CN204212140U - The ground anchorage of the quiet spy equipment of formula of casting anchor - Google Patents
The ground anchorage of the quiet spy equipment of formula of casting anchor Download PDFInfo
- Publication number
- CN204212140U CN204212140U CN201420626604.2U CN201420626604U CN204212140U CN 204212140 U CN204212140 U CN 204212140U CN 201420626604 U CN201420626604 U CN 201420626604U CN 204212140 U CN204212140 U CN 204212140U
- Authority
- CN
- China
- Prior art keywords
- screw rod
- formula
- ground anchorage
- casting anchor
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Signs Or Road Markings (AREA)
Abstract
The utility model relates to the ground anchorage of the quiet spy equipment of a kind of formula of casting anchor.The purpose of this utility model be to provide a kind of fast, operate simple and easy, original municipal ground to be destroyed to the quiet spy equipment of formula of casting anchor that is little and that easily repair ground anchorage, make civilization, the experimental technique of specialty become the new foothold of enterprise and developing direction.The technical solution of the utility model is: the ground anchorage of the quiet spy equipment of a kind of formula of casting anchor, it is characterized in that: this ground anchorage comprises the plant bottom case of two parallel longitudinal settings, at welding two groups of bearings of this plant bottom case two ends lateral symmetry, often organize bearing to be parallel to each other by two and the channel-section steel that space is left in centre forms, adaptive screw rod in described space, screw rod upper end is screwed on the upper surface of bearing through disc, and screw rod lower end connects expansion bolt by deformable joints.The utility model is applicable to rigid pavement, city and marble road surface.
Description
Technical field
The utility model relates to the ground anchorage of the quiet spy equipment of a kind of formula of casting anchor, and is mainly applicable to rigid pavement, city and marble road surface.
Background technology
Along with the development of economy, the urbanization process of China is also progressively being accelerated, and the living standard of people improves constantly, city size constantly expands, urban population sharply increases, and the height of resident trip and the interflow of commodities is frequent, and urban traffic is faced with severe situation.Thus along with China's urban modernization, process of industrialization, this power of subway greatly, does not take the traffic transporting facility of ground space, just quietly rises in the construction of big and medium-sized cities, and becomes the optimal selection solving urban transport problems.
The construction of subway engineering is that traditional engineering investigation industry brings new opportunity, cone penetration test is widely adopted as a kind of full-fledged soil engineering in-situ test technology, and engineering investigation static cone penetration equipment in the past large for existing urban road damage area, test length consuming time, to repair difficulty large, thus the urban traffic that this has blocked up be can't bear the heavy load more.
Summary of the invention
The technical problems to be solved in the utility model is: for above-mentioned Problems existing provide a kind of fast, operate simple and easy, original municipal ground to be destroyed to the quiet spy equipment of formula of casting anchor that is little and that easily repair ground anchorage, make civilization, the experimental technique of specialty become the new foothold of enterprise and developing direction.
The technical scheme that the utility model adopts is: the ground anchorage of the quiet spy equipment of a kind of formula of casting anchor, it is characterized in that: this ground anchorage comprises the plant bottom case of two parallel longitudinal settings, at welding two groups of bearings of this plant bottom case two ends lateral symmetry, often organize bearing to be parallel to each other by two and the channel-section steel that space is left in centre forms, adaptive screw rod in described space, screw rod upper end is screwed on the upper surface of bearing through disc, and screw rod lower end connects expansion bolt by deformable joints.
Described screw rod has 6, and layout 3 on every collateral seat, one of them is positioned in the middle of two root device bases, and two other is symmetrically set in outside plant bottom case.
The beneficial effects of the utility model are: the utility model is equivalent to provide a counter-force platform, when concrete thickness meets the demands, the counter-force required for test is provided by the expansion bolt arranged, screw rod can be removed rapidly after off-test and connect deformable joints, equipment entrucking is gone to position, next hole, the hole that stays after hole for the expansion bolt and test all job mix cement mortar can be carried out to sealing of hole and fills and leads up, consumption is little, consuming time short, operate simple and easy, easy reparation, little on traffic circulation impact, improve development and the quality of city track traffic engineering prospecting, meet the requirement of civilized construction in municipal prospecting process.
Accompanying drawing explanation
Fig. 1 is top view of the present utility model.
Fig. 2 is front view of the present utility model.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the ground anchorage of the present embodiment is equivalent to a counter-force platform, utilizes the frictional force between expansion bolt 6 and material to provide test counter-force, carries out static sounding operation on the platform.This ground anchorage is made up of two groups of bearings 4 that two parallel longitudinal plant bottom cases 5 are parallel with welding transverse direction on the base, forms the counter-force platform of groined type.Often organize the upper surface (two ends near plant bottom case) being welded on plant bottom case 5 that bearing 4 is parallel to each other by two channel-section steels, gap is left between two channel-section steels, screw rod 3 (described gap should slightly larger than screw diameter) is furnished with in this gap, bearing 4 upper surface is fixed on by tapped disc 2 in the upper end of screw rod, and the lower end of screw rod connects a deformable joints 1, the other end of deformable joints is threaded expansion bolt 6.
In order to transversely both sides provide counter-force symmetrically, this routine screw rod has 6, and every collateral seat 4 arranges 3, and one of them screw rod is positioned at the centre of two root device bases 5, and two other screw rod is symmetrically set in outside plant bottom case.
In the present embodiment the key dimension of each parts and annexation as follows:
Deformable joints 1 entirety is long is 6cm, and inner logical threading, upper and lower side is connecting screw rod 3 and expansion bolt 6 respectively.
Disc 2 external diameter is about 10cm, internal diameter size is consistent with screw rod 3 external diameter, for screw rod 3 is fixed on bearing 4.
Screw rod 3 external diameter is about 22mm, length 50cm, and upper end utilizes disc 2 to be fixed on bearing 4, and bottom and deformable joints 1 are threaded connection.
The long 1500mm of bearing 4, wide is be reserved with the gap being greater than screw rod 3 diameter in the middle of 1100mm, and static cone penetration equipment is positioned over above bearing 4, and is stable at ground by six screw rods.
The bolt model of expansion bolt 6 is M16 × 200, and its specification is long 20cm, diameter is Φ 22mm, and permission maximum pull is 1940kg, maximum shear 1440kg; Expansion bolt utilizes to take along shape gradient to impel to expand produce friction bond stress and reach fixed effect.
The operating procedure of the present embodiment is as follows:
A, set static cone penetration equipment according to test hole position, and determine the position of 6 hole for the expansion bolts.
B, first use electric impact drill (hammer) on concrete or marble road surface, open the hole of corresponding size, hole depth should 5 millimeter darker in the length of expansion tube, then in bolt, expansion tube load hole, abundant tightening nut.
C, screw rod 3 is screwed in deformable joints 1 form entirety, this joint lower end connects the nut of expansion bolt 6, checks junction quality, guarantees reliable.
D, by screw rod 3 through behind the gap of bearing 4, screw in disc 2 to bearing 4 from top, and reserved certain space.
E, set gradually remaining five screw rod 3 as stated above, tighten fixing entirely anchor device successively.
F, conveniently method of operating connect the spy equipment that is fond of tranquility, and measurement obtains data.
After j, DATA REASONING, remove disc 2, screw rod 3, deformable joints 1 successively, fill up road surface with cement paste.
H, the end of job.
Claims (2)
1. the ground anchorage of the quiet spy equipment of formula of casting anchor, it is characterized in that: this ground anchorage comprises the plant bottom case (5) of two parallel longitudinal settings, welding two groups of bearings (4) of this plant bottom case two ends lateral symmetry, often organize bearing to be parallel to each other by two and the channel-section steel that space is left in centre forms, adaptive screw rod (3) in described space, screw rod upper end is screwed on the upper surface of bearing (4) through disc (2), and screw rod lower end connects expansion bolt (6) by deformable joints (1).
2. the ground anchorage of the quiet spy equipment of formula of casting anchor according to claim 1, it is characterized in that: described screw rod (3) has 6, the upper layout 3 of every collateral seat (4), one of them is positioned in the middle of two root device bases (5), and two other is symmetrically set in outside plant bottom case.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420626604.2U CN204212140U (en) | 2014-10-27 | 2014-10-27 | The ground anchorage of the quiet spy equipment of formula of casting anchor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420626604.2U CN204212140U (en) | 2014-10-27 | 2014-10-27 | The ground anchorage of the quiet spy equipment of formula of casting anchor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204212140U true CN204212140U (en) | 2015-03-18 |
Family
ID=52980827
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420626604.2U Active CN204212140U (en) | 2014-10-27 | 2014-10-27 | The ground anchorage of the quiet spy equipment of formula of casting anchor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204212140U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105714752A (en) * | 2016-02-25 | 2016-06-29 | 山西省交通科学研究院 | Static sounding construction technology for pavement of urban road |
CN109487771A (en) * | 2018-12-28 | 2019-03-19 | 中船勘察设计研究院有限公司 | A kind of the static sounding counter force system and test method of mattess |
-
2014
- 2014-10-27 CN CN201420626604.2U patent/CN204212140U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105714752A (en) * | 2016-02-25 | 2016-06-29 | 山西省交通科学研究院 | Static sounding construction technology for pavement of urban road |
CN109487771A (en) * | 2018-12-28 | 2019-03-19 | 中船勘察设计研究院有限公司 | A kind of the static sounding counter force system and test method of mattess |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Rehman et al. | Experimental study on demountable shear connectors in composite slabs with profiled decking | |
CN101831925B (en) | Detection method for static load of pile foundation | |
CN104792561A (en) | Low-frequency cyclic loading test device | |
CN204212140U (en) | The ground anchorage of the quiet spy equipment of formula of casting anchor | |
CN103088842A (en) | Rubble retaining wall reinforced single-face pattern plate support system and construction method | |
CN107964870A (en) | A kind of detachable assembling type reinforced concrete bridge pier cushion cap connection structure | |
CN103243922B (en) | Floorslab concrete thickness control device | |
CN203908864U (en) | Simple tunnel anchor rod drawing supporting tool | |
CN102953344B (en) | Climbing cone type triangular cantilever bracket | |
CN202000347U (en) | Movable ground anchor | |
CN202433253U (en) | Auxiliary device for pull-out test of hooked anchors | |
CN208009182U (en) | A kind of prefabricated assembled Cement Concrete Pavement Slab | |
CN207176411U (en) | One kind is applied to the reusable combined type base board of soft soil foundation | |
CN203583514U (en) | Pre-buried structure of ultra-deep foundation bolt | |
CN104805910A (en) | Embedded part for cast-in-place concrete component and construction method of embedded part | |
CN213597442U (en) | Elevator shaft template operation platform that encorbelments | |
CN207619988U (en) | The cast-in-place concrete of bar shaped foundation pit is to supportting the connection structure with prefabricated linking beam | |
CN203383217U (en) | Prestressed ground anchor device for foundation pit supporting | |
CN206769153U (en) | Assemble cast-in-place combined type superposed box mesh-beam floor system attachment structure | |
CN203603490U (en) | Supporting structure used for erecting formwork truss on prefabricated beam | |
CN206225848U (en) | Bridge-type high-voltage board installs suspension and support | |
CN204402020U (en) | A kind of extensible canopy of template platform | |
CN203113384U (en) | Detachable top plate reinforcing supporting device | |
CN103993754A (en) | Pre-stress reinforcing device of basement roof temporary overloads and implementation method of pre-stress reinforcing device | |
CN204282933U (en) | A kind of communication tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |