CN204139566U - A kind of wood flooring erecting tools - Google Patents

A kind of wood flooring erecting tools Download PDF

Info

Publication number
CN204139566U
CN204139566U CN201420625170.4U CN201420625170U CN204139566U CN 204139566 U CN204139566 U CN 204139566U CN 201420625170 U CN201420625170 U CN 201420625170U CN 204139566 U CN204139566 U CN 204139566U
Authority
CN
China
Prior art keywords
junction plate
guide rod
wood flooring
impact hammer
erecting tools
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420625170.4U
Other languages
Chinese (zh)
Inventor
蒋玉珑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN SIRUIZE TECHNOLOGY ADVISORY SERVICES Co Ltd
Original Assignee
WUHAN SIRUIZE TECHNOLOGY ADVISORY SERVICES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN SIRUIZE TECHNOLOGY ADVISORY SERVICES Co Ltd filed Critical WUHAN SIRUIZE TECHNOLOGY ADVISORY SERVICES Co Ltd
Priority to CN201420625170.4U priority Critical patent/CN204139566U/en
Application granted granted Critical
Publication of CN204139566U publication Critical patent/CN204139566U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Percussive Tools And Related Accessories (AREA)

Abstract

The utility model discloses a kind of wood flooring erecting tools, comprise junction plate and be arranged on the perpendicular hook portion of junction plate left end, described junction plate is arranged with guide rod in parallel, guide rod is arranged with impact hammer, impact hammer is provided with handle, be provided with elastomeric connector strip between guide rod left part and impact hammer, below guide rod right-hand member, be provided with the beam be positioned on junction plate; This wood flooring erecting tools catches on wood flooring side by the hook portion of junction plate left end when using, the handle held on impact hammer is firmly turned right and is drawn, and impact hammer clashes into the stress point on the right side of junction plate along guide rod, and the emboss pit of two pieces of wood floorings is interlocked, time saving and energy saving, improve operating efficiency.

Description

A kind of wood flooring erecting tools
Technical field
The utility model relates to a kind of wood flooring erecting tools.
Background technology
The known course of work of laying the wood flooring of band emboss pit the flange of one piece of wood flooring is put into the groove of another block wood flooring completed, then left hand uses back power hook to pin the side of the wood flooring that will install, right hand iron hammer knocks the side of wood flooring gently, makes the wood flooring that will install upright neat.
Require when this wood flooring is installed that installing master worker uses back power hook on the other hand, a hand-held iron hammer knocks, extremely inconvenient, and it is very high with the accuracy requirement that drops hammer to knock the dynamics of wood flooring with iron hammer to installation master worker, wastes time and energy.
Utility model content
The purpose of this utility model is to provide simple, the time saving and energy saving wood flooring erecting tools of a kind of structure.
The utility model solves the technical scheme that its technical problem adopts: a kind of wood flooring erecting tools, comprise junction plate and be arranged on the perpendicular hook portion of junction plate left end, described junction plate is arranged with guide rod in parallel, guide rod is arranged with impact hammer, impact hammer is provided with handle, between guide rod left part and impact hammer, is provided with elastomeric connector strip.
Described a kind of wood flooring erecting tools, is provided with the beam be positioned on junction plate below its guide rod right-hand member.
Described a kind of wood flooring erecting tools, its elastomeric connector strip can be rubber strip or silica gel strip or spring.
The beneficial effects of the utility model are: catch on wood flooring side by the hook portion of junction plate left end when this wood flooring erecting tools uses, the handle held on impact hammer is firmly turned right and is drawn, impact hammer clashes into the stress point on the right side of junction plate along guide rod, the emboss pit of two pieces of wood floorings is interlocked, time saving and energy saving, improve operating efficiency; To return power hook due to this wood flooring erecting tools and impact hammer unites two into one, simple to operate, stress point is single, and on the right side of junction plate, stress point is provided with beam, makes the dynamics of shock have also been obtained effective control, significantly reduces the noise produced when iron hammer knocks.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
With reference to shown in Fig. 1, the utility model discloses a kind of wood flooring erecting tools, comprise junction plate 1 and be arranged on the perpendicular hook portion 2 of junction plate 1 left end, described junction plate 1 is arranged with guide rod 3 in parallel, guide rod 3 is arranged with impact hammer 4, impact hammer 4 is provided with handle 5, described junction plate 1 can use the steel plate of 3mm, described guide rod 3 can use the round steel of Φ 14, impact hammer 4 can use the cylindrical iron of the Φ 70 of center drilling, described handle 5 can use the round steel bending of Φ 20 to form, elastomeric connector strip 6 is provided with between guide rod 3 left part and impact hammer 4, described elastomeric connector strip 6 can be rubber strip or silica gel strip or spring.During use, wood flooring side is caught on by the hook portion 2 of junction plate 1 left end, then the handle 5 held on impact hammer 4 is firmly turned right and is drawn, impact hammer 4 is made to clash into the stress point on the right side of junction plate 1 along guide rod 3, the emboss pit of two pieces of wood floorings is interlocked, and then impact hammer 4 resets under the effect of elastomeric connector strip 6.
Wherein, be provided with the beam 7 be positioned on junction plate 1 below described guide rod 3 right-hand member, the dynamics that such impact hammer 4 clashes into junction plate 1 obtains effective control, significantly reduces the noise produced when iron hammer knocks.
Above-described embodiment is illustrative principle of the present utility model and effect thereof only; and the embodiment that part is used; for the person of ordinary skill of the art; under the prerequisite not departing from the utility model creation design; can also make some distortion and improvement, these all belong to protection domain of the present utility model.

Claims (3)

1. a wood flooring erecting tools, it is characterized in that: comprise junction plate (1) and be arranged on the perpendicular hook portion (2) of junction plate (1) left end, described junction plate (1) is arranged with guide rod (3) in parallel, guide rod (3) is arranged with impact hammer (4), impact hammer (4) is provided with handle (5), between guide rod (3) left part and impact hammer (4), is provided with elastomeric connector strip (6).
2. a kind of wood flooring erecting tools according to claim 1, is characterized in that, is provided with the beam (7) be positioned on junction plate (1) below described guide rod (3) right-hand member.
3. a kind of wood flooring erecting tools according to claim 1 and 2, is characterized in that, described elastomeric connector strip (6) can be rubber strip or silica gel strip or spring.
CN201420625170.4U 2014-10-27 2014-10-27 A kind of wood flooring erecting tools Expired - Fee Related CN204139566U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420625170.4U CN204139566U (en) 2014-10-27 2014-10-27 A kind of wood flooring erecting tools

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420625170.4U CN204139566U (en) 2014-10-27 2014-10-27 A kind of wood flooring erecting tools

Publications (1)

Publication Number Publication Date
CN204139566U true CN204139566U (en) 2015-02-04

Family

ID=52416261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420625170.4U Expired - Fee Related CN204139566U (en) 2014-10-27 2014-10-27 A kind of wood flooring erecting tools

Country Status (1)

Country Link
CN (1) CN204139566U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264954A (en) * 2014-10-27 2015-01-07 武汉思睿泽科技咨询服务有限公司 Wood floor mounting tool
CN105507569A (en) * 2016-01-25 2016-04-20 湖州南浔双林振森实木加工厂 Mounting tool of wood floor
CN106121207A (en) * 2016-07-22 2016-11-16 石庆宁 A kind of floor tensioning device for building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264954A (en) * 2014-10-27 2015-01-07 武汉思睿泽科技咨询服务有限公司 Wood floor mounting tool
CN105507569A (en) * 2016-01-25 2016-04-20 湖州南浔双林振森实木加工厂 Mounting tool of wood floor
CN105507569B (en) * 2016-01-25 2017-10-24 湖州南浔双林振森实木加工厂 The installation tool of timber floor
CN106121207A (en) * 2016-07-22 2016-11-16 石庆宁 A kind of floor tensioning device for building

Similar Documents

Publication Publication Date Title
CN104264954A (en) Wood floor mounting tool
CN204139566U (en) A kind of wood flooring erecting tools
CN204108962U (en) A kind of engineering tool hammer
CN205086118U (en) Multiple gun nailing device
CN203839863U (en) Groove type large-span straight-through cable tray
CN204819389U (en) Portable strike to bind put
CN204449185U (en) A kind of cooler aluminium accessory riveting tool
CN204252623U (en) A kind of easy-to-mount bracing wire sheath
CN203878974U (en) Scaffold connecting assembly
CN204662982U (en) A kind of Multifunction pulling device
CN203701542U (en) Quick mounting mechanism of bamboo-wood floor
CN203129578U (en) Building template
CN204123369U (en) Architectural engineering multi-functional hammer
CN105058329A (en) Multifunctional tool hammer
CN204819388U (en) Clamping device is fixed to nail
CN204850703U (en) Stealthy handle apron
CN205254912U (en) Novel it is quick fixed device
CN203426971U (en) Nail assistant tool
CN204089026U (en) Power circuit bird-scaring unit can charged erecting device
CN203160635U (en) Floor tile
CN204531098U (en) A kind of cladding metal curtain wall
CN104209746B (en) The screw concentrated supply device of Full-automatic screw locking machine
CN205742919U (en) A kind of Novel supporting hawk
CN204159930U (en) There is the tool of detent mechanism
CN205743016U (en) A kind of aluminum alloy pattern plate installation tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150204

Termination date: 20171027

CF01 Termination of patent right due to non-payment of annual fee