CN204126359U - Prefabricated modular is built - Google Patents

Prefabricated modular is built Download PDF

Info

Publication number
CN204126359U
CN204126359U CN201420502602.2U CN201420502602U CN204126359U CN 204126359 U CN204126359 U CN 204126359U CN 201420502602 U CN201420502602 U CN 201420502602U CN 204126359 U CN204126359 U CN 204126359U
Authority
CN
China
Prior art keywords
module
pipeline
level functionality
main structure
central hub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420502602.2U
Other languages
Chinese (zh)
Inventor
朱帼珍
刘岩
邵鹏飞
王佳莹
宋兆春
刘文浩
代海岩
姜帅
郑静
关晓
高亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI PENGYU JICHUANG INDUSTRY Co Ltd
Dalian CIMC Logistics Equipment Co Ltd
Original Assignee
SHANGHAI PENGYU JICHUANG INDUSTRY Co Ltd
Dalian CIMC Logistics Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI PENGYU JICHUANG INDUSTRY Co Ltd, Dalian CIMC Logistics Equipment Co Ltd filed Critical SHANGHAI PENGYU JICHUANG INDUSTRY Co Ltd
Priority to CN201420502602.2U priority Critical patent/CN204126359U/en
Application granted granted Critical
Publication of CN204126359U publication Critical patent/CN204126359U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of prefabricated modular building, it comprises: at least one main structure module; At least one top-level functionality integration module, at least one top-level functionality integration module is arranged on the top of main structure module, and the inside of top-level functionality integration module is provided with prefabricated pipeline; At least one appearance customization module, appearance customization module installation is in the outside of main structure module; With central hub control module, central hub control module is arranged on the outside of main structure module or the outside of appearance customization module; Central hub control module accommodates equipment, and equipment is connected with pipeline and supplies with outside and is connected; Pipeline installing has pipeline interface, and the pipeline in adjacent top layer function i ntegration module is connected by pipeline interface, and the pipeline at least one top-level functionality integration module is by pipeline interface and equipment connection.Build according to prefabricated modular of the present utility model, make building assembling more convenient, the reduction of erection time, make maintenance convenient, and improve secondary utilization rate.

Description

Prefabricated modular is built
Technical field
The utility model relates to modular architectural field, particularly relates to a kind of prefabricated modular building.
Background technology
Existing modular architectural is by factory's module of production main structure in advance, and the operations such as water, electricity, warm and interior decoration will be carried out again in job site after main structure module assembled.Although the production of main structure module to be constructed more easy quick, economic environmental protection than traditional architecture with assembling, but later stage water, electricity, warm engineering time are still very long, and secondary utilize in process be easy to damage, lose, produce unnecessary waste and loss, the theory of modular architectural environmental protection is had a greatly reduced quality.And due to water power warm up supporting complex circuit, the problem such as interface is tired many, and not only difficulty of design and construction is large, has maintenace point and compare dispersion in later period maintenance process, and the unreasonable and service clearance of layout is narrow and small, strengthen maintenance difficulty.
Therefore, a kind of prefabricated modular is needed to build, to solve the problems of the prior art at least in part.
Utility model content
In order to solve the problem, the utility model discloses a kind of prefabricated modular building, it is characterized in that, described prefabricated modular building comprises: at least one main structure module, and described main structure module structure is cuboid; At least one top-level functionality integration module, described top-level functionality integration module is configured to cuboid, and top-level functionality integration module described at least one is arranged on the top of described main structure module, and the inside of described top-level functionality integration module is provided with prefabricated pipeline; At least one appearance customization module, described appearance customization module installation is in the outside of described main structure module; And central hub control module, described central hub control module is arranged on the outside of described main structure module or the outside of described appearance customization module; Described central hub control module accommodates equipment, and described equipment is connected with described pipeline and supplies with outside and is connected; Described pipeline installing has pipeline interface, and the described pipeline in adjacent described top-level functionality integration module is connected by described pipeline interface, and the described pipeline in top-level functionality integration module described at least one is by described pipeline interface and described equipment connection.
Preferably, described pipeline comprises at least one in water-feeding drainaging line, air conditioning piping and circuit pipeline.
Preferably, described top-level functionality integration module is provided with at least one in fire-fighting spray device, lighting device and solar energy equipment.
Preferably, the equipment in described central hub control module comprises at least one in power supplying and distributing equipment, control appliance, air-conditioning equipment and plumbing equipment, and described prefabricated modular building is connected with outside supply by described central hub control module.
Preferably, described appearance customization module comprises at least one in sunshade eaves, French window and entry door.
Preferably, the top of described central hub control module is provided with top-level functionality integration module.
Preferably, the corner, top of described main structure module, described top-level functionality integration module, described appearance customization module and described central hub control module and corner, bottom are provided with connector.
Preferably, described connector be used between adjacent described main structure module, between described main structure module and described top-level functionality integration module, between adjacent described top-level functionality integration module, between described main structure module and described appearance customization module, being interconnected between described central hub control module and described main structure module or described appearance customization module.
Build according to prefabricated modular of the present utility model, just complete the making of each module before assembly, each module has reserved pipeline interface, makes building assembling more convenient, effectively reduces cost of labor, shortens the construction period, and safe and reliable.Each module is by the unified planning of central hub control module and management, and make to install more succinct, later period maintenance is more convenient, and improves building module secondary utilization rate.
Accompanying drawing explanation
The following accompanying drawing of the utility model embodiment in this as a part of the present utility model for understanding the utility model.Shown in the drawings of embodiment of the present utility model and description thereof, be used for explaining principle of the present utility model.In the accompanying drawings,
Fig. 1 is the three-dimensional view of a kind of embodiment of prefabricated modular of the present utility model building;
Fig. 2 is the explosive view of the prefabricated modular building shown in Fig. 1;
Fig. 3 is the elevation of the prefabricated modular building shown in Fig. 1;
Fig. 4 is the three-dimensional view of a kind of embodiment of top-level functionality integration module of the present utility model;
Fig. 5 is the top view of the prefabricated modular building shown in Fig. 1;
Fig. 6 is the fragmentary isometric views of a kind of embodiment of prefabricated modular of the present utility model building.
Detailed description of the invention
In the following description, give a large amount of concrete details to provide to understand more thoroughly the utility model.But, it will be apparent to one skilled in the art that the utility model embodiment can be implemented without the need to these details one or more.In other example, in order to avoid obscuring with the utility model embodiment, technical characteristics more well known in the art are not described.
In order to thoroughly understand the utility model embodiment, by following description, detailed structure is proposed.Obviously, the execution of the utility model embodiment is not limited to the specific details that those skilled in the art has the knack of.Better embodiment of the present utility model is described in detail as follows, but except these are described in detail, the utility model can also have other embodiments.
The utility model discloses a kind of prefabricated modular building, as depicted in figs. 1 and 2, prefabricated modular building comprises: at least one main structure module 1, and main structure module 1 is configured to cuboid; At least one top-level functionality integration module 2, it is also cuboid that top-level functionality integration module 2 constructs, and at least one top-level functionality integration module 2 is arranged on the top of main structure module 1, and the inside of top-level functionality integration module 2 is provided with prefabricated pipeline; At least one appearance customization module 4, appearance customization module 4 is arranged on the outside of main structure module 1; And central hub control module 3, central hub control module 3 is arranged on the outside of main structure module 1 or the outside of appearance customization module 4; Accommodate equipment in central hub control module 3, equipment is connected with pipeline and supplies with outside and is connected; Pipeline installing has pipeline interface, and the pipeline in adjacent top layer function i ntegration module 2 is connected by pipeline interface, and the pipeline at least one top-level functionality integration module 2 is by pipeline interface and equipment connection.
Build according to prefabricated modular of the present utility model, just complete the making of each module before assembly, each module has reserved pipeline interface, makes building assembling more convenient, effectively reduces cost of labor, shortens the construction period, and safe and reliable.Each module is by the unified planning of central hub control module and management, and make to install more succinct, later period maintenance is more convenient, and improves building module secondary utilization rate.
Preferably, pipeline comprises at least one in water-feeding drainaging line 23, air conditioning piping 22 and circuit pipeline 21.The pipeline of preferred embodiment as shown in Figure 4 includes flowing line 23, air conditioning piping 22 and circuit pipeline 21.In the shown embodiment, the end of flowing line 23 is provided with flowing line interface 231, and the end of air conditioning piping 22 is provided with air conditioning piping interface 221, and circuit pipeline 21 is provided with circuit pipeline interface.Flowing line interface 231, air conditioning piping interface 221 and circuit pipeline interface are arranged on the edge of top-level functionality integration module 2, to be connected with the pipeline in adjacent top-level functionality integration module 2.
Like this, as shown in Figure 5, in the prefabricated modular building being provided with multiple top-level functionality integration module 2, the pipeline in adjacent top-level functionality integration module 2 can be interconnected, and does not need carrying out complicated pipeline construction and connection.And near central hub control module 3 top-level functionality integration module 2 can easily with the equipment connection in central hub control module 3.Those skilled in the art should know, in the prefabricated modular building being provided with multiple top-level functionality integration module 2, the pipeline being in two top-level functionality integration modules 2 at two ends should with the equipment connection in central hub control module 3, and the top-level functionality integration module 2 being in the other end only can be provided with a pipeline interface.Namely the top-level functionality integration module 2 be not connected with central hub control module 3 in two top-level functionality integration modules 2 except the two ends of prefabricated modular building, pipeline in remaining top-level functionality integration module 2 includes at least two pipeline interfaces, to be connected with the pipeline in adjacent module.
It can be that known any type of pipeline connects that this pipeline connects, such as in adjacent top-level functionality integration module 2, by the mode of snap joint, industrial connector or prefabricated junction box, circuit pipeline 21 is docked, by flange docking, directly, the mode such as reducing docking docks air conditioning piping 22 and flowing line 23, and air conditioning piping interface 221 used by these docking modes, flowing line interface 231 are prefabricated in advance completing.The interface of the pipeline namely in module just installs when producing this module, when prefabricated modular construction and installation, only needs to carry out the connection work such as simple pipeline plug after fixing connection device.
In preferred embodiment as shown in Figure 4, top-level functionality integration module 2 is provided with fire-fighting spray device 25, lighting device 26, solar energy equipment 24, those skilled in the art can be learnt apparently by the disclosure, these devices can be arranged together, also can arrange separately according to demand, other equipment needed also can be arranged in top-level functionality integration module 2.
Preferably, equipment in central hub control module 3 can comprise power supplying and distributing equipment, control appliance, air-conditioning equipment, plumbing equipment, to be used for prefabricated modular architectural power supply, plumbing, cooling and warming, control power supply etc., and can to relevant device integration operation, control and maintenance.Prefabricated modular building supply with outside by central hub control module 3 and is connected, namely connects municipal or water power temporarily.Those skilled in the art can be learnt apparently by the disclosure, according to demand and/or expect, other be applicable to equipment also can be arranged in central hub control module 3.The problems such as the water power of existing modular architectural warms up supporting complex circuit, interface is tired many, and not only difficulty of design and construction is large, has maintenace point and compare dispersion in later period maintenance process, and the unreasonable and service clearance of layout is narrow and small, make maintenance difficulty strengthen.And supporting circuit is concentrated in central hub control module 3, maintenace point can be concentrated, make rationally distributed, reduce difficulty of construction.
As shown in Figure 3, preferably, appearance customization module 4 can be customized to sunshade eaves 41, French window 42 or entry door according to demand.Certainly, also can according to the demand to outward appearance, and the specific requirement to function, arrange appearance customization module, add personalized element.
In a kind of preferred embodiment of the present utility model, as shown in Figure 1, the top of central hub control module 3 is provided with top-level functionality integration module 2, the pipeline be arranged in the top-level functionality integration module 2 above main structure module 1 is connected to the pipeline in the top-level functionality integration module 2 be arranged on above central hub control module 3, is connected to the equipment in central hub control module 3.
As shown in Figure 6, in a preferred embodiment, the corner, top of main structure module 1, top-level functionality integration module 2, appearance customization module 4 and central hub control module 3 and corner, bottom are provided with connector 7.Further preferably, between adjacent module, the connector 7 namely between adjacent main construction module 1, between main structure module 1 and top-level functionality integration module 2, between adjacent top layer function i ntegration module 2, between main structure module 1 and appearance customization module 4, between central hub control module 3 and main structure module 1 or appearance customization module 4 is interconnected.It will be appreciated by those skilled in the art that being interconnected of connector 7 can for known any connected mode, such as use authority notification number is: mode disclosed in the patent of CN203669098U connects.
The utility model is illustrated by above-mentioned embodiment, but should be understood that, above-mentioned embodiment just for the object of illustrating and illustrate, and is not intended to the utility model to be limited within the scope of described embodiment.In addition it will be understood by those skilled in the art that; the utility model is not limited to above-mentioned embodiment; more kinds of variants and modifications can also be made, within these variants and modifications all drop on the utility model scope required for protection according to instruction of the present utility model.

