloading platform | |
CN204713079U (en) | A kind of articulated car | |
CN204161908U (en) | Tubing stacking frame | |
CN203332634U (en) | Dispatching assembly jig for fan guards | |
CN203402245U (en) | Steel transportation semi-trailer | |
CN207595033U (en) | A kind of haulage equipment cart | |
CN106516482A (en) | Tank container | |
CN107554922B (en) | A kind of plastic pallet | |
CN202463834U (en) | Vertical type rolled steel seat frame | |
CN202508813U (en) | Detachable field distribution transformer transporting vehicle | |
CN205132183U (en) | Load chassis of container | |
CN204688694U (en) | Flatcar heavy wall is pipe pallet heavily | |
CN203496914U (en) | Horizontal coiled steel support | |
CN203624284U (en) | Carrying shelf for container | |
CN204037409U (en) | Automatic loading and unloading type mine engineering car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Jiang Enquan Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice |
Addressee: Jiang Enquan Document name: Notification of Termination of Patent Right |
|
DD01 | Delivery of document by public notice | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150408 Termination date: 20161205 |
|
CF01 | Termination of patent right due to non-payment of annual fee |