CN204238832U - Steel tube tower is auxiliary climbs device - Google Patents
Steel tube tower is auxiliary climbs device Download PDFInfo
- Publication number
- CN204238832U CN204238832U CN201420750350.5U CN201420750350U CN204238832U CN 204238832 U CN204238832 U CN 204238832U CN 201420750350 U CN201420750350 U CN 201420750350U CN 204238832 U CN204238832 U CN 204238832U
- Authority
- CN
- China
- Prior art keywords
- main body
- steel tube
- tube tower
- placed cavity
- foot rest
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 45
- 239000010959 steel Substances 0.000 title claims abstract description 45
- 230000009194 climbing Effects 0.000 claims abstract description 32
- 238000000151 deposition Methods 0.000 claims abstract description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 230000005489 elastic deformation Effects 0.000 claims description 4
- 210000003462 vein Anatomy 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 9
- 238000005516 engineering process Methods 0.000 description 6
- 230000007812 deficiency Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
The utility model relates to steel tube tower auxiliary climbing device.The steel tube tower that the utility model provides is auxiliary climbs device, body interior is provided with for depositing rod tool and the placed cavity of upper end open, described main body upper end is provided with the lid for closed placed cavity opening, described lid is arranged in main body by hinge, described placed cavity inside is provided with the location-plate for preventing instrument from mutually colliding, described location-plate is provided with the locating hole for orientation tool, described main body is also provided with the foot rest for climbing for operating personnel; In concrete use procedure, main body is leant against on steel tube tower, utilize the foot rest in main body to enter climbing tower, greatly reduce the labour intensity of operating personnel, improve security performance during operating personnel's climbing tower; In addition, can store tools easily by arranging placed cavity, use very convenient.
Description
Technical field
The utility model relates to steel tube tower auxiliary climbing device.
Background technology
Steel tube tower is as requisite accessory in electrical network erection, be widely used in field of power transmission, relate to a lot of need of work in actual use and climb steel tube tower, as the maintenance etc. of electrical network, but in order to prevent non-electricity staff from arbitrarily climbing, the first step ladder height off the ground of steel tube tower, at about 1.8 meters, causes operating personnel also to there is inconvenience when climbing steel tube tower.
In prior art, operating personnel carry out climbing tower by free-hand mode, this climbing tower mode makes technology people labour intensity large, and potential safety hazard is there is in climbing tower process, if as technician's misoperation in climbing tower process is easy to make technician and steel tube tower collide, thus the technician that damages, therefore, in prior art there is technician's labour intensity greatly in free-hand climbing tower, the deficiency of poor safety performance.
Summary of the invention
The steel tube tower that the utility model provides is auxiliary climbs device, and be intended to overcome operating personnel in prior art and carry out climbing tower by freehand manner, in climbing tower process, labor intensity of operating staff is large, there is the deficiency of potential safety hazard.
In order to solve the problems of the technologies described above, the utility model adopts following technical scheme: steel tube tower is auxiliary climbs device, comprise main body, described body interior is provided with for depositing rod tool and the placed cavity of upper end open, described main body upper end is provided with the lid for closed placed cavity opening, described lid is arranged in main body by hinge, described placed cavity inside is provided with the location-plate for preventing instrument from mutually colliding, described location-plate is provided with the locating hole for orientation tool, described main body is also provided with the foot rest for climbing for operating personnel.
As preferably, described main body lower end is provided with base, described base and main body are rotationally connected by bearing pin, described base is provided with for holding main body and main body can being made to rotate groove around bearing pin, the sidewall of described main body and groove is equipped with the through hole for wearing bearing pin, described base is provided with the decorative pattern for increasing base and ground friction coefficient, by arranging base and making base be connected with body rotation, in concrete use procedure, because main body will lean against on steel tube tower, therefore there is certain angle on main body and ground, reduce the contact area in main body and face, lead to and base is set and base and main body body are rotationally connected, can ensure during use that base and ground have good contact, improve steel tube tower and assist climbing device security performance in use, in addition, by arranging decorative pattern, increase the friction factor on base and ground, improve steel tube tower and assist climbing device stability in use.
As preferably, described foot rest is rotationally connected by locating shaft and is arranged in main body, described locating shaft is welded in main body, described foot rest is provided with the connecting hole suitable with locating shaft, described foot rest is also provided with for foot rest being fixed on perpendicular to the locating piece on body position, described locating piece welding on the footrests, foot rest is rotationally connected by locating shaft and is arranged in main body, and can foot rest be fixed in duty by arranging locating piece, in the state of i.e. foot rest and body normal, thus foot rest can be received no time disturb, make steel tube tower auxiliary climbing device easy to carry.
As preferably, described main body upper end is provided with for increasing main body and steel tube tower contact area and can producing a pair jig arm of elastic deformation, described jig arm is arranged in main body by attachment screw, described jig arm is provided with the anti-slip veins for increasing jig arm and steel tube tower friction factor, by arranging jig arm, increase the contact area of main body and steel tube tower, further increase steel tube tower and assist climbing device stability in use; In addition, by arranging anti-slip veins, increase the friction factor of jig arm and main body.
As preferably, the shape of cross section of described main body is polygon, described main body is also provided with the reinforcing rib for improving main body flexural strength, described reinforcing rib and main body are integral type structure, by the shape of cross section of main body being set to polygon and arranging reinforcing rib in main body, effectively improve the anti-bending strength of main body, easy to use.
As preferably, the sidewall of described placed cavity is provided with the projection for stationary positioned plate, the shape of cross section of described locating piece and the shape of cross section of placed cavity suitable, can go up fixing for location-plate in place easily by arranging projection, using very convenient.
The steel tube tower that the utility model provides is auxiliary climbs device, tool has the following advantages: body interior is provided with for depositing rod tool and the placed cavity of upper end open, described main body upper end is provided with the lid for closed placed cavity opening, described lid is arranged in main body by hinge, described placed cavity inside is provided with the location-plate for preventing instrument from mutually colliding, described location-plate is provided with the locating hole for orientation tool, described main body is also provided with the foot rest for climbing for operating personnel; In concrete use procedure, main body is leant against on steel tube tower, utilize the foot rest in main body to enter climbing tower, greatly reduce the labour intensity of operating personnel, improve security performance during operating personnel's climbing tower; In addition, can store tools easily by arranging placed cavity, use very convenient.
Accompanying drawing explanation
Accompanying drawing 1 is that the utility model steel tube tower assists the front view climbing device,
Accompanying drawing 2 is that the utility model steel tube tower assists the left view climbing device,
Accompanying drawing 3 is that the utility model steel tube tower assists the partial sectional view climbing device,
Accompanying drawing 4 is that the utility model steel tube tower assists climbing device schematic diagram in use.
Detailed description of the invention
Below in conjunction with accompanying drawing, the auxiliary device of climbing of steel tube tower of the present utility model is described further.As Fig. 1, Fig. 2, shown in Fig. 3, steel tube tower is auxiliary climbs device, comprise main body 1, described main body 1 inside is provided with for depositing rod tool and the placed cavity 2 of upper end open, described main body 1 upper end is provided with the lid 3 for closed placed cavity 2 opening, described lid 3 arranges on the body 1 by hinge 14, described placed cavity 2 inside is provided with the location-plate 4 for preventing instrument from mutually colliding, described location-plate 4 is provided with the locating hole 5 for orientation tool, described main body 1 is also provided with the foot rest 6 for climbing for operating personnel, the opening of described placed cavity 2 should be angle, namely there is certain angle in placed cavity 2 plane of the opening and main body 1 symmetrical centre face, this angle can be 30 degree to 60 degree, more easily take out to make the instrument being positioned at placed cavity 2, described foot rest 6 can adopt the mode of welding to arrange on the body 1.
As Fig. 1, Fig. 2, shown in Fig. 3, optionally, described main body 1 lower end is provided with base 7, and described base 7 is rotationally connected by bearing pin 8 with main body 1, and described base 7 is provided with for holding main body 1 and main body 1 can being made to rotate groove 9 around bearing pin 8, the sidewall of described main body 1 and groove 9 is equipped with the through hole for wearing bearing pin 8, described base 7 is provided with the decorative pattern for increasing base 7 and ground friction coefficient.
As Fig. 1, shown in Fig. 2, optionally, described foot rest 6 is rotationally connected setting on the body 1 by locating shaft 10, described locating shaft 10 welds on the body 1, described foot rest 6 is provided with the connecting hole suitable with locating shaft 10, described foot rest 6 is also provided with for foot rest 6 being fixed on perpendicular to the locating piece 11 on main body 1 position, described locating piece 11 is welded on foot rest 6, described foot rest 6 can also arrange Anti-slip cover, namely rubber structure foot rest 6 increasing foot rest 6 friction factor is set in, in order to make locating piece 11 have better positioning performance in concrete use procedure, described locating piece 11 should be arranged on the downside of foot rest 6.
As Fig. 1, Fig. 2, shown in Fig. 3, optionally, described main body 1 upper end is provided with and can produces a pair jig arm 12 of elastic deformation for increasing main body 1 with steel tube tower 15 contact area, and described jig arm 12 arranges on the body 1 by attachment screw, and described jig arm is provided with the anti-slip veins for increasing jig arm 12 and steel tube tower 15 friction factor, also can sheathed rubber sleeve in described jig arm 12, to increase the friction factor of jig arm 12 and steel tube tower 15.
Optionally, the shape of cross section of described main body 1 is polygon, described main body 1 is also provided with the reinforcing rib for improving main body 1 flexural strength, described reinforcing rib and main body 1 are integral type structure, the shape of cross section of described main body 1 can be rectangle, pentagon, hexagon etc., and the shape of cross section of described reinforcing rib is rectangle.
As shown in Figure 3, optionally, the sidewall of described placed cavity 2 is provided with the projection 13 for stationary positioned plate 4, the shape of cross section of described locating piece 11 and the shape of cross section of placed cavity 2 suitable, namely locating piece 11 can slide in placed cavity 2, and locating piece 11 utilizes projection 13 to position.
Technique scheme in use, as shown in Figure 4, assisted by steel tube tower the base 7 climbed in device to place to go up in place, then main body 1 upper end is made to lean against on steel tube tower 15, now, the jig arm 12 be positioned in main body 1 produces elastic deformation, improves the contact area of main body 1 and steel tube tower 15, then launched by foot rest 6, operating personnel can climb steel tube tower 15 easily; In addition, also can uncap 3, rod tool is placed in placed cavity 2, use very convenient, relative to climbing tower free-hand in prior art, steel tube tower assists the labour intensity climbed when device significantly reduces technician's climbing tower, substantially increases the security performance of technician's climbing tower operation.
These are only the preferred embodiment of the present invention, being intended to embody outstanding technique effect of the present invention and advantage, is not the restriction to technical scheme of the present invention.Those skilled in the art will appreciate that all amendments made based on the technology of the present invention content, change or substitute technology feature, all should be covered by the technology category of claims of the present invention opinion.
Claims (6)
1. steel tube tower is auxiliary climbs device, it is characterized in that: comprise main body (1), described main body (1) inside is provided with for depositing rod tool and the placed cavity of upper end open (2), described main body (1) upper end is provided with the lid (3) for closed placed cavity (2) opening, described lid (3) is arranged in main body (1) by hinge (14), described placed cavity (2) inside is provided with the location-plate (4) for preventing instrument from mutually colliding, described location-plate (4) is provided with the locating hole (5) for orientation tool, described main body (1) is also provided with the foot rest (6) for climbing for operating personnel.
2. steel tube tower according to claim 1 is auxiliary climbs device, it is characterized in that: described main body (1) lower end is provided with base (7), described base (7) and main body (1) are rotationally connected by bearing pin (8), described base (7) is provided with for holding main body (1) and main body (1) can being made to rotate groove (9) around bearing pin (8), the sidewall of described main body (1) and groove (9) is equipped with the through hole for wearing bearing pin (8), described base (7) is provided with the decorative pattern for increasing base (7) and ground friction coefficient.
3. steel tube tower according to claim 1 is auxiliary climbs device, it is characterized in that: described foot rest (6) is rotationally connected by locating shaft (10) and is arranged in main body (1), described locating shaft (10) is welded in main body (1), described foot rest (6) is provided with the connecting hole suitable with locating shaft (10), described foot rest (6) is also provided with for being fixed on foot rest (6) perpendicular to the locating piece (11) on main body (1) position, described locating piece (11) is welded on foot rest (6).
4. the steel tube tower according to claims 1 to 3 any one is auxiliary climbs device, it is characterized in that: described main body (1) upper end is provided with for increasing main body (1) and steel tube tower (15) contact area and can producing a pair jig arm (12) of elastic deformation, described jig arm (12) is arranged in main body (1) by attachment screw, and described jig arm is provided with the anti-slip veins for increasing jig arm (12) and steel tube tower (15) friction factor.
5. steel tube tower according to claim 4 is auxiliary climbs device, it is characterized in that: the shape of cross section of described main body (1) is polygon, described main body (1) is also provided with the reinforcing rib for improving main body (1) flexural strength, described reinforcing rib and main body (1) are integral type structure.
6. steel tube tower according to claim 3 is auxiliary climbs device, it is characterized in that: the sidewall of described placed cavity (2) is provided with the projection (13) for stationary positioned plate (4), the shape of cross section of described locating piece (11) and the shape of cross section of placed cavity (2) suitable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420750350.5U CN204238832U (en) | 2014-12-03 | 2014-12-03 | Steel tube tower is auxiliary climbs device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420750350.5U CN204238832U (en) | 2014-12-03 | 2014-12-03 | Steel tube tower is auxiliary climbs device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204238832U true CN204238832U (en) | 2015-04-01 |
Family
ID=52768345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420750350.5U Withdrawn - After Issue CN204238832U (en) | 2014-12-03 | 2014-12-03 | Steel tube tower is auxiliary climbs device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204238832U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104563838A (en) * | 2014-12-03 | 2015-04-29 | 国家电网公司 | Assistant climbing device of steel pipe tower |
-
2014
- 2014-12-03 CN CN201420750350.5U patent/CN204238832U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104563838A (en) * | 2014-12-03 | 2015-04-29 | 国家电网公司 | Assistant climbing device of steel pipe tower |
CN105696931A (en) * | 2014-12-03 | 2016-06-22 | 国网浙江省电力公司丽水供电公司 | Auxiliary climbing device for steel tube tower |
CN104563838B (en) * | 2014-12-03 | 2017-01-04 | 国家电网公司 | Steel tube tower auxiliary climbs device |
CN105696931B (en) * | 2014-12-03 | 2017-11-24 | 国网浙江省电力公司丽水供电公司 | Steel tube tower auxiliary climbs device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105839988A (en) | Self-vertical positioning pole erecting device and construction method thereof | |
CN204172112U (en) | Lift puncher | |
CN204238832U (en) | Steel tube tower is auxiliary climbs device | |
CN104563838A (en) | Assistant climbing device of steel pipe tower | |
CN208701506U (en) | Bridge Thin-wall Hollow Pier safety climbing ladder adheres to attachment device | |
CN203114154U (en) | Anti-climbing ladder stand provided with locking mechanism | |
CN202333536U (en) | Maintenance workbench | |
CN205778500U (en) | Ascend a height under a kind of vile weather the anti-slip ladder of operation | |
CN205386644U (en) | Be used for boring auxiliary stand of bar planting at bottom of roof beam or board | |
CN204402335U (en) | A kind of strain insulator Special maintenance tool | |
CN204481399U (en) | 10kV distribution line masthead maintenance and support bar | |
CN211173335U (en) | Telescopic cross arm for steel pipe tower | |
CN204386137U (en) | A kind of bottom tube bracing means of building scaffold | |
CN209568970U (en) | A kind of upper people's ladder of spigot-and-socket push-and-pull | |
CN208212420U (en) | The dedicated aerial device of Repair of Transformer | |
CN105442826A (en) | Elevating construction assisting device | |
CN202423898U (en) | Maintenance workbench | |
CN110644752A (en) | Adjustable scaffold | |
CN205637814U (en) | From vertical location pole setting ware | |
CN205743676U (en) | Electric power network repairing hanging ladder | |
CN204060485U (en) | A kind of Anti-inclining ladder | |
CN109638715B (en) | Movable insulating hard ladder for live working of power transmission line and working method thereof | |
CN204112314U (en) | A kind of liftable job platform of pile frame front end | |
CN211974856U (en) | Hydraulic engineering overhauls cat ladder | |
CN210443149U (en) | Warning sign is used in electric power construction convenient to carry |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150401 Effective date of abandoning: 20171124 |
|
AV01 | Patent right actively abandoned |