CN204199562U - One is marked time stair - Google Patents

One is marked time stair Download PDF

Info

Publication number
CN204199562U
CN204199562U CN201420655499.5U CN201420655499U CN204199562U CN 204199562 U CN204199562 U CN 204199562U CN 201420655499 U CN201420655499 U CN 201420655499U CN 204199562 U CN204199562 U CN 204199562U
Authority
CN
China
Prior art keywords
time
framework
marking time
support bar
marking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420655499.5U
Other languages
Chinese (zh)
Inventor
王小华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI QINDING ARCHITECTURAL DECORATION DESIGN ENGINEERING Co Ltd
Original Assignee
SHANGHAI QINDING ARCHITECTURAL DECORATION DESIGN ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI QINDING ARCHITECTURAL DECORATION DESIGN ENGINEERING Co Ltd filed Critical SHANGHAI QINDING ARCHITECTURAL DECORATION DESIGN ENGINEERING Co Ltd
Priority to CN201420655499.5U priority Critical patent/CN204199562U/en
Application granted granted Critical
Publication of CN204199562U publication Critical patent/CN204199562U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses one and to mark time stair, comprises framework, mark time assembly and hook; Framework connects many groups of assemblies of marking time, often group mark time assembly comprise mark time, a support bar and wire gauze; To mark time the first end lead frame of both sides, the second end of the two ends of support bar lead frame and both sides of marking time respectively, support bar is vertical with framework; Mark time perpendicular to the length direction of framework, surface of marking time arranges wire gauze, and support bar is the cylinder body of rod, and the diameter of support bar equals the thickness of marking time, and is parallel to each other between marking time, and the distance between marking time equals the width of marking time; The two ends of framework are respectively equipped with a pair hook, and framework is provided with some reinforcing ribs.The utility model can hang on scaffold cross bar, and ensure that constructor arrives the safety of operating platform, easy moulding also saves taking of space simultaneously, and the technique that selected materials extremely welds also ensure that the intensity of stair of marking time.

Description

One is marked time stair
Technical field
The utility model relates to building appliance, and particularly one is marked time stair.
Background technology
Scaffolding stairway has been marked time six step stair and eight step stair, can select six steps or eight step stair according to scaffold lapping height.But the stability of existing scaffolding stairway is not strong, is prone to accidents.
In view of this, one stair of marking time arise at the historic moment.
Summary of the invention
The utility model provides one and to mark time stair, overcome the difficulty of prior art, can hang on scaffold cross bar, ensure that constructor arrives the safety of operating platform, easy moulding also saves taking of space simultaneously, and the technique that selected materials extremely welds also ensure that the intensity of stair of marking time.
The utility model provides one and to mark time stair, comprises framework, mark time assembly and hook; Described framework connects many groups of assemblies of marking time, assembly of often marking time described in group comprise mark time, a support bar and wire gauze; The first end of described both sides of marking time welds described framework, and described framework is welded and the second end of both sides of marking time respectively in the two ends of described support bar, and described support bar is vertical with described framework; Describedly mark time perpendicular to the length direction of described framework, described surface of marking time arranges described wire gauze, and described support bar is the cylinder body of rod, the thickness of marking time described in the diameter of described support bar equals, described mark time between be parallel to each other, described in mark time between distance equal described in the width of marking time; The two ends of described framework are respectively equipped with a pair hook, and described framework is provided with some reinforcing ribs.
Preferably, described framework is provided with six groups of assemblies of marking time.
Preferably, described framework is provided with eight groups of assemblies of marking time.
The utility model can hang on scaffold cross bar, and ensure that constructor arrives the safety of operating platform, easy moulding also saves taking of space simultaneously, and the technique that selected materials extremely welds also ensure that the intensity of stair of marking time.
The utility model is further illustrated below in conjunction with drawings and Examples.
Accompanying drawing explanation
Fig. 1 is the structural representation of stair of marking time of the present utility model.
Fig. 2 is the lateral view of Fig. 1; And
Fig. 3 is the left view of Fig. 1.
reference numeral
1 is framework
2 for marking time
3 is support bar
4 is hook
5 is wire gauze
Detailed description of the invention
A kind of specific embodiment of the present utility model is introduced below by Fig. 1 to 3.
Embodiment 1
As shown in Figures 1 to 3, the utility model additionally provides one and to mark time stair, comprises framework 1, mark time assembly and hook 4.Described framework 1 connects many groups of assemblies of marking time, assembly of often marking time described in group comprises mark time 2, one support bar 3 and wire gauze 5; Described first end of marking time 2 both sides welds described framework 1, and the second end of described framework 1 and 2 both sides of marking time is welded at the two ends of described support bar 3 respectively, and described support bar 3 is vertical with described framework 1; Describedly mark time 2 perpendicular to the length direction of described framework 1, described 2 surfaces of marking time arrange described wire gauze 5, described support bar 3 is the cylinder body of rod, mark time described in the diameter of described support bar 3 equals 2 thickness, described marking time between 2 is parallel to each other, described in the distance of marking time between 2 equal described in mark time 2 width.The two ends of described framework 1 are respectively equipped with a pair hook 4, and described framework 1 is provided with some reinforcing ribs.Described framework 1 is provided with six groups of assemblies of marking time, or, eight groups of assemblies of marking time.
In summary, the utility model can hang on scaffold cross bar, and ensure that constructor arrives the safety of operating platform, easy moulding also saves taking of space simultaneously, and the technique that selected materials extremely welds also ensure that the intensity of stair of marking time.
Above-described embodiment is only for illustration of technological thought of the present utility model and feature, its object is to enable those skilled in the art understand content of the present utility model and implement according to this, only can not limit the scope of the claims of the present utility model with the present embodiment, namely the equal change done of all spirit disclosed according to the utility model or modification, still drop in the scope of the claims of the present utility model.

Claims (3)

1. to mark time stair, it is characterized in that: comprise framework (1), mark time assembly and hook (4);
Described framework (1) is upper connects many groups of assemblies of marking time, and assembly of often marking time described in group comprises mark time (2), a support bar (3) and wire gauze (5); Described first end of marking time (2) both sides welds described framework (1), and described framework (1) is welded and second end of (2) both sides of marking time respectively in the two ends of described support bar (3), and described support bar (3) is vertical with described framework (1); Described (2) length direction perpendicular to described framework (1) of marking time, described (2) surface of marking time arranges described wire gauze (5), described support bar (3) is the cylinder body of rod, to mark time described in the diameter of described support bar (3) equals the thickness of (2), described marking time between (2) is parallel to each other, described in the distance of marking time between (2) equal described in mark time the width of (2);
The two ends of described framework (1) are respectively equipped with described in a pair links up with (4), and described framework (1) is provided with some reinforcing ribs.
2. to mark time as claimed in claim 1 stair, it is characterized in that: described framework (1) is provided with six groups of assemblies of marking time.
3. to mark time as claimed in claim 1 stair, it is characterized in that: described framework (1) is provided with eight groups of assemblies of marking time.
CN201420655499.5U 2014-11-06 2014-11-06 One is marked time stair Expired - Fee Related CN204199562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420655499.5U CN204199562U (en) 2014-11-06 2014-11-06 One is marked time stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420655499.5U CN204199562U (en) 2014-11-06 2014-11-06 One is marked time stair

Publications (1)

Publication Number Publication Date
CN204199562U true CN204199562U (en) 2015-03-11

Family

ID=52657534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420655499.5U Expired - Fee Related CN204199562U (en) 2014-11-06 2014-11-06 One is marked time stair

Country Status (1)

Country Link
CN (1) CN204199562U (en)

Similar Documents

Publication Publication Date Title
CN205314586U (en) Prefabricated element slings
CN204040515U (en) Cat ladder
CN204454235U (en) A kind of novel many suspension centres equalizing bar device
CN204199562U (en) One is marked time stair
CN104668873A (en) Processing die for reinforcement cage
CN205873733U (en) Hoist frame that climbs
CN204475813U (en) A kind of building operations height adjustable scaffold
CN205153501U (en) Exhibition room is built and is used rack with adjustable height
CN204456912U (en) A kind of box type column structure
CN203334640U (en) Indoor movable scaffold with foldable transverse rod
CN204110075U (en) Bridge fender wall template transhipment mounting transport vehicle
CN105508732B (en) Pipe frame
CN203977836U (en) A kind of tool-type escalator building formwork platform
CN204324810U (en) A kind of pressure vessel manufacturing process operation platform machine frame
CN204960186U (en) Triangle rigid coupling stair bone for building shape single face angle bead
CN202990840U (en) Step ladder for moving into and out of cabin
CN204042403U (en) A kind of section bar
CN203294988U (en) Lift support for construction
CN203834675U (en) High-strength steel structure building
CN203755627U (en) Movable type scaffold
CN202481643U (en) Dimension stone carrying auxiliary tool
CN207392054U (en) Side stand group in portable concreting in lifts mould bases
CN205768234U (en) Cross beam of engraving machine
CN206256381U (en) A kind of mobile support for facilitating jack to transport
CN203769323U (en) Curtain wall column hoisting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150311

Termination date: 20181106

CF01 Termination of patent right due to non-payment of annual fee