CN204176721U - Semiconductor heated multi-function electric boiler - Google Patents

Semiconductor heated multi-function electric boiler Download PDF

Info

Publication number
CN204176721U
CN204176721U CN201420626598.0U CN201420626598U CN204176721U CN 204176721 U CN204176721 U CN 204176721U CN 201420626598 U CN201420626598 U CN 201420626598U CN 204176721 U CN204176721 U CN 204176721U
Authority
CN
China
Prior art keywords
water
communicated
semiconductor
water tank
energy storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420626598.0U
Other languages
Chinese (zh)
Inventor
周世敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin mewbourne Amperex Technology Limited
Original Assignee
周世敏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周世敏 filed Critical 周世敏
Priority to CN201420626598.0U priority Critical patent/CN204176721U/en
Application granted granted Critical
Publication of CN204176721U publication Critical patent/CN204176721U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Central Heating Systems (AREA)
  • Instantaneous Water Boilers, Portable Hot-Water Supply Apparatuses, And Control Of Portable Hot-Water Supply Apparatuses (AREA)

Abstract

The utility model belongs to a kind of semiconductor heated multi-function electric boiler, is made up of heating furnace body, radiator, shower nozzle and semiconductor heating tube.Heating furnace body and water tank and energy storage tank split are arranged, at least 2 semiconductor heating tubes are provided with in heating furnace body, water pump and electric-controlled plate is provided with in the heating furnace body of semiconductor heating tube lower end, pump outlet is communicated by the water inlet end of branched pipe with each semiconductor heating tube, pump intake is communicated with return pipe by water filter, the water side of each semiconductor heating tube is communicated by branched pipe the water inlet of water tank, and the delivery port of water tank is divided into two-way.The utility model has well stable confession and to warm up shower, bathing function, and volume is little, structure simple, cost of manufacture and price is low, heat utilization efficiency is high, use cost is low, the energy is saved in power saving, uses comfortable and advantage that is long service life.

Description

Semiconductor heated multi-function electric boiler
Technical field
The utility model belongs to a kind of semiconductor heated multi-function electric boiler.
Background technology
Traditional heating boiler volume is large, complex structure, get angry slow, heat utilization efficiency is low, cost of manufacture is high and price is expensive, and using function is single, can only heat, and uses and stoking inconvenience.On the other hand, traditional heating boiler, fuel is single, can only coal separation, oil as the energy, thus cause that use cost is high, energy waste is serious, pollutes large and that service life is short deficiency.
Summary of the invention
The purpose of this utility model is a kind of semiconductor heated multi-function electric boiler of design, make it have well stable confession to warm up bathing function, and volume is little, structure is simple, cost of manufacture and price is low, heat utilization efficiency is high, use cost is low, the energy is saved in power saving, uses the advantage of comfort and convenient and long service life.
For this reason, the utility model is made up of heating furnace body, radiator, shower nozzle and semiconductor heating tube.Heating furnace body and water tank and energy storage tank split are arranged, at least 2 semiconductor heating tubes are provided with in heating furnace body, water pump and electric-controlled plate is provided with in the heating furnace body of semiconductor heating tube lower end, pump outlet is communicated by the water inlet end of branched pipe with each semiconductor heating tube, pump intake is communicated with return pipe by water filter, the water side of each semiconductor heating tube is communicated by branched pipe the water inlet of water tank, the delivery port of water tank is divided into two-way, the triple valve of leading up to of water tank delivery port communicates with the shower nozzle in bathroom, the valve of separately leading up to of water tank delivery port communicates with the water inlet of energy storage tank, the delivery port of energy storage tank is communicated with the water inlet of each radiator by conduit and each valve, the delivery port of each radiator communicates return pipe, return pipe establishes filler, the upper end of water tank and energy storage tank is respectively provided with air bleeding valve,
Or the water side of each semiconductor heating tube is communicated by branched pipe the water inlet end of the spiral radiator in water tank, the water side of spiral radiator is communicated with the water inlet of energy storage tank by valve, the delivery port of energy storage tank is communicated with the water inlet of each radiator by conduit and each valve, the delivery port of each radiator communicates return pipe, return pipe establishes filler, the lower end of water tank is communicated with the shower nozzle in bathroom by triple valve, and water filling port and air bleeding valve are established in the upper end of water tank.
Heating furnace body outside described electric-controlled plate is provided with control panel, and control panel is provided with display screen and control button.Temperature control sensor is provided with in described water tank and energy storage tank.
Said structure design achieves the purpose of this utility model.
The utility model has well stable confession and to warm up shower, bathing function, and volume is little, structure simple, cost of manufacture and price is low, heat utilization efficiency is high, use cost is low, the energy is saved in power saving, uses comfortable and advantage that is long service life.Trample data factually to show: the boiler raising 15 ~ 20% that heat utilization of the present utility model is more traditional.Power saving significantly can save the energy, can save energy cost 30 ~ 40%.Comparatively traditional product reduces pollution 100%.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is another example structure schematic diagram of the utility model.
Detailed description of the invention
As depicted in figs. 1 and 2, a kind of semiconductor heated multi-function electric boiler, by heating furnace body 18, radiator 14,17, shower nozzle 13 and semiconductor heating tube 26 formed.Heating furnace body and water tank 2 and energy storage tank 7 split are arranged.At least 2 semiconductor heating tubes are provided with in heating furnace body.Water pump 24 and electric-controlled plate is provided with in the heating furnace body of semiconductor heating tube lower end.Heating furnace body outside described electric-controlled plate is provided with control panel 19, and control panel is provided with display screen 20 and control button 21.Pump outlet is communicated by the water inlet end of branched pipe 25 with each semiconductor heating tube.Pump intake 23 is communicated with return pipe 16 by water filter 22.The water side 27 of each semiconductor heating tube is communicated by branched pipe the water inlet 28 of water tank.The effect of water filter filters out circulation impurities in water.
The delivery port of water tank is divided into two-way, and a road 3 of water tank delivery port is communicated with the shower nozzle 13 in bathroom by triple valve 12, and a road of triple valve connects cold water pipe 11, in order to adjust water temperature; Another road 4 of water tank delivery port is communicated with the water inlet of energy storage tank by valve 5.The delivery port 6 of energy storage tank is communicated with the water inlet of each radiator 14,17 by conduit and each valve 15, and radiator 14 is arranged in each room, and radiator 17 is arranged in bathroom.The delivery port of each radiator communicates return pipe 16, and return pipe is established filler 9, filler is positioned at the position higher than water tank and energy storage tank by conduit 10, or conduit is the conduit of band check valve.The upper end of water tank and energy storage tank is respectively provided with air bleeding valve 1,8, and air bleeding valve is used for the gas in water tank and energy storage tank to discharge.Temperature control sensor 31,32 is provided with in described water tank and energy storage tank.
During use, in water tank and energy storage tank, each semiconductor heating tube, each radiator, inject demineralized water or cold water by filler and conduit.Turn on the power switch, water pump and each semiconductor heating tube are started working, and the relevant control circuit on electric-controlled plate also works (be traditional circuit, therefore be not repeated).The demineralized water of process or cool water heating are become hot water under water pump effect by each semiconductor heating tube, and hot water is pressed in water tank.Now, if bathing, close the valve 5 between water tank and energy storage tank, open triple valve 12, with the shower nozzle bathing in bathroom.Water adds cold water from filler time not enough.Now, if heating, closes triple valve, open the valve 5 between water tank and energy storage tank, the water of heating flows into energy storage tank from water tank and enters each radiator to each rooms through the delivery port 6 of energy storage tank by conduit and each valve 15, in radiator, the cold water of heat radiation flows back in each semiconductor heating tube through water filter 22 and water pump again from return pipe, reheats circulation.Relevant control circuit on electric-controlled plate shows the temperature on water tank and energy storage tank by the temperature control sensor that reading water tank and energy storage tank are provided with, the display screen be provided with by control panel and control button carry out adjustment temperature or timing.If heating and bathing, then open triple valve 12 and the valve between water tank and energy storage tank 5, therefore be not repeated simultaneously simultaneously.
As shown in Figure 2, with said structure unlike: or the water side 27 of each semiconductor heating tube to be communicated by branched pipe the water inlet end of the spiral radiator 29 in water tank, and the water side 33 of spiral radiator is communicated with the water inlet of energy storage tank by valve.The delivery port of energy storage tank is communicated with the water inlet of each radiator by conduit and each valve, the delivery port of each radiator communicates return pipe, return pipe establishes filler, and the lower end of water tank is communicated with the shower nozzle in bathroom by triple valve, and water filling port 30 and air bleeding valve are established in the upper end of water tank.Temperature control sensor 31,32 is provided with in described water tank and energy storage tank.
During different from said structure use be: the cold water in water tank is heated by the spiral radiator be connected with each semiconductor heating tube, spiral radiator supplies water to energy storage tank, separately establish a water filling port in the upper end of water tank, add water for bathing, bathe with water Xian of water tank.Therefore be not repeated.
In a word, the utility model has well stable confession and to warm up shower, bathing function, and volume is little, structure simple, cost of manufacture and price is low, heat utilization efficiency is high, use cost is low, the energy is saved in power saving, uses comfortable and advantage that is long service life.Can promote the use of.

Claims (3)

1. a semiconductor heated multi-function electric boiler, by heating furnace body, radiator, shower nozzle and semiconductor heating tube formed, it is characterized in that: heating furnace body and water tank and energy storage tank split are arranged, at least 2 semiconductor heating tubes are provided with in heating furnace body, water pump and electric-controlled plate is provided with in the heating furnace body of semiconductor heating tube lower end, pump outlet is communicated by the water inlet end of branched pipe with each semiconductor heating tube, pump intake is communicated with return pipe by water filter, the water side of each semiconductor heating tube is communicated by branched pipe the water inlet of water tank, the delivery port of water tank is divided into two-way, the triple valve of leading up to of water tank delivery port communicates with the shower nozzle in bathroom, the valve of separately leading up to of water tank delivery port communicates with the water inlet of energy storage tank, the delivery port of energy storage tank is communicated with the water inlet of each radiator by conduit and each valve, the delivery port of each radiator communicates return pipe, return pipe establishes filler, the upper end of water tank and energy storage tank is respectively provided with air bleeding valve,
Or the water side of each semiconductor heating tube is communicated by branched pipe the water inlet end of the spiral radiator in water tank, the water side of spiral radiator is communicated with the water inlet of energy storage tank by valve, the delivery port of energy storage tank is communicated with the water inlet of each radiator by conduit and each valve, the delivery port of each radiator communicates return pipe, return pipe establishes filler, the lower end of water tank is communicated with the shower nozzle in bathroom by triple valve, and water filling port and air bleeding valve are established in the upper end of water tank.
2., by semiconductor heated multi-function electric boiler according to claim 1, it is characterized in that: the heating furnace body outside described electric-controlled plate is provided with control panel, control panel is provided with display screen and control button.
3., by semiconductor heated multi-function electric boiler according to claim 1, it is characterized in that: in described water tank and energy storage tank, be provided with temperature control sensor.
CN201420626598.0U 2014-10-28 2014-10-28 Semiconductor heated multi-function electric boiler Active CN204176721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420626598.0U CN204176721U (en) 2014-10-28 2014-10-28 Semiconductor heated multi-function electric boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420626598.0U CN204176721U (en) 2014-10-28 2014-10-28 Semiconductor heated multi-function electric boiler

Publications (1)

Publication Number Publication Date
CN204176721U true CN204176721U (en) 2015-02-25

Family

ID=52565529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420626598.0U Active CN204176721U (en) 2014-10-28 2014-10-28 Semiconductor heated multi-function electric boiler

Country Status (1)

Country Link
CN (1) CN204176721U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105910162A (en) * 2016-06-08 2016-08-31 山西亿鼎节能环保科技有限公司 Heat supply system for electric heating of thick film
WO2021147323A1 (en) * 2020-01-20 2021-07-29 东北大学 Comprehensive energy optimization control method for park

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105910162A (en) * 2016-06-08 2016-08-31 山西亿鼎节能环保科技有限公司 Heat supply system for electric heating of thick film
WO2021147323A1 (en) * 2020-01-20 2021-07-29 东北大学 Comprehensive energy optimization control method for park

Similar Documents

Publication Publication Date Title
CN204176721U (en) Semiconductor heated multi-function electric boiler
CN203964391U (en) Hot-water heating system output water temperature thermostat
CN202304002U (en) Instant solar water heater
CN102384581A (en) Cavity-divided heating water heater
CN201983469U (en) Solar heat pump water heater
CN205717980U (en) Conventional solar boilers Intelligent improvement facility
CN204943925U (en) Self-powered solar water heating system
CN203572020U (en) Static state one-time heating type water system
CN202734226U (en) Novel gas heating water heater
CN102278822A (en) Solar water heater with gas water heater
CN203615064U (en) Liquid vaporization device
CN103557545B (en) Associating heat-exchanger
CN201740214U (en) Double-container low-power double-die heating fast energy-saving heater
CN203190602U (en) Water heater
CN202057041U (en) Heat pump water heater system with variable-capacity water tank
CN102519147A (en) Solar water heater with quick-heating water heater
CN201575571U (en) Fast and instant double module electric water heater
CN106642644B (en) Multi-energy constant-temperature water supply system
CN204963230U (en) Air source hot water machine controlling means
CN202133108U (en) Double-chamber air source water heater
CN2384168Y (en) Water heater
CN2906440Y (en) Heating device
CN205156401U (en) Water tank of solar water heater
CN203771532U (en) Water circulation type electric heating device
CN205425112U (en) Semiconductor heating energy storage heating system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160707

Address after: 100000 Beijing economic and Technological Development Zone, Beijing, West Road, No. 6, building No. 3, floor, floor 5

Patentee after: Beijing Aili constant energy environmental protection technology Co. Ltd.

Address before: 100063 Beijing city Xicheng District Zhenwu Hutong No. 29

Patentee before: Zhou Shimin

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161128

Address after: 100000 Beijing Hutong, Xicheng District, building 1, unit 1, No. 108

Patentee after: Zhou Shimin

Address before: 100000 Beijing economic and Technological Development Zone, Beijing, West Road, No. 6, building No. 3, floor, floor 5

Patentee before: Beijing Aili constant energy environmental protection technology Co. Ltd.

TR01 Transfer of patent right

Effective date of registration: 20180412

Address after: 100000 Gaobeidian East District B14-8, Chaoyang District, Beijing

Patentee after: Tianjin mewbourne Amperex Technology Limited

Address before: 100000 Beijing Hutong, Xicheng District, building 1, unit 1, No. 108

Patentee before: Zhou Shimin

TR01 Transfer of patent right
CP02 Change in the address of a patent holder

Address after: 301900 200 meters south of Xiaoxuzhuang Village, Dongerying Town, Jizhou District, Tianjin

Patentee after: TIANJIN NEWBOURNE NEW ENERGY TECHNOLOGY Co.,Ltd.

Address before: 100000 Gaobeidian East District B14-8, Chaoyang District, Beijing

Patentee before: TIANJIN NEWBOURNE NEW ENERGY TECHNOLOGY Co.,Ltd.

CP02 Change in the address of a patent holder