CN204199546U - A kind of roof tile - Google Patents
A kind of roof tile Download PDFInfo
- Publication number
- CN204199546U CN204199546U CN201420529683.5U CN201420529683U CN204199546U CN 204199546 U CN204199546 U CN 204199546U CN 201420529683 U CN201420529683 U CN 201420529683U CN 204199546 U CN204199546 U CN 204199546U
- Authority
- CN
- China
- Prior art keywords
- platform
- tile body
- positioning datum
- drainage channel
- tile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to a kind of roof tile, comprise tile body, it is characterized in that: the tiling of described tile body is also provided with the positioning datum platform exceeding upper surface, the top edge of tile body is provided with support eaves, the top edge of positioning datum platform forms drainage channel with support eaves inward flange, the two ends of drainage channel respectively longitudinally center line direction be provided with guiding gutter, the lower limb certain distance of the lower end Distance positioning standard station of described guiding gutter to the lower limb of tile body; The lower limb of described positioning datum platform centrally line direction is provided with slot segmentation to the lower limb of tile body; Obstruct platform is provided with in described drainage channel; Intercept platform and drainage channel is divided into two parts, but it intercepts the top intercommunication of platform.The utility model can solve seepy question, avoids suck-back phenomenon, and can take into account again after laying completes, the problems such as whole structure is attractive in appearance, and planeness is higher, in addition due to the design of positioning datum platform, improve the quality and laying effect of laying.
Description
Technical field
The utility model belongs to building material technical field, particularly relates to a kind of roof tile.
Background technology
Roof tile be a kind of on construction work pitched roof watt, critical role is occupied in China's constructional materials, it is the traditional roofing materials of China, because the combining structure mode of traditional roof tile and selection limit, cause function singleness, volume is heavy, many disadvantages such as to construct loaded down with trivial details, domestic and international tens of generation attempts the drawback breaking through traditional roof tile, but hammer away, final be all tile vpg connection change and, the planeness of the overall tiling of most critical when designing roof tile, overall visual effect, speed of application and junction leak, existing tile is substantially all solve one of them or two problems, during bamboo product, often solve one of them problem and other problem will be abandoned, many persons technical problem has both the roof tile also not having this type of in the market, according to the investigation of reality, the general improvement direction of existing tile is all be how to solve that seam is not tight, blow-by problem, but once run into when raining heavyly, current are more anxious, guiding gutter draining not in time, thus causing flow into tile between adjacent watt of seam, cause roof leaked water problems, but also have back suction phenomenon, namely when current are overrun, mutually reply watt under produce negative pressure, and then rainwater can from watt seam in suck, produce seepy question, after leaking, be difficult to the place of pinpointing the problems when actual inspection and maintenance.
Summary of the invention
The utility model provides that a kind of structure is simple, efficiency of construction is high, can solve seepy question for solving in known technology the technical problem that exists, and save consumption, avoid suck-back phenomenon, after having laid, whole structure is attractive in appearance, the roof tile that planeness is higher.
The technical scheme that the utility model is taked for the technical problem existed in solution known technology is:
A kind of roof tile, comprise tile body, the soffit of described tile body is paved surface, and described paved surface is plane structure; The upper surface of tile body is tiling, which is provided with guiding gutter and installing hole; It is characterized in that: the tiling of described tile body is also provided with the positioning datum platform exceeding upper surface, the shape of described positioning datum platform is rectangle structure, and positioning datum platform is positioned at tile body center line upper position;
The top edge of tile body is provided with support eaves, described support eaves is divided into three sections, wherein the upper surface of interlude and the upper surface of positioning datum platform in the same plane, and width equals the width of positioning datum platform, the upper surface of both sides section and the upper surface of tile body in the same plane;
The top edge of positioning datum platform forms drainage channel with support eaves inward flange, drainage channel extends on the collateral support eaves of tile body to both sides from longitudinal midline, the upper surface of described collateral support eaves and the upper surface of tile body in the same plane, the two ends of drainage channel respectively longitudinally center line direction be provided with guiding gutter, the lower limb certain distance of the lower end Distance positioning standard station of described guiding gutter to the lower limb of tile body; It is domatic that the bottom of described guiding gutter is provided with water guide;
Described mounting hole site is in the both sides of positioning datum platform;
The lower limb of described positioning datum platform centrally line direction is provided with slot segmentation to the lower limb of tile body.
The utility model can also adopt following technical measures:
The described guiding gutter be positioned at inside collateral support eaves is at least provided with compartment wall, and guiding gutter is divided into separate disposal ditches by compartment wall, and the disposal ditches being wherein positioned at inner side is communicated with drainage channel.
Be provided with obstruct platform in described drainage channel, intercept the upper surface certain distance of platform distance upper surface positioning datum platform; Intercept platform and drainage channel is divided into two parts, but it intercepts the top intercommunication of platform.
The advantage that the utility model has and good effect are: because the utility model adopts technique scheme, the drawback that the modes such as the left and right docking, the up and down overlap joint that break traditions exist, solve the inaccurate and problem that causes cumulative errors increasing in traditional tile location when laying, compare with traditional same specification size roof tile the consumption saving tile simultaneously, reduce and lay man-hour; At seepy question, by the unique design of drainage channel be interconnected, thoroughly solve the suck-back phenomenon that existing roof tile exists; The design of positioning datum platform makes had benchmark to follow when practice of construction, lays at any time and looks for adjacent tile as benchmark at any time, just can ensure the whole structure laid; To form substantially identical rectangular block assembled on its surface after having laid, and cannot see any guiding gutter, disposal ditches etc., thus from overall visual effect arrangement namely neatly but also regular, to a kind of fresh and new sensation of people; Be particularly useful for the situation of present busy city foreign-style house and high-rise lap, down overlook foreign-style house roof from high level, to the enjoyment of a kind of U.S. of people.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the rear elevation of Fig. 1;
Fig. 3 is the left view of Fig. 1;
Fig. 4 is the top view of Fig. 1;
Fig. 5 and Fig. 6 is Fig. 1 tow sides perspective view;
Fig. 7 is laying structure schematic diagram;
Fig. 8 is the left view of Fig. 7;
Fig. 9 is the rear elevation laid;
Figure 10 and Figure 11 is positive and negative stereogram structural representation after laying.
In figure: 1, tile body; 1-1, paved surface; 1-2, tiling; 1-3, guiding gutter; 1-30, water guide are domatic; 1-4, installing hole; 1-5, positioning datum platform; 1-6, top edge; 1-7, support eaves; 1-8, drainage channel; 1-9, lower limb; 1-10, slot segmentation; 1-11, obstruct platform; 1-12, compartment wall; 1-13, collateral support eaves.
Detailed description of the invention
For summary of the invention of the present utility model, Characteristic can be understood further, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
Refer to Fig. 1 to Fig. 6, a kind of roof tile, comprise tile body 1, the soffit of described tile body is paved surface 1-1, and described paved surface is plane structure; The upper surface of tile body is tiling 1-2, which is provided with guiding gutter 1-3 and installing hole 1-4; The tiling of described tile body is also provided with the positioning datum platform 1-5 exceeding upper surface, the shape of described positioning datum platform is rectangle structure, and positioning datum platform is positioned at tile body center line upper position;
The top edge 1-6 of tile body is provided with and supports eaves 1-7, described support eaves is divided into three sections, wherein the upper surface of interlude and the upper surface of positioning datum platform in the same plane, and width equals the width of positioning datum platform, the upper surface of both sides section and the upper surface of tile body in the same plane;
The top edge 1-6 of positioning datum platform forms drainage channel 1-8 with support eaves 1-7 inward flange, drainage channel extends on the collateral support eaves 1-13 of tile body to both sides from longitudinal midline, the upper surface of described collateral support eaves and the upper surface of tile body in the same plane, the two ends of drainage channel respectively longitudinally center line direction be provided with guiding gutter 1-3 to the lower limb of tile body, the lower limb 1-9 certain distance of the lower end Distance positioning standard station of described guiding gutter, this distance does not limit, and does not expose as long as cover adjacent tile; The bottom of described guiding gutter is provided with the domatic 1-30 of water guide, and the domatic design of this water guide effectively prevents water from remaining dead angle, is thoroughly removed by Water in Rainwater Drainage, solve rainwater retain after leakage problems;
Described mounting hole site is in the both sides of positioning datum platform; Adopt the design of both sides and existing tile dead angle Stationary liquid to ensure that bonding strength than namely, again save installation cost; When fixed dress, the connector in installing hole by adjacent tile lid below, thus slows down the corrosion of connector, ensures intensity and the application life of connector.
The lower limb of described positioning datum platform centrally line direction is provided with slot segmentation 1-10 to the lower limb of tile body; The design of this slot segmentation makes assembled rear integral roofing be have several consistent rectangle assembled on the one hand, thus more smooth in visual effect, compares more outstanding with other roofing; Secondly he can shunt when raining heavyly, ensures that rainwater carries out dirty from roof tile surface smoothly.
Be provided with in described drainage channel and intercept platform 1-11, intercept the upper surface certain distance of platform distance upper surface positioning datum platform; Intercept platform and drainage channel is divided into two parts, but it intercepts the top intercommunication of platform, the design of above-mentioned obstruct platform improves the bulk strength of drainage channel on the one hand, on the one hand ensure that the guiding gutter of both sides can intercommunication in addition, when rainwater is less, this intercepts platform and plays the problem of placing rainwater channelling, when rainwater is larger, rainwater can cross obstruct platform, shares side guiding gutter drainability; The design of the structure that communicates effectively prevent, and produces negative pressure when raining heavyly and causes the problem of suck-back.
In order to solve seepy question further, be at least provided with compartment wall 1-12 at the described guiding gutter be positioned at inside collateral support eaves, guiding gutter is divided into separate disposal ditches by compartment wall, and the disposal ditches being wherein positioned at inner side is communicated with drainage channel.Adopt this technical scheme to make to be separated by compartment wall in guiding gutter, also just say that the rainwater flowed out in drainage channel needs to climb over the connecting sewing that a few wall wall could arrive the tile that is connected, and then improve drainability, thoroughly solve seepy question.
Laying method of the present utility model, refers to Fig. 7 to Figure 11, substantially the same with existing roof tile laying order, namely lays first row roof tile from offering bottom of slope, then upwards lays second row, the 3rd row gradually Such as, on laying during row's roof tile, the lower limb of the roof tile of this row should be concordant with the lower limb of the positioning datum platform of subordinate roof tile, and ensure that the side of roof tile of laying and the side of positioning datum platform are adjacent to, then by securing member by fastening for this roof tile; When laying second piece of roof tile of same row, the lower limb of second piece of roof tile is concordant with the lower limb of the positioning datum platform of the roof tile of the same row just spread, and it is close, second piece of roof tile will ride on the positioning datum platform of subordinate's roof tile, at same row's laying the 3rd piece of roof tile be, the lower limb of the 3rd piece of roof tile is concordant with the lower limb of the positioning datum platform of subordinate roof tile, and it is close, four, the 5th roof tile is by that analogy until after this row's laying completes, carrying out the laying of upper level roof tile; When reality is laid, also can mixing and take laying, so-called mixed taking that to lay be exactly lay for laying point according to the superior and the subordinate's positioning datum platform, can once many rows lay so simultaneously.
In sum, adopt technique scheme, the drawback that the modes such as the left and right docking, the up and down overlap joint that break traditions exist, the design of positioning datum platform solves the inaccurate and problem that causes cumulative errors increasing in traditional tile location when laying on the one hand, compare with traditional same specification size roof tile the consumption saving tile on the other hand, reduce and lay man-hour; At seepy question, by the unique design of drainage channel be interconnected, thoroughly solve the suck-back phenomenon that existing roof tile exists; The design of positioning datum platform makes had benchmark to follow when practice of construction, lays at any time and looks for adjacent tile as benchmark at any time, just can ensure the whole structure laid; To form substantially identical rectangular block assembled on its surface after having laid, and cannot see any guiding gutter, disposal ditches etc., thus from overall visual effect arrangement namely neatly but also regular, to a kind of fresh and new sensation of people; Be particularly useful for the situation of present busy city foreign-style house and high-rise lap, down overlook foreign-style house roof from high level, to the enjoyment of a kind of U.S. of people.
The above is only to preferred embodiment of the present utility model, not any pro forma restriction is done to the utility model, every according to technical spirit of the present utility model to any simple modification made for any of the above embodiments, equivalent variations and modification, all belong in the scope of technical solutions of the utility model.
