CN204225468U - A kind of scaffolding steel pipe structure - Google Patents

A kind of scaffolding steel pipe structure Download PDF

Info

Publication number
CN204225468U
CN204225468U CN201420604847.6U CN201420604847U CN204225468U CN 204225468 U CN204225468 U CN 204225468U CN 201420604847 U CN201420604847 U CN 201420604847U CN 204225468 U CN204225468 U CN 204225468U
Authority
CN
China
Prior art keywords
steel pipe
pipe body
utility
model
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420604847.6U
Other languages
Chinese (zh)
Inventor
冯建平
冯涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHANGJIAGANG RENHE HIGH-PRECISION TUBE Co Ltd
Original Assignee
ZHANGJIAGANG RENHE HIGH-PRECISION TUBE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHANGJIAGANG RENHE HIGH-PRECISION TUBE Co Ltd filed Critical ZHANGJIAGANG RENHE HIGH-PRECISION TUBE Co Ltd
Priority to CN201420604847.6U priority Critical patent/CN204225468U/en
Application granted granted Critical
Publication of CN204225468U publication Critical patent/CN204225468U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of scaffolding steel pipe structure, comprise steel pipe body, described steel pipe body middle part is circular configuration, described steel pipe body is provided with outer wall of steel pipe and steel pipe inner wall, described steel pipe body two ends are provided with projection, bulge-structure is rectangular preiection structure, in the middle of steel pipe, be provided with rectangular recess simultaneously, in scaffold use procedure, protruding and groove cooperatively interacts, jointly complete the building of scaffold, the beneficial effects of the utility model are: the utility model body abrasion resistance is high, corrosion-resistant excellent, long service life, it is firm that steel tubular structure connects, greatly reduce circular fixing illusive potential safety hazard.

Description

A kind of scaffolding steel pipe structure
Technical field
The utility model relates to steel pipe field, particularly relates to a kind of scaffolding steel pipe structure.
Background technology
Along with the development of society, seamless steel pipe is applied to every field, and scaffold adopts round steel pipe mostly, traditional steel tubular structure also exists to install and connects unsteady defect, at bridge construction, building aspect, scaffolding steel pipe is owing to being rounded face, not firmly easily to cause danger if fixing, serious meeting causes casualties, and current scaffold is regular length scaffold, and Long-Time Service, scaffold requires steel pipe support resistance to deformation, corrosion-resistant.
The utility model provides the scaffolding steel pipe structure that a kind of solid drawn tube makes, and structure is simple, uses reliable simultaneously.
Utility model content
The technical problem that the utility model mainly solves is to provide a kind of scaffolding steel pipe structure, can stable connection between steel pipe and steel pipe, use safety, convenient, and fast, the scaffold length adjustment simultaneously set up is convenient.
A kind of scaffolding steel pipe structure, comprise steel pipe body, described steel pipe body middle part is circular configuration, and described steel pipe body is provided with outer wall of steel pipe and steel pipe inner wall.
Described scaffolding steel pipe structure material can adopt alloy pipe, stainless steel or clad pipe.
Described steel pipe body two ends are provided with projection, and bulge-structure is rectangular preiection structure, is provided with rectangular recess in the middle of steel pipe simultaneously, in scaffold use procedure, protruding and groove cooperatively interacts, and jointly complete the building of scaffold, building speed is fast.
In order to better fixing feet hand cradle, described each steel pipe body two ends are provided with hexagonal fixed sleeving, described hexagonal fixed sleeving is socketed on the outer wall of steel pipe body, be convenient to fixing between scaffold, be outside equipped with fixed sleeving fastening bolt at hexagonal fixed sleeving simultaneously, be convenient to the intensity regulating fixed sleeving.
Between groove and steel pipe body, be provided with clip screw, be convenient to fixing between groove and projection, be convenient to building of scaffold.
The beneficial effects of the utility model are: the utility model scaffolding steel pipe structure body abrasion resistance is high, corrosion-resistant excellent, long service life, and it is firm that steel tubular structure connects, and greatly reduce circular fixing illusive potential safety hazard.
Accompanying drawing explanation
Fig. 1 is a kind of scaffolding steel pipe structural representation of the utility model.
In accompanying drawing, the mark of each parts is as follows: 1 is steel pipe body, and 2 is outer wall of steel pipe, and 3 is steel pipe inner wall, and 4 is clip screw, and 5 is groove, and 6 is protruding, and 7 is hexagonal fixed sleeving, 8 fixed sleeving fastening bolts.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, to make advantage of the present utility model and feature can be easier to be readily appreciated by one skilled in the art, thus more explicit defining is made to protection domain of the present utility model.
Refer to Fig. 1, the utility model embodiment comprises:
A kind of scaffolding steel pipe structure, comprise steel pipe body, described steel pipe body middle part is circular configuration, and described steel pipe body is provided with outer wall of steel pipe and steel pipe inner wall.
Described steel pipe material can adopt alloy pipe, stainless steel or clad pipe.
Described steel pipe body two ends are provided with projection, and bulge-structure is rectangular preiection structure, is provided with rectangular recess in the middle of steel pipe simultaneously, and in scaffold use procedure, protruding and groove cooperatively interacts, and jointly completes the building of scaffold.Building speed is fast.
In order to better fixing feet hand cradle, described each steel pipe body two ends are provided with hexagonal fixed sleeving, described hexagonal fixed sleeving is socketed on the outer wall of steel pipe body, be convenient to fixing between scaffold, be outside equipped with fixed sleeving fastening bolt at hexagonal fixed sleeving simultaneously, be convenient to the intensity regulating fixed sleeving.
Between groove and steel pipe body, be provided with clip screw, be convenient to fixing between groove and projection, be convenient to building of scaffold.
The foregoing is only embodiment of the present utility model; not thereby the scope of the claims of the present utility model is limited; every utilize the utility model manual and accompanying drawing content to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present utility model.

Claims (1)

1. a scaffolding steel pipe structure, it is characterized in that, comprise: steel pipe body, described steel pipe body middle part is circular configuration, described steel pipe body is provided with outer wall of steel pipe and steel pipe inner wall, described steel pipe material adopts alloy pipe, stainless steel or clad pipe, described steel pipe body two ends are provided with projection, bulge-structure is rectangular preiection structure, in the middle of steel pipe, be provided with rectangular recess simultaneously, described each steel pipe body two ends are provided with hexagonal fixed sleeving, described hexagonal fixed sleeving is socketed on the outer wall of steel pipe body, be outside equipped with fixed sleeving fastening bolt at hexagonal fixed sleeving simultaneously, clip screw is provided with between groove and steel pipe body, be convenient to fixing between groove and projection.
CN201420604847.6U 2014-10-20 2014-10-20 A kind of scaffolding steel pipe structure Expired - Fee Related CN204225468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420604847.6U CN204225468U (en) 2014-10-20 2014-10-20 A kind of scaffolding steel pipe structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420604847.6U CN204225468U (en) 2014-10-20 2014-10-20 A kind of scaffolding steel pipe structure

Publications (1)

Publication Number Publication Date
CN204225468U true CN204225468U (en) 2015-03-25

Family

ID=52923581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420604847.6U Expired - Fee Related CN204225468U (en) 2014-10-20 2014-10-20 A kind of scaffolding steel pipe structure

Country Status (1)

Country Link
CN (1) CN204225468U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328904A (en) * 2014-10-20 2015-02-04 张家港市人和高精管有限公司 Scaffold steel pipe structure
CN108277968A (en) * 2017-12-28 2018-07-13 绿城装饰工程集团有限公司 A kind of slub type scaffolding steel pipe and preparation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104328904A (en) * 2014-10-20 2015-02-04 张家港市人和高精管有限公司 Scaffold steel pipe structure
CN108277968A (en) * 2017-12-28 2018-07-13 绿城装饰工程集团有限公司 A kind of slub type scaffolding steel pipe and preparation method thereof
CN108277968B (en) * 2017-12-28 2020-02-21 绿城装饰工程集团有限公司 Bamboo joint type scaffold steel pipe and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN204357104U (en) Scaffolding steel pipe connector
CN204225468U (en) A kind of scaffolding steel pipe structure
CN204326483U (en) A kind of construction safety scaffold
CN204185942U (en) A kind of construction steel pipe connecting structure
CN103552927A (en) Wire slider suitable for round cable
CN104328904A (en) Scaffold steel pipe structure
CN204899038U (en) Overcoat straight thread connection structure in reinforcing bar
CN203927100U (en) High-performance composite pipe
CN203223665U (en) Novel stainless steel corrugated pipe
CN204491422U (en) A kind of variable-sized high-adaptability pier stud anchor ear
CN204784000U (en) Flange ring connecting piece
CN204531332U (en) A kind of bananas type scaffold
CN203273079U (en) Petroleum pipeline with guide groove structures
CN204194489U (en) Steel pipe brace
CN202202395U (en) Pipe clamp for PVC (polyvinyl chloride) sewer pipes of buildings
CN203808367U (en) Composite carbon fiber threaded bar
CN204346172U (en) A kind of mineral hot furnace blanking column assembly structure
CN203961088U (en) For the scaffolding steel pipe linkage of multistory building
CN203334653U (en) Steel tube connector
CN204060128U (en) A kind of carbon fiber tent rack
CN203686360U (en) Quick locking type pipe clamp
CN211286651U (en) Conical pin type wall-through fixing rod for building
CN210440726U (en) Butt-joint structure is used in water supply pipe construction
CN202302422U (en) Hoop type joint for thick pipe and thin pipe
CN203257086U (en) Fixing pipe fastener of scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150325

Termination date: 20151020

EXPY Termination of patent right or utility model