CN103915901A - Transformer area load management system - Google Patents

Transformer area load management system Download PDF

Info

Publication number
CN103915901A
CN103915901A CN201410158096.4A CN201410158096A CN103915901A CN 103915901 A CN103915901 A CN 103915901A CN 201410158096 A CN201410158096 A CN 201410158096A CN 103915901 A CN103915901 A CN 103915901A
Authority
CN
China
Prior art keywords
transformer
data
intelligent monitoring
end processor
controlling device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410158096.4A
Other languages
Chinese (zh)
Inventor
杨旭东
郝智强
李继刚
李智玲
张有亮
韩建亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Power Supply Bureau Of Inner Mongolia Power Group Co ltd
Original Assignee
Baotou Power Supply Bureau Of Inner Mongolia Power Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Power Supply Bureau Of Inner Mongolia Power Group Co ltd filed Critical Baotou Power Supply Bureau Of Inner Mongolia Power Group Co ltd
Priority to CN201410158096.4A priority Critical patent/CN103915901A/en
Publication of CN103915901A publication Critical patent/CN103915901A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/128Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a transformer area load management system, and relates to the technical field of power system control. An intelligent monitoring device is used for collecting the oil temperature of a transformer, electrical parameters of the transformer and environment parameters, a heat path model is utilized for conducting analysis and calculation to obtain the hot-spot temperature, the line oil temperature difference, 30-minute overload predication and 1.5-time load safety time of the transformer, then, the calculated data are transmitted to a front-end processor, the front-end processor is used for receiving data calculated by the intelligent monitoring device, operations, like transformer parameter downloading, are carried out on the intelligent monitoring device, and therefore the running state of the transformer is monitored in real time. The front-end processor stores the data of the intelligent monitoring device in a local database, and transmits the data to a WEB data server through the network, and the use efficiency and safety of the transformer can be greatly improved.

Description

Transformer region load management system
Technical field
What the present invention relates to is control technique in power system field, is specifically related to a kind of transformer region load management system.
Background technology
Transformer is a large amount of a kind of high-efficient electric equipment using in electrical power trans mission/distribution system.The capacity that is characterized in is large, longevity of service, electric energy loss cumulative amount are very large.Especially with existing great waste in electric process, in peak of power consumption short of electricity, when low ebb, there is again a large amount of electric energy not to be fully used.Therefore, excavate the potentiality of existing capacity, limited electric power is fully used, be of great significance for improving social benefit tool.Native system has been inquired into the power-saving technique of transformer from load management aspect, proposed the new technology of transformer compartmentalization load management.
Transformer compartmentalization load management is exactly that the transformer of the transformer oil in whole region is managed and analyzed.Conventional method to transformer load management is that each transformer station manages separately, do not form unified regional management platform, the transformer operating load causing like this and is easily high, some transformer operating loads are low, can cause like this waste of load and affect the safety of transformer, thereby endanger the transformer safety and economic operation in whole region.
In prior art, need transformer region load management system badly.
Summary of the invention
For the deficiency existing in prior art, the present invention seeks to be to provide a kind of transformer region load management system, both the load that can be used for current transformer judges, can be used for again the transformer load in whole region to carry out a comprehensive assessment for dispatcher, can greatly improve service efficiency and the safety of transformer.
To achieve these goals, the present invention realizes by the following technical solutions: transformer region load management system, comprise transformer station and control centre, multiple A of transformer station are connected with control centre, described transformer station comprises intelligent monitoring and controlling device and front end processor, and intelligent monitoring and controlling device is connected with front end processor with transformer respectively; Described intelligent monitoring and controlling device be for the electric parameter of the oil temperature to transformer, transformer and environmental parameter gather and utilize that hot road model carries out that analytical calculation show that hot-spot temperature of transformer, line oil temperature are poor, overload in 30 minutes prediction, 1.5 times of payload security times, then the data that these are calculated are passed to front end processor; Described front end processor is the data of calculating for receiving intelligent monitoring and controlling device, and can carry out to intelligent monitoring and controlling device the operations such as transformer parameter download, thereby running state of transformer is monitored in real time.Can there is local data base the data of intelligent monitoring and controlling device in front end processor, and pass to WEB data server by network.
The described B of control centre comprises mobile workstation, WEB data server and management work station, and multiple mobile workstations, WEB data server and management work station are all connected with front end processor by Intranet; Described WEB data server is the data for receiving all front end processors in this institute region, and data are carried out to Macro or mass analysis releases for management work station and mobile workstation in WEB mode; Described management work station is that dispatching technique librarian use WEB mode is accessed the service data of the transformer in institute compass of competency, and passes through obtained data and provide science reliable foundation to the compartmentalization load management of transformer; Described mobile workstation is used for facilitating the relevant personnel can check transformer service data whenever and wherever possible, but rights of using are lower than management work station.
The invention has the beneficial effects as follows: the load that both can be used for current transformer judges, can be used for again the transformer load in whole region to carry out a comprehensive assessment for dispatcher, can greatly improve service efficiency and the safety of transformer, for dispatching technique personnel provide rationally technical basis reliably, and the abnormal sign of discovering device operation in time, guarantee equipment safety operation, thereby improve power supply reliability.The present invention can be used as the main tool of power plant or power supply administration's transformer compartmentalization load management.
Brief description of the drawings
Describe the present invention in detail below in conjunction with the drawings and specific embodiments;
Fig. 1 is structural representation of the present invention.
  
Embodiment
For technological means, creation characteristic that the present invention is realized, reach object and effect is easy to understand, below in conjunction with embodiment, further set forth the present invention.
With reference to Fig. 1, this embodiment is by the following technical solutions: transformer region load management system, comprise intelligent monitoring and controlling device 1, be used for monitoring present load and the top oil temperature of transformer, calculate the parameters such as hot(test)-spot temperature, line oil temperature are poor, overload in 30 minutes prediction, 1.5 times of payload security time predictions; Front end processor 2 is for communicating with intelligent monitoring and controlling device; WEB data server 4 is the data for receiving each front end processor in this compass of competency; Management work station 5 uses the data that visit on WEB data server to professional dispatcher; Mobile workstation 3 is the data that are used for accessing WEB data server to general personnel; It is exactly a transformer compartmentalization load management that modules recited above combines.
Wherein, the transformer in transformer station refers to high-power transformer more than 110kV.
Intelligent monitoring and controlling device 1 be for the electric parameter of the oil temperature to transformer, transformer and environmental parameter gather and utilize that hot road model carries out that analytical calculation show that hot-spot temperature of transformer, line oil temperature are poor, overload in 30 minutes prediction, 1.5 times of payload security times.The data of again these being calculated are passed to front end processor.
Front end processor 2 is data of calculating for receiving intelligent monitoring and controlling device, and can carry out to intelligent monitoring and controlling device the operations such as transformer parameter download, thereby running state of transformer is monitored in real time.Can there is local data base the data of intelligent monitoring and controlling device in front end processor, and pass to WEB data server by network.
WEB data server 4 is the data for receiving all front end processors in this institute region, and data are carried out to Macro or mass analysis releases for management work station and mobile workstation in WEB mode.
Management work station 5 is that dispatching technique librarian use WEB mode is accessed the service data of the transformer in institute compass of competency, and passes through obtained data and provide science reliable foundation to the compartmentalization load management of transformer.
Mobile workstation 3 is for facilitating the relevant personnel can check transformer service data whenever and wherever possible, but rights of using are lower than management work station.
This embodiment can be made comprehensive analysis to the various data of transformer operation, reaches a conclusion, and proposes corresponding measure, becomes user's competent assistant.The present invention can grasp easily transformer real time execution load and the transformer load in region is played to intelligent management effect, has good economic benefit.
More than show and described general principle of the present invention and principal character and advantage of the present invention.The technical staff of the industry should understand; the present invention is not restricted to the described embodiments; that in above-described embodiment and specification, describes just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (2)

1. transformer region load management system, it is characterized in that, comprise transformer station (A) and control centre (B), multiple transformer stations (A) are connected with control centre (B), described transformer station (A) comprises intelligent monitoring and controlling device (1) and front end processor (2), and intelligent monitoring and controlling device (1) is connected with front end processor (2) with transformer respectively; Described intelligent monitoring and controlling device (1) be for the electric parameter of the oil temperature to transformer, transformer and environmental parameter gather and utilize that hot road model carries out that analytical calculation show that hot-spot temperature of transformer, line oil temperature are poor, overload in 30 minutes prediction, 1.5 times of payload security times, then the data that these are calculated are passed to front end processor (2); Described front end processor (2) is the data of calculating for receiving intelligent monitoring and controlling device (1), and can carry out the operations such as transformer parameter download to intelligent monitoring and controlling device (1), thereby running state of transformer is monitored in real time; Can there is local data base the data of intelligent monitoring and controlling device (1) in front end processor (2), and pass to WEB data server (4) by network.
2. transformer according to claim 1 region load management system, it is characterized in that, described control centre (B) comprises mobile workstation (3), WEB data server (4) and management work station (5), and multiple mobile workstations (3), WEB data server (4) and management work station (5) are all connected with front end processor (2) by Intranet; Described WEB data server (4) is the data for receiving all front end processors (2) in this institute region, and data are carried out to Macro or mass analysis releases for management work station (5) and mobile workstation (3) in WEB mode; Described management work station (5) is that dispatching technique librarian use WEB mode is accessed the service data of the transformer in institute compass of competency, and passes through obtained data and provide science reliable foundation to the compartmentalization load management of transformer; Described mobile workstation (3) is for facilitating the relevant personnel can check transformer service data whenever and wherever possible, but rights of using are lower than management work station.
CN201410158096.4A 2014-04-21 2014-04-21 Transformer area load management system Pending CN103915901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410158096.4A CN103915901A (en) 2014-04-21 2014-04-21 Transformer area load management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410158096.4A CN103915901A (en) 2014-04-21 2014-04-21 Transformer area load management system

Publications (1)

Publication Number Publication Date
CN103915901A true CN103915901A (en) 2014-07-09

Family

ID=51041375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410158096.4A Pending CN103915901A (en) 2014-04-21 2014-04-21 Transformer area load management system

Country Status (1)

Country Link
CN (1) CN103915901A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108845200A (en) * 2018-05-10 2018-11-20 南通盛洋电气有限公司 A kind of method of discrimination and system of transformer safety
CN112034302A (en) * 2020-07-17 2020-12-04 贵州电网有限责任公司 Method for reinforcing overhead line transmission safety by using microclimate real-time monitoring information
CN113344325A (en) * 2021-04-30 2021-09-03 广西电网有限责任公司电力科学研究院 Intelligent load management analysis method and device for transformer
CN113472064A (en) * 2021-04-30 2021-10-01 广西电网有限责任公司电力科学研究院 Method and system for monitoring running safety of transformer

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201518418U (en) * 2009-10-16 2010-06-30 巩义市供电公司 On-line distributed voltage reactive control system
CN201780503U (en) * 2010-09-19 2011-03-30 巩义市供电公司 Transformer economical running control system
CN102255386A (en) * 2011-06-16 2011-11-23 成都科星电力电器有限公司 Operation management system of client distribution equipment
CN202817908U (en) * 2012-10-10 2013-03-20 河南开启电力实业有限公司 Intelligent monitoring system for special-purpose transformer
JP2013172537A (en) * 2012-02-20 2013-09-02 Toshiba Corp Power system monitoring control system
CN103475090A (en) * 2013-08-20 2013-12-25 上海海能信息科技有限公司 Intelligent short-term transformer load prediction system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201518418U (en) * 2009-10-16 2010-06-30 巩义市供电公司 On-line distributed voltage reactive control system
CN201780503U (en) * 2010-09-19 2011-03-30 巩义市供电公司 Transformer economical running control system
CN102255386A (en) * 2011-06-16 2011-11-23 成都科星电力电器有限公司 Operation management system of client distribution equipment
JP2013172537A (en) * 2012-02-20 2013-09-02 Toshiba Corp Power system monitoring control system
CN202817908U (en) * 2012-10-10 2013-03-20 河南开启电力实业有限公司 Intelligent monitoring system for special-purpose transformer
CN103475090A (en) * 2013-08-20 2013-12-25 上海海能信息科技有限公司 Intelligent short-term transformer load prediction system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108845200A (en) * 2018-05-10 2018-11-20 南通盛洋电气有限公司 A kind of method of discrimination and system of transformer safety
CN112034302A (en) * 2020-07-17 2020-12-04 贵州电网有限责任公司 Method for reinforcing overhead line transmission safety by using microclimate real-time monitoring information
CN113344325A (en) * 2021-04-30 2021-09-03 广西电网有限责任公司电力科学研究院 Intelligent load management analysis method and device for transformer
CN113472064A (en) * 2021-04-30 2021-10-01 广西电网有限责任公司电力科学研究院 Method and system for monitoring running safety of transformer

Similar Documents

Publication Publication Date Title
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN102663530A (en) Safety early warning and evaluating system for high-voltage direct current transmission system
CN103701212B (en) A kind of method for monitoring and analyzing for safety and stability control device of electric network and system
CN103219727B (en) Partition power grid structure dynamics method of adjustment based on PMU actual measurement
CN202676300U (en) An intelligent wireless electric contact temperature monitoring device of an electric power distribution cabinet
CN202167018U (en) Power supply reliability data statistical treatment device suitable for power system
CN103559654A (en) Comprehensive analysis system and method of power distribution network
CN102879696B (en) Automatic judgment method for over-load operational feasibility of transformer
CN104410169A (en) Intelligent and online area monitoring system and implementation method thereof
CN108170073B (en) Intelligent photovoltaic cloud platform
CN107730088A (en) A kind of controller switching equipment inspection scheme generation method and device based on distribution big data
CN103915901A (en) Transformer area load management system
CN102361351A (en) Remote monitoring diagnosis system of power system
CN103020761A (en) Method for overhauling distribution network based on automatic unit division and evaluation
CN203192207U (en) Wireless automatic meter reading system
CN104166061A (en) Intelligent power distribution and utilization state detection device based on 4D technology
CN204304606U (en) A kind of transformer load prediction and management study system
CN107292759A (en) Distribution network planning based on power supply reliability calculates analysis system
CN203455440U (en) High-voltage single core cable protective layer grounding online monitoring device
CN105631552A (en) Power distribution automation engineering economic benefit assessment method based on whole life cycle
CN204205601U (en) Transformer loads device for controlling dynamically
CN103439938A (en) Small hydropower station control system
CN204065313U (en) A kind of distribution line failure on-Line Monitor Device
CN203455377U (en) Power consumption monitoring device
CN202103489U (en) Intelligent agricultural network power distribution monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140709