Claims (3)
1. a roof tile, comprises tile body, and the soffit of described tile body is paved surface, and described paved surface is plane structure; The upper surface of tile body is tiling, which is provided with guiding gutter and installing hole; It is characterized in that: the tiling of described tile body is also provided with the positioning datum platform exceeding upper surface, the shape of described positioning datum platform is rectangle structure, and positioning datum platform is positioned at tile body center line upper position;
The top edge of tile body is provided with support eaves, described support eaves is divided into three sections, wherein the upper surface of interlude and the upper surface of positioning datum platform in the same plane, and width equals the width of positioning datum platform, the upper surface of both sides section and the upper surface of tile body in the same plane;
The top edge of positioning datum platform forms drainage channel with support eaves inward flange, drainage channel extends on the collateral support eaves of tile body to both sides from longitudinal midline, the upper surface of described collateral support eaves and the upper surface of tile body in the same plane, the two ends of drainage channel respectively longitudinally center line direction be provided with guiding gutter, the lower limb certain distance of the lower end Distance positioning standard station of described guiding gutter to the lower limb of tile body; It is domatic that the bottom of described guiding gutter is provided with water guide;
Described mounting hole site is in the both sides of positioning datum platform;
The lower limb of described positioning datum platform centrally line direction is provided with slot segmentation to the lower limb of tile body.
2. roof tile according to claim 1, is characterized in that: described in the guiding gutter be positioned at inside collateral support eaves be at least provided with compartment wall, guiding gutter is divided into separate disposal ditches by compartment wall, and the disposal ditches being wherein positioned at inner side is communicated with drainage channel.
3. roof tile according to claim 1 and 2, is characterized in that: be provided with obstruct platform in described drainage channel, intercepts the upper surface certain distance of platform distance upper surface positioning datum platform; Intercept platform and drainage channel is divided into two parts, but it intercepts the top intercommunication of platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420529683.5U CN204199546U (en) | 2014-09-15 | 2014-09-15 | A kind of roof tile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420529683.5U CN204199546U (en) | 2014-09-15 | 2014-09-15 | A kind of roof tile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204199546U true CN204199546U (en) | 2015-03-11 |
Family
ID=52657519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420529683.5U Withdrawn - After Issue CN204199546U (en) | 2014-09-15 | 2014-09-15 | A kind of roof tile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204199546U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104196174A (en) * | 2014-09-15 | 2014-12-10 | 吴在祥 | Roofing tile |
-
2014
- 2014-09-15 CN CN201420529683.5U patent/CN204199546U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104196174A (en) * | 2014-09-15 | 2014-12-10 | 吴在祥 | Roofing tile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103628502A (en) | Method for using plastic drainage plates as hollow floor of underground engineering base plates | |
CN204199546U (en) | A kind of roof tile | |
CN202831317U (en) | Daylighting roof dew formation groove water discharging structure | |
CN208792646U (en) | A kind of roof boarding gap waterproof construction | |
CN202658843U (en) | Ponding preventing shower cubicle ground | |
CN209066505U (en) | A kind of diaphragm wall circular construction joint waterproof construction | |
CN104712105A (en) | Tile plate preventing rainwater leakage | |
CN104196174B (en) | A kind of roofing tile | |
CN202850224U (en) | Waterproof plate | |
CN201826446U (en) | Flashing device for house | |
CN204960145U (en) | Improved generation tile | |
CN204498886U (en) | A kind of roof greening planting basin | |
CN211396020U (en) | Green building waterproof layer | |
CN209244167U (en) | A kind of assembled multifunctional water-proofing shower platform | |
CN208950228U (en) | A kind of accomodation ground water proof structure for indoor design | |
CN208136655U (en) | A kind of environmental protection brick applied to road surfacing | |
CN209053112U (en) | Building caisset | |
CN205955022U (en) | Tile modelled after an antique | |
CN208844809U (en) | A kind of buffering band structure for planted roof and parapet junction | |
CN204825664U (en) | Case roof beam seals anchor template | |
CN211647021U (en) | Cornice connecting structure for building construction | |
CN204455995U (en) | A kind of environment affinity type water suction Revetment block for building shore protection | |
CN204677213U (en) | A kind of point pool waterproof layer structure | |
CN202347645U (en) | Draining floor drain | |
CN203429673U (en) | Shear wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150311 Effective date of abandoning: 20160914 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |