CN204129784U - Damage simulation analysis system falls in a kind of power distribution network - Google Patents

Damage simulation analysis system falls in a kind of power distribution network Download PDF

Info

Publication number
CN204129784U
CN204129784U CN201420107446.XU CN201420107446U CN204129784U CN 204129784 U CN204129784 U CN 204129784U CN 201420107446 U CN201420107446 U CN 201420107446U CN 204129784 U CN204129784 U CN 204129784U
Authority
CN
China
Prior art keywords
server
data
work station
distribution network
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420107446.XU
Other languages
Chinese (zh)
Inventor
杨晋彪
张毅
白水富
胡丽娜
张玉霞
冯守申
王志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhan NARI Ltd
Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Wuhan NARI Ltd
Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuhan NARI Ltd, Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420107446.XU priority Critical patent/CN204129784U/en
Application granted granted Critical
Publication of CN204129784U publication Critical patent/CN204129784U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model relates to distribution network line loss per unit, and particularly a kind of power distribution network falls and damages simulation analysis system and method.System of the present utility model it comprise front server, emulation server, Intra-Network switch, teller work station.Front server is connected with dedicated communications network, obtain GIS interface server, distribution subsystem interface server and real-time subsystem interface server data, the data of acquisition are transferred to emulation server by front server, and simulation result is exported to teller work station by Intra-Network switch by emulation server.After user arranges different loss reducing technology by teller work station, data are transferred to emulation server by Intra-Network switch by teller work station, the real-time power distribution network data that emulation server is obtained by front server, calculate loss-reducing and electricity-saving amount and gain on investments.The utility model can assess input and the income that damage means fall in difference, falls damage work provide comprehensive Data support for scientifically instructing.

Description

Damage simulation analysis system falls in a kind of power distribution network
Technical field
The utility model relates to distribution network line loss per unit, and particularly damage simulation analysis system falls in a kind of power distribution network.
Background technology
Line loss per unit weighs the important indicator of electric quantity loss size, embodies the level of the operation control of electric company, is the important technology economic target of examination power supply enterprise of country, and line loss statistics and the meaning of falling damage work are great for electric system.
Matching net wire loss is relevant with electric network composition, circuit, transformer, reactive power source and the method for operation.Current damage work of falling mainly relies on various cognition of falling damage method, by changing the means such as distribution line, transformer, usually the estimation that benefit do not carry out in advance is damaged for falling of falling that damage means bring, under the background of building a conservation-minded society, develop a set of power distribution network and fall damage simulation analysis system, different input and the income of falling damage means of assessment, fall damage work provide comprehensive Data support for scientifically instructing, improve the level of Controlling line loss, effectively improve the utilization factor of resource, reduce line loss, ensure benefit.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art part, provides a kind of power distribution network to fall damage simulation analysis system, and what can provide gain on investments optimum for Utilities Electric Co. supervisory engineering staff falls damage scheme.
The technical solution of the utility model is: damage simulation analysis system falls in a kind of power distribution network, and it comprises database server, emulation server, Intra-Network switch, teller work station.Front server, by extracting voltage, the current data of network frame topology structured data, distribution net equipment parameter, distribution network transformer substation feeder line side from electric network synthetic database, sends to emulation server, and emulation server calculates the line loss of current power distribution network; User passes through teller work station, Intra-Network switch arranges the replacing existing distribution being carried out to transformer, wire, radius of electricity supply and the method for operation, emulation server is by the replacing data by Intra-Network switch, calculate the investment that loss-reducing and electricity-saving amount and the distribution house of correction of distribution need, simulation result is sent to teller work station.
Damage simulating analysis falls in a kind of power distribution network, and its step is as follows:
(1) from voltage, the current data of electric network synthetic database distribution net equipment parameter, distribution network transformer substation feeder line side, generate distribution topological structure according to generalized information system, set up Line Loss of Distribution Network System Simulation Calculation.
(2) simulation analysis distribution line changes the loss-reducing and electricity-saving amount after dissimilar transformer, wire and gain on investments.
(3) according to load growth prediction, simulation analysis reduces the loss-reducing and electricity-saving amount after radius of electricity supply and gain on investments.
(4) the loss-reducing and electricity-saving amount after simulation analysis adjustment reactive-load compensation and gain on investments.
(5) line loss under simulation analysis different temperatures and the method for operation.
(6) according to different simulation results, the scheme that damage falls in power distribution network best techniques is generated.
Accompanying drawing explanation
Fig. 1 power distribution network falls and damages simulation analysis system structural representation
Fig. 2 power distribution network falls and damages simulating analysis frame diagram.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described.
Embodiment 1:
A damage simulation analysis system falls in power distribution network as shown in Figure 1, and it comprises front server, emulation server, Intra-Network switch, teller work station.In the present embodiment, front server obtains GIS spatial data from generalized information system, front server from the switching data storehouse of electric power distribution network system, track data storehouse, line switching database obtain power distribution network transformer, circuit and switch data.Front server obtains voltage, the current data of power distribution network substation feeder side from electric company's real-time subsystem (data acquisition and supervisor control system or comprehensive automation system of transformer substation).
Front server is connected with dedicated communications network, obtain GIS interface server, distribution subsystem interface server and real-time subsystem interface server data, the data of acquisition are transferred to emulation server by front server, and simulation result is exported to teller work station by Intra-Network switch by emulation server.
After user arranges the dissimilar transformer of replacing, wire by teller work station, data are transferred to emulation server by Intra-Network switch by teller work station, the real-time power distribution network data that emulation server is obtained by front server, calculate the loss-reducing and electricity-saving amount after changing transformer, wire and gain on investments.
User arranges load growth situation data by teller work station, and distributed power generation configuration data, data are transferred to emulation server by Intra-Network switch by teller work station, the real-time power distribution network data that emulation server is obtained by front server, calculate the loss-reducing and electricity-saving amount after change radius of electricity supply and gain on investments.
User is by teller work station set temperature, and the power distribution network method of operation, data are transferred to emulation server by Intra-Network switch by teller work station, the real-time power distribution network data that emulation server is obtained by front server, calculate the loss-reducing and electricity-saving amount after the change method of operation and gain on investments.
User arranges the capacity of reactive-load compensation and the node of compensation by teller work station, data are transferred to emulation server by Intra-Network switch by teller work station, the real-time power distribution network data that emulation server is obtained by front server, calculate the loss-reducing and electricity-saving amount after adjustment reactive-load compensation and gain on investments.
It is same as the prior art that the present embodiment does not state part.
Embodiment 2:
Damage simulating analysis falls in a kind of power distribution network, and its step is as follows:
(1) obtain GIS spatial data from generalized information system, from the switching data storehouse of electric power distribution network system, track data storehouse, line switching database obtain power distribution network transformer, circuit and switch data.Voltage, the current data of power distribution network substation feeder side is obtained from electric company's real-time subsystem (data acquisition and supervisor control system or comprehensive automation system of transformer substation).Set up Line Loss of Distribution Network System Simulation Calculation.
(2) according to the line loss Simulation Calculation of power distribution network, simulation analysis distribution line changes the loss-reducing and electricity-saving amount of a year after dissimilar transformer, wire and gain on investments.
(3) according to load growth prediction, simulation analysis reduces the loss-reducing and electricity-saving amount of a year after radius of electricity supply and gain on investments.
(4) the loss-reducing and electricity-saving amount of a year and gain on investments after simulation analysis adjustment reactive-load compensation.
(5) line loss under simulation analysis different temperatures and the method for operation.
(6) according to different simulation results, contrast gain on investments, generates the scheme that damage falls in power distribution network best techniques.
It is same as the prior art that the present embodiment does not state part.

Claims (1)

1. damage simulation analysis system falls in a power distribution network, comprise front server, emulation server, Intra-Network switch, teller work station, by described teller work station, different loss reducing technology and environmental parameter are set, data are transferred to emulation server by Intra-Network switch by described teller work station, the real-time power distribution network data that emulation server is obtained by front server, calculate loss-reducing and electricity-saving amount and gain on investments, it is characterized in that: described front server is connected with dedicated communications network, for obtaining GIS interface server, distribution subsystem interface server and real-time subsystem interface server data, the data of acquisition are transferred to emulation server by front server, simulation result is exported to teller work station by Intra-Network switch by emulation server.
CN201420107446.XU 2014-03-11 2014-03-11 Damage simulation analysis system falls in a kind of power distribution network Expired - Lifetime CN204129784U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420107446.XU CN204129784U (en) 2014-03-11 2014-03-11 Damage simulation analysis system falls in a kind of power distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420107446.XU CN204129784U (en) 2014-03-11 2014-03-11 Damage simulation analysis system falls in a kind of power distribution network

Publications (1)

Publication Number Publication Date
CN204129784U true CN204129784U (en) 2015-01-28

Family

ID=52386119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420107446.XU Expired - Lifetime CN204129784U (en) 2014-03-11 2014-03-11 Damage simulation analysis system falls in a kind of power distribution network

Country Status (1)

Country Link
CN (1) CN204129784U (en)

Similar Documents

Publication Publication Date Title
CN104598671B (en) A kind of digital electric network construction method based on online data
CN102545212B (en) Electrical energy quality centralized monitoring and auxiliary management decision support system
CN104504183A (en) Power distribution network intelligent planning system based on automatic optimization
CN105137231A (en) Power quality monitoring method and system
CN103838921B (en) PSCAD-EMTDC simulation model automatic generation method
CN102545204B (en) Automatic generation method and device of power grid fault set
CN103412208A (en) Intelligent substation electric telecontrol device closed loop test method
CN105098777A (en) Low-voltage assistant decision method for rural distribution network
CN103914789A (en) Simulation analysis system and method for power distribution network loss reduction
CN105071399A (en) Voltage and reactive power coordinated control system based on interaction and coordination of primary and distributed networks
CN107463732A (en) A kind of multiterminal alternating current-direct current active distribution network scheduling controlling analogue system and method
CN104463465B (en) A kind of real time monitoring clustering methods based on distributed model
CN204129784U (en) Damage simulation analysis system falls in a kind of power distribution network
CN103915901A (en) Transformer area load management system
CN102946109B (en) Wide area damping control system of electric system based on event trigger
CN103400215A (en) Method associating PMU measurement equipment with electrical-network operational data equipment
CN108510164A (en) The online generation method of external network equivalent model of designated area in a kind of electric system
CN104050381A (en) Simulation system for recognition of hidden danger of power system based on WAMS data
CN105576695A (en) Digital-analogue hybrid real-time simulation method for hydraulic power plant monitoring system
CN203930498U (en) Alternating current-direct current complex large power grid frequency control closed loop test system
CN104751239A (en) Optimal configuration method of distribution automation equipment based on GA (Genetic Algorithm)
CN103715768B (en) The multimode acquisition of major network information and maintaining method in a kind of electrical power distribution automatization system
CN103473714A (en) Graph model automatic maintaining method in distribution network system
CN202121322U (en) Urban power grid risk assessment model generating device
CN201355805Y (en) Dynamic generation side control performance standard index calculation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20150128

CX01 Expiry of patent term