Claims (8)

1. a prefabricated modular building, is characterized in that, described prefabricated modular building comprises:
At least one main structure module, described main structure module structure is cuboid;
At least one top-level functionality integration module, described top-level functionality integration module is configured to cuboid, and top-level functionality integration module described at least one is arranged on the top of described main structure module, and the inside of described top-level functionality integration module is provided with prefabricated pipeline;
At least one appearance customization module, described appearance customization module installation is in the outside of described main structure module; And
Central hub control module, described central hub control module is arranged on the outside of described main structure module or the outside of described appearance customization module; Described central hub control module accommodates equipment, and described equipment is connected with described pipeline and supplies with outside and is connected;
Described pipeline installing has pipeline interface, and the described pipeline in adjacent described top-level functionality integration module is connected by described pipeline interface, and the described pipeline in top-level functionality integration module described at least one is by described pipeline interface and described equipment connection.
2. prefabricated modular building according to claim 1, it is characterized in that, described pipeline comprises at least one in water-feeding drainaging line, air conditioning piping and circuit pipeline.
3. prefabricated modular building according to claim 1, it is characterized in that, described top-level functionality integration module is provided with at least one in fire-fighting spray device, lighting device and solar energy equipment.
4. prefabricated modular building according to claim 1, it is characterized in that, equipment in described central hub control module comprises at least one in power supplying and distributing equipment, control appliance, air-conditioning equipment and plumbing equipment, and described prefabricated modular building is connected with outside supply by described central hub control module.
5. prefabricated modular building according to claim 1, it is characterized in that, described appearance customization module comprises at least one in sunshade eaves, French window and entry door.
6. prefabricated modular building according to claim 1, it is characterized in that, the top of described central hub control module is provided with top-level functionality integration module.
7. prefabricated modular building according to claim 1, it is characterized in that, corner, top and the corner, bottom of described main structure module, described top-level functionality integration module, described appearance customization module and described central hub control module are provided with connector.
8. prefabricated modular building according to claim 7, it is characterized in that, described connector is used between adjacent described main structure module, between described main structure module and described top-level functionality integration module, between adjacent described top-level functionality integration module, between described main structure module and described appearance customization module, being interconnected between described central hub control module and described main structure module or described appearance customization module.
CN201420502602.2U 2014-09-02 2014-09-02 Prefabricated modular is built Expired - Fee Related CN204126359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420502602.2U CN204126359U (en) 2014-09-02 2014-09-02 Prefabricated modular is built

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420502602.2U CN204126359U (en) 2014-09-02 2014-09-02 Prefabricated modular is built

Publications (1)

Publication Number Publication Date
CN204126359U true CN204126359U (en) 2015-01-28

Family

ID=52382726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420502602.2U Expired - Fee Related CN204126359U (en) 2014-09-02 2014-09-02 Prefabricated modular is built

Country Status (1)

Country Link
CN (1) CN204126359U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105173966A (en) * 2015-09-30 2015-12-23 福建快科城建增设电梯股份有限公司 Modularization steel structure elevator with modularization electrical connection structure and installing method
CN106812353A (en) * 2017-01-12 2017-06-09 马嵩林 Modularization book bar
CN109914853A (en) * 2019-03-28 2019-06-21 南阳师范学院 A kind of free modular apartment and flats

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105173966A (en) * 2015-09-30 2015-12-23 福建快科城建增设电梯股份有限公司 Modularization steel structure elevator with modularization electrical connection structure and installing method
CN106812353A (en) * 2017-01-12 2017-06-09 马嵩林 Modularization book bar
CN109914853A (en) * 2019-03-28 2019-06-21 南阳师范学院 A kind of free modular apartment and flats

Similar Documents

Publication Publication Date Title
CN204126359U (en) Prefabricated modular is built
CN109518811A (en) A kind of easy-to-mount building structure
CN204420308U (en) Knockdown enter wall tap
CN201959893U (en) Modularized automatic spraying system for automobile guide plate
CN201061085Y (en) Modularization intelligent power distribution unit
CN104456765B (en) Air-conditioner outdoor unit
CN203594246U (en) Cable connector modular quick-mounting chamber for dust prevention construction
CN206625427U (en) A kind of novel and multifunctional quick LOFT assemblings floor
CN205369747U (en) Novel solar energy light and heat integration roof device
CN210857599U (en) Pipeline separation waterproof heat preservation integration wall body and building that constitutes thereof
GB2437416A (en) A domestic services pod
CN204290861U (en) Photovoltaic generation Combined integrated machine
CN203850627U (en) Overall framework type modularization secondary device applied to substation construction
CN203478460U (en) Outdoor unit of air conditioner
JP2013044187A (en) Building
CN104947748A (en) Method for preventing supply line trough or water supply trough from being mounted on house wall
CN207228388U (en) A kind of prefabricated board with insulating layer and decorative layer
CN204202049U (en) A kind of idle call cage structure and air-conditioning
CN204059772U (en) Roof longitudinal expansion joint coupling assembling
CN207436559U (en) Photovoltaic packing box
CN204391537U (en) Modular transformer substation system
CN103062963A (en) Modularized water dividing and concentrating device
CN201671264U (en) Movable pipeline wall
CN202672519U (en) Waterproof type solar cell tile
CN202697377U (en) Dual-sun-shielding device of green house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150128

Termination date: 20160902