CN204166383U - A kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board - Google Patents

A kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board Download PDF

Info

Publication number
CN204166383U
CN204166383U CN201420691657.2U CN201420691657U CN204166383U CN 204166383 U CN204166383 U CN 204166383U CN 201420691657 U CN201420691657 U CN 201420691657U CN 204166383 U CN204166383 U CN 204166383U
Authority
CN
China
Prior art keywords
test board
wind power
installation
cabinet
board cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420691657.2U
Other languages
Chinese (zh)
Inventor
顾天涛
陈波
史伟
孟军峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodian United Power Technology Lianyungang Co Ltd
Original Assignee
Guodian United Power Technology Lianyungang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian United Power Technology Lianyungang Co Ltd filed Critical Guodian United Power Technology Lianyungang Co Ltd
Priority to CN201420691657.2U priority Critical patent/CN204166383U/en
Application granted granted Critical
Publication of CN204166383U publication Critical patent/CN204166383U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model is a kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board, comprise test board cabinet, test board cabinet is provided with installation crossbeam, crossbeam is installed and is provided with guide rail, guide rail is provided with some installation of electrical equipment plates, installation of electrical equipment plate is provided with aerogenerator PLC, and test board cabinet is provided with aviation socket, the front of described test board cabinet is set to operation bench, and operation bench is provided with testing button pilot lamp.The control system of switch board at the bottom of the wind power generating set tower of each type can concentrate in this test board cabinet by the utility model, directly uses the primary control program adopted during fan operation comprehensively to test blower fan; By aviation plug with under arranging the cooperation of aviation socket with aerogenerator PLC one_to_one corresponding, while reduction equipment cost, also reduce equipment volume; Utilize the some installation of electrical equipment plates be arranged on guide rail, facilitate aerogenerator PLC.

