CN204163119U - 桩基声测管结构 - Google Patents

桩基声测管结构 Download PDF

Info

Publication number
CN204163119U
CN204163119U CN201420502751.9U CN201420502751U CN204163119U CN 204163119 U CN204163119 U CN 204163119U CN 201420502751 U CN201420502751 U CN 201420502751U CN 204163119 U CN204163119 U CN 204163119U
Authority
CN
China
Prior art keywords
pile foundation
buckle
sound
detecting pipe
reinforcing cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420502751.9U
Other languages
English (en)
Inventor
陈春来
邵敏
卢森
张敏
任宏飞
杨益洪
冯卫民
吕江
余剑英
张茹
朱萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201420502751.9U priority Critical patent/CN204163119U/zh
Application granted granted Critical
Publication of CN204163119U publication Critical patent/CN204163119U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种公共设施建筑结构,尤其是涉及一种桩基声测管结构。钢筋笼上焊接有卡扣,卡扣中部开有通孔,声测管从通孔中穿过,卡扣与钢筋笼的焊接缝之间设置有钢筋环,钢筋环环绕声测管并将钢筋笼与声测管隔离。本实用新型具有结构简单,施工成本较低,拔除较方便,检测结果受影响较小,安装时间较短等特点。

Description

桩基声测管结构
技术领域
本实用新型涉及一种公共设施建筑结构,尤其是涉及一种桩基声测管结构。
背景技术
声测管的施工是桩基检测工作中的基础工作,是正确检测评价桩基完整性的关键工序,声测管的作用主要是在灌注桩浇筑砼施工时预留一个能够让超声波探头可以正常放到桩底的一个通道,并不作为结构受力计算的考虑。声测管是现在桥梁建设必不可少的声波检测管,利用声测管可以检测出一根桩的质量好坏,声测管是灌注桩进行超声检测法时探头进入桩身内部的通道。它是灌注桩超声检测系统的重要组成部分,它在桩内的预埋方式及其在桩的横截面上的布置形式,将直接影响检测结果。因此,为了形成这样一个通道,即采取抽拨棒的方式,在桩基砼形成初凝时把抽拨棒给抽出来,这样就可以节省钢材的使用。
发明内容
本实用新型主要是针对现有技术所存在的拔除不便,检测结果受影响较大,安装时间较长的技术问题,提供一种结构简单,施工成本较低,拔除较方便,检测结果受影响较小,安装时间较短的桩基声测管结构。
本实用新型的上述技术问题主要是通过下述技术方案得以解决的:桩基声测管结构,在桩基笼上安装声测管,桩基笼由桩和钢筋构成,钢筋围绕在桩外形成钢筋笼,钢筋笼上焊接有卡扣,卡扣中部开有通孔,声测管从通孔中穿过,卡扣与钢筋笼的焊接缝之间设置有钢筋环,钢筋环环绕声测管并将钢筋笼与声测管隔离。钢筋笼作为一个桩基的框架保护声测管,声测管与卡扣之间可互相转动,使得声测管可随时上下移动拔除,钢筋环在径向上保证了声测管与桩基的相对位置处于平行。
因此,本实用新型具有结构简单,施工成本较低,拔除较方便,检测结果受影响较小,安装时间较短等特点。
附图说明
附图1是本实用新型的整体结构示意图。
具体实施方式
下面通过实施例,并结合附图,对本实用新型的技术方案作进一步具体的说明。
实施例1:桩基声测管结构,在桩基笼上安装声测管,桩基笼由桩和钢筋构成,钢筋围绕在桩外形成钢筋笼,钢筋笼1上焊接有卡扣2,卡扣2中部开有通孔,声测管3从通孔中穿过,卡扣2与钢筋笼1的焊接缝之间设置有钢筋环4,钢筋环4环绕声测管3并将钢筋笼1与声测管3隔离(如图1所示)。

Claims (1)

1.一种桩基声测管结构,在桩基笼上安装声测管,桩基笼由桩和钢筋构成,钢筋围绕在桩外形成钢筋笼,其特征在于所述钢筋笼(1)上焊接有卡扣(2),卡扣(2)中部开有通孔,声测管(3)从通孔中穿过,卡扣(2)与钢筋笼(1)的焊接缝之间设置有钢筋环(4),钢筋环(4)环绕声测管(3)并将钢筋笼(1)与声测管(3)隔离。
CN201420502751.9U 2014-08-28 2014-08-28 桩基声测管结构 Expired - Fee Related CN204163119U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420502751.9U CN204163119U (zh) 2014-08-28 2014-08-28 桩基声测管结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420502751.9U CN204163119U (zh) 2014-08-28 2014-08-28 桩基声测管结构

Publications (1)

Publication Number Publication Date
CN204163119U true CN204163119U (zh) 2015-02-18

Family

ID=52536824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420502751.9U Expired - Fee Related CN204163119U (zh) 2014-08-28 2014-08-28 桩基声测管结构

Country Status (1)

Country Link
CN (1) CN204163119U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723092A (zh) * 2017-10-30 2019-05-07 中国电力科学研究院有限公司 一种声测管平行限位装置
CN112922338A (zh) * 2021-01-28 2021-06-08 中铁三局集团广东建设工程有限公司 一种基于声测管的钢筋笼混凝土施工装置及施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723092A (zh) * 2017-10-30 2019-05-07 中国电力科学研究院有限公司 一种声测管平行限位装置
CN112922338A (zh) * 2021-01-28 2021-06-08 中铁三局集团广东建设工程有限公司 一种基于声测管的钢筋笼混凝土施工装置及施工方法
CN112922338B (zh) * 2021-01-28 2022-02-01 中铁三局集团广东建设工程有限公司 一种基于声测管的钢筋笼混凝土施工装置及施工方法

Similar Documents

Publication Publication Date Title
CN103644940A (zh) 一种煤层内瓦斯压力、瓦斯流量及地应力监测装置及监测方法
CN103215975B (zh) 分布式传感光缆在基桩中的埋设方法
CN203772304U (zh) 一种煤层内瓦斯压力、瓦斯流量及采动应力一体监测装置
CN104328810B (zh) 预制管桩单桩地基承载力检测改进方法
CN206736987U (zh) 一种多节预应力管桩桩长检测设备
CN203310562U (zh) 一种直接测量混凝土侧向压力装置
CN204163119U (zh) 桩基声测管结构
CN104515791A (zh) 混凝土可泵送性监测方法及装置
CN204356818U (zh) 混凝土灌注桩荷载传递检测弧形保护装置
CN203256733U (zh) 灌注桩桩顶混凝土标高检测装置
CN206002086U (zh) 超高泵送混凝土输送管堵塞的监测装置
CN105509683B (zh) 一种用于自平衡试桩法的位移测量装置
CN207775952U (zh) 声测管保护装置
CN206539820U (zh) 一种水电站在役压力钢管安全检测用小车系统
CN108226191A (zh) 建筑已有管道位置及损伤检查装置与方法
CN206410929U (zh) 一种锚杆拉拔仪连接器
CN105424485B (zh) 钢管混凝土拱架灌注试验系统及试验方法
CN109211464B (zh) 渗压计埋设装置及埋设方法
CN203203525U (zh) 水下灌注桩砼超灌检测器
CN204080882U (zh) 一种用于基桩超声波法检测的声测管装置
CN207749544U (zh) 一种基桩声测管预埋装置
CN205175830U (zh) 钢管混凝土拱架灌注试验系统
CN208363146U (zh) 一种螺纹式声测管
CN104790994B (zh) 锚杆受力状态快速评估装置及其应用方法
CN204238266U (zh) 用于检测桩孔沉渣厚度的组合测锤

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218

Termination date: 20150828

EXPY Termination of patent right or utility model