Description

A kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board
Technical field
The utility model relates to the proving installation of a kind of wind power generating set production phase, particularly a kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board.
Background technology
When now comprehensive combined debugging, test being carried out to the equipment such as fan engine room, axial fan hub, all need to run primary control program and test.Usual aerogenerator at the bottom of tower switch board and engine room control cabinet communication normal time primary control program just can run.At present, the primary control program that many wind power generating set manufacturers adopt when production test stage blower fan actual motion inapplicable in order to guaranteed efficiency is tested, thus adds the workload of blower fan field adjustable.Some manufacturer uses the primary control program of blower fan to carry out comprehensively test to blower fan and just uses switch board at the bottom of the tower mated with this type, when producing type and being more, workshop needs to put switch board at the bottom of a large amount of towers, not only take large quantity space, and handle tower base cabinet also greatly can have impact on the efficiency of production.
Summary of the invention
The technical problems to be solved in the utility model is for the deficiencies in the prior art, proposes one and takes up room little, the integrated form engine rooms of wind power generators equipment uniting and adjustment test board that can enhance productivity.
The technical problems to be solved in the utility model is achieved through the following technical solutions.The utility model is a kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board, be characterized in: comprise test board cabinet, two parallel installation crossbeams are laterally provided with at the back side of test board cabinet, install on crossbeam at two and be equipped with guide rail, article two, guide rail parallel is arranged, described guide rail is provided with some installation of electrical equipment plates being vertically arranged on test board cabinet inside, installation of electrical equipment plate is provided with aerogenerator PLC, the aviation socket arranged with aerogenerator PLC one_to_one corresponding is provided with in the side of test board cabinet, the front of described test board cabinet is set to operation bench, operation bench is provided with some testing button pilot lamp for simulating aerogenerator master control cabinet button indicating lamp to be measured, testing button pilot lamp is connected with the aviation plug coordinated with aviation socket by control cables.
In a kind of integrated form engine rooms of wind power generators of the utility model equipment uniting and adjustment test board technical scheme, preferred technical scheme feature is further:
1, at the bottom symmetrical of test board cabinet, four universal wheels are installed;
2, an installation of electrical equipment plate is provided with power module wherein;
3, on the operation bench of test board cabinet, be also provided with graphoscope, be provided with the main frame coordinated with graphoscope in the inside of test board cabinet;
4, clamping screw crossbeam being provided with locking installation of electrical equipment plate is being installed.
Compared with prior art, the control system of switch board at the bottom of the wind power generating set tower of each type can concentrate in this test board cabinet by the utility model, directly uses the primary control program adopted during fan operation comprehensively to test blower fan; By aviation plug with under arranging the cooperation of aviation socket with aerogenerator PLC one_to_one corresponding, while reduction equipment cost, also reduce equipment volume; Utilize the some installation of electrical equipment plates be arranged on guide rail, facilitate aerogenerator PLC, be easy to upgrading expansion; Utilize the universal wheel being arranged on test board bottom of cabinet bulk, make test board cabinet light and handy and be convenient to mobile.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the right TV structure schematic diagram of Fig. 1.
Embodiment
Referring to accompanying drawing, further describe concrete technical scheme of the present utility model, so that those skilled in the art understands the utility model further, and do not form the restriction of its power.
Embodiment 1, with reference to Fig. 1, 2, a kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board, comprise test board cabinet 1, two parallel installation crossbeams 12 are laterally provided with at the back side of test board cabinet 1, install on crossbeam 12 at two and be equipped with guide rail, article two, guide rail parallel is arranged, described guide rail is provided with some installation of electrical equipment plates 9 being vertically arranged on test board cabinet inside, installation of electrical equipment plate 9 is provided with aerogenerator PLC 10, the aviation socket 6 arranged with aerogenerator PLC one_to_one corresponding is provided with in the side of test board cabinet, the front of described test board cabinet is set to operation bench, operation bench is provided with some testing button pilot lamp 3 for simulating aerogenerator master control cabinet button indicating lamp to be measured, testing button pilot lamp is connected with the aviation plug 5 coordinated with aviation socket by control cables 4.
No. 1 station of described Workshop Production aerogenerator and No. 2 stations there is the wind power generating set to be measured of 2 different models, wind power generating set on No. 1 station adopts the aerogenerator PLC of A type, uses D type aerogenerator PLC in the wind generating set engine room cabinet on No. 2 stations.First confirm before test job starts whether A type aerogenerator PLC is connected on corresponding aviation socket respectively with D type aerogenerator PLC input/output signal separately.When testing the aerogenerator of A type aerogenerator PLC, aviation plug is inserted on aviation socket corresponding with it, then power on, by computer run testing software, blower fan primary control program is loaded in blower fan PLC master control, combined debugging, test are carried out to blower fan.Time after having tested as associating combined debugging, test need be carried out to adopting the blower fan of D type aerogenerator PLC.Only need power-off, aviation plug is inserted on the aviation socket corresponding with D type aerogenerator PLC, repeats above-mentioned work.If there is no the model of the PLC master controller of aerogenerator to be measured in this test board cabinet 1, only need remove one piece of electrical equipment installing plate, namely two clamping screws are removed, the installation of electrical equipment plate of the aerogenerator PLC that corresponding model is housed is reinstalled on guide rail, on the vacant aviation socket removed before again the input/output signal of this aerogenerator PLC being connected to, can re-power and carry out fan test work.
Embodiment 2, in the integrated form engine rooms of wind power generators equipment uniting and adjustment test board described in embodiment 1: be provided with four universal wheels 11 at the bottom symmetrical of test board cabinet.Like this, the movement of test board cabinet is facilitated.
Embodiment 3, in the integrated form engine rooms of wind power generators equipment uniting and adjustment test board described in embodiment 1 or 2: an installation of electrical equipment plate is provided with power module 8 wherein.Described power module 8 is powered for aerogenerator PLC 10.
Embodiment 4, in embodiment 1 or the integrated form engine rooms of wind power generators equipment uniting and adjustment test board described in 2 or 3: be also provided with graphoscope 2 on the operation bench of test board cabinet, be provided with the main frame 7 coordinated with graphoscope in the inside of test board cabinet.Utilizing main frame 7, be connected to the aerogenerator PLC 10 in test board cabinet by netting twine, carrying out fan test by running fan test software.
Embodiment 5, in embodiment 1 or 2 or the integrated form engine rooms of wind power generators equipment uniting and adjustment test board described in 3 or 4: installing clamping screw crossbeam being provided with locking installation of electrical equipment plate.

Claims (5)

1. an integrated form engine rooms of wind power generators equipment uniting and adjustment test board, it is characterized in that: comprise test board cabinet, two parallel installation crossbeams are laterally provided with at the back side of test board cabinet, install on crossbeam at two and be equipped with guide rail, article two, guide rail parallel is arranged, described guide rail is provided with some installation of electrical equipment plates being vertically arranged on test board cabinet inside, installation of electrical equipment plate is provided with aerogenerator PLC, the aviation socket arranged with aerogenerator PLC one_to_one corresponding is provided with in the side of test board cabinet, the front of described test board cabinet is set to operation bench, operation bench is provided with some testing button pilot lamp for simulating aerogenerator master control cabinet button indicating lamp to be measured, testing button pilot lamp is connected with the aviation plug coordinated with aviation socket by control cables.
2. integrated form engine rooms of wind power generators equipment uniting and adjustment test board according to claim 1, is characterized in that: be provided with four universal wheels at the bottom symmetrical of test board cabinet.
3. integrated form engine rooms of wind power generators equipment uniting and adjustment test board according to claim 1, is characterized in that: an installation of electrical equipment plate is provided with power module wherein.
4. integrated form engine rooms of wind power generators equipment uniting and adjustment test board according to claim 1, it is characterized in that: on the operation bench of test board cabinet, be also provided with graphoscope, be provided with the main frame coordinated with graphoscope in the inside of test board cabinet.
5. integrated form engine rooms of wind power generators equipment uniting and adjustment test board according to claim 1, is characterized in that: installing clamping screw crossbeam being provided with locking installation of electrical equipment plate.
CN201420691657.2U 2014-11-18 2014-11-18 A kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board Active CN204166383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420691657.2U CN204166383U (en) 2014-11-18 2014-11-18 A kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420691657.2U CN204166383U (en) 2014-11-18 2014-11-18 A kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board

Publications (1)

Publication Number Publication Date
CN204166383U true CN204166383U (en) 2015-02-18

Family

ID=52540050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420691657.2U Active CN204166383U (en) 2014-11-18 2014-11-18 A kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board

Country Status (1)

Country Link
CN (1) CN204166383U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109343510A (en) * 2018-10-19 2019-02-15 苏州源源机械设备有限公司 A kind of small-sized wind power generator controller test platform
CN109538425A (en) * 2017-10-25 2019-03-29 许继集团有限公司 A kind of debugging system for wind power plant
CN110778462A (en) * 2018-07-31 2020-02-11 北京金风慧能技术有限公司 Wind generating set spare part detection platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538425A (en) * 2017-10-25 2019-03-29 许继集团有限公司 A kind of debugging system for wind power plant
CN110778462A (en) * 2018-07-31 2020-02-11 北京金风慧能技术有限公司 Wind generating set spare part detection platform
CN109343510A (en) * 2018-10-19 2019-02-15 苏州源源机械设备有限公司 A kind of small-sized wind power generator controller test platform

Similar Documents

Publication Publication Date Title
CN204166383U (en) A kind of integrated form engine rooms of wind power generators equipment uniting and adjustment test board
CN204117521U (en) A kind of suitcase
CN204167387U (en) A kind of storage battery install bin
CN203552053U (en) Elevator control cabinet detecting system
CN202693242U (en) Multipurpose fixture for routine experiment of inertial navigation system
CN202697111U (en) Power supply supporting frame
CN202502232U (en) Electrodeless lamp aging testing jig
CN202870621U (en) Device for testing inverter control panel
CN203429949U (en) Building wall panel
CN202783216U (en) Mounting beam structure of kitchen top plate and equipment of high speed electric multiple unit
CN204366934U (en) Service kit car
CN203192959U (en) Quick connecting device for circuit board assembly installation
CN101604827A (en) Electrical secondary pre-wiring method of high-voltage switch cabinet
CN203932682U (en) A kind of low-tension switch cabinet based on three dimensional design
CN203536740U (en) Combined type switch cabinet
CN201541428U (en) Large-scale electrical vertical rectangular cabinet product work tooling
CN204270572U (en) A kind of real training instrument box
CN204902806U (en) Novel convertible formula pencil equipment inspection device
CN204241680U (en) A kind of multifunctional electric energy quality testing platform
CN203180388U (en) Single-side container electric hanging plate
CN204214943U (en) A kind of electrical equipment electric power proving installation
CN202444718U (en) Special bus card device for industrial robot control system and case formed by special bus card device
CN202197483U (en) Fan for base station outdoor cabinet
CN202034314U (en) Box structure of universal breaker controller
CN207198311U (en) A kind of automobile lighting module reliability tester

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant